advertisement
GB
ES
RO
HU
RU
High efficiency wall-mounted gas-fired boilers
Instructions for Users and Installers
Caldera mural de gas de alto rendimiento
Manual para el usuario y el instalador
Centrală murală cu gaz, de înalt randament
Manual de instrucţiuni destinat utilizatorului şi instalatorului
Magas hozamú fali gázkazán
Felhasználói és szerelői kézikönyv
Высокопроизводительный настенный газовый котел
Руководство по эксплуатации и монтажу
Dear Customer,
We are sure your new boiler will comply with all your requirements.
Purchasing one of the
Baxi products satisfies your ex pec ta tions: good functioning, simplicity and ease of
use.
Do not dispose of this booklet without reading it: you can find here some very useful information, which will help you to run your boiler correctly and efficiently.
Do not leave any parts of the packaging (plastic bags, polystyrene, etc.) within children’s reach as they are a potential source of danger.
Baxi S.p.A. declares that these models of boiler bear the CE mark in compliance with
the basic requirements of the following Directives:
- Gas Directive 90/396/EEC
- Efficiency Directive 92/42/EEC
- Electromagnetic Compatibility Directive 2004/108/EEC
- Low Voltage Directive 2006/95/EC
COntEntS
IStRUCtIOnS pERtaInInG tO tHE USER
1. Instructions prior to installation
2. Instructions prior to commissioning
3. Commissioning of the boiler
4. DHW temperature adjustment
5. Room temperature adjustment
6. Filling the boiler
7. Turning off the boiler
8. Gas change
9. Prolonged standstill of the system. Frost protection
10. Safety device indicators - activation
11. Servicing instructions
IStRUCtIOnS pERtaInInG tO tHE InStallER
12. General information
13. Instructions prior to installation
14. Boiler installation
15. Boiler size
16. Installation of flue and air ducts
17. Connecting the mains supply
18. Fitting a room thermostat
19. Gas change modalities
20. Displaying electronic control card parameters on the boiler display (“INFO” mode)
21. Control and operation devices
22. Electronic board calibration
23. Positioning of the ignition and flame sensing electrode
24. Check of combustion parameters
25. Output / pump head performances
26. Connection of the external probe
27. Connection an external boiler
28. How to purge the DHW system from limestone deposits
29. How to disassemble the DHW heat exchanger
30. Cleaning the cold water filter
31. Boiler schematic
32. Illustrated wiring diagram
33. Technical data
Baxi s.p.a., a leading European manufacturer of hi-tech boilers and heating systems, has developed CSQ-certified quality management (ISO 9001), environmental (ISO 14001) and health and safety (OHSAS 18001) systems. This means that BAXI S.p.A. includes among its objectives the safeguard of the environment, the reliability and quality of its products, and the health and safety of its employees.
Through its organisation, the company is constantly committed to implementing and improving these aspects in favour of customer satisfaction.
19
20
21
21
21
17
18
18
18
19
9
13
13
14
16
8
8
7
7
22-25
26-29
30
5
6
5
5
6
4
4
3
3
5
6 instructions pertaininG to the user 924.674.3 - GB
2
1. InStRUCtIOnS pRIOR tO InStallatIOn
This boiler is designed to heat water at a lower than boiling temperature at atmospheric pressure. The boiler must be connected to a central heating system and to a domestic hot water supply system in compliance with its performances and output power.
Have the boiler installed by a Qualified Service Engineer and ensure the following operations are accomplished: a) careful checking that the boiler is fit for operation with the type of gas available. For more details see the notice on the packaging and the label on the appliance itself.
b) careful checking that the flue terminal draft is appropriate; that the terminal is not obstructed and that no other appliance exhaust gases are expelled through the same flue duct, unless the flue is especially designed to collect the exhaust gas coming from more than one appliance, in conformity with the laws and regulations in force.
c) careful checking that, in case the flue has been connected to pre-existing flue ducts, thorough cleaning has been carried out in that residual combustion products may come off during operation of the boiler and obstruct the flue duct.
d) to ensure correct operation of the appliance and avoid invalidating the guarantee, observe the following precautions:
1. hot water circuit:
1.1.
If the water hardness is greater than 20 °F (1 °F = 10 mg calcium carbonate per litre of water) a polyphosphate or comparable treatment system responding to current regulations.
1.2.
Domestic Hot Water circuit must be thoroughly flushed after the installation of the appliance and before its use.
1.3. The materials used for the domestic hot water circuit of the product comply with Directive 98/83/EC.
2. heating circuit
2.1.
new system
Before proceeding with installation of the boiler, the system must be cleaned and flushed out thoroughly to eliminate residual thread-cutting swarf, solder and solvents if any, using suitable proprietary products.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non alkaline. The recommended products for cleaning are:
SENTINEL X300 or X400 and FERNOX heating circuit restore. To use this product proceeding strictly in accordance with the maker’s directions.
2.2.
existing system
Before proceeding with installation of the boiler, the system must be cleaned and flushed out to remove sludge and contaminants, using suitable proprietary products as described in section 2.1.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non-alkaline such as SENTINEL X100 and FERNOX heating circuit protective. To use this product proceeding strictly in accordance with the maker’s directions.
Remember that the presence of foreign matter in the heating system can adversely affect the operation of the boiler (e.g. overheating and noisy operation of the heat exchanger).
Failure to observe the above will render the guarantee null and void .
2. InStRUCtIOnS pRIOR tO COMMISSIOnInG
Initial lighting of the boiler must be carried out by a licensed technician. Ensure the following operations are carried out: a) compliance of boiler parameters with (electricity, water, gas) supply systems settings.
b) compliance of installation with the laws and regulations in force.
c) appropriate connection to the power supply and grounding of the appliance.
Failure to observe the above will render the guarantee null and void.
Prior to commissioning remove the protective plastic coating from the unit. Do not use any tools or abrasive detergents as you may spoil the painted surfaces.
The instructions shall state the substance of the following:
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety.
Children should be supervised to ensure that they do not play with the appliance.
instructions pertaininG to the user 924.674.3 - GB
3
3. COMMISSIOnInG Of tHE BOIlER
To correctly light the burner proceed as follows:
1) provide power supply to the boiler;
2) open the gas cock;
3) turn the selector switch (Figure 2) to set the boiler on summertime ( ) or wintertime ( ) operation;
4) turn the central heating (2) and domestic hot water (1) adjusting controls in order to light the main burner.
