Annual Plan of Operation

Government of Jharkhand
Department of Forests and Environment
Annual Plan of Operation
2010-11
(Supplementary)
Scheme for Compensatory Afforestation,
Penal Compensatory Afforestation
Prepared
by
JHARKHAND CAMPA
Details of Forest land diversion & Target of CA/PCA (MoEF)
Details of Forest Land diversion
Sl.
No.
1
1
2
3
4
5
6
7
8
9
10
11
Name of User Agency
2
CCL –
Rajrappa OC Mining
New Giddi C
Pindra UG Mining
Tapin North OC Mining
Jharkhand OC Mining
Kedala OC Mining
ECLRaj Mahal OC Mining
M/S Panem Coal Mines
RailwayKoderma-Giridih B.G. Line
-do-doRailwayDeoghar-Dumka B.G. Line
-doTrikut Pahar Rope way
Name of Forest Div.
Area in ha
4
510.82
GoI Diversion O.O.
No.
5
8-105/2005 FC
3
Ramgarh Forest Div.
-do-do-do-do-doGodda Forest Div.
73.55
54.79
55.69
96.28
168.50
69.75
Pakur Forest Div.
Giridih Forest Div.
6
15.3.2007
Prescribed
C.A. (ha)
7
1021.64
Prescribed
P.C.A. (ha)
8
2028.36
8-149/2002 FC
8-68/2003 FC
8-66/2003 FC
8-52/2003 FC
8-55/2003 FC
8-37/2003 FC
01.6.2004
02.11.2004
21.6.2005
28.5.2004
23.8.2004
31.7.2006
148.00
54.79
111.38
192.56
324.70
139.5
--109.58
111.38
92.50
423.80
---
400.00
119.53
8-17/2004 FC
8-90/2003 FC
31.10.2006
03.5.2005
400.00
240.00
-----
Giridih Aff. Div.
Koderma Forest Div.
93.91
25.10
-----
9.61
03.5.2005
03.5.2005
04.01.2008
19.7.2006
188.00
50.20
Deoghar Forest Div.
8-90/2003 FC
8-90/2003 FC
8-40/2007 FC
12(26)-2003 FCE
---
---
Dumka Forest Div.
Deoghar Forest Div.
6.56
3.134
12(26)-2003 FCE
5 JHB-001/2004
BHU
19.7.2006
30.3.2005
--6.50
-----
8-37/2003 FC
31.7.2006
2909.61
350
2765.62
359.2
8-79/2003 FC
17.7.2008
82.2
656
5-JHC 076/2008
BHU
23.11.2009
20.54174
5-JHC 077/2008
BHU
23.11.2009
57.9852
12(26)2/2003 FCE
30.6.2005
31.08
Total CCL –
Khas Mahal OCP
CCL –
Dhori Khas UGP
Bokaro Forest Div.
14
RGGVY –
Chandwara Block
Koderma Forest Div.
15
RGGVY –
Koderma Block
16
NHAI –
G.T. Road widening
-do-
12
13
-do17
18
19
RailwayDeoghar-Dumka new B.G.
Line (Mandar hill station Rly
project)
DVC –
2x500=1000 KW Mega
thermal power station
M/s. Uranium Corporation of
India
Total Grand Total -
-do-
-do-
Hazaribag East Forest
Div.
Hazaribag West Forest
Div.
Giridih Forest Div.
1687.224
174.48
41.1
131.10
172.20
8.82460
1.44527
10.27087
25.7236
3.2690
28.9926
15.540
Date
0.930
1.86
1.273
2.546
Dumka Forest Div.
75.226
8-150/2002 FC
03.02.2005
150.452
Koderma Forest Div.
155.1498
8-40/2007 FC
04.01.2008
310.30
Dhalbhum Forest Div.
130.82
8-138/2003 FCE
07.4.2005
262
764.88247
2452.10647
1268.965
4178.580
1015.20
3781.200
Proposed CA / PCA scheme in the supplementary A.P.O.
Sl.
No
.
1
1
User Agency/
Name of Project
Area diverted under
Forest Division
CA/P
CA
2
3
CCL - Rajrappa
OCP
Ramgarh Forest
Div.
4
CA
Forest Division
5
Hazaribag SF
Div.
Koderma SF
Div.
2
New Giddi “C”
OCP
Ramgarh Forest
Div.
CA
3
CCL - Pindra
UGC
CCL - Tapin
North OCP
Jharkhand OCP
Ramgarh Forest
Div.
Ramgarh Forest
Div.
Ramgarh Forest
Div.
CA
6
CCL Kedala
OCP
Ramgarh Forest
Div.
7
ECL- Raj Mahal
OC Mining
8
9
4
5
10
7
621.64
400
8
Saraibinda,
Pirgul, Garke,
Harhudu, Rakua,
Dumarkudar,
Beko, Santurpi,
Khetko
Chourahi,
Simratari,
Matakhaira, Beko,
Patrunia,
Nandodih
Remarks
No. of
Plants /
ha
Period of
scheme
(years)
9
1666
7
54.79
Mandaramo
1666
111.38
Karma, Bagodar
1666
192.56
1666
CA
Hazaribag SF
Div.
276.7
Godda Forest
Div.
CA
Godda Forest
Div.
60
Kheshkari,
Kalitanr
Kheshkari,
Chutiyaro
Chatibariatu,
Jordag, Nawadih,
Honhe, Koid,
Kubhdang kala
Bara gogra,
Chhota gogra,
Chhota itahri,
Bara dorma
M/S.Panem
Coal Mines
Pakur Forest
Div.
CA
Pakur Forest
Div.
RailwayKodarma
-Giridih B.G.
Line
Koderma Forest
Div.
CA
Koderma Forest
Div.
Giridih Forest
Div.
CA
Giridih Forest
Div.
Giridih Aff. Div.
Deoghar Forest
Div.
CA
CA
Giridih Aff. Div.
Deoghar Forest
Div.
Dumka Forest
Div.
CA
Dumka Forest
Div.
RailwayDeoghar
-Dumka B.G.
Line
CA
CA
Deoghar Forest
Div.
CA
Deoghar Forest
Div.
12
CCL- Khas
Mahal OCP
Bokaro Forest
Div.
CA
Bokaro Forest
Div.
13
CCL- Dhori
Khas UGP
Bokaro Forest
Div.
14
RGGVY –
Chandwara
Block
RGGVY –
Koderma
Block
NHAI –
Koderma Forest
Div.
Koderma Forest
Div.
Hazaribag East
PCA
CA
PCA
CA
CA
10
11
1666
Hazaribag East
Forest Div.
Hazaribag East
Forest Div.
Hazaribag East
Forest Div.
