1
USE ............................................................................................................................................................. 4
2
DESCRIPTION ............................................................................................................................................. 4
3
FUNCTION: ................................................................................................................................................. 5
4
ADVANTAGES OF USE ................................................................................................................................ 5
5
ENERGY SAVING......................................................................................................................................... 6
6
OPERATION AND TEMPERATURE SETTING................................................................................................ 6
7
OPERATION PRECONDITIONS .................................................................................................................... 6
8
ASSEMBLY AND SAFETY INSTRUCTIONS .................................................................................................... 7
9
8.1
General Instructions .......................................................................................................................... 7
8.2
TPK - division...................................................................................................................................... 8
8.3
Heating Unit Assembly ...................................................................................................................... 9
8.4
Electrical Connection ......................................................................................................................... 9
8.5
Putting into Operation..................................................................................................................... 12
INSPECTION, CARE, MAINTENANCE ........................................................................................................ 12
10 MALFUNCTIONS....................................................................................................................................... 12
11 TECHNICAL DATA ..................................................................................................................................... 13
12 SPARE PARTS LIST .................................................................................................................................... 14
13 DISPOSAL OF PACKAGING MATERIAL AND NON-FUNCTIONING PRODUCT............................................ 14
-2-
CAREFULLY READ THIS MANUAL BEFORE INSTALLING THE WATER HEATER!
Dear customer,
The Works Cooperative of Dražice – Machine Plant, Ltd., would
like to thank you for your decision to use a product of our
brand. With this guide, we will introduce you to the use,
construction, maintenance and other information on electrical
water heaters.
The product is not intended to be controlled by
a) people (including children) with reduced physical, sensual or mental capacities, or
b) people with insufficient knowledge and experiences unless supervised by responsible person, or
unless properly instructed by such responsible person.
The manufacturer reserves the right for engineering modification of the product. The product is
designed for permanent contact with drinkable water.
It is recommended to use the product in indoor environment with air temperatures from +2°C to 45°C
and a relative humidity up to 80%. 80%.
Product’s reliability and safety is proven by tests implemented by the Engineering Test Institute in Brno.
Made in the Czech Republic.
Meaning of pictograms used in the Manual
Important information for heater users.
Abiding by the recommendations of the manufacturer serves to ensure trouble-free
operation and the long service life of the product.
Caution!
Important notice to be observed.
-3-
1 USE
The TPK series heating flanges are designed as main heating devices for electric heaters from DZD type
OKCE S as secondary heating devices for OKC NTR(R)/BP, and accumulation tanks of heating, solar and
other systems. Heating flange can be used to heat water also in other facilities provided the installation
instructions are achieved.
With their construction, they are only designed to heat water up to tank pressure of 1 MPa and
temperature of 110°C.
2 DESCRIPTION
Heating flange is an enamelled weld of flange and wells. TPK is equipped with a thermostat and a safety
fuse with external control and relevant electric installation. The electric wiring is placed underneath
a plastic cover.
TPK 168 - 8
TPK 210 -12
3
1.
2.
2
Metal electric installation guard
Heating flange
4
1
3. Sealing
4. Ceramic element
-4-
TPK 210 -12
3
2
1. Sheet metal electric installation guard
2. Heating flange
4
1
3. Gasket
4. Ceramic element
3 FUNCTION:
After setting the heating temperature between 5°C - 74°C, the in-built PTK is unmanned. The thermostat
activates heating elements and after reaching the set temperature the thermostat turns off. The operation
of the element is indicated with lit up control glow lamps. If the thermostat fails, the safety fuse deactivates
power supply if 95°C is reached. The safety fuse is non-reversible, i.e. that it has to be turned on once the
failure is removed.
4 ADVANTAGES OF USE
-
-
Heating flange with elements in steel wells is more resistant in waters rich in calcium, with
increased formation of scale.
Placing the elements in steel wells increases the lifetime of the heater tank. Electric potential is
better kept at corresponding values.
If the element fails, it can be replaced without draining water from the tank.