To increase temperature values turn the control clockwise and anti clockwise to decrease it.
When on summertime operation ( ) the main burner and the pump will start running only when there is a call for hot water.
LeGenD:
Operating in
Central Heating mode (CH)
Flame present
(burner switch on)
Loss of flame
(burner off)
Operating in Domestic
Hot Water mode (D.H.W.)
Generic ERROR
RESET
1
2
Water pressure LOW
Numeric signalling
(temperature, error codes, etc)
Figure 1 summer / Winter / reset / oFF selector positions
Domestic hot water (D.H.W.) control knob
Central heating (C.H.) control knob
3
4
Selector (figure 2)
Display
0605_2201 / cG_1805
Warning: During initial lighting, until the air contained in the gas pipes is not released, the burner may fail to light immediately and that may cause a ‘blockage’ of the boiler. Under such circumstances we recommend you repeat the ignition procedure until gas is delivered to the burner, and set knob to ( - RESET) for at least 2 second.
Figure 2 reset Winter oFF summer
4. dHw tEMpERatURE adjUStMEnt
The gas valve is provided with an electronic flame-modulating function, which operates depending on the DHW temperature adjusting control (1) settings and on the quantity of water drawn from the taps.
This electronic device allows to keep the water coming out of the boiler at a constant temperature also when small quantities of water are drawn.
During a domestic ho water request, the display shows a domestic hot water (D.H.W.) temperature.
To increase temperature values turn the control clockwise and anticlockwise to decrease it. instructions pertaininG to the user 924.674.3 - GB
4
5. ROOM tEMpERatURE adjUStMEnt
The system must be equipped with a room thermostat (see the relevant regulations) to control the temperature in the rooms.
In case there is no room thermostat, during initial lighting, it will be possible to control the room temperature by turning control (2).
During a central heating mode, the display shows a central heating (C.H.) flow temperature.
To increase temperature values turn the control clockwise and anticlockwise to decrease it. Electronic modulation of the flame will enable the boiler to reach the set temperature by adapting the gas supply to the burner to the actual heat exchange demand.
6. fIllInG tHE BOIlER
Important: Regularly check that the pressure displayed by the pressure gauge is 0.7 to 1.5 bar, with boiler not operating.
In case of overpressure, open the boiler drain valve (Figure 3).
In case the pressure is lower open the boiler filling tap (Figure 3).
We recommend you open the tap very slowly in order to let off the air.
During this operation, the Summer/Winter selector (Figure 2) must be in the OFF position (0).
note: in case pressure drops occur frequently have the boiler checked by a Qualified service engineer.
Filling tap
Manometer
The boiler is supplied with a hydraulic pressure sensor, which blocks the boiler in case water is lacking.
Drain point
Figure 3
7. tURnInG Off tHE BOIlER
The electric supply to the boiler must be removed in order to switch it off. With the selector in O position (off – figure 2), the gas boiler remain switched off, the display (4 – figure 1) reads out “OFF” but the main board is still supplied and the
Frost protection function is activated.
note: with the selector in “0” position and external probe connected, the display carries out the actual value of the external temperature.
8. GaS CHanGE
These boilers set for natural gas can be converted to work with LpG.
Any gas change must be effected by a Qualified Service Engineer.
instructions pertaininG to the user 924.674.3 - GB
5
9. pROlOnGEd StandStIll Of tHE SyStEM. fROSt pROtECtIOn
We recommend you avoid draining the whole system as water replacements engender purposeless and harmful limestone deposits inside the boiler and on the heating elements. In case the boiler is not operated during wintertime and is therefore exposed to danger of frost we suggest you add some specific-purpose anti-freeze to the water contained in the system
(e.g.: propylene glycole coupled with corrosion and scaling inhibitors).
The electronic management of boilers includes a “frost protection” function in the central heating system which operates the burner to reach a heating flow temperature of 30° C when the system heating flow temperature drops below 5°C.
The frost protection function is enabled if:
* electrical supply to the boiler is on;
* the gas service cock is open;
* the system pressure is as required;
* the boiler is not blocked.
10. SafEty dEvICE IndICatORS - aCtIvatIOn
If a fault occurs, the display reads out an error message identifying it (es. E 01):
To RESET the gas boiler, turn selector (Figure 2) to
“R” for at least 2 seconds. If the fault persists, call an authorised service centre.
note: It is possible to carry out n° 5 relighting attempts in a row, after which the RESET function is disabled and the gas boiler still blocked.
To carry out a new RESET attempt, turn the selector (figure 2) in OFF position for at least 2 seconds.
resettinG errors
Figure 4 error code e01 e02 e03 e05 e06 e10 e25 e35
Description of FauLts
Gas supply fault
Safety thermostat sensor tripped
Flue thermostat sensor tripped / Flue pressure switch tripped
Central heating NTC sensor fault
Domestic Hot Water NTC sensor fault
Water pressure LOW
Boiler max temperature exceeded(probable pump jammed)
Fault flame (parasitic flame) corrective action
Turn selector (figure 2) to “R” for at least 2 seconds. If this fault persists, call an authorised service centre.
Turn selector (figure 2) to “R” for at least 2 seconds. If this fault persists, call an authorised service centre.
Call an authorised service centre.
Call an authorised service centre.
Call an authorised service centre.
Check that the pressure in the system is as specified.
See section 6. If this fault persists, call an authorised service centre.
Call an authorised service centre.
Turn selector (figure 2) to “R” for at least 2 seconds. If this fault persists, call an authorised service centre.
note: if a fault occurs, the display reads out an error code flashing together with background light.
11. SERvICInG InStRUCtIOnS
To maintain efficient and safe operation of your boiler have it checked by a Qualified Service Engineer at the end of every operating period.
Careful servicing will ensure economical operation of the system.
Do not clean the outer casing of the appliance with abrasive, aggressive and/or easily flammable cleaners (i.e.: gasoline, alcohol, and so on). Always isolate the electrical supply to the appliance before cleaning it (see section 7 “Turning off the boiler”).
instructions pertaininG to the user 924.674.3 - GB
6
12. GEnERal InfORMatIOn
Warning: When the selector switch (figure 2) is set on Wintertime operation ( ), it may be necessary to wait some minutes for the relight of the boiler, at each intervention of the central heating temperature adjusting control (2-figura 1).
no waiting is needed when the boiler is in the DhW mode on models with this option.