Trikut Pahar
Rope way
16
6
SCA
Proposed CA / PCA sceme
Area
Name of site
Already
taken up in
APO
11
15
Name of
scheme
1666
1100
Already
taken up in
APO
Already
taken up in
APO
140
59
19.22
Lohpitti, Makoria,
Burhiatanr
Doranda
Latbedia
1100
1100
1100
Already
taken up in
APO
Already
taken up in
APO
350
1100
359.2
82.2
1100
1100
150
21
1100
1100
Koderma Forest
Div.
58
1100
Hazaribag East
35.64
1100
Bokaro Forest
Div.
Koderma Forest
Div.
G.T. Road
widening
-do-do17
18
19
RailwayDeogharDumka new
B.G. Line
(Mandar hill
station Rly
project)
DVC –
2x500=1000
KW Mega
thermal power
station
M/s. Uranium
Corporation of
India
Forest Div.
Forest Div.
Hazaribag West
Forest Div.
Giridih Forest
Div.
Dumka Forest
Div.
Hazaribag West
Forest Div.
Giridih Forest
Div.
Dumka Forest
Div.
Koderma Forest
Div.
Dhalbhum
Forest Div.
CA
CA
Koderma Forest
Div.
Dhalbhum
Forest Div.
Total G.Total CA
PCA
G. Total
111
1100
310.23
1100
262
1100
1739.27
3674.56
3165.36
509.20
3674.56
Division-wise, scheme-wise, year-wise, site-wise targets of compensatory afforestation/penal compensatory
afforestation
Sl.
No
.
Name of
Site
1
2
Net
area
Length
of
fencing
(chain)
3
4
Estimated Cost @ Rs. 111.00 per manday
Grand Total
Amount
Total
Amount
Total
Amount
Total
Amount
Total
Amount
Total
Amount
Total
Amount
Total
Amount
Ist Year
IInd Year
IIIrd Year
IVth Year
Vth Year
VIth Year
VIIth Year
7
8
5
6
9
10
11
12
Hazaribag Social Forestry Division
Soil conservation and afforestation
1
Saraibinda
50.00
252.00
1992288.99
634848.00
242709.00
169830.00
169830.00
169830.00
169830.00
3549166.00
2
Prirgul
50.00
255.00
2000780.49
634848.00
242709.00
169830.00
169830.00
169830.00
169830.00
3557657.50
3
Garke
60.00
460.00
2836833.59
761817.60
291250.80
203796.00
203796.00
203796.00
203796.00
4705086.00
4
Harhudu
100.00
560.00
4143085.99
1269696.00
485418.00
339660.00
339660.00
339660.00
339660.00
7256840.00
5
Rakua
77.00
485.00
3342457.11
977665.92
373771.86
261538.20
261538.20
261538.20
261538.20
5740047.70
6
Dumar kudar
60.00
165.00
2001836.09
761817.60
291250.80
203796.00
203796.00
203796.00
203796.00
3870088.50
7
Beko
75.00
375.00
2979941.99
952272.00
364063.50
254745.00
254745.00
254745.00
254745.00
5315257.50
8
Santurpi
75.00
375.00
2979941.99
952272.00
364063.50
254745.00
254745.00
254745.00
254745.00
5315257.50
9
Khetka
74.64
375.00
2970733.17
947701.10
362316.00
253522.22
253522.22
253522.22
253522.22
5294839.16
10
Chatti
bariatu
50.00
280.00
2071542.99
634848.00
242709.00
169830.00
169830.00
169830.00
169830.00
3628420.00
11
Jordag
50.00
333.00
2221559.49
634848.00
242709.00
169830.00
169830.00
169830.00
169830.00
3778436.50
12
Nawadih
50.00
732.60
3352627.29
634848.00
242709.00
169830.00
169830.00
169830.00
169830.00
4909504.30
13
Honhe
50.00
756.00
3418860.99
634848.00
242709.00
169830.00
169830.00
169830.00
169830.00
4975738.00
14
Koid
50.00
650.00
3118827.99
634848.00
242709.00
169830.00
169830.00
169830.00
169830.00
4675705.00
15
Kumbhdang
kala
Kumbhdang
khurd
26.70
483.30
2050968.25
339008.83
129606.61
90689.22
90689.22
90689.22
90689.22
2882340.57
898.34
6536.90
41482286.41
11406187.05
4360704.0
7
3051301.64
3051301.64
3051301.64
3051301.64
69454384.23
Total
(Rounded)
Kodarma Social Forestry Division
Soil conservation and afforestation
1
Chourahi
100.00
225.00
3194868.49
1269696.00
485418.00
339660.00
339660.00
339660.00
339660.00
6308622.49
2
Simaratari
50.00
210.00
1873407.99
634848.00
242709.00
169830.00
169830.00
169830.00
169830.00
3430284.99
3
Matha
Khaira
95.00
291.00
3253781.19
1206211.20
461147.10
322677.00
322677.00
322677.00
322677.00
6211847.49
4
Beko
75.00
400.00
3050704.49
952272.00
364063.50
254745.00
254745.00
254745.00
254745.00
5386019.99
5
Patarunia
60.00
300.00
2383953.59
761817.60
291250.80
203796.00
203796.00
203796.00
203796.00
4252205.99
6
Nandodih
20.00
115.00
837108.70
253939.20
97083.60
67932.00
67932.00
67932.00
67932.00
1459859.50
Total
(Rounded)
400.00
1541.00
14593824.45
5078784.00
1941672.0
0
1358640.00
1358640.00
1358640.00
1358640.00
27048840.50
Hazaribag East Forest Division.
Soil conservation and afforestation
1
Mandramo
54.79
250.00
2109156.48
695666.44
265960.52
186099.71
186099.71
186099.71
186099.71
3815182.28
2
Karma
65.00
530.00
3162868.89
825302.40
315521.70
220779.00
220779.00
220779.00
220779.00
5186808.99
3
Bagodar
46.38
783.50
3404099.93
588885.01
225136.87
157534.31
157534.31
157534.31
157534.31
4848259.05
4
Kheskari
60.00
485.00
2907596.09
761817.60
291250.80
203796.00
203796.00
203796.00
203796.00
4775848.49
5
Kali Tand
85.00
515.00
3632012.59
1079241.60
412605.30
288711.00
288711.00
288711.00
288711.00
6278703.49
6
Chatiaro
47.56
221.00
1842128.15
603867.42
230864.80
161542.30
161542.30
161542.30
161542.30
3323029.57
4554780.47
1741339.9
9
1218462.32
1218462.32
1218462.32
1218462.32
28227831.87
Total -
358.73
2784.50
17057862.13
7
Karamba
35.64
252.00
842869.84
347496.42
141928.60
102493.08
102493.08
102493.08
102493.08
1742267.18
Total -
35.64
128.00
842869.84
347496.42
141928.60
102493.08
102493.08
102493.08
102493.08
1742267.18
394.37
2912.50
17900731.97
4902276.89
1883268.5
9
1320955.40
1320955.40
1320955.40
1320955.40
29970099.09
Total
(Rounded)
Godda Forest Division.
