Solar Pumping Inverter
User Manual
Just For You
Shenzhen JFY Tech. Co., Ltd.
I
Preface
Thank you very much for using the SPRING series of solar pumping inverter produced by
Shenzhen JFY Tech. Co., Ltd.
Please be sure to read this manual carefully before installation and use in order to give full play
to the performance of this product and ensure the safety of user and equipment.
Please preserve the manual in an orderly manner in order to subsequently facilitate the routine
inspection and maintenance of the inverter and find out the cause of abnormity and treatment
countermeasure.
If there are any puzzling questions or specific requirement during using, please contact the
distributors of our company or directly keep in touch with the technology service center of our
company.
The manual will be subject to change without any further notice.
II
Contents
Safety Instruction.............................................................................................................I
Chapter 1 Products Introduction.....................................................................................1
1.1 Introduction of Solar Pumping System..........................................................1
1.2 JFY Solar Pumping Inverter Features............................................................ 2
1.3 Inverter Specification..................................................................................... 3
Chapter 2 Installation and Wiring...................................................................................6
2.1 Purchase Inspection........................................................................................6
2.2 Dimension and Weight................................................................................... 6
2.3 Selecting the place of installation.................................................................. 8
Chapter 3 Operation Control........................................................................................ 14
3.1 Panel Layout and Instruction....................................................................... 15
3.2 Setting and Operating...................................................................................17
3.3 Function Parameter Definition.....................................................................20
3.4 Debugging before First Operation............................................................... 24
Chapter 4 Fault Diagnosis.............................................................................................26
4.1 Fault Code Description and Countermeasure.............................................. 26
4.2 Fault Inquiry and Reset .............................................................................. 29
Chapter 5 Service and Maintenance............................................................................. 30
5.1 Routine Inspection and Maintenance...........................................................30
5.2 Inspection and Replacement of the Damageable Part................................. 32
5.3 Storage and Warranty................................................................................... 33
Warranty Card............................................................................................................... 34
Packing List...................................................................................................................34
Warranty Agreement..................................................................................................... 35
III
JFY Technology
Safety Instruction
Safety Instruction
The equipment is provided with several labels, some of them with a yellow
background, which are related to safety issues.
Make sure to read the labels and fully understand them before installing the
equipment.
The symbols are:
Equipment grounding conductor (Main
grounding protective earth, PE)
Alternate Current (AC) value
Direct Current (DC) value
Phase
5minutes
To avoid risk of electric shock from energy
stored in capacitor, please wait for at least 5
minutes to access the conductor part of input
or output terminals of the inverter after it is
disconnected from the output of PV panel and
solar pump.
Caution: The temperature of metal enclosure
may be high during operation.
Disposal: Do not dispose of electrical appliances as
unsorted municipal waste, use separate collection
facilities. Contact your local government for information
regarding the collection systems available. If electrical
appliances are disposed of in landfills or dumps,
hazardous substances can leak into the groundwater and
get into the food chain, damaging your health and
well-being.
I
JFY Technology
Safety Instruction
 Purchase Inspection
Caution
1. Never install if you find inverter damage or lack of component, or else it
will cause occurrence of accident.
 Installation
Caution
1. To ensure a good convective cooling effect, the inverter must be installed
vertically with at least 10 cm space left in the top and bottom.
2. It’s suitable for indoor and outdoor installations. Install it in the indoor
location which is possessed of ventilation opening or ventilating device. It
is forbidden to install where exposes directly to the sunlight.
3. Do not let the drilling remains fall into the inverter fin or fan during
installation in case that heat dissipation is effected.
4. No user serviceable parts inside.
5. It can apply with all types of PV panel; the systems can operate with or
without earthing.
 Connection
Warning
1. Connection job must be performed by qualified electric professionals, or
else it will cause electrocution or fire.
2. Please confirm that input power has already been cut off before connection,
or else it will cause electrocution or fire.
3. Earth terminal must be reliably grounded, or else the inverter shell will have
a danger of being electrified.
4. The type selection of PV array, motor load and inverter must be reasonable,
or else the equipment will be damaged.
5. When the photovoltaic array is exposed to light, it supplies a D.C. voltage to
the PV inverter.
II
JFY Technology
Safety Instruction
Caution
1. Please use the fasten terminal of the specified torque, or else it will cause
fire.
2. Do not connect the output terminal of the inverter to the capacitor and
phase-advanced LC/RC noise filter. It is recommended to use the output
reactor when the distance between the inverter and motor load exceeds
100m.
 Running
Warning
1. Energize after confirming the correct connection or else it will damage the
inverter or cause fire.
2. Do not modify the connection during electrifying, or else it will cause
electrocution.
3. Don’t block any of the ventilation openings.
Caution
1. Adjust partial control parameters according to the steps indicated by the
manual before its first running. Do not change the control parameters of the
inverter randomly, or else it will cause damage to the equipment.
2. Because the heat sink's temperature is high during running, do not touch it
for a long time, or else it will cause burn.
3. In the condition of altitude over 1000m, the inverter should be derated for
use, that is, output current will be de-rated by 10% at every 1500 m
increment of height.
 Others
Warning
1. Maintenance and inspection must be performed by the qualified electric
professionals.
2. Do not dismantle the inverter during electrifying. Conduct maintenance and
inspection at least 5 minutes after the power off.
III
JFY Technology
Safety Instruction
3. It is absolutely forbidden to reconstruct the inverter by oneself, or else it
will cause personnel injury or equipment damage.