To relight the main burner immediately place the selector switch (figure 2) on 0 position and then again on ( ) position.
The following remarks and instructions are addressed to Service Engineers to help them carry out a faultless installation. Instructions regarding lighting and operation of the boiler are contained in the ‘Instructions pertaining to the user’ section.
Note that installation, maintenance and operation of the domestic gas appliances must be performed exclusively by qualified personnel in compliance with current standards.
Please note the following:
* This boiler can be connected to any type of double- or single feeding pipe convector plates, radiators, thermoconvectors. Design the system sections as usual though taking into account the available output / pump head performances, as shown in section 26.
* Do not leave any packaging components (plastic bags, polystyrene, etc.) within children’s reach as they are a potential source of danger.
* Initial lighting of the boiler must be effected by a Qualified Service Engineer.
Failure to observe the above will render the guarantee null and void.
13. InStRUCtIOnS pRIOR tO InStallatIOn
This boiler is designed to heat water at a lower than boiling temperature at atmospheric pressure. The boiler must be connected to a central heating system and to a domestic hot water supply system in compliance with its performances and output power.
Have the boiler installed by a Qualified Service Engineer and ensure the following operations are accomplished: a) careful checking that the boiler is fit for operation with the type of gas available. For more details see the notice on the packaging and the label on the appliance itself.
b) careful checking that the flue terminal draft is appropriate; that the terminal is not obstructed and that no other appliance exhaust gases are expelled through the same flue duct, unless the flue is especially designed to collect the exhaust gas coming from more than one appliance, in conformity with the laws and regulations in force.
c) careful checking that, in case the flue has been connected to pre-existing flue ducts, thorough cleaning has been carried out in that residual combustion products may come off during operation of the boiler and obstruct the flue duct.
To ensure correct operation of the appliance and avoid invalidating the guarantee, observe the following precautions:
1. hot water circuit:
1.1.
If the water hardness is greater than 20 °F (1 °F = 10 mg calcium carbonate per litre of water) a polyphosphate or comparable treatment system responding to current regulations.
1.2.
Domestic Hot Water circuit must be thoroughly flushed after the installation of the appliance and before its use.
1.3. The materials used for the domestic hot water circuit of the product comply with Directive 98/83/EC.
2. heating circuit
2.1.
new system
Before proceeding with installation of the boiler, the system must be cleaned and flushed out thoroughly to eliminate residual thread-cutting swarf, solder and solvents if any, using suitable proprietary products.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non alkaline. The recommended products for cleaning are:
SENTINEL X300 or X400 and FERNOX heating circuit restore. To use this product proceeding strictly in accordance with the maker’s directions.
2.2.
existing system
Before proceeding with installation of the boiler, the system must be cleaned and flushed out to remove sludge and contaminants, using suitable proprietary products as described in section 2.1.
To avoid damaging metal, plastic and rubber parts, use only neutral cleaners, i.e. non-acid and non-alkaline such as SENTINEL X100 and FERNOX heating circuit protective. To use this product proceeding strictly in accordance with the maker’s directions.
Remember that the presence of foreign matter in the heating system can adversely affect the operation of the boiler (e.g. overheating and noisy operation of the heat exchanger).
Failure to observe the above will render the guarantee null and void .
instructions pertaininG to the instaLLer 924.674.3 - GB
7
14. BOIlER InStallatIOn
Decide upon the boiler location, then tape the template on the wall. Connect the pipework to the gas and water inlets prearranged on the template lower bar. We suggest you fit two G3/4 stop cocks (available on demand) on the central heating system flow and return pipework; the cocks will allow to carry out important operations on the system without draining it completely. If you are either installing the boiler on a pre-existent system or substituting it, we suggest you also fit settling tank on the system return pipework and under the boiler to collect the deposits and scaling which may remain and be circulated in the system after the purge.
When the boiler is fixed on the template connect the flue and air ducts (fittings supplied by the manufacturer) according to the instructions given in the following sections.
When installing the 240 i - 1.240 i models (boilers with natural draught), make the connection to the flue using a metal pipe which will provide resistance over time to the normal mechanical stresses, heat and the effects of the combustion products and any condensation they form.
1.240 i - 1.240 Fi 240 i - 240 Fi
BOILER CONNECTION POINTS
: G3/4 heating flow / return
: Filling the system G 1/2
: G3/4 gas inlet to the boiler
: G3/4 heating flow / return
: G1/2 domestic hot water inlet / outlet
: G3/4 gas inlet to the boiler
0710_2501 / cG1769
Figure 5
240 i - 1. 240 i
15. BOIlER SIzE
240 Fi - 1. 240 Fi
0512_0505/cG1769
Figure 6 instructions pertaininG to the instaLLer
8
924.674.3 - GB
16. InStallatIOn Of flUE and aIR dUCtS
Models 240 Fi - 1.240 Fi
We guarantee ease and flexibility of instal lation for a gasfired forced draught boiler thanks to the fittings and fixtures supplied (described below).
The boiler is especially designed for connection to an exhaust flue / air ducting, with either coaxial, vertical or horizontal terminal. By means of a splitting kit a two-pipe system may also be installed.
exclusively install fittings supplied by the manufacturer.
WARNING : To guarantee more operating insurance it is necessary to assure the flue pipes to the wall using the apposite clamps.
Figure 7
… coaxiaL FLue - air Duct (concentric)
This type of duct allows to disengage exhaust gases and to draw combustion air both outside the building and in case a
LAS flue is fitted.
The 90° coaxial bend allows to connect the boiler to a flue-air duct in any direction as it can rotate by 360°. It can moreover be used as a supplementary bend and be coupled with a coaxial duct or a 45° bend.
Figure 8 securing clamp
B
A concentric outlet
If the flue outlet is placed outside, the flue-air ducting must protrude at least 18mm out of the wall to allow alluminium weathering tile to be fitted and sealed to avoid water leakages.
Ensure a minimum downward slope of 1 cm towards the outside per each metre of duct length.
•
A 90° bend reduces the total duct length by 1 metre.
•
A 45° bend reduces the total duct length by 0.5 metre.
The first 90° bend is not included in the maximum available length.