-5-
5 ENERGY SAVING
Low water temperature in the heater proves to be especially economic. Therefore the temperature should
be set to be adequate for intended hot water consumption, not higher. This helps to save electricity and
prevents lime sediment occurrence.
6 OPERATION AND TEMPERATURE
SETTING
The temperature of water in the heater can be adjusted as needed by the thermostat, either continuously
or in three steps as indicated. This allows energetically economic operation. To set the temperature, 3 main
marked symbols are used:



* accumulator freezing protection
Approx. 600C, hot water – to prevent scalding, setting this degree is recommended as it is
the economic operation with minimum energy loss and minimum scale occurrence;
maximum, approx. 74°C, hot water.
Attention :
When the thermostat wheel is in the utmost left position, this is not the zero position nor is
the heating turned off.
During day mode operation, the thermostat should not be set to temperatures above 600C.
7 OPERATION PRECONDITIONS
The connection of an electric flange unit must follow the data on the plate (operation pressure, heating
time, electric voltage). Connecting to the electrics must follow the scheme on the inside of the protective
cover for the particular flange types.
Aside from the electric regulations the conditions of local distribution and water supply plants, as well as
assembly and operation conditions, must be followed. If the water is really hard, we recommend
installation of water treatment filters preventing the scale occurrence.
These heating elements are suitable for enamelled accumulators, double casing tanks, or accumulators
coated with either plastic or zinc; they are also suitable for ribbed exchangers. Combination with
chromium–nickel tanks is problematic, and therefore not recommended. All elements are suitable for
heating drinkable and heating water with operating pressure within 10 bar.
-6-
8 ASSEMBLY AND SAFETY
INSTRUCTIONS
8.1 General Instructions
During operation, both the heating element and the anode rod must be under water. Necessary thermal
flow of heated water must not be prevented. The heating unit is equipped with a safety fuse preventing
further water heating at the maximum temperature of 95 ºC approximately. It is therefore necessary to
select suitable connecting components (pipelines, safety valve combination) that, in case of thermostat
defect, resist the maximum temperature of 110 ºC.
Both the assembly and installation must be implemented by authorised people only.
Position of installation of TPK series elements
Correct
Faulty
Too long flange welded too high.
Thermowell under the heating element.
The flange rim must not exceed 130 mm, so that the temperature sensor and the element reach into the
tank deep enough. Correct position of a built-in element assures even heating of the tank contents. In front
of the flange, a free space depending on the length of the element must be left for the assembly. Scale
occurrence lowers functionality; it is therefore necessary, especially with hard water, to take the following
measures: Select proper temperature setting; install a device reducing water hardness; regular removal of
heater scale.
-7-
8.2 TPK - division
TPK 168 - 8/2.2 kW
Used with:
OKC 160 NTR/BP
OKC 200 NTR(R)/BP
OKC 250 NTR(R)/BP
TPK 210 - 12/2.2 kW
Used with:
OKCE 160 S
OKCE 200 S
OKCE 250 S
OKCE 300 S
OKCE 400 S
OKCE 500 S
OKC 300 NTR(R)/BP
OKC 400 NTR(R)/BP
OKC 500 NTR(R)/BP
Tanks NAD and NADOwith flange 210 mm
TPK 210 - 12/3-6 kW
TPK 210 - 12/5-9 kW
TPK 210 - 12/8-12 kW
Used with:
OKCE 160 S
OKCE 200 S
OKCE 250 S
OKCE 300 S
OKCE 400 S
OKCE 500 S
OKC 300 NTR(R)/BP
OKC 400 NTR(R)/BP
OKC 400 NTR(R)/BP
TPK 210 - 12/8-12 kW
is only used with
OKCE 300 S
OKCE 400 S
OKCE 500 S
Tanks NAD and NADOwith flange 210 mm
-8-
8.3 Heating Unit Assembly
Aside from the installation regulations, the conditions of connection resulting from local distribution and
water supply plants must be followed:
1. Remove protective cover (position 1)
2. The variant TPK 168-8 requires to fit sealing on the screws, place the heating flange (position 2) and
screw on the screws in the flange above the tanks (torque 15 Nm). The variant TPK 210-12 requires
to screw 3 auxiliary threaded bars M12x50 evenly on the periphery into 3 threaded holes. Fit on the
sealing and place the heating flange (position 2). Then screw the remaining 9 screws M12x30
and fasten it with a cross (torque 15 Nm). Then unscrew the threaded bars and replace them with
the remaining 3 šscrews M12x30 and fasten it (torque 15 Nm).