Artificial Regeneration
1
Bara Gogara
30
200
970616.70
292505.40
119468.52
86273.64
86273.64
86273.64
86273.64
1727685.18
2
Chhota
Itahari
30
116
732854.70
292505.40
119468.52
86273.64
86273.64
86273.64
86273.64
1489923.18
Total
(Rounded)
60
316
1703471.4
585010.8
238937.04
172547.28
172547.28
172547.28
172547.28
3217608.36
Giridih Forest Division.
Artificial Regeneration
1
Lohpitti
35.00
219.00
1091815.65
341256.30
139379.94
100652.58
100652.58
100652.58
100652.58
1975062.21
2
Makoria
45.00
348.00
1591789.05
438758.10
179202.78
129410.46
129410.46
129410.46
129410.46
2727391.77
3
Burhia Tand
60.00
256.00
1533641.40
585010.80
238937.04
172547.28
172547.28
172547.28
172547.28
3047778.36
140.00
823.00
4217246.10
1365025.20
557519.76
402610.32
402610.32
402610.32
402610.32
7750232.34
Total
(Rounded)
Giridih Afforestation Division.
Artificial Regeneration
1
Doranda
59.00
300.00
1644699.51
575260.62
234954.76
169671.49
169671.49
169671.49
169671.49
3133600.85
Total
(Rounded)
59.00
300.00
1644699.51
575260.62
234954.76
169671.49
169671.49
169671.49
169671.49
3133600.85
Deoghar Forest Division.
Artificial Regeneration
1
Latbedia
19.22
73.00
465786.87
187398.46
76539.50
55272.65
55272.65
55272.65
55272.65
950815.41
Total
(Rounded)
19.22
73.00
465786.87
187398.46
76539.50
55272.65
55272.65
55272.65
55272.65
950815.41
Bokaro Forest Division.
Soil conservation and afforestation
1
Amjhar
60.00
205.00
1389285.90
585010.80
238937.04
172547.28
172547.28
172547.28
172547.28
2903422.86
2
Bhalmara
40.00
230.00
1190370.60
390007.20
159291.36
115031.52
115031.52
115031.52
115031.52
2199795.24
3
Baradih
50.00
411.00
1837530.00
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
3099310.80
4
Chhutu
Garha
50.00
263.00
1418616.00
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2680396.80
5
Bandhdih
50.00
418.00
1857343.50
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
3119124.30
6
Gopalpur
50.00
352.80
1672794.90
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2934575.70
7
Koshi
50.00
506.00
2106427.50
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
3368208.30
8
Kachcho
50.00
304.00
1534666.50
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2796447.30
9
Kujubera
50.00
227.00
1316718.00
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2578498.80
10
Banshi
50.00
341.00
1639395.00
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2901175.80
11
Barki Punno
50.00
305.00
1537497.00
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2799277.80
12
Goppo
50.00
220.00
1296904.50
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2558685.30
13
Khirabera
50.00
235.00
1339362.00
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2601142.80
14
Tirla
30.00
165.00
871549.20
292505.40
119468.52
86273.64
86273.64
86273.64
86273.64
1628617.68
15
Tulbul
29.20
137.25
782215.71
284705.26
116282.69
83973.01
83973.01
83973.01
83973.01
1519095.70
16
Ghosh
50.00
255.00
1395972.00
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2657752.80
17
Lugu Pahar
32.20
142.30
836961.41
313955.80
128229.54
92600.37
92600.37
92600.37
92600.37
1649548.23
18
Birni
100.00
210.00
1942794.00
975018.00
398228.40
287578.80
287578.80
287578.80
287578.80
4466355.60
19
Birsa
50.00
304.00
1534666.50
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2796447.30
Total
(Rounded)
941.40
5231.35
27501070.22
9178819.46
3748922.1
5
2707266.82
2707266.82
2707266.82
2707266.82
51257879.11
Kodarma Forest Division.
Artificial Regeneration
1
Bhuladih
21.00
99.75
565504.07
204753.78
83627.96
60391.55
60391.55
60391.55
60391.55
1095452.00
2
Bhuladih
58.00
275.50
1561868.37
565510.44
230972.47
166795.70
166795.70
166795.70
166795.70
3025534.10
3
Golbateyan
33.00
140.00
841238.37
321755.94
131415.37
94901.00
94901.00
94901.00
94901.00
1674013.70
4
Baripur
50.00
270.00
1438429.50
487509.00
199114.20
143789.40
143789.40
143789.40
143789.40
2700210.30
5
Dhulmuneya
35.00
155.00
910663.65
341256.30
139379.94
100652.58
100652.58
100652.58
100652.58
1793910.21
6
Laxmandih
35.00
155.00
910663.65
341256.30
139379.94
100652.58
100652.58
100652.58
100652.58
1793910.21
7
Manorathpur
73.00
225.00
1621186.47
711763.14
290706.73
209932.52
209932.52
209932.52
209932.52
3463386.44
8
Khair Pahar
84.23
276.00
1916966.05
821257.66
335427.78
242227.62
242227.62
242227.62
242227.62
40442561.99
Total
(Rounded)
389.23
1596.25
9766520.13
3795062.56
1550024.4
0
1119342.96
1119342.96
1119342.96
1119342.96
19588978.95
Dumka Forest Division.
Artificial Regeneration
1
Brindavani
55.00
409.20
1899854.55
536259.90
219025.62
158168.34
158168.34
158168.34
158168.34
3287813.43
2
Palendah
56.00
279.60
1546505.64
546010.08
223007.90
161044.13
161044.13
161044.13
161044.13
2959700.14
Total
(Rounded)
111.00
688.80
3446360.19
1082269.98
442033.52
319212.47
319212.47
319212.47
319212.47
6247513.57
Dhalbhum Forest Division.
Artificial Regeneration
1
Muraha Kanja
262.00
1319.00
7266208.68
2554547.16
1043358.41
753456.46
753456.46
753456.46
753456.46
13877940.07
Total
(Rounded)
262.00
1319.00
7266208.68
2554547.16
1043358.41
753456.46
753456.46
753456.46
753456.46
13877940.07
Grand Total
(Rounded)
3674.56
21337.80
129988205.98
40710642.23
16077934.23
11430277.51
11430277.51
11430277.51
11430277.51
232497892.49
Modification in the Original CA / PCA schemes
Sl.