Boiler model
240 Fi
1.240 Fi
280 Fi
Length (m)
0 ÷ 1
1 ÷ 2
2 ÷ 5
0 ÷ 1
1 ÷ 2
2 ÷ 4
air suction restrictor
B
Yes
No
No
Yes
No
Flue restrictor a
Yes
No
No
Yes
No
No
instructions pertaininG to the instaLLer
9
924.674.3 - GB
16.1 HORIzOntal flUE tERMInal InStallatIOn OptIOnS
L max = 5 m 240 Fi Ø 60/100 mm - 9 m Ø 80/120 mm
L max = 4 m 280 Fi Ø 60/100 mm
L max = 4 m 240 Fi Ø 60/100 mm - 8 m Ø 80/120 mm
L max = 3 m 280 Fi Ø 60/100 mm
16.2 laS flUE dUCt InStallatIOn OptIOnS
L max = 5 m 240 Fi Ø 60/100 mm - 9 m Ø 80/120 mm
L max = 4 m 280 Fi Ø 60/100 mm
16.3 vERtICal flUE tERMInal InStallatIOn OptIOnS
This type of installation can be carried out both on a flat or pitched roof by fitting a terminal, an appropriate weathering tile and sleeve, (supplementary fittings supplied on demand).
L max = 4 m Ø 60/100 mm
L max = 10 m Ø 80/120 mm
L max = 2 m Ø 60/100 mm
L max = 8 m Ø 80/120 mm
L max = 3 m Ø 60/100 mm
L max = 9 m Ø 80/120 mm
For detailed instructions concerning the installation of fittings refer to the technical data accompanying the fittings.
instructions pertaininG to the instaLLer 924.674.3 - GB
10
… separateD FLue-air DuctinG
This type of ducting allows to disengage exhaust flue gases both outside the building and into single flue ducts.
Comburant air may be drawn in at a different site from where the flue terminal is located.
The splitting kit consists of a flue duct adaptor (100/80) and of an air duct adaptor.
For the air duct adaptor fit the screws and seals previously removed from the cap.
The restrictor must be removed in the following cases
Boiler model (L1+L2)
Flue restrictor a co2 %
240 Fi
1.240 Fi
280 Fi
0 ÷ 4
4 ÷ 15
15 ÷ 25
25 ÷ 40
0 ÷ 2
2 ÷ 10
10 ÷ 25
air suction copupling position
3
1
1
2
2
3
3
Yes
No
No
G20
6,4
7,4
G31
7,3
8,4
The first 90° bend is not included in the maximum available length.
The 90° bend allows to connect the boiler to flue-air ducting regardless of direction as it can be rotated by 360°. It can moreover be used as a supplementary bend to be coupled with the duct or with a 45° bend.
• A 90° bend reduces the total duct length by 0.5 metre.
• A 45° bend reduces the total duct length by 0.25 metre.
split flue air control adjustment
The adjustment of this control is required to optimise performance and combustion parameters. The air suction coupling can be rotated to adjust excess air according to the total length of the flue and intake ducts for the combustion air.
Turn this control to increase or decrease excess combustion air (figure 9):
To improve optimisation a combustion product analyser can be used to measure the CO
2
contents of the flue at maximum heat output, gradually adjusting air to obtain the CO
2
reading in the table below, if the analysis shows a lower value.
To properly install this device, also refer to the technical data accompanying the fitting.
Flue duct adaptor
Seal
Air suction coupling adjust
Index instructions pertaininG to the instaLLer
11
Opening
Figure 9
924.674.3 - GB
16.4 SplIt flUE OvERall dIMEnSIOnS
16.5 SEpaRatEd HORIzOntal flUE tERMInalS InStallatIOn OptIOnS
iMportant: Ensure a minimum downward slope of 1 cm toward the outside per each metre of duct length.
In the event of installation of the condensate collection kit, the angle of the drain duct must be directed towards the boiler.
L max = 10 m 240 Fi
L max = 8 m 280 Fi
(L1 + L2) max = 40 m 240 Fi
(L1 + L2) max = 25 m 280 Fi
NB: For C52 types, terminals for combustion air suction and combustion product extraction must never be fitted on opposite walls of the building.
The maximum length of the suction duct for type C52 must be 10 metres.
If the flue duct exceeds 6 m, the condensate collection kit (supplied as an accessory) must be fitted close to the boiler.
16.6 SEpaRatEd vERtICal flUE tERMInalS InStallatIOn OptIOnS
L max = 15 m 240 Fi
L max = 12 m 280 Fi instructions pertaininG to the instaLLer
12
L max = 14 m 240 Fi
L max = 10 m 280 Fi
924.674.3 - GB
important: if fitting a single exhaust flue duct, ensure it is adequately insulated (e.g.: with glass wool) wherever the duct passes through building walls.
For detailed instructions concerning the installation of fittings refer to the technical data accompanying the fittings.
17. COnnECtInG tHE MaInS SUpply
Electrical safety of the appliance is only guaranteed by correct grounding, in compliance with the applicable laws and regulations.
Connect the boiler to a 230V monophase + ground power supply by means of the three-pin cable supplied with it and make sure you connect polarities correctly.
use a double-pole switch with a contact separation of at least 3mm in both poles.
In case you replace the power supply cable fit a HAR H05 VV-F’ 3x0.75mm
2 cable with an 8mm diameter max.
…access to the power supply terminal block
• isolate the electrical supply to the boiler by the double-pole switch;
• unscrew the two screws securing the control board to the boiler;
• rotate the control board;
• unscrew the lid and gain access to the wiring (Figure 10).
A 2A fast-blowing fuse is in cor po rated in the power supply terminal block (to check or replace the fuse, pull out the black fuse carrier).
iMportant: be sure to connect polarities correctly L (LIVE) - n (NEUTRAL).
(L) = Live (brown)
(N) = neutral (blue)
= Ground (yellow/green)
(1) (2) = room thermostat terminals
TERmINAL BLOCk M1
Figure 10
18. fIttInG a ROOM tHERMOStat
• gain access to the power supply terminal block (Figure 10) as described in the previous section;
• remove the jumper placed on terminals (1) and (2);
• insert the duplex cable through the core hitch and connect it to the two terminals.
instructions pertaininG to the instaLLer
13
924.674.3 - GB
19. GaS CHanGE MOdalItIES
A Qualified Service Engineer may adapt this boiler to operate with natural gas ( G. 20) or with liquid gas (G. 31).