3. Carry out electric connection following the scheme (see point 8.5). Warning – do not forget to
connect the guard wire. With flanges with selectable output, interconnect the terminal boards to
the required output.
4. Put on the protective guard and thermostat control. Cover the gap between the heater shell and
flange guard with the attached profile.
5. Commissioning is possible solely when the tank is filled with water.
Heating element assembly and its initial operation can only be implemented by an expert, who takes
responsibility for proper implementation and equipment.
8.4 Electrical Connection
The electrical connection must be implemented based on the attached scheme. The scheme is placed
inside the plastic cover of the heating flange and it relates to the specific type!
The network voltage must be respected!
All metal parts of the accumulator must meet relevant protective regulations.
The main must have multipole switch with at least 3 mm contact spacing. All switches must be connected
to circuit breakers. The supply cable must be supplied into the area of connection via a sealing bushing and
secured from shifting, wringing, and tearing out by a clamp.
Wiring scheme
Heating unit 2.2 kW
-9-
Heating unit 3-6 kW, 5-9 kW and 8-12 kW
Caution! The factory connection must not be changed!
Heating unit 3-6 kW enables 4 connection types and heating units 5-9 kW and 8-12 kW 3 types of
connection according to the required output considering the heating tank and the option of electricity
network onsite.
To achieve the chosen performance of the heating unit, connect the inlet conductor to L1, L2, L3 and
N terminal board and interconnect the terminals on the terminal board 1-10 according to the below
schemes:
- 10 -
TPK 3 - 6 kW
P = 1 kW
3 kW
1 PE - N AC 230 V / 50 Hz
3 kW
2 PE - N AC 400 V / 50 Hz
4 kW
3 PE - N AC 400 V / 50 Hz
6 kW
3 PE - N AC 400 V / 50 Hz
TPK 5 - 9 kW
P = 1 kW
TPK 8 - 12 kW
P = 1.33 kW
TPK 5-9 kW
5 kW
3 PE - N AC 400 V / 50 Hz
7 kW
3 PE - N AC 400 V / 50 Hz
9 kW
3 PE - N AC 400 V / 50 Hz
TPK 8-12 kW
8 kW
3 PE - N AC 400 V / 50 Hz
10.5 kW
12 kW
3 PE - N AC 400 V / 50 Hz
3 PE - N AC 400 V / 50 Hz
- 11 -
8.5 Putting into Operation
Before electric part connection, the accumulator must be filled with water. During the rating, water must
drip off the safety valve.
Attention : Both the hot water outlet pipe and safety armature parts may be hot.
After heating, the set temperature of consumed water should roughly correspond with temperature shown
on the thermometer.
9 INSPECTION, CARE, MAINTENANCE
High calcium content water requires the removal of both scale and calcium sediments after one or two
years, implemented by an expert worker. Cleaning may be implemented through the flange opening; a new
seal must be used during assembly.
Specially enamelled accumulator containers must not get in contact with scale solvents or a lime pump.
Eventually, the container must be thoroughly rinsed; its re-heating must follow the method of initial
operation.
During the maintenance, protective connection of all metal (conductive) parts of the heater must not be
damaged or removed. Neither mechanical means causing abrasion nor paint thinners (nitro, tricholor, etc.)
can be used for cleaning. It is best to use a wet cloth with couple drops of a neutral cleaning preparation.
10 MALFUNCTIONS
Do not attempt to repair the failure yourselves. Seek either expert or service help. It does not take much
for an expert to remove the defect. When making a repair appointment, report the type and serial number
you find on the performance plate of your heating element.
