I N S T A L L A T I O N I N S T R U C T I O N S
LVS1U LVSXU
ConnexSys™ Video Wall Mounting System
Spanish Product Description
German Product Description
Portuguese Product Description
Italian Product Description
Dutch Product Description
French Product Description
LVS1U / LVSXU
LVS1U / LVSXU
DISCLAIMER
Milestone AV Technologies and its affiliated corporations and subsidiaries (collectively "Milestone"), intend to make this manual accurate and complete. However, Milestone makes no claim that the information contained herein covers all details, conditions or variations, nor does it provide for every possible contingency in connection with the installation or use of this product. The information contained in this document is subject to change without notice or obligation of any kind. Milestone makes no representation of warranty, expressed or implied, regarding the information contained herein. Milestone assumes no responsibility for accuracy, completeness or sufficiency of the information contained in this document.
Installation Instructions
WARNING:
Exceeding the weight capacity can result in serious personal injury or damage to equipment! It is the installer’s responsibility to make sure the combined weight of all components attached to the LVS1U/LVSXU does not exceed maximum weights listed in table below.
MODEL
LVS1U
LVSXU
Maximum Weight Allowed
150 lbs
(68.0 kg)
150 lbs
(68.0 kg)
Chief®, ConnexSys™, RapidDraw™, and PowerZone™ are trademarks of Milestone AV Technologies. All rights reserved.
IMPORTANT SAFETY INSTRUCTIONS
WARNING:
A WARNING alerts you to the possibility of serious injury or death if you do not follow the instructions.
CAUTION:
A CAUTION alerts you to the possibility of damage or destruction of equipment if you do not follow the corresponding instructions.
WARNING:
Failure to read, thoroughly understand, and follow all instructions can result in serious personal injury, damage to equipment, or voiding of factory warranty! It is the installer’s responsibility to make sure all components are properly assembled and installed using the instructions provided.
WARNING:
Failure to provide adequate structural strength for this component can result in serious personal injury or damage to equipment! It is the installer’s responsibility to make sure the structure to which this component is attached can support five times the combined weight of all equipment.
Reinforce the structure as required before installing the component.
IMPORTANT ! :
The video wall system ships either with rails
(LVS1U) or without rails (LVSXU). If you’re installing a video wall of LVSXU mounts you will need to provide the strut channel for mounting to the wall. (See LET’S GET STARTED!
Measurements You’ll Need section for further information.)
IMPORTANT ! :
The LVS1U/LVSXU is designed to be mounted to:
• a bare 8" thick solid concrete wall. Fasteners must be placed a minimum of 16" (406mm) and a maximum of
24" (610mm) apart AND within 9" (230mm) of each end of the rail/strut channel.
• a 5/8" minimum thickness plywood-backed, steel stud wall covered with drywall having a maximum thickness of 5/8". Fasteners must be placed a maximum of 8"
(203mm) apart AND in last slots on each end of rail/ strut channel.
• a 2" x 4" wood stud wall covered with drywall having a maximum thickness of 5/8". Fasteners must be placed a minimum of 16" (406mm) and a maximum of 24"
(610mm) apart AND within 9" (230mm) of each end of the rail/strut channel.
--SAVE THESE INSTRUCTIONS--
WARNING:
Use this mounting system only for its intended use as described in these instructions. Do not use attachments not recommended by the manufacturer.
WARNING:
Never operate this mounting system if it is damaged. Return the mounting system to a service center for examination and repair.
WARNING:
Do not use this product outdoors.