A Qualified Service Engineer may adapt this boiler to operate with natural gas ( G. 20) or with liquid gas (G. 31).
The procedure for calibrating the pressure regulator may vary according to the type of gas valve fitted (HONEY WELL or
SIT; see figure 12).
Carry out the following ope rations in the given sequence:
A) substitute the main burner injectors;
B) change the modulator voltage;
C) proceed with a new max. and min. setting of the pressure adjusting device.
a) substitute the main burner injectors
• carefully pull the main burner off its seat;
• substitute the main burner injectors and make sure you tighten them to avoid leakage. The nozzle diameters are specified in table 2.
B) change the modulator voltage
• remove the 2 screws securing the control board cover and hinge it upward;
• set the jumper or the switch, according to the type of gas used, as described in the chapter 22.
c) pressure adjusting device setting
• connect the positive pressure test point of a differential (possibly water-operated) manometer to the gas valve pressure test point ( pb) (Figure 12); connect, for sealed chamber models only, the negative pressure test point of the manometer to a “T” fitting in order to join the boiler adjusting outlet, the gas valve adjusting outlet ( pc) and the manometer. (The same measurement can be carried out by connecting the manometer to the pressure test point ( pb) after removing the sealed chamber front panel);
If you measure the pressure of burners in a different way you may obtain an altered result in that the low pressure created in the sealed chamber by the fan would not be taken into account.
c1) adjustment to rated output
• open the gas tap and rotate knob (Figure 12) to set the boiler to the Winter setting ( );
• open a hot water tap to reach a minimum 10 l/minute flow rate or ensure that maximum heating requirements are set;
• remove the modulator cover;
• adjust the tube brass screw ( a) Fig. 13 to obtain the pressure settings shown at table 1;
• check that boiler feeding dynamic pressure, as measured at the inlet gas valve pressure test point (Pa) (Figure 12) is correct (37 mbar for LPG gas (G.31), 20 mbar for natural gas); c2) adjustment to reduced heat output
• disconnect the modulator feeding cable and unscrew the ( b) Fig. 13 screw to reach the pressure setting corresponding to reduced heat output (see table 1);
• connect the cable again;
• fit the modulator cover and seal.
c3) Final checks
• apply the additional dataplate, specifying the type of gas and settings applied.
sit valve - mod. siGMa 845 honeywell valve - mod. VK 4105 M
Figure 12 instructions pertaininG to the instaLLer
14
924.674.3 - GB
table of burner pressures
Gas used
240 i - 1.240 i
G20 G31 nozzle diameter (mm)
Burner pressure (mbar*) reDuceD heat output
1,18
1,9
0,74
4,7
10,0 26 Burner pressure (mbar*) noMinaL heat output no. of nozzles
* 1 mbar = 10,197 mm H
2
O table 1
240 Fi
G20
1,18
1,9
G31
0,74
4,9
11,3 29,4
15
G20
1,28
1,8
11,3
280 Fi
G31
0,77
4,9
31,0 consumption 15°c-1013 mbar
rated heat output
reduced heat output
p.c.i. table 2
240 i - 1.240 i
G20 G31
2,78 m 3 /h 2,04 kg/h
240 Fi
G20 G31
2,73 m 3 /h 2,00 kg/h
280 Fi
G20 G31
3,18 m 3 /h 2,34 kg/h
1,12 m 3 /h 0,82 kg/h 1,12 m 3 /h 0,82 kg/h 1,26 m 3 /h 0,92 kg/h
34,02 mJ/m 3 46,30 mJ/kg 34,02 mJ/m 3 46,30 mJ/kg 34,02 mJ/m 3 46,30 mJ/kg instructions pertaininG to the instaLLer
15
924.674.3 - GB
20. dISplayInG paRaMEtERS On tHE dISplay (“InfO” MOdE)
Proceed as follows to display boiler parameters on the front panel display:
iMportant: the following operations (figure 14), it has to be carried out in fast sequence in a short time (~ 4 seconds) without making any break during the steps:
1) with the control knob ( ) in any position turns it fully anti-clockwise to the minimum value;
2) quickly turn control knob clockwise through about a 1 /
4
turn;
3) again turns the control knob fully anti-clockwise to it minimum value
4) then set back the control knob to it original position.
Figure 14
note: in “inFo” mode, the display (4 - figure 1) alternates between the message “a00” and ch temperature.
•
turn the control knob ( ) to display the following informations:
a00: domestic hot water output temperature (°C); a01: outdoor temperature (in °C) with outdoor sensor probe connected; a02: the value (%) of the modulator current (100% = 230 mA NATURAL GAS - 100% = 310 mA LPG); a03: heat output (%) power range (max R); a04: central heating water output setpoint temperature (°C); a05: central heating water output temperature (°C); a07: valve (µA) of the ionization current.
note: program lines from a06 - a08 - a09 are not used.
•
“INFO” function remains active for 3 minutes. To exit “INFO” function before this time repeat the operation as described in points 1...4 or cutting OFF the power supply to the boiler.
instructions pertaininG to the instaLLer
16
924.674.3 - GB
21. COntROl and OpERatIOn dEvICES
The boiler has been designed in full compliance with European reference standards and in particular is equipped with the following:
• Central heating temperature adjustment potentiometer ( )
This potentiometer sets the central heating flow max. temperature. Its temperature range goes from 30 °C min. to 80 °C max. To increase the temperature turn knob (2 - figure 1) clockwise and anti clock wise to decrease it.
• Domestic hot water temperature adjusting potentiometer ( )
This potentiometer sets the domestic hot water max. temperature. Its temperature range goes from 35 °C min. to 60 °C max according to the water inlet flow rate.
To increase the temperature turn knob (1 - figure 1) clockwise and anticlockwise to decrease it.
note: domestic hot water is guaranteed even if the NTC sensor is damaged. In this case, the temperature control is carried out by the boiler flow temperature.
• Flue pressure switch for forced draught model (240 Fi - 1.240 Fi - 280 Fi)
This switch allows the burner to switch on provided the exhaust flue duct efficiency is perfect.
In the event of one of the following faults:
• the flue terminal is obstructed
• the venturi is obstructed
• the fan is blocked
• the connection between the venturi and the air pressure switch is interrupted,
the boiler will stay on stand-by and the display shows out error code E03 (see table on section 10).