Defect
1
Water in the tank is cold
LED is on
2
Water in the tank is not warm
enough
LED is on
3
Water in the tank is cold
LED is not on
4
Water in the tank does not
correspond with temperature
set
LED is on
Failure
- Heating element failure
- Some elements are not heating
- Failure of one of the elements
- Failure of one of the heating coils in
the element
- See note
- Thermostat failure – the safety fuse
turned off electricity supply
- Power supply outside the heater
discontinued

Thermostat failure
Note: Every heating element is made of two or more coils connected in parallel.
The element works but on lower output.
- 12 -
11 TECHNICAL DATA
Screw spacing circle diameter 168 mm Screw spacing circle diameter 210 mm -
TPK 168 - 8 / 2,2 kW; TPK 168 - 8 / 3 kW
TPK 210 -12 / 2,2 kW; TPK 210 -12 / 3 kW;
TPK 210 -12 / 3-6 kW; TPK 210 -12 / 5-9 kW;
TPK 210-12/8-12 kW
Range of thermostat settings: Continuous setting from 5°C by approx. 74°C. The gasket is attached.
Type
TPK 168 - 8 / 2,2 kW
TPK 168 - 8 / 3 kW
TPK 210 -12 / 2,2 kW
TPK 210 -12 / 3 kW
TPK 210 -12 / 3 - 6 kW
TPK 210 -12 / 5 - 9 kW
TPK 210 -12 / 8 -12 kW
Output [kW]
2,2
3
2,2
3
3 - 4,0 - 6
3-5-7-9
8 - 10,5 - 12
Connection
1 PE - N AC 230 V / 50 Hz
1 PE - N AC 230 V / 50 Hz
1 PE - N AC 230 V / 50 Hz
1 PE - N AC 230 V / 50 Hz
3 PE - N AC 400 V / 50 Hz
3 PE - N AC 400 V / 50 Hz
3 PE - N AC 400 V / 50 Hz
Build-up length [mm]
405
405
440
440
440
550
550
OKC 100 NTR / BP
OKC 125 NTR / BP
OKC 160 NTR / BP
OKCE 160 S
OKC 200 NTR / BP
OKC 200 NTRR / BP
OKCE 200 S
OKC 250 NTR / BP
OKC 250 NTRR / BP
OKCE 250 S
OKC 300 NTR / BP
OKC 300 NTRR / BP
OKCE 300 S
3
3,5
4,5
5,5
5,5
6,5
6,5
-
2
2,5
3
4
4
5
5
-
4,5
5,5
6,5
8
8
8
3
4
5
6
6
6
2,5
3
4
4,5
4,5
4,5
2
2,5
3
4
4
4
1,6
2
2,5
3
3
3
2,5
2,2
2
1,7
- 13 -
TPK 210 - 12 / 12kW
TPK 210 -12 /10,5kW
TPK 210 - 12 / 9kW
TPK 210 - 12 / 8kW
TPK 210 - 12 / 7kW
TPK 210 - 12 / 6kW
TPK 210 - 12 / 5kW
TPK 210 - 12 / 4kW
TPK 210 - 12 / 3kW
TPK 210 - 12 / 2,2kW
TPK 168 - 8 / 3kW
TPK 168 - 8 / 2,2kW
Heating time:
1,5
12 SPARE PARTS LIST









Housing cover
Gasket
Ceramic element 2.2 kW for single-phase connection
Ceramic element 3 kW for single-phase connection
Ceramic element 2 kW, 3 kW and 4 kW for three-phase connection
Thermostat
Control light
Thermostat knob
Set of bolts
More on www.dzd.cz
13 DISPOSAL OF PACKAGING MATERIAL
AND NON-FUNCTIONING PRODUCT
A service fee for providing return and recovery of packaging material has
been paid for the packaging in which the product was delivered. The service
fee was paid pursuant to Act No 477/2001 Coll., as amended, at EKO-KOM
a.s. The client number of the company is F06020274. Take the water tank
packages to a waste disposal place determined by the municipality. When the
operation terminates, disassemble and transport the discarded and
unserviceable heater to a waste recycling centre (collecting yard), or contact
the manufacturer.
1-11-2016
- 14 -
Open as PDF
Similar pages