2
Installation Instructions
TABLE OF CONTENTS
IMPORTANT SAFETY INSTRUCTIONS ....................................2
TABLE OF CONTENTS ...............................................................3
LEGEND ......................................................................................4
DIMENSIONS ..............................................................................5
TOOLS REQUIRED FOR INSTALLATION .................................6
PARTS .........................................................................................6
LET’S GET STARTED! Measurements You’ll Need ....................7
STRUT CHANNEL REQUIREMENTS (LVSXU) ..........................8
MOUNTING PATTERN OFFSET CALCULATION ......................8
ATTACHING STRUT CHANNEL OR RAIL .................................9
HANGING LVS1U/LVSXU MOUNT ON RAIL .............................10
Preparing Strut Channel (LVSXU only) ..................10
Hanging Mounts .....................................................10
INSTALLING INTERFACE BRACKETS ......................................11
ADDING DISPLAYS TO MOUNTS ..............................................11
ADJUSTMENTS ..........................................................................12
COMPLETING THE INSTALLATION ..........................................14
Cable Management Clips .......................................14
Security ...................................................................14
FASTENER INSTALLATION METHODS ....................................14
Wood Stud ..............................................................14
Concrete .................................................................14
Plywood-Backed Steel Stud ...................................15
SERVICE .....................................................................................16
Extending and Retracting Mount ............................16
Interface Bracket Kickstands ..................................16
RapidDraw Display Release ...................................16
LVS1U / LVSXU
3
LVS1U / LVSXU
LEGEND
Tighten Fastener
Apretar elemento de fijación
Befestigungsteil festziehen
Apertar fixador
Serrare il fissaggio
Bevestiging vastdraaien
Serrez les fixations
Loosen Fastener
Aflojar elemento de fijación
Befestigungsteil lösen
Desapertar fixador
Allentare il fissaggio
Bevestiging losdraaien
Desserrez les fixations
Phillips Screwdriver
Destornillador Phillips
Kreuzschlitzschraubendreher
Chave de fendas Phillips
Cacciavite a stella
Kruiskopschroevendraaier
Tournevis à pointe cruciforme
Open-Ended Wrench
Llave de boca
Gabelschlüssel
Chave de bocas
Chiave a punte aperte
Steeksleutel
Clé à fourche
By Hand
A mano
Von Hand
Com a mão
A mano
Met de hand
À la main
Hex-Head Wrench
Llave de cabeza hexagonal
Sechskantschlüssel
Chave de cabeça sextavada
Chiave esagonale
Zeskantsleutel
Clé à tête hexagonale
4
Installation Instructions
Adjust
Ajustar
Einstellen
Ajustar
Regolare
Afstellen
Ajuster
Remove
Quitar
Entfernen
Remover
Rimuovere
Verwijderen
Retirez
Pencil Mark
Marcar con lápiz
Stiftmarkierung
Marcar com lápis
Segno a matita
Potloodmerkteken
Marquage au crayon
Drill Hole
Perforar
Bohrloch
Fazer furo
Praticare un foro
Gat boren
Percez un trou
Optional
Opcional
Optional
Opcional
Opzionale
Optie
En option
Security Wrench
Llave de seguridad
Sicherheitsschlüssel
Chave de segurança
Chiave di sicurezza
Veiligheidssleutel
Clé de sécurité
Installation Instructions
DIMENSIONS
LVS1U / LVSXU
LVS1U
3.99
101.4
MIN DEPTH
1.00
25.4
HEIGHT
ADJUST
17.47
443.7
27.56
[700]
MAX DISPLAY
PATTERN WIDTH
DIMENSIONS: INCHES
[MILLIMETERS]
LVSXU
3.99
101.4
MIN DEPTH
1.00
25.4
HEIGHT
ADJUST
17.47
443.7
27.56
[700]
MAX DISPLAY
PATTERN WIDTH
WALL RAILS NOT INCLUDED IN LVSXU VERSION. WALL RAILS
SHOWN FOR DEPTH AND POSITION MEASUREMENTS. 13/16" WALL
STRUT SHOWN. IF USING DEEPER CHANNEL ADD IN THE
ADDITIONAL DEPTH.
DIMENSIONS: INCHES
[MILLIMETERS]
5
LVS1U / LVSXU
TOOLS REQUIRED FOR INSTALLATION
Installation Instructions
7/32"
3/8"
7/16"
1/2"
3/8" nut driver
7/16"
1/2"
3/8"
7/16"
1/2"
#2
M3 x 6"
(included)
PARTS
M (10)
1/4"
N (10)
#14 x 1-1/2"
Plywood-backed Walls
Install Hardware Kit
Display Hardware Kit
(Letters correspond to letters on bag)
Concrete and Wood Stud Walls
Install Hardware Kit
K (4)
5/16" A (4)
M6 x 12
B (4)
M6 x 16
E (4)
.75x.344x.5
F (4)
M8 x 12
C (4)
M6 x 30
G (4)
M8 x 16
D (4)
3/16"
J (4)
UX10 x 60
H (4)
M8 x 25
L (4)
5/16" x 2-1/2"
P (8)
[7-1/2" cable tie]
Q (4)
[Cable clip]
Cable Management Kit
R (2)
[Outer stop
clamp]
S (2)
[Inner stop
clamp]
T (2)
1/4-20 x 1/2"
(LVSXU only)
W (1)
M3 x 6"
X (2)
[Interface
bracket]
U (1)
[LVS1U assembly]
V (1)
[Rail]
(LVS1U only)
OR
Y (1)
[Label sheet]
PowerZone™ Adjustment Guide
Z (1)
U (1)
[LVSXU assembly]
6
Installation Instructions
LET’S GET STARTED! Measurements You’ll Need
LVS1U / LVSXU
Description
A -
Number of displays in each row
B -
Number of displays in each column
C -
Width of individual display
D -
Height of individual display
E -
Total width -
(A) x (C)
F -
Floor to bottom of display (bottom row) OR Ceiling to top of display
(top row)
G -
1/2 height of display
(D) / 2
H -
Display mounting pattern offset. (Only applies to some displays.
