- Computers & electronics
- Computer cables
- Signal cables
- Cisco Systems
- uBR10-MC5X20H
- Getting started guide
Cisco Systems uBR10-MC5X20H Getting Started Guide
Add to my manuals3 Pages
Cisco Systems uBR10-MC5X20H is an advanced cable interface line card that enhances your network with its exceptional capabilities. It utilizes 75-ohm precision video coax cables and MCX connectors to seamlessly connect to CMTS. With this line card, you can leverage its dual-shielded or quad-shielded cable options to suit your specific requirements, ensuring reliable data transmission.
advertisement
Quick Start Guide
Is Cisco documentation helpful? Click here or go to http://forums.cisco.com/eforum/servlet/viewsflash?cmd=s howform&pollid=rtgdoc01!rtgdoc
to give us your feedback.
Cabling the
Cisco uBR10-MC5X20S/U/H
Cable Interface Line Card with
Universal Cable Holder—UCH2
Warning Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Caution Use an ESD-preventive wrist or ankle strap during the line card installation.
1
Feature Description
The Cisco uBR10-MC5X20S, U and H cable interface line cards use 75–ohm precision video coax cables and 75–ohm MCX connectors to connect to the CMTS.
This document describes how to install and remove cables and the second generation universal cable holder (UCH2).
Figure 1 shows the cards in a Cisco uBR10012
router.
Figure 1 Cisco uBR10-MC5X20S/U/H Cards
Downstream
US15
US16
US17
US18
US19
US10
US11
US12
US13
US14
DS0
RF
DS1
RF
DS2
RF
DS3
RF
DS4
RF
DS0
RF
DS1
RF
DS2
RF
DS3
RF
DS4
RF
US5
US6
US7
US8
US9
US0
US1
US2
US3
US4
PO
W ER
STA
TU
S
MA
INT
Upstream
US0
US1
US2
US3
US4
US5
US6
US7
US8
US9
DS0
DS1
DS2
DS3
DS4
US15
US16
US17
US18
US19
US10
US11
US12
US13
US14
US5
US6
US7
US8
US9
US0
US1
US2
US3
US4
US5
US6
US7
US8
US9
US0
US1
US2
US3
US4
US0
US1
US2
US3
US4
US5
US6
US7
US8
US9
US0
US1
US2
US3
US4
US5
US6
US7
US8
US9
US0
US1
US2
US3
US4
US5
US6
US7
US8
US9
US15
US16
US17
US18
US19
US10
US11
US12
US13
US14
US15
US16
US17
US18
US19
US10
US11
US12
US13
US14
US15
US16
US17
US18
US19
US10
US11
US12
US13
US14
US15
US16
US17
US18
US19
US10
US11
US12
US13
US14
US15
US16
US17
US18
US19
US10
US11
US12
US13
US14
US5
US6
US7
US8
US9
US0
US1
US2
US3
US4
US4
US5
US6
US0
US1
US2
US3
US7
US8
US9
US0
US1
US2
US3
US4
US5
US6
US7
US8
US9
US10
US11
US12
US13
US14
US15
US16
US17
US18
US19
US15
US16
US17
US18
US19
US10
US11
US12
US13
US14
DS0
DS1
DS2
DS3
DS4
DS0
DS1
DS2
DS3
DS4
DS0
DS1
DS2
DS3
DS4
DS0
DS1
DS2
DS3
DS4
DS0
DS1
DS2
DS3
DS4
DS0
DS1
DS2
DS3
DS4
DS0
DS1
DS2
DS3
DS4
CISCO
10000 CISCO
10000 CISCO
10000 CISCO
10000
The cables come in kits that consist of cable sets and spare F connectors.
The MC5X20 dual-shielded cable kit includes:
• Two 10-bundle MCX to “F” conn., 3–m cables
• One 5-bundle MCX to “F” conn., 3–m cables
• 28 spare F connectors
The MC5X20 quad-shielded cable kit includes:
• Five 5-bundle MCX to “F” conn., 3–m cables
• Five spare F connectors
The cable kits do not contain the universal cable holder (UCH); however, the UCH is available with line card accessory kits and spare cards. Or, the
UCH2 is available as a spare.
Note In European markets only, you must use the quad-shielded cable kit with the
Cisco uBR10-MC5X20H.
Tools required for cable installation include:
• 1/4-in. slotted screwdriver and T-10 TORX driver
Also see “Tool Manufacturers and Part Numbers.”
2
Installing the Cables
The UCH must be used for all Cisco uBR10-
MC5X20S/U/H line card cable connections.
Failure to use the UCH may cause permanent damage to the line card connectors and result in low or no RF output.
Step 1 Loosen the top screws and slide open the lock bar. (If the UCH2 is already installed in the line card, use a screwdriver to slide
Step 2 Remove the ESD cap from a cable, and insert it into the hole in the UCH2. See
We recommend that the cables be installed
in the UCH as shown in Table 1 and
Caution If using quad-shielded cables, make sure there is no heat-shrink wrap on the ends by the MCX connectors.
Table 1
US0–US9
US10–US19
DS0–DS4
Port—Dual-Shielded Cable Colors
US0 to US9–red, white, blue, green, yellow, violet, orange, black, gray, brown, respectively.
US10–grey; US11–brown; US12 to
US19–red, white, blue, green, yellow, violet, orange, black, respectively.
DS0 to DS4–red, white, blue, green, yellow, respectively.
Table 2
US0–US9
US10–US19
DS0–DS4
Port—Quad-Shielded Cable Colors
US0 to US9–red, white, blue, green, yellow, red, white, blue, green, yellow, respectively.