No
.
User Agency/
Name of Project
Forest
Division
Area diverted under
Specified
plantation site
CA/
PCA
Name of
scheme
Original CA / PCA scheme
Area
No. of
Wage
(ha)
Plants s rate
/ ha
Period
of
scheme
Forest
Division
Name
of
sche
me
Proposed CA / PCA sceme
Area
Name of site
Remarks
N
o
.
o
f
P
l
a
n
t
s
Perio
d of
sche
me
(yrs)
/
h
a
1
1
2
3
CCL - Rajrappa
OCP
Ramgarh
Forest Div.
Sangrampur,
Kutma,
Narsinghwa
Protected Forest
4
CA
5
SCA
1021.6
4
1666
64.61
3 Yrs
Hazarib
ag SF
Div.
Koderm
a SF
Div.
2
New Giddi “C”
OCP
Ramgarh
Forest Div.
3
CCL - Pindra
UGC
Ramgarh
Forest Div.
4
CCL - Tapin
North OCP
5
6
SCA
7
621.64
SCA
400
8
Saraibinda,
Pirgul, Garke,
Harhudu, Rakua,
Dumarkudar,
Beko, Santurpi,
Khetko
Chourahi,
Simratari,
Matakhaira, Beko,
Patrunia,
Nandodih
Neither Place is
mentioned nor
scheme of
plantation is
available in file.
Amnari,,
Modidih,
Pasaridih
CA
SCA
CA
SCA
54.79
1666
64.61
3 Yrs
Hazarib
ag East
Forest
Div.
54.79
Mandaramo
Ramgarh
Forest Div.
Adjoining forest
of Kajari, Pipara,
Pindra
CA
SCA
111.38
1666
64.61
4 Yrs
Hazarib
ag East
Forest
Div.
111.38
Karma, Bagodar
Jharkhand OCP
Ramgarh
Forest Div.
Adjoining forest
of Loiya, Kedla
CA
Hazarib
ag East
Forest
Div.
192.56
6
CCL Kedala
OCP
Ramgarh
Forest Div.
CA
SCA
324.7
1666
64.61
2003-04
to 200607
Hazarib
ag SF
Div.
276.7
7
ECL- Raj Mahal
OC Mining
Godda
Forest Div.
Adjoining forest
area of
Arjunbandh,
Uarava
Village –
Sundaridol &
Salaga tand
CA
SCA
50
1666
58.84
2002-03
to 200405
Godda
Forest
Div.
60
Kheshkari,
Kalitanr
Kheshkari,
Chutiyaro
Chatibariatu,
Jordag, Nawadih,
Honhe, Koid,
Kubhdang kala
Bara gogra,
Chhota gogra,
Chhota itahri,
Bara dorma
9
1
6
6
6
1
6
6
6
10
11
7
7
Already
taken up
in APO
1
6
6
6
1
6
6
6
1
6
6
6
1
6
6
6
1
1
0
0
7
7
7
7
7
8
M/S.Panem
Coal Mines
Pakur
Forest Div.
9
RailwayKodarma
-Giridih B.G.
Line
Koderma
Forest Div.
-do-
Giridih
Forest Div.
-do-
Giridih Aff.
Div.
RailwayDeoghar
-Dumka B.G.
Line
Deoghar
Forest Div.
-do-
10
11
12
13
CA
SCA
461.87
1666
CA
SCA
50.2
1666
800
Bardanga,
Karinatand – 50
ha, Kajara – 50
ha, Bariarpur – 50
ha,
Margonunda/Mat
kisingh -40 ha,
Bariapur
Kangodih – 50 ha
Village – Damgi –
99.73 ha,
Charghara – 17.24
ha, Sakhaitand –
9.15 ha, Jhanjh –
14.17 ha
Villge - Khijuria
CA
SCA
under
W.L.
SCA
CA
Dumka
Forest Div.
Trikut Pahar
Rope way
Deoghar
Forest Div.
CCL- Khas
Mahal OCP
Grand
Total
Bokaro
Forest Div.
CCL- Dhori
Khas UGP
7 Yrs
Pakur
Forest
Div.
Already
taken up
in APO
76
2005-06
to 201112
Koderm
a Forest
Div.
Already
taken up
in APO
1666
72.3
240
1666
72.3
2005-06
to 201112
2005-06
to 201112
Giridih
Forest
Div.
140
Lohpitti, Makoria,
Burhiatanr
1
1
0
0
7
SCA
188
1000
72.3
2003-04
to 200607
Giridih
Aff. Div.
59
Doranda
1
1
0
0
7
CA
SCA
19.22
2500
76.68
2003-04
to 200607
Deoghar
Forest
Div.
19.22
Latbedia
1
1
0
0
7
Village - Jambad
CA
SCA
13.125
1000
76.68
2003-04
to 200607
Dumka
Forest
Div.
6.5 ha Non-Forest
land provided in
Village – Harkatta
CA
SCA
6.5
1666
67.72
2004-05
to 201011
Deoghar
Forest
Div.
Village –
Dakasaram – 32
ha, Dania – 30 ha
CA
SCA
62
1666
86.40
7 Yrs
Bokaro
Forest
Div.
PCA
SCA
CA
SCA
401.22 ha NoonForest land
provided in 15
Villages
-
-
Bokaro
Forest Div.
Village – Makoli,
PS – Bermo, Dist
67.72
Already
taken up
in APO
Already
taken up
in APO
350
359.2
82.2
64.61
4 Yrs
Bokaro
Forest
82.2
Amjher,
Bhalmara,
Baradih –
Araldiha, Chhut
ghhara,
Bhandhdih –
Gopinathpur,
Gopalpur, Koshi
(7 sites)
Kachho,
Kujubera, Banshi,
Barkki punnu,
Gopo, Khirabera,
Tirla, Turbul (8
sites)
Ghosh, Logu
pahar
1
1
0
0
7
1
1
0
0
1
1
7
Div.
- Bokaro
14
RGGVY –
Chandwara
Block
Koderma
Forest
Div.
15
RGGVY –
Koderma
Block
Koderma
Forest
Div.
16
NHAI –
G.T. Road
widening
Hazaribag
East
Forest
Div.
Hazaribag
West
Forest
Div.
Giridih
Forest
Div.
17
18
19
RailwayDeogharDumka new
B.G. Line
(Mandar hill
station Rly
project)
DVC –
2x500=1000
KW Mega
thermal power
station
M/s. Uranium
Corporation of
India
Dumka
Forest
Div.
Ratnadih – 100
ha, Kharna – 50
ha, Sabladih – 50
ha of Bagodar
Forest Range
Area not
Specified for
plantation
PCA
SCA
CA
SCA
CA
SCA
200
2008-09
to 201415
1666
150
Birani, Birsa
Koderm
a Forest
Div.