4. Treat the inverter as industrial waste when processing the abandoned
inverter. It is possible that the electrolytic capacitor will explode during
incineration and that part of components will produce toxic and harmful
gas.
5. Pollution degree classification: Pollution degree 3.
IV
JFY Technology
Products Introduction
Chapter 1 Products Introduction
1.1 Introduction of Solar Pumping System
Solar pumping systems produced by Shenzhen JFY Tech.Co.,Ltd can be applied
to daily use (underground water), agricultural irrigation, forestry irrigation, desert
control, pasture animal husbandry, water supply for islands, wastewater treatment
engineering, and so on. In recent years, with the promotion of the utilization of new
energy resources, solar pumping systems are more and more used in municipal
engineering, city centre squares, parks, tourist sites, resorts and hotels, the landscapes
and fountain systems in the residential areas.
The system is composed of a solar array, a pump and a solar pumping inverter
(see figure 1-1). Based on the design philosophy that it is better to store water than
electricity, there is no energy storing device such as storage battery in the system.
Fig. 1-1 Structure of solar pumping system
The PV array, an aggregation of many PV modules connected in series and in
parallel, absorbs sunlight radiation and converts it into electrical energy, providing
dynamical power for the whole system. The pumping inverter controls and adjusts the
system operation and converts the DC produced by the PV array into AC to drive the
www.jfy-tech.com
1
JFY Technology
Products Introduction
pump, and adjusts the output frequency in real-time according to the variation of
sunlight intensity to realize the maximum power point tracking (MPPT). The pump,
driven by 3-phase AC motor, can draw water from the deep wells or rivers and lakes
to pour into the storage tank or reservoir, or directly connect to the irrigation system,
fountain system, etc. According to the actual system demand and installation
condition, different types of pumps such as centrifugal pump, axial flow pump, mixed
flow pump or deep well pump can be used.
1.2 JFY Solar Pumping Inverter Features
Based on many years of development and experiment, the self-developed
pumping inverter (figure 1-1) by our company has the following features:
Adopting the proposed dynamic VI maximum power point tracking (MPPT)
control method which has independent intellectual property; Fast response speed and
stable operation; Better than the conventional methods which may lead to the
problems including poor tracking performances, unstable operation or even damaging
water hammer effects when the irradiation on the array changes rapidly.
 Digital control with full automatic running, data storage and complete
protective function
 The SPRING series of solar pumping inverter is produced to drive solar
pump, it is more professional and stably.
 The main components of the SPRING series of solar pumping inverter are
come from famous suppliers.
components
suppliers
country
IGBT module
Infineon
German
Capacitance
NCC
Japan
DSP
TI
America
 Option of up and down water level detection and control circuit is available.
 Protection level IP65 (machine type’s rated power less than 22 kW); ambient
temperature for using: -10 ~ +50˚C.
 Protective class: Class I; Overvoltage category PV: OVC II.
www.jfy-tech.com
2
JFY Technology
Products Introduction
Fig. 1-1 SPRING series of solar pumping inverter
1.3 Inverter Specification
Label and Type Description
Product label is stick to the right side of outer casing, which contains the
important information such as product series, voltage, power grade and SW and HW
version that’ll provide important basis for product application, maintenance and after
service.
www.jfy-tech.com
3
JFY Technology
Products Introduction
SPRING 2200 L
Output voltage(L:220V null:380V )
Power of motor(W)
Product series
Fig. 1-2 Product nameplate and type description
Caution: Do not tear off the product's nameplate label.
Product Specification and Technical Index
Model
SPRING
400L
SPRING
750L
SPRING
1100L
SPRING
1500L
SPRING
2200L
SPRING
3000
SPRING
4000
SPRING
5500
Max.
DC
input
vltage
(Vdc)
Recommended
PV
voltage
(Voc)
450
300-400
450
300-400
450
300-400
450
300-400
450
300-400
900
680-850
900
680-850
900
680-850
RecomMax.
Rated
Output Rated
mended Start
AC
output
frequ- output
MPP
voltage
output
power
ency voltage
voltage (Vdc)
current
(W)
(Hz) (Vac)
(A)
(Vdc)
3PH
150-400
150
550
3
0-50
220V
3PH
150-400
150
750
5
0-50
220V
3PH
150-400
150
1100
6
0-50
220V
3PH
150-400
150
1500
7
0-50
220V
3PH
150-400
150
2200
11
0-50
220V
3PH
500-680
200
3000
8
0-50
380V
3PH
500-680
200
4000
10
0-50
380V
3PH
500-680
200
5500
13
0-50
380V
www.jfy-tech.com
4
JFY Technology
SPRING
7500
SPRING
9200
SPRING
11K
SPRING
13K
SPRING
15K
SPRING
18K5
SPRING
22K
SPRING
26K
SPRING
30K
SPRING
37K
SPRING
45K
SPRING
55K
Products Introduction
900
680-850
500-680
200
7500
18
0-50
900
680-850
500-680
200
9200
21
0-50
900
680-850
500-680
200
11000
24
0-50
900
680-850
500-680
200
13000
28
0-50
900
680-850
500-680
200
15000
30
0-50
900
680-850
500-680
200
18500
39
0-50
900
680-850
500-680
200
22000
45
0-50
900
680-850
500-680
200
26000
54
0-50
900
680-850
500-680
200
30000
60
0-50
900
680-850
500-680
200
37000
75
0-50
900
680-850
500-680
200
45000
91
0-50
900
680-850
500-680
200
55000
112
0-50
3PH
380V
3PH
380V
3PH
380V
3PH
380V
3PH
380V
3PH
380V
3PH
380V
3PH
380V
3PH
380V
3PH
380V
3PH
380V
3PH
380V
Caution: Please be sure to select the appropriate model according to the PV
array and motor load.