US10 to US19–red, white, blue, green, yellow, red, white, blue, green, yellow, respectively.
DS0 to DS4–red, white, blue, green, yellow, respectively.
Step 3 Insert the cable completely into the UCH.
(The cables will fit loosely in the holes
until the lock bar is closed in Step 5.)
Caution
Figure 2
Do not kink the cables.
Inserting a Cable in the UCH2
Step 4 Repeat this procedure for all of the cables.
Step 5 Ensure the cables are fully inserted in the
UCH2 and slide the lock bar closed completely. (The lock bar will not close if cables are not fully inserted or properly aligned.)
Step 6 Using the T-10 TORX driver tool tighten the screws on the lock bar (maximum torque—10 in-lbs).
Corporate Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 526-4100
Copyright © 2006 Cisco Systems, Inc. All rights reserved. Cisco, Cisco IOS, Cisco Systems, and the Cisco Systems logo are registered trademarks of Cisco Systems, Inc. or its affiliates in the U.S.
and certain other countries. All other trademarks mentioned in this document or Website are the property of their respective owners. The use of the word partner does not imply a partnership relationship between Cisco and any other company. (0601R)
Printed in the USA on recycled paper containing 10% postconsumer waste.
78-17657-02
3
Installing the UCH
After the cables are installed in the UCH, perform the following steps to prevent ESD damage to the line card.
Note Before proceeding, remove the protective sticker covering the line card DS ports.
Step 1 Make sure that you are grounded using an
ESD-preventive wrist or ankle strap.
Step 2 Attach a jumper cable to the ground point on the chassis.
Step 3 Briefly touch each cable’s center connector with the jumper cable to remove any built-up ESD potential.
Step 4 Position the UCH2 so the red line is on the same side as the red triangle on the faceplate.
Figure 3 Installing the UCH
Red line
Small pin
US0
US1
US2
US3
US4
Red triangle
US5
US6
US7
US8
US9
Shroud
Large pin
Cutout
Lead screw
Step 5 Align the end pins with the pin holes in the faceplate, and guide the UCH onto the faceplate.
Step 6 Hold the cables and UCH in place while finger tightening the leadscrew. Do not bend the cables at right angles.
Step 7 Use the flathead screwdriver to tighten the leadscrew 10 in–lbs, (maximum torque
15 in.-lbs).
Caution Torquing the leadscrew to more than
20 in-lbs can cause the leadscrew to fail.
The UCH is fully engaged when the semi-circles on the shroud show metal and the red and black lines are completely
4
Removing the UCH
Step 1 Make sure that you are grounded using an
ESD-preventive wrist or ankle strap.
Step 2 Loosen the lead screw (counterclockwise) until it disengages from the faceplate.
Step 3 Gently pull the UCH straight away from the faceplate.
Note If the UCH does not easily pull away from the card, loosen the lead screw until it completely disengages from the faceplate.
Figure 4 Removing the UCH
Red line
US5
US6
US7
US8
US9
US0
US1
US2
US3
US4
Shroud
1/4 in. flathead screwdriver
5
Removing the Cables
Step 1 Use the T-10 TORX driver tool to loosen the lock bar on the side you want to remove cables.
Step 2 Slide the lock bar open by hand, or with a flathead screwdriver if the bar is stuck or
(Make sure the lock bar is completely open or the cables will not release.)
Caution Be careful not to bend the cables.
Step 3 Carefully pull the cable out of the hole.
Figure 5 Sliding Open the Lock Bar
6
Troubleshooting
Check the following:
1.
Verify that the lead screw is tight.
2.
Verify that the shroud fits snugly against the faceplate (the cutouts are closed).
3.
Verify that the cables are properly seated and secure in the UCH.
If downstream RF power measurements are made, use these ESD precautions to prevent damage to the product:
1.
Check for a proper ground on the equipment and chassis before connecting any cables.
2.
Ensure that there is a common ground between all the test equipment that you are using and the unit under test.
3.
Keep test cables as short as possible to limit static buildup.
4.
Before attaching any test cables to the unit under test, momentarily ground the center pin of the test cable to remove any ESD potential that may be present.
Contact Cisco TAC for further information: http://www.cisco.com/tac
Tool Manufacturers and Part Numbers
Table 3 Tool Part Numbers
Cisco Systems
MC5X20 dual-shielded
MC5X20 quad-shielded
UCH2
White Sands Engineering, Inc.
CAB-RFSW520TPMF=
CAB-RFSW520QTPMF=
CAB-520-UCH2
F and MCX crimper tool
MCX connector strip tool:
Dual-shielded cables
Quad-shielded cables
PN–ACT-483
PN–CPT-7538-125
PN–CPT-7538-200Q
Dual-shielded F connector strip tool
Quad-shielded F connector strip tool
CPT-7538
CPT-7538Q
75–ohm precision miniature video cable:
Dual-shielded single cable
Quad-shielded five pk
PN–WS940
PN–WS386
MCX fixed pin conn.:
Dual-shielded cable
Quad-shielded cable
F conn.:
Dual-shielded cable
Quad-shielded cable
PN–MCXFP
PN–MCXFPQ
PN–ASFP
PN–ASFPQ
7
Related Documentation
• Cisco uBR10-MC5X20S/U/H Cable Interface
Line Card for the Cisco uBR10012 Router: http://www.cisco.com/univercd/cc/td/doc/ product/cable/ubr10k/ubr10012/frus/ index.htm
• More Cisco cable products information:
http://www.cisco.com/warp/public/44/jump/ cable.shtml
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project