Calculation instructions on next page.)
I -
Strut channel length
* (E) – 4" (102mm)
(LVSXU only)
J -
Number of strut channel lengths
(B) x 2
(LVSXU only)
Measurement
*
Check with your local strut channel dealer to determine the lengths available. You may need to buy multiple pieces or cut longer pieces down to size.
CEILING
I
F
C
D
G
E
Figure 1
F
FLOOR
7
LVS1U / LVSXU
STRUT CHANNEL REQUIREMENTS (LVSXU)
IMPORTANT ! : Strut channel must be made of steel with a minimum yield strength of 33ksi (230MPa), and meeting the profile and dimension requirements outlined.
Table 1: Strut Channel Dimension Requirements
STEEL THICKNESS
14 ga [0.075"] (2.5mm)
12 ga [0.104"] (3mm)
14 ga or 12 ga
DIMENSION (See Figure 2)
K = 13/16" (21mm)
13/16" (21mm) < K < 3-1/4" (83mm)
L (minimum) = 1/4" (6mm)
L (maximum) = 9/32" (7mm)
Installation Instructions
UNACCEPTABLE strut channel profiles
Strut channel MUST have rolled up lips on both sides of channel.
Figure 3
Strut channel MUST NOT have holes or slots on side walls of channel.
L
Strut Channel Profile
1-5/8"
(41mm)
7/8"
3/8"
(10mm)
(22mm)
K
IMPORTANT! All dimensions other than "L" and "K"
are nominal requirements.
Figure 2
MOUNTING PATTERN OFFSET CALCULATION
Center line of display Mounting pattern of display
8
Center line of mounting pattern
Offset (H)
NOTE: An offset measurement (H) is required if the centerline of the display does not match the centerline of the display mounting pattern.
1. If display mounting pattern is BELOW display centerline: 8-3/4" - H = Distance from display centerline to rail
mounting location.
2. If display mounting pattern is ABOVE display centerline: 8-3/4" + H = Distance from display centerline to rail mounting location.
Figure 4
Installation Instructions
ATTACHING STRUT CHANNEL OR RAIL
IMPORTANT ! : Reference measurements noted on page 7.
1.
Mark distance (F) from floor to desired location for bottom of display OR from ceiling to desired location for top of display (if installing top row first). (See Figure 1) and (See
Figure 5)
2.
Mark distance (G) from bottom of display (or top of display) to center line of display. (See Figure 1) and (See Figure 5)
3.
Measure up 8-3/4" (222mm) from centerline of display and mark location for top strut channel/rail attachment.
NOTE:
If an offset measurement (H) is needed (See Figure 4):
• If display mounting pattern is BELOW display centerline, measure up: 8-3/4" (222mm) - H
• If display mounting pattern is ABOVE display centerline, measure up: 8-3/4" (222mm) + H
4.
Level and attach strut channel/rail (V) using the provided hardware. See Parts drawing, (See Figure 5) and (See
Table 2).
5.
Mark distance (D) (up or down) from first strut channel/rail slots and mark location of next row of strut channel/rail.
6.
Repeat for remaining rows of strut channels/rails.
7.
(LVSXU only) Proceed to Hanging LVS1U/LVSXU Mount
On Rail section.
8.
(LVS1U only) Measure over (C) (width of display) from center of first installed rail, level and mark location of adjacent rail. (See Figure 1) and (See Figure 5)
9.
Repeat Step 8 for remaining rails in that row.