Caution: High-power machine model uses multiple-channel DC input
structure.
The input power in the above table indicates total multi-channel input power;
maximum DC current input should not exceed 15A.
www.jfy-tech.com
5
JFY Technology
Installation and Wiring
Chapter 2 Installation and Wiring
2.1 Purchase Inspection
Our company has high quality assurance system in product manufacturing,
package, etc. If any abnormity is found, please immediately contact the distributors of
our company or directly keep in touch with the technology service center of our
company. We will solve the problems for you immediately. Once you get the product,
please confirm the following items:
Inspection item
Inspection method
Consistency with ordered
Inspect the product’s
product
nameplate label
Damage or exfoliation
Inspect whole appearance
phenomenon
Completeness of main machine
Check carefully according to
and accessories
the product list
Looseness of fastening parts
If necessary, inspect with
such as screw
screwdriver
2.2 Dimension and Weight
www.jfy-tech.com
6
JFY Technology
Installation and Wiring
Fig. 2-1 Product appearance and installation dimension
Model
Weight(Kg)
SPRING 400L
Appearance and installation dimension (mm)
L
W
H
6
478
325
155
SPRING 750L
8
478
325
155
SPRING 1100L
8
478
325
155
SPRING 1500L
10
478
325
155
SPRING 2200L
10
478
325
155
SPRING 3000
14
478
325
155
SPRING 4000
14
478
325
155
SPRING 5500
15
478
325
155
SPRING 7500
15
563
346
148
SPRING 9200
15
563
346
148
SPRING 11K
15
563
346
148
SPRING 13K
16
533
405
190
www.jfy-tech.com
7
JFY Technology
Installation and Wiring
SPRING 15K
16
533
405
190
SPRING 18K5
22
533
405
190
SPRING 22K
22
533
405
190
SPRING 26K
22
533
405
190
SPRING 30K
22
533
405
190
SPRING 37K
23
600
465
350
SPRING 45K
23
600
465
350
SPRING 55K
23
600
465
350
Caution: Most of SPRING series machine types are to be wall mounted. Please
ensure that the mounting backplane can support the weight of the inverter.
2.3 Selecting the place of installation
www.jfy-tech.com
8
JFY Technology
Installation and Wiring
Caution: Please identify with the plug to ensure the exact locations of the DC
input “PV+” and “PV-” sockets for different model.
Caution: Please ensure the AC output wiring based on the marks of the
sockets.
www.jfy-tech.com
9
JFY Technology
Installation and Wiring
Wiring Diagram

Fig. 2-2 SPRING wiring diagram
www.jfy-tech.com
10
JFY Technology
Installation and Wiring
A/O terminals` wiring diagram
Fig. 2-3 A/O terminals
www.jfy-tech.com
11
JFY Technology
Installation and Wiring
Socket
Terminal description
Connection description
PV+
To PV array positive
PV-
To PV array negative
PE
To Earth
U
To pump U phrase
V
To pump V phrase
W
To pump W phrase
+12V
Power for water level sensor
COM
The GND to +12V
S1
Auto start
S2
Water full(digital signal)
DC input
AC output
Water level sensor(digital)
S3
Water level sensor(analogue)
Water lack(digital signal)
+10V
Power for water level sensor
GND
The GND to +10V
AI2
Water full(analogue signal)
AI3
Water lack(analogue signal)
RS485+
485 communication
RS485-
485 communication
CANAH
CAN communication
CANAL
CAN communication
Caution: To ensure normal operation of the system, it is recommended to select
a suitable wire size according to the following table.
Recommended Wire Size Table
Recomm-e Recommended length≤
model
length≤
length≤
length≤ length≤
30m
60m
90m
120m
length≤
180m
210m
nded output
output
current(A)
voltage(V)
SPRING 400L
4
3HP 220V
0.75
1.5
1.5
2.5
2.5
4
4
SPRING 750L
5
3HP 220V
0.75
1.5
2.5
2.5
4
4
4
SPRING 1100L
6
3HP 220V
1
1.5
2.5
4
4
4
6
SPRING 1500L
7
3HP 220V
1
2.5
2.5
4
4
6
6
SPRING 2200L
11
3HP 220V
1.5
2.5
2.5
6
6
6
6
www.jfy-tech.com
150m
length≤
12
JFY Technology
Installation and Wiring
SPRING 3000
8
3HP 380V
1.5
2.5
2.5
6
6
6
6
SPRING 4000
9
3HP 380V
1.5
2.5
2.5
6
6
6
6
SPRING 5500
13
3HP 380V
2.5
2.5
4
6
6
6
6
SPRING 7500
18
3HP 380V
2.5
4
6
6
10
10
SPRING 9200
21
3HP 380V
4
4
6
10
10
10
SPRING 11K
24
3HP 380V
4
6
10
10
10
16
SPRING 13K
28
3HP 380V
6
6
10
10
10
10
SPRING 15K
30
3HP 380V
6
6
10
10
16
16
SPRING 18K5
39
3HP 380V
6
10
10
16
16
25
SPRING 22K
45
3HP 380V
10
16
16
25
25
SPRING 26K
54
3HP 380V
10
16
16
25
25
SPRING 30K
60
3HP 380V
10
16
25
25
35
SPRING 37K
75
3HP 380V
16
25
25
35
35
SPRING 45K
91
3HP 380V
25
35
35
50
SPRING 55K
112
3HP 380V
35
50
50
Units: mm2
Prompt: Ambient temperature condition for the above-recommended wire size
is ≤50°C.
www.jfy-tech.com
13
JFY Technology
Installation and Wiring
Prompt: High-power wall-mounting machine model uses multi-channel DC
input. Wire size of DC of each channel is selected and used as per the
recommendation in the above table.
