TCB4 Upgrade Kit for LBB 3500/00, /10 and /30

TCB4 Upgrade Kit for LBB 3500/00, /10 and /30
LBB 3500/00 and LBB 3500/10
LBB 3500/30
Security
SecuritySystems
Systems
Installation Instruction
en
LBB 3519/20
Digital Congress Network | TCB 4 Upgrade Kit LBB 3519/20 | Chapter 1. Upgrade Kit LBB 3519/20
Chapter 1. Upgrade Kit LBB 3519/20
en | 3
LBB 3500/xx
Introduction
The upgrade kit LBB 3519/20 is intended for upgrading of the following DCN Central
Control Units:
•
LBB 3500/00 (D)
•
LBB 3500/10 (D)
•
LBB 3500/30 (D)
The upgrade kit LBB 3519/20 (Trunk Communication Board (TCB 4)) once installed
in the Central Control Units provides the CCUs’ with a high speed serial RS 232
port. This port can be used for either ‘DIRECT’ connection to a DCN control PC,
camera control, test/diagnostic purposes or for remote control.
The TCB4 has two Ports, Port 1 and Port 2. Both Ports can be used if a second hole is
made at the rear of the CCU housing to accommodate the second 9-pole D-type
connector.
NOTE: If a second port is required, then an additional interconnection cable is
also required. This cable is ordered separately under Code No. 3922 156
24090, through your local Bosch supplier.
TCB 2 or 3
LBB 3500/xx (with upgrade)
TCB 4
Single port only (Port 1)
NOTE: The default settings for Port 1 can be changed to suit
your requirements (see Chapter 3).
LBB 3500/xx (also applicable for LBB 3500/10)
TCB 2 or 3
REMARKS:
1. Using the ‘DIRECT’ connection method the PC-Network card LBB 3510/00 is
NO longer required.
2. If a ‘DIRECT’ connection is made between the Control PC and the CCU, the PC
operator has no connection to the PC for headphone or intercom handset. Additional
DCN hardware is required for the operator if these functions are required. Use can be
made of DCN table-top or flush-mounted hardware depending on the requirements.
LBB 3500/xx (with upgrade)
TCB 4
Two ports
Port 1 - ‘DIRECT’ connection to DCN control PC (default) (see Note)
Port 2 - Automatic camera control (default) (see Note )
NOTE: The default settings for Port 1 and 2 can be changed to
suit your requirements (see Chapter 3.).
FIGURE 1-1 CCU upgrade kit LBB 3519/20
Bosch Security Systems | April 03 | 3922 988 97112 en
Digital Congress Network | TCB 4 Upgrade Kit LBB 3519/20 | Chapter 1. Upgrade Kit LBB 3519/20
1.1 Before you Begin
en | 4
Installation procedure
1. Remove the top-cover from the CCU.
2. Locate the TCB (version 2 or 3). For location of the TCB see Fig 1-1.
NOTE: For Multi-CCUs type LBB 3500/30 carefully remove the ‘Multi-CCU’
card from the TCB card. The TCB is located under the ‘Multi-CCU’ card.
3. Remove all interconnection cables from the TCB.
4. Remove the 6 screws securing the TCB,
5. Remove the TCB.
WARNING: Before performing any of the procedures described in this
document that require you to remove the top-cover of the CCU,
1. Before removing the top cover of the CCU, disconnect the mains supply and
remove the mains cable from its source and from the rear of the CCU.
2. Disconnect any peripherals connected to the CCU
3. The TCB4 upgrade interface card is shipped in antistatic packaging for protection
from electrostatic damage.
Once the TCB 2 or 3 is removed proceed as follows:
CAUTION: Before unwrapping the antistatic packaging, ground yourself by
touching any unpainted metal surface on the Central Control Unit. This procedure discharges static electricity that might harm the interface card.
Digital Congress Network
Installation and Operating Manual
If available refer also to Chapter 4 of the latest
edition of the DCN Installation and Operating Manual .
(Code No. 3922 988 433xx).
REFERENCE:
1.2 INSTALLING the TCB4 Interface card
1. Your upgrade kit includes:
- 1 x TCB4 interface card
- Interconnection (ribbon) cable terminated with a 9-pole D-type connector at one end
and a Micromatch connector at the other end.