21
Bhuladih
Koderm
a Forest
Div.
58
Bhuladih
35.64
Karamba
Dumka
Forest
Div.
111
Bagodar 116 –
35.64 ha
SCA
35.64
1666
64.61
4 Yrs
Hazarib
ag East
Forest
Div.
Village – Dondlo,
Dondlo 116 – Net
area 35.64 ha
Road side
SCA
35.64
1666
64.61
4 Yrs
Giridih
Forest
Div.
18
2000
73
5 Yrs
SCA
80.45
1666
67.72
7 Yrs
Linear
Pl.
2000
67.72
7 Yrs
SCA
53.75
4
310.3
1666
81.00
7 Yrs
Koderm
a Forest
Div.
310.23
SCA
262
2500
64.61
2004-05
to 200708
Dhalbhu
m
Forest
Div.
262
Linear
Pl.
Village – Jambad
– 04, PS –
Masalia – 80.45
ha & Asansol, PS
– Masalia – 70 ha
Railway side
CA
Koderma
Forest
Div.
Village / PF –
Belgada – 158.07
ha, Jaber – 65.40
& Kutuwa – 86.83
ha
CA
Dhalbhum
Forest
Div.
Hathibinda –
56.80 ha,
Sarsabera –
159.40 ha &
Khairbani – 46.00
ha
0
0
1
1
0
0
1
1
0
0
7
7
1
1
0
0
1
1
0
0
7
Brindavani,
Fitloria, Palendah,
Sarsawad, Jhikra
1
1
0
0
7
Golbateyan,
Baripur,
Dhurmunia,
Laxamandih,
Nanorathdih,
Khairpahar singh,
Wawadih
Murhakanjia,
Luabasa, Manpita
1
1
0
0
7
1
1
0
0
7
7
Government of Jharkhand
Department of Forests and Environment
CAMPA Project (NPV)
2010-11
Scheme for Utilization of money realized as NPV
Prepared
by
JHARKHAND CAMPA
Table of Contents
Contents
Introduction
Page No
5
Schemes
Establishment of Natural Forests
Greening of Hills
Water Harvesting Structures
Division-wise and scheme-wise targets
Division-wise, year-wise targets
Species
Schedule of rates (CAMPA)
3
4
5
6
7
10
11
Introduction
This project has been prepared to undertake schemes for utilization of money realized as Net
Present Value (NPV) of the forest land diverted for non-forestry purposes. The project consists of
following schemes –
(i) Establishment of Natural Forests
(ii) Greening of Hills
(iii) Water Harvesting Structures
The project has been prepared for a 10-year period.
Establishment of Natural Forests
This schemes intends to facilitate establishment of natural forest on 1,40,000 ha of
degraded forest land over a period of 10 years. Each of 31 territorial divisions and 4 wild life
divisions will execute this scheme with a physical target of 4000 ha per division. Each year each
division will undertake advance work in 1000 ha of such degraded forests where forest crop is not
likely to survive due to biotic pressure like grazing, lopping of trees and incidence of fire.
Completion work will be done in the 2nd year and maintenance work would continue up to 7th year.
Under this scheme, the selected degraded forests will be given a comprehensive
treatment, comprising of (i) assisted natural regeneration including cut back of inferior growth of
coppicing species, followed by singling of multiple coppice shoots (ii) soil and moisture
conservation works as required by the site and (iii) artificial regeneration by planting of local
species of villager’s choice. Initially coppicing work will be carried out and then 10% regeneration
survey (40m x 25m sampling plot/ha) will be done at the end of 1st, 3rd, 5th, and 7th year. Protection
will be done with active participation of village community without digging trench fencing /
constructing stone wall. In the selected degraded forest every year artificial plantation will be
carried out in the gaps and the species will be chosen in consultation with local people. A judicious
combination of fruit bearing, fuel wood, fodder and timber species will be planted so that the
requirements of local villagers are met.
In the first year the advance works (survey and demarcation, cleaning / site clearance,
coppicing, soil and moisture conservation works like contour trenching, silt detention dams, check
dams, gully plugging in the existing nallas, retaining & breast wall etc., pit digging, part work of
nursery, entry point works, etc.) will be carried out. Money would also be given to the villagers
through JFM Committees to sensitize them towards protecting the area from fire, grazing and
felling. In the second year, the works of maintenance of nursery, planting of seedlings, entry point
works, twice hoeing-weeding, singling of multiple coppice shoots etc. will be done. Third year
operations will include one hoeing-weeding, casualty replacement, singling of coppice shoots,
payment for protection of plantation area etc., whereas, in the fourth year onwards, one hoeingweeding will be carried out.
Greening of Hills
On many hillocks within the forests specially on the road sides the greenery is now
becoming out of sight. Hillocks become naked due to depletion of trees resulting in increase in
pollution and environmental degradation with adverse effect on climate. This is confined not only
along roads but there are many such naked hillocks situated inside the forest areas. In this scheme,
plantation will be done on such hillocks. Besides securing the areas from grazing, fire and other
biotic damages by digging trench / constructing stonewall fencing, the works of cleaning and
planting (per ha 1666 plants in 3m x 2m spacing) of mixed local species like sissoo, gamhar,
kadamb, peepal, biju aam, kathal, aonla, chilbil, chakundi etc. will be carried out.
In the first year the advance works (survey and demarcation, cleaning / site clearance,
coppicing, trench/stonewall fencing, soil and moisture conservation works like contour trenching,
silt detention dams, check dams, gully plugging in the existing nallas, retaining & breast wall etc.,
pit digging, part work of nursery, entry point works, etc.) will be carried out. In the second year,
the works of maintenance of nursery, planting of seedlings, entry point works, twice hoeingweeding, sowing of seeds of thorny and bushy species on trench-berm, singling of multiple
coppice shoots, protection of plants etc. will be done. Third year operations will include one
hoeing-weeding, casualty replacement, repair of fencing as required, protection of plantation area
etc., whereas, in the fourth year onwards, one hoeing-weeding and protection of plantation area
will be carried out.
It is proposed to carry out at least two hillocks (125 hac.) per year per division in 31
territorial divisions and restoration of a total 500 hac. Of such hillocks will be covered in each
division over a period of four years. The area will be looked after intensively up to 5 years after
planting.