Instruction of Float Water Level Switch
Description
1.The water level sensor is made
up of three bareness wires,
2. When the water level of the
cistern is high or the water level of
the namma is low, the solar
pumping inverter run; When the
water level of the cistern is low or
the water level of the namma is
high, the solar pumping inverter
stop.
3.The water sensors must be:
①signal 1 shortest
②signal 2 medium
③signal 3 longest
Caution: When use the water level sensors, Please connect high level signal
wire to A/O terminals S2 and COM; connect low level signal wire to A/O terminals
S3 and COM (see Fig.2-3).
www.jfy-tech.com
14
JFY Technology
Operation Control
Chapter 3 Operation Control
3.1 Panel Layout and Instruction
Solar pumping inverter uses LCD display operating panel which is shown as the
figure below, including 3 LED lamps, LCD display and 5 keys.
Fig. 3-1 Keyboard layout and name of each part
Indicator light and
Name
Function Description
key
Running
POWER
Green
Bright: Inverter is running
Yellow
Bright: Inverter is alarm
Red
Bright: System fault
indicator light
Alarm indicator
ALARM
light
Fault indicator
FAULT
light
www.jfy-tech.com
15
JFY Technology
Operation Control
Indicator light and
Name
Function Description
key
1. Starting control for the inverter;
Run /Stop key 2. Stop control for the inverter for long
press 2s.
1. Confirm the content to be viewed or
edited;
Enter/Program- 2. Confirm and save the parameter value
ming key
when the parameter is edited;
3. Quit from the display status of the
control parameter for long press 2s.
1. Increase the parameter number or its
Increment key
value when the status of the control
parameter is displayed;
1. Decrease the parameter number or its
Decrement key
value when the status of the control
parameter is displayed;
1. Switch the digit to be edited during
data editing.
Shift key
2. Viewing the running data when the
inverter is display in the main menu.
www.jfy-tech.com
16
JFY Technology
Operation Control
3.2 Setting and Operating
Inverter start-up and operation
Step 1: Ensure that the DC cable is connected correctly; unused DC plugs and
AC terminal cover is sealed.
Step 2: Connect the solar pump to the AC output terminals (see Fig.2-2). If
there have a AC switch between the pump and inverter (not suggest), Ensure the AC
switch is ON.
Step 3: Connect the PV array to the PV input terminals before ensure the DC
switch is OFF (see Fig.2-2).
Warning: It`s absolutely forbidden to turn on the AC switch when the inverter
is working, or may broken the inverter. The smart mind is turn off the DC switch first,
wait 5 minutes at least to avoid risk of electric shock from energy stored in capacitor,
then turn on the AC switch, and turn on the DC switch at last.
Ensure all the wires is corrected connect, turn on the DC switch, the LCD
display and power light will bright; then the inverter will drive the pump for wait 60
seconds.
Caution: There are two operation modes in the product; the factory set is
full-automatic operation:
1: Press
key to operate, the initial frequency value is determined by
S00.10, and then modifies the output frequency by pressing Increment key or
Decrement key. In this mode: it`s need to press
key to operate and long press
2s to stop.
2: Full-automatic operation: the inverter will start automatically if the sunlight is
strong enough, the output frequency will track automatically according to the sunlight.
The control cell array will export maximum power; in this mode, it isn`t need to
www.jfy-tech.com
17
JFY Technology
Operation Control
control the inverter, it will start automatically if the sunlight is strong enough and
stop when the sunlight is weak. It could only view running data and parameter, and
use DC switch to control the inverter if you want.
Once the solar pump inverter starts, it enters one of the following 3 states in
turn:
Standby: The PV array can only provide just enough voltage to minimum
requirements of the internal controller unit.
Try to working: When the PV array DC voltage is greater than 500V, the
inverter will try to working.
Normal: when the inverter operates and the PV array DC voltage is greater than
500V, the inverter will work normally.
The Inverter will keep MPPT function and drive the solar pump when it is in
normal operation. Maybe it will stop under the situation of low input DC-power,
don’t worry, it will automatically restart again when DC-power from the PV array is
sufficient.
Warning: The rated power of the pump exceed the inverter, it may broken the
inverter; if the rated power of the pump match the inverter, it isn`t need to edit the
parameter; if the rated power of the pump not exceed the inverter, it is need to edit the
parameter in following steps.