LVS1U / LVSXU
10. Attach upper rails (V) using Fastener Information. (See
Table 2)
11. Measure up from attached rails the distance (D) and mark for next row of rails (V). (See Figure 1) and (See Figure 5)
12. Repeat Steps 4 - 10 for that row of rails.
13. Repeat Step 11 for any remaining rows of rails (V).
IMPORTANT ! :
See Fastener Installation Methods section at end of Installation Instructions for details on installing product into various wall types.
Table 2: Fastener Information
WALL
TYPE
Drywall attached to plywoodbacked walls
/Steel studs
Wood stud
(2" x 4")
Concrete
PILOT
HOLE
FASTENERS (see PARTS drawing)
N/A #14 x 1-1/2" hex slot head screw
(N) & 1/4" washer (M). Fasteners placed a maximum of 8" (203mm) apart AND in last slots on each end of strut channel.
7/32" x 3" 5/16 x 2-1/2" hex head lag (L) &
5/16" washer (K). Fasteners placed at stud locations, min. 16" (400mm) and max. 24" (610mm) AND within 9"
(230mm) of each end of the rail/strut channel.
3/8" x 3" 5/16 x 2-1/2" hex head lag (L) &
Fischer UX10x60 anchor (J).
Fasteners placed a min. 16" (400mm) and max. 24" (610mm) apart AND within 9" (230mm) of each end of the rail/strut channel.
Ceiling
1
I
C
D
3
2
Centerline - display
H
7
C
Top strut channel - LVSXU
5
D
Top rail - LVS1U 3
Centerline - display
2
Figure 5
1
Floor
9
LVS1U / LVSXU
HANGING LVS1U/LVSXU MOUNT ON RAIL
Preparing Strut Channel (LVSXU only)
1.
On the top rail, slide one inner stop clamp (S) into end of strut channel section. (See Figure 6)
2.
Fasten outer stop clamp (R) to inner stop clamp (S) using one 1/4-20 x 1/2" hex head screw (T). (See Figure 6)
3.
Repeat for each end of each top section of strut channel.
Stop clamp fastened in place at each end of upper row of strut channel
3 lower strut channel
3
Installation Instructions side view wall strut channel
upper lip
(S)
(R) 1
2
(T)
Figure 6
Hanging Mounts
1.
Lift mount and hang it on lower lip of upper strut channel or rail (V). (See Figure 7) lower lip of strut channel or rail mount hooks
Figure 8
4.
Tighten two hex head fasteners at bottom of each mount.
(See Figure 8)
1
RapidDraw pull cord
1
5 x 2
(LVS1U shown as example)
Figure 7
2.
Repeat for remaining mounts in that row, and slide mounts along strut channels to desired location.
3.
LVSXU only: Add lower strut channel to bottom of all mounts in row by lifting strut channel up from below mounts and setting upper lip of strut channel onto mounts’ latching hooks. (See Figure 8)
10
Figure 9
5.
Fasten bottom rail (LVS1U) or lower strut channel (LVSXU) to wall using the provided hardware. See Parts drawing, and (See Table 2).
6.
Extend RapidDraw pull cord to bottom row of displays so that it is accessible, re-tie to correct length and label the pull cord using label (Y) so that it is identifiable. (See Figure 9)
IMPORTANT ! : See Service section for more information on properly configurating the RapidDraw cord and display release.
7.
Repeat Attaching Strut Channel or Rail and Hanging
LVS1U/LVSXU Mount On Rail sections for each row of displays.
Installation Instructions
INSTALLING INTERFACE BRACKETS
1.
Place displays face down on a soft, non-abrasive surface.
CAUTION:
Using screws of improper diameter may damage your display! Proper screws will easily thread into display mounting holes.
2.
Select screw diameter by examining hardware (A-C and F-H)
(6mm or 8mm) and comparing with mounting holes on display. (See Figure 10)
3.
Select spacers:
• Spacers are NOT required if mounting holes are not recessed and interface brackets (X) can lay flat against display.
•
Spacers (E) ARE required if mounting holes are recessed, or if protrusions prevent interface brackets
(X) from laying flat.
LVS1U / LVSXU
5.
Make sure diamond on interface brackets is even with center of display. (See Figure 10)
6.
Use selected screws (A-C or F-H), washers (D, if using screws A, B or C) and spacers (E), if necessary, to connect interface brackets (X) to back of display. (See Figure 10)
ADDING DISPLAYS TO MOUNTS
1.
