METHOD STATEMENT
THE FOLLOWING GUIDANCE NOTES SHOULD BE ADHERED TO TO ENSURE
THE SAFE WORKING ON THE CANTILEVER UNIT
1 ) THE MAIN TOWER STRUCTURE TO BE ERECTED USING THE STANDARD
ASSEMBLY INSTRUCTIONS SUPPLIED WITH THE EQUIPMENT AND ALL
THE SAFETY NOTES READ AND UNDERSTOOD.
2 ) THE SAFE WORKING LOAD ON THE CANTILEVER ( 100 Kg ) SHOULD NOT BE
EXCEEDED.
3 ) ENSURE ALL RAKER TUBES ( IF SPECIFIED ) ARE FITTED CORRECTLY.
4 ) IT IS ADVISABLE TO ERECT UNIT AWAY FROM SITE, TEST FOR
SUITABILITY AND STABILITY BEFORE PUSHING INTO POSITION.
5 ) ENSURE COUPLERS ARE TIGHTENED ON THE FRAMES AND RAKERS.
6 ) DO NOT USE DAMAGED OR INCOMPATIBLE EQUIPMENT, IF DAMAGE
DOES OCCUR REPLACE IMMEDIATELY BEFORE USING EQUIPMENT.
7 ) ALL PERSONNEL MUST BE OFF THE UNIT IF IT IS TO BE MOVED.
8 ) MAKE REGULAR CHECKS ON THE EQUIPMENT FOR DAMAGE AND THAT
THE SET UP HAS NOT BEEN ALTERED, THIS SHOULD BE DONE DAILY
BEFORE USE.
9 ) IF IN DOUBT ABOUT ANY ASPECT OF THE ERECTION OR USE OF THE
EQUIPMENT DO NOT GUESS CONSULT YOUR SUPPLIER.
TO BRACE BETWEEN
FLOOR AND 2.6 M
10 ) ALL GUARDRAILS AND TOEBOARDS SHOULD BE FITTED ON THE
CANTILEVER AND SAFETY HARNESS WORN.
11 ) JACKS TO BE ADJUSTED TO LOCK TOWER UNDER TENSION TO BRACE IN SITU.
CEILING
0.8 M
1.9 M
WALK THROUGH FRAME
1.0 M
CANT - JACKCANT 09.03.10