E.g. Inverter (7.5kW) drive the pump (5.5kW)
Operation
Description
Display
Enter the main
parameter
modification interface
for long press 2s
Represent:S00 parameter group
Initial status:
non-historical data
display
↓
↓
Press OK key to enter
the branch menu
Represent:S00.00
www.jfy-tech.com
18
JFY Technology
Operation Control
Operation
Description
Display
↓
Press UP key to view
the S00.01
Represent:S00.01
↓
↓
↓
↓
Press OK key to enter
the S00.01(the factory
set is 1)
Edited it to
0(controlled by
keyboard)
Press to save the
parameter value and
display the next code
number
Return the main
parameter modification
interface for long press 2s
Represent:1
Represent:0
Represent:S00.03
Represent:S00 parameter group
↓
Long press OK for 2s to
return to the initial status
Represent:Working freq. 50.00Hz
↓
Long press ON/OFF key
for 2s to stop the inverter.
↓
↓
Represent:Set freq. 50.00Hz
Enter the main
parameter
modification interface
for long press 2s
Represent:S00 parameter group
Press the UP key to
S02 group
Represent:S02 parameter group
↓
Press OK key to enter
the S02.01
Represent:S02.01
www.jfy-tech.com
19
JFY Technology
Operation Control
Operation
Description
Display
↓
and
Edited the rated power
to 5.5kW
Represent:5.5kW
↓
Press OK turn to
S02.02
Represent:S02.02
↓
Press UP key to
S02.05 and enter
Represent:S02.05
↓
and
Edited the rated
current of the pump(it
will write in pump)
e.g.11.3A
Represent:11.3A
↓
Press to save the
parameter value and
return to the branch menu
Represent:S00 parameter group
↓
Long press OK for 2s to
return to the main menu
Represent:S02 parameter group
↓
Press DOWN key to S00
parameter group.
Represent:S00 parameter group
↓
Press OK key to enter the
branch menu.
Represent:S00.00
↓
or
Press UP or DOWN
key to view the S00.01
Represent:S00.01
↓
Press OK key to enter
the S00.01.
Represent:0
www.jfy-tech.com
20
JFY Technology
Operation Control
Operation
Description
↓
Edited it to 1
(controlled by
terminals)
Press to save the
parameter value and
display the next code
number.
↓
Display
Represent:1
Represent:S00.03
↓
Long press OK for 2s to
return to the main menu.
Represent:S00 parameter group
↓
Long press OK for 2s to
return to the initial
status.
Represent:50.00Hz
↓
Turn off the DC switch,
waiting the LCD display
off, then turn on the DC
switch, the inverter will
auto-start to drive
pump(5.5kW)
Prompt: It can only view the control parameter during inverter operation. The
control parameter cannot be modified until the inverter stops running.
Instruction for Display Status
There are 3 kinds of status for operating panel display: running data display,
control parameter display, historical data display. The default status is the status of
running data display.
Press the
or
can control inverter run/ stop, Press the
and
to view/edit the parameter.
www.jfy-tech.com
21
JFY Technology
Operation Control
View running data
Operation
Description
Initial status: Current
running data
↓
Output frequency
of the inverter
↓
Set frequency of
the inverter
Display
Represent:50.00Hz
Represent:50.00Hz
↓
Input voltage of the
inverter
Represent:542.3V
↓
Output voltage of
the inverter
Represent:379V
↓
↓
↓
Output current of
the inverter
Represent:11.1A
The relative value
of rated power
Represent:79.1%
Output frequency
of the inverter
Represent:50.00Hz
www.jfy-tech.com
22
JFY Technology
Operation Control
View or modify the control parameter
Operation
Initial status:
non-historical data
display
↓
Description
Display
Enter the main
parameter
modification interface
for long press 2s
Represent:S00 parameter group
↓
or
Select the parameter to
be viewed and edited
Represent:S02 parameter group
↓
↓
Enter the branch
parameter
modification interface
Represent:S00.00
or
↓
Select the parameter to
be viewed and edited
Represent:S00.10
↓
Confirm the parameter
to be viewed or edited
Represent:50.00Hz
or
↓
Edited the parameter
Represent:40.00Hz
↓
Confirm the editing
and save the parameter
value
Display the next code
number
Represent:S00.11
↓
Quit to the main
parameter
modification interface
for long press 2s
Represent:S00 parameter group
www.jfy-tech.com
23
JFY Technology
Operation Control
Operation
Description
Display
Return to the main menu
for long press 2s
Represent:50.00Hz
Prompt: It can only view the control parameter during inverter operation. The
control parameter cannot be modified until the inverter stops running.
3.3 Function Parameter Definition
Factory
Number
Name
Scope
Description
set
value
0: Controlled by keyboard (the LED
off).
1: Controlled by terminal (the LED
S00.01
Control mode
0~2
1
flash).
2: Controlled by communication (the
LED light).