Raise display with attached interface brackets and hook top of brackets into top of mount. (See Figure 11)
2.
Slowly bring bottom of display in towards mount until it clicks into place.
3.
Repeat Steps 1 and 2 for remaining mounts in that row.
(LVS1U shown
as example)
Interface bracket hooked over mount
CAUTION:
Using screws of improper length may damage your display! Proper screws will have adequate thread engagement without contacting bottom of display mounting holes.
4.
Select screw length: (See Figure 10)
• By hand, insert SHORTEST length screw of selected diameter (A or F) through 3/16" washer (D, if using screw A), bracket (X), selected spacer (E, if required), into display mounting hole. Do NOT thread screw into hole at this time.
• Proper screw length requires base of screw head to protrude above flat washer (if flat washer is used) a
distance equal to or greater than the screw diameter. If screw length is inadequate, select longer screw. Select
shortest screw which will protrude the required distance.
1
1
4
6
(D) x 4
(A-C or F-H) x 4
5
Match diamond with center of display
5
4
(Display not shown)
Figure 11
4.
The displays can be easily removed by pulling both interface bracket cords down. (See Figure 11)
5.
Pull the bottom of the display out.
6.
Lift up display to lift hooks off the mount.
(X)
(E) x 4, if required
Bracket kickstand may be raised to allow hardware attachment
Figure 10
11
LVS1U / LVSXU
ADJUSTMENTS
NOTE:
The following steps are also referenced on the next page (See Figure 16) and the PowerZone
Adjustment guide (Z).
1.
Place the level against the front of the display and use knob
(#1 in Figure 16) to straighten the tilt. (See Figure 12)
3
Installation Instructions
1
Figure 12
2.
Place a level on top of display and use the knobs at the top of the interface brackets (#2 in Figure 16), to raise/lower each side of display and level the display. (See Figure 13) and (See Figure 16)
Figure 14
4.
Slide latch mechanism until tab sits flush against the interface bracket.
5.
Pull tab forward to lock latch mechanism to interface bracket. (See Figure 15)
6.
Push latch down to engage the micro lateral adjustment knobs (#4B and #4C). (See Figure 15) and (See Figure 16)
7.
Turn micro lateral adjustment knobs clockwise to move display toward knob end until displays are in correct position. (See Figure 16)
Latch
Tab
(Display not shown)
Interface bracket
4
5
6
2
2
3
Figure 13
3.
Place level across face of adjoining screens and adjust depth (#3 in Figure 16) to make displays flush across the front of the video wall. (See Figure 14) and (See Figure 16)
12
Figure 15
Installation Instructions LVS1U / LVSXU
Figure 16
13
LVS1U / LVSXU
COMPLETING THE INSTALLATION
Cable Management Clips
1.
Place cable clip (Q) into rail and turn 90° in either direction until cable clip is vertical. (See Figure 17)
2.
Route cables and RapidDraw release cords along rails, through cable clips.
3.
Fasten cables and cords to cable clips (Q) using cable ties
(P).
Installation Instructions
FASTENER INSTALLATION METHODS
IMPORTANT ! : (See Table 2) for appropriate hardware and pilot hole sizes for various wall types.
Wood Stud
1.
Use one 5/16" x 2-1/2" lag bolt (L) through product and into pilot hole. (See Figure 19)
2.
Repeat for remaining pilot holes.
1
(Q)
Figure 17
Security
The displays may be secured to the mounts by using a padlock
(not included) through the bottom of the interface brackets.
(See Figure 18)
NOTE:
Padlock must have a 1/4" (6mm) shackle diameter.
1
2
(L) x 2
Figure 19
Concrete
1.
Install one UX10 x 60 anchor (J) into each pilot hole using a hammer, making sure that the anchor is flush with the wall.
(See Figure 20)
2.
Use one 5/16" x 2-1/2" lag bolt (L) through product into each anchor in wall.
1 (J)
Figure 18
Insert padlock
2 (L)
Figure 20
14
Installation Instructions LVS1U / LVSXU
Plywood-Backed Steel Stud
1.
Use one #14 x 1-1/2" hex-head washer slot head screw (N) and one 1/4" washer (M) through strut channel or rail. (See Figure 21)
If back side of wall is unfinished, drywall must be installed to a minimum of one stud left and right of the stud(s) being used to install the mount. Drywall must be secured to studs with screws a maximum of 12" (305mm) apart down center of stud.