• Flue thermostat for natural draught (models 240 i - 1.240 i)
This device has a sensor positioned on the left section of the flue extraction hood and shuts off the gas flow to the burner if the flue duct is obstructed or in the event of draught failure.
Under such conditions the boiler is blocked and the display shows E03 error (see section 10).
To relight the main burner immediately, place the selector switch (figure 2) on “ ” position for at least 2 seconds.
It is forbidden to disenable this safety device
• Overheat safety thermostat
Thanks to a sensor placed on the heating flow, this thermostat interrupts the gas flow to the burner in case the water contained in the primary system has overheated. Under such conditions the boiler is blocked and relighting will only be possible after the cause of the anomaly has been removed.
Turn the selector (figure 2) to ( ) for at least 2 seconds to RESET normal operating conditions.
It is forbidden to disenable this safety device
• Flame ionization detector
The flame sensing electrode, placed on the right of the burner, guarantees safety of operation in case of gas failure or incomplete interlighting of the burner. Under such conditions the boiler is blocked.
Turn the selector (figure 2) to ( ) for at least 2 seconds to RESET normal operating conditions.
• Hydraulic pressure sensor
This device enables the main burner only to be switched on if the system pressure is over 0.5 bars.
• Pump overrun for central heating circuit
The electronically-controlled supplementary running of the pump lasts 180 seconds, when the boiler is in the central heating mode, after the burner has switched off due to a room thermostat or intervention.
• Pump overrun for domestic hot water circuit
The electronic control system keeps the pump operating for 30 seconds in domestic hot water mode after the D.H.W. sensor has switched off the burner.
• Frost protection device (central heating and domestic hot water systems)
Boilers electronic management includes a “frost protection” function in the central heating system which operates the burner to reach a heating flow temperature of 30°C when the system heating flow temperature drops below 5 °C.
This function is enabled when the boiler is connected to electrical supply, the gas supply is on and the system pressure is as required.
• Lack of water circulation (probable pump jammed)
If the water inside the primary circuit doesn’t circulate, the display shows E03 error (see section 10).
• Anti-block pump function
In the event that no heat is required (during heating and/or sanitary mode), the pump will automatically start up and operate for one minute during the following 24 hours.
This function is operative when the boiler is powered.
• Three-way anti-blockage valve
In the case of no heat is request for a period of 24 hours the three way valve carries out a complete commutation.
This function is operative when the boiler is powered.
• Hydraulic safety valve (heating circuit)
This device is set to 3 bar and is used for the heating circuit.
The safety valve should be connected to a siphoned drain. Use as a means of draining the heating circuit is strictly prohibited.
instructions pertaininG to the instaLLer 924.674.3 - GB
17
22. ElECtROnIC BOaRd CalIBRatIOn
When the jumper or the switch is in the oFF position
(fig. 15a):
Met operation of the boiler with NATURAL gas
t.risc boiler heating temperature range 30 - 85°c t-off 150-seconds heating stand-by time
Figure 15a
When the jumper or the switch is in the on position
(fig. 15b):
GpL operation of the boiler with LPG
t.risc boiler heating temperature range 30 - 45°c t-off 30-seconds heating stand-by time
Figure 15b nB.
make sure that electrical power supply has been disconnected before making settings.
23. pOSItIOnInG Of tHE IGnItIOn and flaME SEnSInG ElECtROdE
Figure 16
24. CHECk Of COMBUStIOn paRaMEtERS
The boiler has two connection points specifically designed to allow technicians to measure the combustion efficiency after installation and ensure that the combustion products do not constitute a health risk.
One connection point is connected to the flue gas discharge circuit, and allows monitoring of the quality of the combustion products and the combustion efficiency.
The other is connected to the combustion air intake circuit, allowing checking of any recycling of the combustion products in case of coaxial pipelines.
The following parameters can be measured at the connection point on the flue gas circuit:
• temperature of the combustion products;
• oxygen (O
2
) or carbon dioxide (CO
2
) concentration;
• carbon monoxide (CO) concentration.
The combustion air temperature must be measured at the connection point on the air intake circuit, inserting the measurement probe to a depth of about 3 cm.
The boiler has two connection points specifically designed to allow technicians to measure the combustion efficiency after installation and ensure that the combustion products do not constitute a health risk.
One connection point is connected to the flue gas discharge circuit, and allows monitoring of the quality of the combustion products and the combustion efficiency.
The other is connected to the combustion air intake circuit, allowing checking of any recycling of the combustion products in case of coaxial pipelines.
instructions pertaininG to the instaLLer 924.674.3 - GB
18
The following parameters can be measured at the connection point on the flue gas circuit:
• temperature of the combustion products;
• oxygen (O
2
) or carbon dioxide (CO
2
) concentration;
• carbon monoxide (CO) concentration.
The combustion air temperature must be measured at the connection point on the air intake circuit, inserting the measurement probe to a depth of about 3 cm.
For natural draught boiler models, a hole must be made in the flue gas discharge pipe at a distance from the boiler equal to twice the inside diameter of the pipe itself.
The following parameters can be measured through this hole:
• temperature of the combustion products;
• oxygen (O
2
) or carbon dioxide (CO
2
) concentration;
• carbon monoxide (CO) concentration.
The combustion air temperature must be measured close to the point where the air enters the boiler.
The hole, which must be made by the person in charge of operating the system when it is commissioned, must be sealed in a way which ensures that the combustion product discharge pipe is airtight during normal operation.
25. OUtpUt / pUMp HEad pERfORManCES
This is a high static head pump fit for installation on any type of single or double-pipe heating systems. The air vent valve incorporated in the pump allows quick venting of the heating system.
280 Fi 240 Fi - 240 i - 1.240 Fi - 1.240 i output l/h
0603_0303 output l/h
Graph 1 Graph 2
26. COnnECtIOn Of tHE ExtERnal pROBE
The boiler is prearranged for connection of an external probe (supplied as accessory).
For the connection, refer to the figure 17 and the instructions supplied with the probe.
0603_0304
Figure 17 instructions pertaininG to the instaLLer
19
Connect the cable, supplied as an accessory together with the external probe, to the cn10 connector of the boiler electronic board, as illustrated in figure 17.
924.674.3 - GB
When the external probe is connected, the heating circuit temperature control device (2 - figure 1), regulates the dispersal coefficient kt (Figure 18).