Maximum
10Hz ~
S00.03
output
S00.04 ~ 600Hz
50.00Hz
S00.05 ~ S00.03
50.00Hz
600Hz
frequency
Maximum
S00.06 ~
S00.04
running
S00.03
frequency
www.jfy-tech.com
24
JFY Technology
Operation Control
Factory
Number
Name
Scope
Description
set
value
Minimum
0.00 ~
S00.05
running
0.00 Hz~ S00.04
0.00Hz
S00.04
frequency
0. Set by keyboard
1. Set by AI1
S00.06
Frequency set
0 ~ 11
0
2. Set by AI2
3. Set by AI3
Running
0.00 ~
S00.10
Only set in manual control model
frequency set
S00.04
Acceleration
0.0 ~
S00.11
time
3600.0
Deceleration
0.0 ~
S00.12
time
3600.0
Rated power
0.1 ~
S02.01
50.00Hz
0.0 ~ 3600.0s
22s
0.0 ~ 3600.0s
10s
Set by
0.1 ~ 3000.0kW
of the motor
3000.0
model
Rated
0.01 ~
S02.02
frequency of
0.01 ~ S00.03
50.00Hz
www.jfy-tech.com
25
S00.03
the motor
JFY Technology
Operation Control
Factory
Number
Name
Scope
Description
set
value
Rated voltage
S02.04
Set by
0 ~ 1200 0 ~ 1200V
of the motor
Rated current
model
0.8 ~
S02.05
Set by
0.8 ~ 6000A
of the motor
6000
model
S1 terminal
S05.01
0. null
function
1. Running in forward model
S2 terminal
S05.02
2. Running in reverse model
function
0 ~ 63
7. Fault reset
0
S3 terminal
8. Run and stop
S05.03
function
42. PV inverter forbidden
S4 terminal
43. Water full
S05.04
function
Custom
0~
You must enter the password when
S07.00
0
password
65535
you want to view or edit parameter
Temperature
0~
S07.11
of the rectifier
100.0℃
module
www.jfy-tech.com
26
JFY Technology
Operation Control
Factory
Number
Name
Scope
Description
set
value
Temperature
0~
S07.12
of the inverter
100.0℃
module
0. null
Current fault
S07.27
0
1. IGBT Shortcut
type
2. Inc
over
Current/Dec
over
Current/Con over Current
S07.28
3. Inc over Volt/Dec over Volt/Con
over Volt
4. Vbus low
S07.29
S07.30
Fault type
5. Overload Tel
record
6. Overload VVVF
1~5
7. Scarce Phase Out
8. Inv Overtemp
9. Shortcut GND 1
S07.31
10. Curr test Fault
11. Lack load
www.jfy-tech.com
27
JFY Technology
Operation Control
Factory
Number
Name
Scope
Description
set
value
12. No Water
S07.32
13. Water Full
14. Com Fault
Prompt: Record is not made because of the under-voltage fault of input
voltage caused by the weakness of the sunlight intensity.
3.4 Debugging before First Operation
To ensure the efficient, reliable and stable operation of the solar pumping system,
professional electric technician must set partial parameters of the inverter according
to the system structure as following steps before first operation.
Steps
Debugging contents
Operating method
Modify the control
Modify the S00.01 value as 0. (in this mode, the
1
mode
Modify the rated
inverter controlled by keyboard)
Modify the S02.01 value follow the motor (Rated
2
power of the motor
power).
Modify the rated
Modify the S02.02 value follow the motor (Rated
3
frequency of the
frequency).
motor
Modify the rated
Modify the S02.04 value follow the motor (Rated
4
voltage of the motor
voltage).
www.jfy-tech.com
28
JFY Technology
Operation Control
Modify the rated
Modify the S02.05 value follow the motor (Rated
5
current of the motor
current).
Modify S15.00 parameter value as 0.
Modify S00.10 parameter value as 30.00. (in a
shining day)
Press the
key to run and observe water
yield from the outlet.
Confirm the motor
Long press
key to shut down and
6
wiring
change the order of output connection.
Press the
key to run and observe water
yield from the outlet.
Long press
key to shut down; select the
wiring method with larger water yield to ensure
the pump’s corotation.
Modify S00.10 parameter value as 10.00.
Press
Modify the minimum
7
operating frequency
key to run.
Observe the effluent of the water outlet.
If there is no effluent in the outlet, press
Increment key to slowly increase the output
frequency.
www.jfy-tech.com
29
JFY Technology
Operation Control
If there is effluent of the pump, record the
operating frequency f.
Modify the S00.05 parameter value as f
(shutdown frequency).
User sets S15.00 (operating mode) according to
his own demand.
0: Press
key to operate, the initial
frequency value is determined by S00.10, and
Set the operating
8
mode of the inverter
then modifies the output frequency by pressing
Increment key or Decrement key.
1: Full-automatic operation: the inverter will start
automatically if the sunlight is strong enough, the
output
frequency
will
track
automatically
according to the sunlight. The control cell array
will export maximum power.
Modify the control
Modify the S00.01 value as 1. (in this mode, the
9
mode
inverter controlled by terminals)
Caution: Please do not modify the control parameters of the inverter randomly,
or else it will cause abnormal working of the system.
www.jfy-tech.com
30
JFY Technology
Fault Diagnosis
Chapter 4 Fault Diagnosis
4.1 Fault Code Description and Countermeasure
SPRING series solar pumping inverter has perfect protection. When the system
fault occurs, the inverter will take protection measures: general protection measure is
to stop driving signals output of the motor (breakaway) immediately while the restart
is forbidden for a certain period of time.
It will automatically switch to the fault display unit when fault or protection
occurs. The fault code will be displayed in the middle of the LCD and flash. You can
cut off the input power supply and get electricity until the internal power supply is cut.
If the fault still exists after reset, please contact the manufacturer and make relevant
processing.
After the fault or protection to be reset is eliminated, the inverter will conduct
automatically a time-delayed restart. At this time the fault number will appear in the
left side of the LCD. The right will display the countdown of the restart, when the
countdown is 0, fault display unit will disappear automatically and operating status
data will be displayed.