Water Harvesting Structures
Under this scheme, water harvesting structures like dams / check dams will be
constructed aiming at harvesting and impoundment / storage of rain water / run off / flow of
rivulets / nallas in forest areas / near outer boundaries, by creating site-specific kuchcha / pucca
obstruction / bunds with provisions for safe overflow. Natural depressions and narrow passages
will be taken advantage of and, if need be, belly of the reservoir so created will be deepened in
order to enhance storage capacity. Ecologically, these dams are effective in improving the ground
water regime which support excellent growth of forest flora in the vicinity. Earthen dams will be
constructed in rivulets after careful site surveying and judging the suitability if location of such
dams. Since earthen dams are an excellent measure for soil and moisture conservation, these Water
Harvesting Structures will improve the site quality, increase water availability in the area for
wildlife as well as for forestry operations and villager’s use. In this scheme it is proposed that 25
such structures will be constructed each year in each division in 31 territorial divisions and 4 wild
life divisions
NPV dh jkf'k ls lacfU/kr ;kstuk,¡
Øe
la0
ou ize.My dk uke
HkkSfrd y{;
izkd`frd igkfM+;ksa dk
ty
ouksa dh gfj;kyhdj.k laj{k.k
LFkkiuk
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
2
jk¡ph iwohZ ou ize.My
[kw¡Vh ou ize.My
jk¡ph if'peh ou izexqeyk ou ize.My
fleMsxk ou ize.My
gtkjhckx iwohZ ou igtkjhckx ¼i½ ou izejkex<+ ou ize.My
dksMjek ou ize.My
prjk mÙkjh ou izeprjk nf{k.kh ou izcksdkjks ou ize.My
/kuckn ou ize.My
lkj.Mk ou ize.My
pkbZcklk ¼n½ ou iziksM+kgkV ou ize.My
dksYgku ou ize.My
/kkyHkwe ou ize.My
ljk;dsyk ou ize.My
nqedk ou ize.My
lkgscxat ou ize.My
ikdqM+ ou ize.My
xksÏk ou ize.My
tkerkM+k ou ize.My
nso?kj ou ize.My
fxfjMhg ou ize.My
fxfjMhg oujksi.k izeMkyVuxat ¼m½ ou ix<+ok mÙkjh ou izex<+ok nf{k.kh ou izeykrsgkj ou ize.My
jk¡ph oU; izk.kh izeGtkjhckx oU; izk- izC;k?kz ;kstuk ¼dksj½
C;k?kz ;kstuk ¼cQj½
3
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
dqy ;ksx &
140000
djksM+ :i;s esa &
lajpuk
4
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
0
0
0
0
5
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
15500
3500
izkd`frd ouksa dh
LFkkiuk @
36643-13 izfrgs0
¼:0½
6
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
146572520.00
foÙkh;
igkfM+;ksa dk
gfj;kyhdj.k@
68323-68izfrgs0
¼:0½
7
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
34161840.00
0.00
0.00
0.00
0.00
5130038200.00 1059017040.00
513.0038
105.9017
y{;
ty laj{k.k
lajpuk @
400000.00 izfrgs0
¼:0½
8
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
40000000.00
9
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
220734360.00
186572520.00
186572520.00
186572520.00
186572520.00
1400000000.00
7589055240.00
140.0000
758.9055
dqy ;ksx
>kj[k.M dSEik & NPV ;kstuk,¡ & ize.Myokj & o"kZokj HkkSfrd y{;
Øe
la0
ou ize.My dk uke
1
2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
jk¡ph iwohZ ou ize.My
[kw¡Vh ou ize.My
jk¡ph if'peh ou izexqeyk ou ize.My
fleMsxk ou ize.My
gtkjhckx iwohZ ou igtkjhckx ¼i½ ou izejkex<+ ou ize.My
dksMjek ou ize.My
prjk mÙkjh ou izeprjk nf{k.kh ou izcksdkjks ou ize.My
/kuckn ou ize.My
lkj.Mk ou ize.My
pkbZcklk nf{k.kh ou iziksM+kgkV ou ize.My
dksYgku ou ize.My
/kkyHkwe ou ize.My
ljk;dsyk ou ize.My
nqedk ou ize.My
lkgscxat ou ize.My
ikdqM+ ou ize.My
xksÏk ou ize.My
tkerkM+k ou ize.My
nso?kj ou ize.My
fxfjMhg ou ize.My
fxfjMhg oujksi.k izeMkyVuxat mÙkjh ou ix<+ok mÙkjh ou ize-
izkd`frd ouksa dh LFkkiuk ¼vfxze dk;Z½ gs0
o"kZ &
o"kZ &
o"kZ &
o"kZ &
;ksx
1
2
3
4
3
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
4
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
5
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
6
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
7
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
4000
igkfM+; ksa dk gfj;kyhdj.k ¼vfxze dk;Z½ gs0
o"kZ & o"kZ & o"kZ & o"kZ &
;ksx
1
2
3
4
8
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
9
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
10
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
11
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
12
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
500
ty laj{k.k lajpuk