16" or 24" (on center) Studs
There must be a minimum of
1-7/8" (48mm) clearance inside wall
Plywood
5/8" minimum thickness plywood (5 layers) covered with drywall having maximum thickness of 5/8"
FRONT
5/8" maximum drywall thickness
(Both Sides of Stud)
Steel Stud (2 x 4 / 25ga minimum)
Stud type and structural strength must conform to the North American
Specification for the Design of Cold-Formed Steel Structural Members.
[362 S 125 18, C-Shaped, S-Stud Section]
Figure 21
15
LVS1U / LVSXU
SERVICE
Extending and Retracting Mount
The mounts may be extended and retracted only in a service situation.
1.
To Extend Mount: Pull on the RapidDraw release cord designated for the specific mount.
2.
When the mount releases, carefully grasp bezel edges of display and pull out slowly, being careful to clear surrounding displays.
3.
To Retract Mount: Carefully push against display bezel edges, being careful to clear surrounding displays.
4.
Push display against mount until it clicks into place.
Installation Instructions
RapidDraw Display Release
The RapidDraw pull cord and display release allows easy service access to any specific display in the video wall.
Each mount ships with the pull cord installed. It is installed so that when pulled from below the mount or from the right of the mount it will release the display for service.
The following steps should be taken if an installation requires that the pull cord be accessible from the left of the display or
above the display:
1.
Unhook the pull cord from the mount. (See Figure 23)
2.
Reinstall the pull cord in the opposite hole on the mount.
(See Figure 23)
Interface Bracket Kickstands
The interface brackets are equipped with kickstands which must only be used in a service situation.
1.
Pull down on interface bracket release cords. (See Figure 22)
2.
Pull out bottom of display.
3.
Flip down the kickstands on both interface brackets, and prop against mount during service.
Mount ships with cord attached here
2
To release display from left or above, reinstall cord here
2
1
Interface bracket release cords
Kickstand
3
(Display not shown)
Figure 22
4.
After service, hold display while flipping up both kickstands.
5.
Slowly bring bottom of display in towards mount until it clicks into place.
16
Figure 23
LVS1U / LVSXU Installation Instructions
17
Installation Instructions LVS1U / LVSXU
18
LVS1U / LVSXU Installation Instructions
19
LVS1U / LVSXU Installation Instructions
Chief, a products division of
Milestone AV Technologies
8800-002523 Rev00
2014 Milestone AV Technologies www.chiefmfg.com
03/14
USA/International A 6436 City West Parkway, Eden Prairie, MN 55344
P 800.582.6480 / 952.225.6000
Europe
F 877.894.6918 / 952.894.6918
A Franklinstraat 14, 6003 DK Weert, Netherlands
P +31 (0) 495 580 852
Asia Pacific
F +31 (0) 495 580 845
A Office No. 1 on 12/F, Shatin Galleria
18-24 Shan Mei Street
Fotan, Shatin, Hong Kong
P 852 2145 4099
F 852 2145 4477
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 2 IMPORTANT SAFETY INSTRUCTIONS
- 3 TABLE OF CONTENTS
- 4 LEGEND
- 5 DIMENSIONS
- 6 TOOLS REQUIRED FOR INSTALLATION
- 6 PARTS
- 7 LET’S GET STARTED! Measurements You’ll Need
- 8 STRUT CHANNEL REQUIREMENTS (LVSXU)
- 8 MOUNTING PATTERN OFFSET CALCULATION
- 9 ATTACHING STRUT CHANNEL OR RAIL
- 10 HANGING LVS1U/LVSXU MOUNT ON RAIL
- 10 Preparing Strut Channel (LVSXU only)
- 10 Hanging Mounts
- 11 INSTALLING INTERFACE BRACKETS
- 11 ADDING DISPLAYS TO MOUNTS
- 12 ADJUSTMENTS
- 14 COMPLETING THE INSTALLATION
- 14 Cable Management Clips
- 14 Security
- 14 FASTENER INSTALLATION METHODS
- 14 Wood Stud
- 14 Concrete
- 15 Plywood-Backed Steel Stud
- 16 SERVICE
- 16 Extending and Retracting Mount
- 16 Interface Bracket Kickstands
- 16 RapidDraw Display Release