Code
Code
Possible reason
Countermeasures
description
PV array
voltage is lower
Power off
to the start
When PV voltage is upto the
value
start value, pumping system
Too weak
will automatic start.
sunlight
intensity
www.jfy-tech.com
31
JFY Technology
Inc over
Volt
Dec over
Volt
Fault Diagnosis
Too high input
Over-voltage
Inspect PV array voltage
voltage
Con over
Volt
Too low input
voltage
Vbus low
Under-voltage
Inspect PV array voltage.
Too weak sunlight
intensity
Inc over
Too large pump
Current
load
Change low-power pump load
Dec over
Low PV array
Inspect PV array voltage
Current
voltage
Reduce the connection
Con over
Too long motor
between inverter and motor.
Current
wiring
Over-current
Too much
The rated power
power for the
of the pump not
Overload
Reduce the highest operating
Tel
frequency of the inverter.
pump
match the inverter
The rated power
Overload
Over load for
Change a smaller power of the
of the pump not
VVVF
the inverter
pump
match the inverter
www.jfy-tech.com
32
JFY Technology
Fault Diagnosis
Over-current of
Shorted output or
Inspect the connection
the IGBT
grounding
Turn to manufacturer for
module
Module damaged
service
Over-temperat-
Air duct blocked
IGBT
shortcut
Inv
Clear the air duct or improve
ure of the IGBT
Too high ambient
Overtemp
the ventilation condition
module
temperature
Error connection
Inspect the connection
IGBT module
Turn to manufacturer for
damaged
service
Error connection
Inspect the connection
Device or circuit
Turn to manufacturer for
damaged
service
Scarce
Output error
Phase Out
Shortcut
GND 1
Shorted to the
Ground
Curr test
CT fault
Fault
Pumping empty,
To check with water level,
pump wire are all
pump running
Lack load
pump wire connection, pump
broken, pump is
empty
rate is match with inverter
not match with
capacity or not.
inverter.
Pumping empty
Too low of the
No Water
To check with water level
A/O terminals
water level
A/O terminals connection
connection error
www.jfy-tech.com
33
JFY Technology
Fault Diagnosis
Cistern full
Too high of the
Water Full
To check with water level
A/O terminals
water level
A/O terminals connection
connection error
Restart
Communication
Device or circuit
Com Fault
Turn to manufacturer for
fault
damaged
service
4.2 Fault Inquiry and Reset
This series of inverters record the fault codes of the latest 5 times. Searching this
information will help find the fault cause. Fault information is stored together with
the control parameter, code numbers are S07.28~S07.32. Please refer to the keyboard
operation method to search and find out relevant information.
Caution: Completely check up on the fault cause and eliminate it before reset.
If it cannot be reset or goes wrong after reset, check up on the cause, because
continuous reset will damage the inverter.
Caution: Delay 5 minutes to reset during overload and overheat protection.
www.jfy-tech.com
34
JFY Technology
Service and Maintenance
Chapter 5 Service and Maintenance
5.1 Routine Inspection and Maintenance
Affected by ambient temperature, humidity, dust, vibration and internal device
aging of the inverter, the inverter will appear some potential problems during
operation. To make the inverter run stably for longer time, a periodic inspect must be
exerted every year.
Requirement of Inspection and Maintenance
The inspection must be performed by professional technical personnel, if
necessary, cut off power supply of the inverter first.
Avoid leaving the metal components in the inverter, or else it will cause damage
to the equipment.
Electric insulation test has been made on the inverter before it is leaving factory,
so the user doesn’t have to carry on a withstand-voltage test.
If it is necessary to conduct insulation test on the inverter, all the input and
output terminals must be reliably shorted. It is forbidden to conduct insulation test on
single terminal. Use the 500V megohmmeter to conduct the test.
It is forbidden to use the megohmmeter to test in the control circuit.
When conducting insulation test on the motor, you have to dismantle the
connection between motor and inverter.
Main Points for Inspection and Maintenance
Please use the inverter under environment recommended by this manual. Inspect
and maintain as per the following table.
Inspect
frequency
Routi Regul
ne
Inspection
Inspection content
Judgment standard
Running
1. temperature,
1. Temperature<50°C.
environme
humidity
2. Humidity <90%, no
item
ar
√
www.jfy-tech.com
35
JFY Technology
Service and Maintenance
Inspect
frequency
Routi Regul
ne
Inspection
Inspection content
Judgment standard
2. dust, gas
dew condensation.
item
ar
nt
No peculiar smell,
flammable,
explosive gas.
1. Excellent ventilation
1. Installation
in installation
environment
environment.
2. Radiator
2. Radiator air duct not
Cooling
√
system
blocked.
1. Stable vibration,
normal temperature of the
1. Vibration,
shell.
Inverter
temperature rise.
√
2. No abnormal noise and
body
2. Noise
peculiar smell.
3. Lead, terminal
3. Fastening screw not
loosen.
√
1. Vibration,
1. Steady running and
temperature rise.
normal temperature.
Motor
www.jfy-tech.com
36
JFY Technology
Service and Maintenance
Inspect
frequency
Routi Regul
ne
Inspection
Inspection content
Judgment standard
2. Noise
2. No abnormal and
item
ar
uneven noise.
1. Input voltage in the
Input and
√
1. Input voltage
specified scope.
2. Output current
2. Output current under
output
parameter
the rated value.