o"kZ & o"kZ & o"kZ & o"kZ &
1
2
3
4
13
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
14
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
15
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
16
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
vH;qfDr
;ksx
17
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
100
18
30
31
32
33
34
35
x<+ok nf{k.kh ou izeykrsgkj ou ize.My
jk¡ph oU; izk.kh ize.My
gtkjhckx oU; izk.kh izC;k?kz ;kstuk ¼dksj½
C;k?kz ;kstuk ¼cQj½
dqy ;ksx &
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
4000
4000
4000
4000
4000
4000
125
125
0
0
0
0
125
125
0
0
0
0
125
125
0
0
0
0
35000 35000 35000 35000 140000
3875
3875
3875
125
125
0
0
0
0
500
500
0
0
0
0
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
100
100
100
100
100
100
3875 15500
875
875
875
875
3500
izkd`frd ouksa dh LFkkiuk 7 o"khZ; ;kstuk gSA e`nk ,oa ty laj{k.k rFkk vfXu] pjkbZ] ikru ls lqj{kk bldk izeq[k fgLlk gSA 200 ikS/ks izfr gs0 dk jksi.k Hkh fd;k tk,xkA izFke o"kZ
vfxze dk;Z fd;k tk,xkA vxys ik¡p o"kZ bldk j[k&j[kko fd;k tk,xkA
igkfM+;ksa dk gfj;kyhdj.k 7 o"kh; ;kstuk gSA e`nk ,oa ty laj{k.k rFkk 3 eh0 x 2 eh0 o`{kkjksi.k bldk izeq[k fgLlk gSA izFke o"kZ esa vfxze dk;Z fd;k tk;xkA f}rh; o"kZ esa lekiu
¼jksi.k½ dk;Z fd;k tk;xkA vxys ik¡p o"kZ bldk j[k&j[kko fd;k tk;xkA
ty laj{k.k ;kstuk LFky dh vko';drk da vuq:i fufeZr dh tk,xhA LFky p;u ds I'pkr~ bldk izkôyu rS; kj fd;k tk,xkA y{; vuqekfur gSA
foÙkh; o"kZ 2010&11 dk HkkSfrd ,oa foÙkh; y{;
>kj[k.M dSEik & NPV ;kstuk,¡
Øe
la0
izkd`frd ouksa dh LFkkiuk
¼vfxze dk;Z½
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
jk¡ph iwohZ ou ize.My
[kw¡Vh ou ize.My
jk¡ph if'peh ou izexqeyk ou ize.My
fleMsxk ou ize.My
gtkjhckx iwohZ ou igtkjhckx ¼i½ ou izejkex<+ ou ize.My
dksMjek ou ize.My
prjk mÙkjh ou izeprjk nf{k.kh ou izcksdkjks ou ize.My
/kuckn ou ize.My
lkj.Mk ou ize.My
pkbZcklk nf{k.kh ou iziksM+kgkV ou ize.My
dksYgku ou ize.My
/kkyHkwe ou ize.My
ljk;dsyk ou ize.My
nqedk ou ize.My
lkgscxat ou ize.My
ikdqM+ ou ize.My
xksÏk ou ize.My
tkerkM+k ou ize.My
nso?kj ou ize.My
fxfjMhg ou ize.My
fxfjMhg oujksi.k izeMkyVuxat ¼m½ ou izx<+ok mÙkjh ou izex<+ok nf{k.kh ou izeykrsgkj ou ize.My
jk¡ph oU; izk.kh izegtkjhckx oU; izk.kh izC;k?kz ;kstuk ¼dksj½
C;k?kz ;kstuk ¼cQj½
dqy ;ksx &
igkfM+;ksa dk gfj;kyhdj.k
¼vfxze dk;Z½
Hkksfrd
y{;
¼gs0½
foÙkh; y{;
¼:0½ @
18200.93 ¼:0½
Hkksfrd
y{;
¼gs0½
2
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
4
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
18200930.00
5
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
125
0
0
0
0
35000 637032550.00
ty laj{k.k lajpuk
@ 400000.00
foÙkh; y{;
Hkksfrd
@ 37792.02
y{;
:0 izfr gs0 ¼:0½ ¼la0½
6
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
4724002.50
0.00
0.00
0.00
0.00
3875 146444077.50
7
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
;ksx
foÙkh; y{;
¼:0½
8
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
10000000.00
9
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
32924932.50
28200930.00
28200930.00
28200930.00
28200930.00
875 350000000.00 1133476627.50
Species to be planted under CAMPA plantation scheme
Sl.
No.
Production
1
Timber yielding species
2
3
4
5
6
Fruit bearing species
Oil yielding species
Fuel/Folder species
Lac / Tasar growing species
Employment
generating
species
Main species
Mahua, Kathal, Mango, Shisham, Sagwan, Gamhar, Arjun, Asan, Mahogni
etc.
Mahua, Kathal, Mango, Bel, Imali, Ber, Jamun, Amla etc.
Mahua, Neem, Karanj, Bakain etc.
Acacia, Shisham, Subabool, Kathal, Kadam etc.
Kusum, Ber, Palas, Malberry, Arjun, Asan etc.
Bamboo.
dSEik vUrxZr NPV dh jkf'k ls igkfM+;ksa dk gfj;kyhdj.k dh ;kstuk
nj rkfydk
&
&
&
&
&
jdck
?ksjku dh ya0
ikS/kksa dh la0
ikS/kksa dh nwjh
etnwjh nj
1
5
1666
3m x
111
gs0
psu
izfr gsDVs;j
2m
:0 izfr ekuo fnol
Øe la0
dk;Z dh fooj.kh
dk;Z
bdkbZa
ekuo
fnol@gs0
¼la0½
lkexzh@gs
0 ¼:0½
dqy etnwjh
¼:0½
dqy O;;
¼:0½
vH;qfDr
1
2
3
4
5
6
8
9
I
1
2
3
4
5
6
7
8
9
II
1
2
3
4
5
6
7
III
1
2
3
4
5
vfxze dk;Z ¼izFke o"kZ½
losZ{k.k ,oa fMekjds'ku
>kM+h lQkbZ
xÔk ?ksjku& uhps dh pkSM+kbZ 1-22 eh0] mij
dh pkSM+kbZ 1-83 eh0 ,oa xgjkbZ 1-22 eh
iRFkj fnokj ?ksjku&uhps dh pkSM+kbZ 1-75 eh0]
mij dh pksM+kbZ 0-30 eh0 ,oa m¡pkbZ 1-00 eh0
Mªsflax lfgr & dqy ---------- psu
e`nk dk;Z & ihV [kqnkbZ ¼0-30 eh0 x 0-30 eh0
x 0-30 eh0½