NOTE: If two ports are required, then an additional interconnection cable is also
required. This cable is ordered separately under Code no. 3922 156 24090,
through your local Bosch supplier.
Minor modifications, (i.e. widening the holes to accommodate the 9-pole D-type
connector(s)) are required at the rear of the CCU. If the upgrade includes two Ports,
then an additional hole is required to accommodate Port 2.
1.
2.
3.
4.
Remove the TCB from its packaging (see 1.1 Before you Begin)
Position the TCB4 in place and secure using its 6 securing screws.
Position and secure the 9-pole D-type connector(s) in their modified hole(s).
With reference to FIGURE 1-1 and FIGURE 2-1 connect Port 1 and if applicable Port
2.
5. Connect the TCB4 to both 1/O control boards.
6. Double check connections according to FIGURE 1-1 and FIGURE 2-1.
1.3 SET-UP of the TCB4 Interface card
To ensure correct operation of the TCB4, the following settings are required:
1. DIP-switch S14 must be set, to configure the communication protocol and baud
rate used on Port 1 and Port 2 (see Chapter 3 ).
2. DIP-switch S9 must be set to configure the boards functionality (see Chapter 2.1 ).
3. Jumpers X13 and X14 must be set (see Chapter 2.2).
NOTE: Once the TCB4 has been successfully installed in the CCU, replace the
top-cover and connect the mains supply to the CCU. Check the CCU for correct operation. If the CCU functions correctly, the CCU should be switched ON
for at least 24 hours to charge the back-up battery located on the TCB4.
Bosch Security Systems | April 03 | 3922 988 97112 en
Digital Congress Network | TCB 4 Upgrade Kit LBB 3519/20 | Chapter 1. Upgrade Kit LBB 3519/20
en | 5
Connection to I/O board
9-pole D-type connector(s)
Ribbon cabling
Port 1
Port 2
Trunk Communication Board TCB4
DIP-switch S14
DIP-switch S9
6 x securing screws Connection to I/O board
FIGURE 1-2 Internal view of CCU after upgrade
Bosch Security Systems | April 03 | 3922 988 97112 en
Digital Congress Network | TCB 4 Upgrade Kit LBB 3519/20 | Chapter 2. Trunk Communication Board (TCB4)
DIP-switch S14
1 2 3
S14
7
6
5
4
3
2
1
ON
1 X14
15
Port 2
8
OFF
ON
1
X17a
X17b
3 S10
S10
Reset Switch
IC1
X41
14
IC12
IC04
Port 1
X40
13
ON
See Table 3.1 and 3-2
DIP-switch S9
IC11
X10
1
2
See Table 2.1
IC9
6
12
1 2 3
X13
IC8
7
X11
11
BATTERY
X13
10
IC4
9
IC3
IC6
X1
FIGURE 2-1 Layout ‘Trunk Communication Board (TCB 4)
Bosch Security Systems | April 03 | 3922 988 97112 en
S9
5
3
S9
4
5
6
7
8
4
1
5
6
7
8
9
10
11
12
13
14
15
Jumper X14 (see Table 2.2)
S14 DIP-switches 1 - 8 (see Chapter 3) )
S10 Push-button switch to reset the Central Control Unit during servicing.
Three LEDs (left to right) green/yellow/red. Normally the green/yellow LEDs flash in
sequence, indicating the software is running. Red LED illuminates during system
reset.
S9 DIP-switches 1 - 8 (see Chapter 2.1)
Yellow LED indicates Digital Signal Processing (DSP) software is running.
Connector for multi-trunk board (used only in the multi-CCU)
Sockets for inserting flash EPROM (even)
Sockets for inserting flash EPROM (odd)
SRAM back-up battery 3.6 V (life-time 5 years min.)
Jumper X13 (see Table 2.2)
Fuse 3.15 amp (delayed)
Connector for multi-trunk board (used only in the multi-CCU LBB 3500/30)
Serial RS232 Port 1
Serial RS232 Port 2
S14
8
FUSE
1
2
3
4
8 7 6 5 4 3 2 1
2
ON
Key to symbols (fig.2-1) :
1
1 2 3 4 5 6 7 8
TCB 4
X14
location Fig. 1-2
ON
Chapter 2. Trunk Communication Board (TCB4)
en | 6
8
Digital Congress Network | TCB 4 Upgrade Kit LBB 3519/20 | Chapter 2. Trunk Communication Board (TCB4)
2.4 S9 DIP-Switch settings
2.5 Jumper settings
See fig. 2-1 for location, and Table 2.1 for functionality of the DIP-switches.