The figures below show the relation between knob position and curves. Intermediate curves may also be set.
tM
tM = Range delivery temperature
te = external temperature te
Figure 18
iMportant: the tM delivery temperature value depends on the position of the jumper or the switch T.RISC. (section 23).
The maximum possible temperature setting is 85 or 45°C.
27. COnnECtInG an ExtERnal BOIlER
For models 1.240 Fi - 1.240 i
IMPORTANT: jumper CN7 must be jumpered (see paragraph 32).
Connect the boiler water pipes as shown in figure 19.
Remove the resistor from terminal board and connect the optional DHW priority sensor to them.
Insert the sensor’s probe in the relevant hole in the boiler.
Set domestic hot water temperature (5°...60 °C) using the control knob (1 - figure 1).
Legend
uB DHW boiler unit
ur central heating unit
V3V external three way valve
M2 terminal block
sB DHW priority sensor
Mr central heating delivery
MB DHW delivery
rr central heating/DHW return
rB resistor, to be removed external 3 way valve connection
3 WaY VaLVe anD D.K.W. prioritY sensor terMinaL BLocK.
Figure 19 instructions pertaininG to the instaLLer
20
924.674.3 - GB
28. HOw tO pURGE tHE dHw SyStEM fROM lIMEStOnE dEpOSItS
To clean the DHW system it is not necessary to remove the DHW heat exchanger if the assembly is equipped with the appropriate taps (supplied on demand) placed on the hot water outlet and inlet.
To carry out the purge it is necessary to:
• close the cold water inlet
• drain the DHW system from the water contained therein by means of a hot water tap
• close the DHW outlet
• unscrew the two stop cocks caps
• remove the filters.
In case the appropriate tap is not supplied it is necessary to disassemble the DHW heat exchanger, as described in the following section, and do the purge aside. We recommend you also purge from limestone deposits the DHW heat exchanger seat and the NTC sensor fitted on the DHW system.
To purge the exchanger and/or the DHW system we suggest the use of Cillit FFW-AL or Beckinser HF-AL.
29. HOw tO dISaSSEMBlE tHE dHw HEat ExCHanGER
The stainless steel plate-type DHW heat exchanger is easily disassembled with a screwdriver by operating as described below:
• drain, if possible, only the boiler system, through the drain tap;
• drain the DHW system from water;
• remove the two screws (right in front of you) securing the DHW heat exchanger and pull it off its seat (figure 19).
30. ClEanInG tHE COld watER fIltER
The boiler is equipped with a cold water filter placed on the hydraulic assembly.
To clean it do the following:
• drain the DHW system from water;
• unscrew the nut on the flow sensing assembly (Figure 19);
• pull out the flow sensing device and its filter;
• remove the impurities.
flow sensing securing nut
important: in the event of replacements and/or cleaning of the O-rings on the hydraulic unit, do not use oil or grease as lubricant but exclusively molykote 111.
Figure 19
DHW heat exchanger securing screws instructions pertaininG to the instaLLer
21
924.674.3 - GB
seaLeD chaMBer
31. BOIlER SCHEMatIC
240 fi - 280 fi
280 Fi
0606_2701
Figure 20 heating inlet domestic water outlet gas domestic heating water inlet return
Key:
1 DHW priority sensor
2 automatic by-pass
3 water pressure switch
4 three way valve
5 DHW NTC sensor
6 flow sensor with filter and water flow rate limiter
7 3-way valve motor
8 gas valve
9 ignition electrode
10 central heating NTC sensor
11 overheat safety thermostat
12 flue-water exchanger
13 flue hood
14 fan
15 air pressure switch
16 positive pressure point
17 negative pressure point
18 flame detector electrode
19 main burner
20 burner injectors
21 expansion vessel
22 plate heat exchanger (D.H.W.)
23 automatic air vent
24 pump and air separator
25 filling the system
26 boiler drain point
27 manometer
28 pressure relief valve instructions pertaininG to the instaLLer
22
924.674.3 - GB
240 i
heating inlet domestic water outlet
Figure 21
Key:
1 DHW priority sensor
2 automatic by-pass
3 water pressure switch
4 three way valve
5 DHW NTC sensor
6 flow sensor with filter and water flow rate limiter
7 3-way valve motor
8 gas valve
9 ignition electrode
10 central heating NTC sensor
11 overheat safety thermostat
12 flue-water exchanger
13 flue hood gas domestic heating water inlet return
14 flue thermostat
15 flame detector electrode
16 main burner
17 burner injectors
18 expansion vessel
19 plate heat exchanger (D.H.W.)
20 automatic air vent
21 pump and air separator
22 filling the system
23 boiler drain point
24 manometer
25 pressure relief valve instructions pertaininG to the instaLLer
23
924.674.3 - GB
1.240 fi
seaLeD chaMBer heating inlet
Figure 22
Key:
1 water pressure switch
2 automatic bypass
3 gas valve
4 ignition electrode
5 central heating NTC sensor
6 overheat safety thermostat
7 flue-water exchanger
8 flue hood
9 fan
10 air pressure switch
11 positive pressure point
(Not featured on 1.140 Fi) gas domestic water inlet heating return
12 negative pressure point
13 flame detector electrode
14 main burner
15 burner injectors
16 expansion vessel
17 automatic air vent
18 pump and air separator
19 boiler drain point
20 manometer
21 pressure relief valve instructions pertaininG to the instaLLer