5.2 Inspection and Replacement of the Damageable Part
Filter Capacitor
Pulsating current of the main circuit will influence the performance of the
aluminum electrolytic filter capacitor, of which the degree will depend on the ambient
temperature and application condition. The inverter used under normal condition
should replace its electrolytic capacitor every 10 years. When the filter capacitor’s
electrolyte is leaking, safety valve bursting out or the capacitor main body expanding,
replace it immediately.
Cooling Fan
Of SPRING series of pumping inverter, all the inverters above SPRING 22kW
have cooling fans inside. Cooling fan’s service life is about 1, 5000 hours. If the fan
appears abnormal noise or produces vibration, replace it immediately.
www.jfy-tech.com
37
JFY Technology
Service and Maintenance
5.3 Storage and Warranty
Storage
If the storage is not used temporarily or stored for long time after purchasing, the
following notice should be paid attention to.
Avoid placing the inverter in high temperature or humid place or where there is
vibration and metal dust, and excellent ventilation should be ensured.
Inside filter capacitor performance of the inverter will decline for long–time
disuse. It is necessary to energize one time every 2 years to restore the performance
of the filter capacitor and inspect the inverter function at the same time. It is
necessary to increase the voltage through a DC power supply during energizing with
power-on time not less than 5 hours.
Warranty
The warranty of this inverter is 2 years. When any fault or damage occurs on the
product, within the warranty period, our company will provide free maintenance.
After the warranty time, we can provide lifetime paid warranty service.
Certain maintenance charge should be considered during warranty period if the
fault is caused by the following reason:
1. Fault caused by operating against the manual or surpass the standard
specification
2. Fault caused by self fix and modification without permission.
3. Fault caused by poor preservation
4. Fault by using the inverter in abnormal function
5. Machine damage caused by fire, salt corrosion, gas corrosion, earthquake,
storm, flood, lightning, abnormal voltage or other force majeure.
Prompt: Warranty only covers the body of the inverter.
www.jfy-tech.com
38
Warranty Card
Client name
Contact person
Client address
Telephone number
Product type
Date of purchase
Warranty length
Machine frame code
(From the leaving
factory day.)
Distributor (Seal)
Packing List
1.
2.
3.
4.
5.
Main machine, 1
Operation manual( including warranty card), 1
Plug of the positive electrode of the PV array, 1
Plug of the negative electrode of the PV array, 1
Water level sensor plug, 1 (matching)
39
JFY-tech WARRANTY
Warranty Policy:
Warranty Period: The JFY-TECH SPRING Series Solar pumping inverters
provided by Shenzhen JFY Tech. Co., LTD. (abbr. JFY-tech) have 24-month
warranty period. The system accessories provided by JFY-tech have 12-month
warranty period.
Warranty Time Start: From the date that you get goods from our
distributors.
Warranty Evidence: The Purchasing Invoice from the distributors &
Product Series No.
Note: JFY-tech will count from 2 months later according to ex-factory date
as the warranty start time if client fails to provide the purchasing invoice and
other documents.
Scope: Any damages that occur during the WARRANTY PERIOD will be
evaluated by Distributor and JFY-tech to define its scope and responsibility.
Warranty Principles:
To provide better service to JFY-tech’s end users, all JFY-tech’s authorized
distributors are requested to respond to end users’ warranty claim, and the
authorized distributors will replace any products or parts of the product during
the warranty period proved to be defective in design or manufacture. The
following cases will be excluded from the warranty (the Distributors are liable
for investigation of the following):
1) “Warranty Card” not being sent back to distributor or JFY-tech.
2) Product modified or design changed or parts replaced not approved by
JFY-tech.
3) Modifications, changes, or attempted repairs and erase series
number or seals by non JFY-tech’s technician.
4) Incorrect installation or commissioning
5) Failure to observe the applicable safety regulations (G59-2.)
40
6) The Product has been improperly stored and damaged while being stored
by the end user.
7) Transport damage, Painting scratch caused by shipping pumping. It
should declare to insurance company as soon as containers unload with
enough evidence.
8) Failure to observe the user manual, the installation guide, and the
maintenance regulations
9) Incorrect use or inappropriate operation
10)
Insufficient ventilation of the device
11)
The maintenance procedures relating to such product have not been
observed or performed to an acceptable standard.
12)
Force majeure (e.g., lightning, overvoltage, storm, fire)
Claims that go beyond the rights cited in the warranty principles, in
particular claims for compensation for direct or indirect damages arising
from the defective device, for compensation for costs arising from
disassembly and installation, or loss of profits are not covered by JFY-tech’s
warranty, insofar JFY-tech is not subject to statutory liability.
Warranty Claim Procedure:
Please report defective devices with a brief error description to the
JFY-tech’s distributors. If we agree to a replacement, we generally send an
equivalent replacement device according to model and age, the remainder of
the warranty entitlement will be transferred to the replacement device. In this
case, you do not receive a new certificate since your entitlement is documented
at JFY-tech. The replacement will be packaged appropriately for transport and
shipped out within 2 working days. The defective device is to be packed in this
transport packaging for return transport to the distributor. If the on-site service
of re-installation is necessary, the end customers need to negotiate with the
distributors in advance. All warranty services in warranty period are free of
charge.
41
Contact JFY
Shenzhen JFY Tech. Co., LTD
ADD: 5th Floor, 12th Block, Nangang Second Industrial Park, Nanshan
District, Shenzhen, P.R.China
Tel: +86-755-26632536
Fax: +86-755-26505986
Email: support@jfy-tech.com
42