See fig. 2-1 for location, and Table 2-2 for functionality of the jumpers.
Table 2.1 : S9 DIP-switch settings
Table 2.2 : Jumper settings
ON*
Chairman priority tone ON (default).
TCB4
X13
OFF
Chairman priority tone OFF
X14
ON
Audio ‘Mix-Minus’ mode activated in combination with SW3 =
OFF
OFF*
Normal Operation (default).
ON
Audio ‘Insertion’ mode activated in combination with SW2 =
OFF
OFF*
Normal Operation (default).
SW 4
OFF
Reserved (IMPORTANT: must not be changed)
SW 5
OFF
Reserved (IMPORTANT: must not be changed)
SW 6
ON
Active microphones and request will be permanently switched
off if the priority function of the chairman unit is used.
OFF*
Active microphones will be switched off temporarily if the priority function of the chairman unit is used (default).
SW 7
OFF
Reserved (IMPORTANT: must not be changed)
SW 8
ON
Switching on the CCU will activate the BOOT software, this
makes a new download possible. All memory settings will be
erased and returns to the default settings. The unit addresses
will not be erased.
OFF*
Normal operation (default).
TCB4
SW 1
SW 2
SW 3
* = default setting
DIP switch S9 (default settings)
S9
ON
1 2 3 4 5 6 7 8
switches 4, 5 and 7 are ‘RESERVED’
Must NOT be changed
For location
see fig.. 2-1.
Bosch Security Systems | April 03 | 3922 988 97112 en
Default
1&2
1&2
Function
Jumpered to provide SRAM Battery back-up
Open when removing back-up battery. (Position 2 & 3)
Watchdog active
Open for service purposes. (Position 2 & 3)
en | 7
Digital Congress Network | TCB 4 Upgrade Kit LBB 3519/20 | Chapter 3. CCU Protocol and Serial Port settings
Chapter 3. CCU Protocol and Serial Port settings
For location of DIP-switches see fig. 2-1
3.1 LBB 3500/xx (TCB 4) - Port 1 : DCN Control PC
Port 2 : Camera Control
In a single (stand-alone) CCU systems two serial COM-ports (Port 1 and Port 2) are
available. Both ports can be individually configured. Default settings are;
•
8 data bits
•
No parity check
•
1 Stop bit
Table 3.1 : LBB 3500/xx Protocol settings
DIP-switch S14
Simple (Open interface)
Terminal
Full
Camera control
* default settings
Switch
DP-1
OFF
OFF
ON*
ON
Port 1
Switch
DP-2
OFF
ON
OFF*
ON
Switch
DP-5
OFF
OFF
ON
ON*
Port 2
Switch
DP-6
OFF
ON
OFF
ON*
Switch
DP-7
OFF
OFF*
ON
ON
Port 2
Switch
DP-8
OFF
ON*
OFF
ON
Table 3.2 : LBB 3500/xx Baud rate settings
DIP-switch S14
9.6 K
19.2 K
57.6 K
115.2 K
* default settings
Switch
DP-3
OFF
OFF
ON
ON*
Port 1
Switch
DP-4
OFF
ON
OFF
ON*
DIP-switch S14 (default settings)
8 7 6 5 4 3 2 1
S14
ON
8 7 6 5 4 3 2 1
S14
ON
Port 1 default
Bosch Security Systems | April 03 | 3922 988 97112 en
Port 2 default
en | 8
NOTE: It is possible to select ‘Full’ protocol on both Port 1 and Port 2. However this is NOT
recommended due to processing power and memory limitations.
Digital Congress Network | TCB 4 Upgrade Kit LBB 3519/20 | Chapter 3. CCU Protocol and Serial Port settings
Bosch Security Systems
| April 03 | 3922 988 97112 en
en | 9
For more information please visit www.boschsecuritysystems.com
© 2003 Bosch Security Systems B.V.
Data subject to change without notice
April 03 | 3922 988 97112 en