24
924.674.3 - GB
1.240 i
Figure 23
Key:
1 water pressure switch
2 automatic bypass
3 gas valve
4 ignition electrode
5 central heating NTC sensor
6 overheat safety thermostat
7 flue-water exchanger
8 flue hood
9 flue thermostat heating inlet gas domestic water inlet heating return
10 flame detector electrode
11 main burner
12 burner injectors
13 expansion vessel
14 automatic air vent
15 pump and air separator
16 boiler drain point
17 manometer
18 pressure relief valve instructions pertaininG to the instaLLer
25
924.674.3 - GB
FLAmE
SENSING
ELECTRODE
32. IllUStRatEd wIRInG dIaGRaM
240 fi - 280 fi
SAFETY
THERmOSTAT
AIR PRESSURE
SWITCH
CONNECTION FOR
EXTERNAL SENSOR
PROBE
WATER PRESSURE
SWITCH
CENTRAL HEATING
NTC SENSOR
DHW NTC
SENSOR
IGNITION
ELECTRODE
DHW
PRIORITY SENSOR
FAN
FUSE
ROOm
THERmOSTAT
FEEDING
POWER
GRID
FeeDinG terMinaL BLocK
PUmP
3-WAY VALVE caBLes coLours
c= light blue
M= brown
n= black
r= red
G/V= yellow/green
B= white
V= green
KeY
p2: DHW potentiometer
p3: S/W/OFF selector
p4: Central heating potentiometer
p5: Heating power regulation trimmer instructions pertaininG to the instaLLer
26
924.674.3 - GB
240 i
FLAmE
SENSING
ELECTRODE
IGNITION
ELECTRODE
SAFETY
THERmOSTAT
FLUE
THERmOSTAT
CONNECTION FOR
EXTERNAL SENSOR
PROBE
WATER PRESSURE
SWITCH
CENTRAL HEATING
NTC SENSOR
DHW NTC
SENSOR
DHW
PRIORITY SENSOR
FUSE
ROOm
THERmOSTAT
FEEDING
POWER
GRID
FeeDinG terMinaL BLocK
PUmP
3-WAY VALVE caBLes coLours
c= light blue
M= brown
n= black
r= red
G/V= yellow/green
B= white
V= green
KeY
p2: DHW potentiometer
p3: S/W/OFF selector
p4: Central heating potentiometer
p5: Heating power regulation trimmer instructions pertaininG to the instaLLer
27
924.674.3 - GB
SAFETY
THERmOSTAT
1.240 fi
AIR PRESSURE
SWITCH
CONNECTION FOR
EXTERNAL SENSOR
PROBE
WATER PRESSURE
SWITCH
CENTRAL HEATING
NTC SENSOR
FLAmE
SENSING
ELECTRODE
IGNITION
ELECTRODE caBLes coLours
c= light blue
M= brown
n= black
r= red
G/V= yellow/green
B= white
V= green
FAN
FUSE
ROOm
THERmOSTAT
FEEDING
POWER
GRID
FeeDinG terMinaL BLocK
PUmP
Jumper cn7 to be jumpered
KeY
p2: DHW potentiometer
p3: S/W/OFF selector
p4: Central heating potentiometer
p5: Heating power regulation trimmer
rB: Resistor, to be removed if an
external boiler is connected
instructions pertaininG to the instaLLer
28
924.674.3 - GB
SAFETY
THERmOSTAT
1.240 i
FLUE
THERmOSTAT
CONNECTION FOR
EXTERNAL SENSOR
PROBE
WATER PRESSURE
SWITCH
CENTRAL HEATING
NTC SENSOR
FLAmE
SENSING
ELECTRODE
IGNITION
ELECTRODE caBLes coLours
c= light blue
M= brown
n= black
r= red
G/V= yellow/green
B= white
V= green
FUSE
ROOm
THERmOSTAT
FEEDING
POWER
GRID
FeeDinG terMinaL BLocK
PUmP
Jumper cn7 to be jumpered
KeY
p2: DHW potentiometer
p3: S/W/OFF selector
p4: Central heating potentiometer
p5: Heating power regulation trimmer
rB: Resistor, to be removed if an
external boiler is connected
instructions pertaininG to the instaLLer
29
924.674.3 - GB
33. tECHnICal data
Model eco3 category maximum heat input
Reduced heat input maximum heat output
Reduced heat output
Useful efficiency according to 92/42/CEE directive
Central heating system max. pressure
Expansion vessel capacity
Expansion vessel pressure
DHW system max. pressure
DHW system min. dynamic pressure
DHW system min. output
DHW production at ΔT=25°C
DHW production at ΔT=35°C
Specific output (*)
Type
Concentric flue duct diameter
Concentric air duct diameter
2-pipe flue duct diameter
2-pipe air duct diameter
Discharge pipe diameter max. flue mass flow rate min. flue mass flow rate max. flue temperature min. flue temperature
NOx Classe
Type of gas used
Natural gas feeding pressure
Propane gas feeding pressure
Power supply voltage
Power supply frequency
Power consumption
Net weight
Dimensions
Protection-limit against humidity and water leakages (**)
(*) according to EN 625
(**) according to EN 60529
height width depth kW kW kW
240 Fi ii
2h3p
25,8
10,6
24
1.240 Fi ii
2h3p
25,8
10,6
24
280 Fi ii
2h3p
30,1
11,9
28
240 i ii
2h3p
26,3
10,6
24
1.240 i ii
2h3p
26,3
10,6
24 kcal/h 20.600 20.600 24.080 20.600 20.600
kW kcal/h
9,3
8.000
9,3
8.000
10,4
8.900
9,3
8.000
9,3
8.000
— bar l bar
★★★
3
8
0,5
★★★
3
8
0,5
★★★
3
10
0,5
★★
3
8
0,5
★★
3
8
0,5
—
— mbar mbar
V
Hz
W mm mm mm mm mm kg/s kg/s
°C
°C
— bar bar l/min l/min
8
0,5
2
13,7
-
-
-
-
8
0,5
2
16 l/min 9,8 - 11,4 l/min 10,7 - 12,5
— C12-C32-C42-C52-C82-B22
60
100
80
80
-
0,016
0,015
135
100
3
60
100
80
80
-
0,016
0,015
135
100
3
60
100
80
80
-
0,017
0,017
140
110
3
G20
G31
20
37
230
50
135
G20
G31
20
37
230
50
135
G20
G31
20
37
230
50
165 kg mm mm mm
38
763
450
345
IP X5D
32
763
40
763
33
763
28
763
450
345
450
345
450
345
450
345
IP X5D IP X5D IP X5D IP X5D
G20
G31
20
37
230
50
80
-
-
-
-
120
0,021
0,018
110
85
3
8
0,5
2
13,7
9,8
10,7
B
11BS
G20
G31
20
37
230
50
80
-
-
-
-
120
0,019
0,017
110
85
3
-
-
-
-
-
-
B
11BS instructions pertaininG to the instaLLer
30
924.674.3 - GB
УКАЗАНИЯ ДЛЯ МОНТАЖНИКА
151
924.674.3 - RU
ED. 1 - 03/09
BaxI
S.p.a.
36061 BASSANO DEL GRAPPA (VI) ITALIA
Via Trozzetti, 20
Tel. 0424 - 517111
Telefax 0424/38089
codice 924.674.3
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Questions & Answers
Y Y W
What is the part number of the expansion vessel?
Related manuals
advertisement