va'k ikS/k'kkyk dk;Z jkf= izgjh lfgr
daVwj Vsaªfpax
flYV MhVsa'ku MSe] psd Mse] jhVsfuax ,oa czsLV
oky] Vks oky] Lij ,oa VksjsaV fu;a=.k dk;Z
vkfn
fofo/k dk;Z ¼Nk;kad.k ,oa izlkj lfgr½
vU;kU; O;; & 2 %
;ksx &
lekiu dk;Z ¼f}rh; o"kZ½
va'k ikS/k'kkyk dk;Z jkf= izgjh lfgr
o`{kkjksi.k ,oa moZjd
nks fudkSuh ,oa dksM+uh dk;Z
Vªsap ds oeZ ij ?ksjku gsrq cht jksi.k
ikS/kksa dh lqj{kk
fofo/k dk;Z ¼lkbZucksMZ] Nk;kad.k] vkfn½
vU;kU; O;; & 2 %
;ksx &
laiks"k.k dk;Z ¼r`rh; o"kZ½
,d fudkSuh ,oa dksM+uh
moZjd
lqj{kk ij O;;
?ksjku dh ejEer
e`r ikS/kksa dk izfrLFkkiu
gs0
gs0
psu
gs0
gs0
3
30
333
363
7
0
777
777
25
0
13875
13875
33
0
3663
3663
69
1784
7659
9443
55
0
6105
6105
gs0
25
0
2775
2775
gs0
gs0
0
50
0
50
0
0
0
741.02
217
1864
35187
37792.02
21
0
2331
2331
37
280
4107
4387
37
0
4107
4107
2
0
222
222
7
0
777
777
0
30
0
30
0
0
0
237.08
104
310
11544
12091.08
20
0
2220
2220
0
140
0
140
10
0
1110
1110
5
0
555
555
4
290
444
734
gs0
gs0
gs0
gs0
gs0
gs0
gs0
gs0
gs0
gs0
gs0
gs0
dqy etnwjh ,oa
dqy O;; izfr gs0
5 psu ds vk/kkj
ij
6
vU;kU; O;; & 2 %
gs0
;ksx &
IV
1
2
3
laiks"k.k dk;Z ¼prqFkZ o"kZ½
,d fudkSuh ,oa dksM+uh
lqj{kk ij O;;
vU;kU; O;; & 2 %
gs0
gs0
gs0
;ksx &
V
1
2
3
laiks"k.k dk;Z ¼iape o"kZ½
,d fudkSuh ,oa dksM+uh
lqj{kk ij O;;
vU;kU; O;; & 2 %
gs0
gs0
gs0
;ksx &
VI
1
2
3
laiks"k.k dk;Z ¼"k"Ve o"kZ½
,d fudkSuh ,oa dksM+uh
lqj{kk ij O;;
vU;kU; O;; & 2 %
gs0
gs0
gs0
;ksx &
VII
1
2
3
laiks"k.k dk;Z ¼lIre o"kZ½
,d fudkSuh ,oa dksM+uh
lqj{kk ij O;;
vU;kU; O;; & 2 %
gs0
gs0
gs0
;ksx &
dqy ;ksx &
uksV & 1- xÔk ?ksjku nj ujsxk ekxZn'kZu ij vk/kkfjr gSA
2- vU; nj ;kstuk nj ij vk/kkfjr gSA
3- jksi.k ds fy, 1 o"kZ iqjkus ikS/kksa dk izko/kku fd;k x;k gSA
0
0
0
95.18
39
430
4329
4854.18
20
0
2220
2220
10
0
1110
1110
0
0
0
66.6
30
0
3330
3396.6
20
0
2220
2220
10
0
1110
1110
0
0
0
66.6
30
0
3330
3396.6
20
0
2220
2220
10
0
1110
1110
0
0
0
66.6
30
0
3330
3396.6
20
0
2220
2220
10
0
1110
1110
0
0
0
66.6
30
0
3330
3396.6
480
2604
64380
68323.68
dSEik vUrxZr NPV dh jkf'k ls izkd`frd ouksa dh LFkkiuk (Establishment of Natural Forests ) dh ;kstuk
nj rkfydk
&
&
&
jdck
ikS/kksa dh la0
etnwjh nj
Øe la0
dk;Z dh fooj.kh
1
2
dk;Z
bdkbZa
1.00 gs0
200 izfr gs0
111.00 :0 izfr ekuo fnol
ekuo
fnol@gs0
¼la0½
lkexzh
¼:0½
dqy etnwjh
¼:0½
5
6
dqy O;;
¼:0½
vH;qfDr
,- vfxze dk;Z ¼izFke o"kZ½
1 losZ{k.k ,oa fMekjds'ku
2 >kM+h lQkbZ ,oa dkSihflax
3 e`nk dk;Z & ihV [kqnkbZ ¼0-45 eh0 x 0-45 eh0 x
0-45 eh0½
gs0
gs0
gs0
3
15
14
30
333
363
0
1665
1665
0
1554
1554
4 va'k ikS/k'kkyk dk;Z jkf= izgjh lfgr
gs0
8.3
198
921.3
1119.3
5 daVwj Vsaªpa & 0-30 eh0 x 0-30 eh0 x 0-30 eh0½
gs0
55
0
6105
6105
6 Hkw ,oa ty laj{k.k dk;Z & psd Mse] jhVsfuax
oky] czsLV oky] Vks oky] VksjsaV fu;a=.k dk;Z
bR;kfn
7 izkd`frd iqutZuu losZ{k.k ¼10 % lSEifyax½ &izfr
gs0 40 eh0 x 25 eh0 dk ,d lSEifyax IykWV
dk fuekZ.k ,oa mlesa iqutZuu @dkSfil 'kqV
losZ{k.k
lqj{kk & vfXu] pjkbZ ,oa voS/k ikru ls lqj{kk
¼ou lfefr ds ek/;e ls Hkqxrku½
gs0
25
0
2775
2775
gs0
4
300
444
744
gs0
31.25
0
3468.75
3468.75
9 fofo/k dk;Z ¼Nk;kad.k ,oa izlkj lfgr½
gs0
0
50
0
50
gs0
0
155.55
0
0
356.88
578
17266.05
18200.93
10 vU;kU; O;; & 2 %
;ksx &
ch1
2
3
4
5
lekiu dk;Z ¼f}rh; o"kZ½
va'k ikS/k'kkyk dk;Z jkf= izgjh lfgr
o`{kkjksi.k
nks fudkSuh ,oa dksM+uh
dkSfil lwV~l dk flaxfyax
fofo/k dk;Z ¼lkbZucksMZ] Nk;kad.k vkfn½
6 vU;kU; O;; & 2 %
;ksx &
lhlaiks"k.k dk;Z ¼r`rh; o"kZ½
1 ,d fudkSuh ,oa dksM+uh
2 moZjd
gs0
gs0
gs0
gs0
gs0
2.6
4.4
4.4
5
0
0
288.6
288.6
0
488.4
488.4
0
488.4
488.4
0
555
555
3
0
3
gs0
0
16.4
0
0
36.47
3
1820.4
1859.87
0
310.8
310.8
16.8
0
16.8
gs0
gs0
2.8
0
3 e`r ikS/kksa dk foLFkkiu
lSEifyax IykWV dk j[kj[kko ,oa iqutZuu
losZ{k.k dk;Z
5 lqj{kk & vfXu] pjkbZ ,oa voS/k ikru ls lqj{kk
¼ou lfefr ds ek/;e ls Hkqxrku½
gs0
gs0
2
1
35.2
222
257.2
200
111
311
gs0
31.25
0
3468.75
3468.75
6 vU;kU; O;; & 2 %
gs0
0
37.05
0
0
87.29
252
4112.55
4451.84
0
310.8
310.8
0
0
6.22
0
310.8
317.02
;ksx &
Mh- laiks"k.k dk;Z ¼prqFkZ o"kZ½
1 ,d fudkSuh ,oa dksM+uh
2 vU;kU; O;; & 2 %
gs0
gs0
;ksx &
b- laiks"k.k dk;Z ¼iape o"kZ½
1 ,d fudkSuh ,oa dksM+uh
2 lSEifyax IykWV dk j[kj[kko ,oa iqutZuu
losZ{k.k dk;Z
3 lqj{kk & vfXu] pjkbZ ,oa voS/k ikru ls lqj{kk
¼ou lfefr ds ek/;e ls Hkqxrku½
vU;kU; O;; & 2 %
gs0
gs0
2.8
1
0
310.8
310.8
200
111
311
gs0
31.25
0
3468.75
3468.75
gs0
0
0
0
81.81
35.05
200
3890.55
4172.36
2.8
0
2.8
0
310.8
310.8
0
0
6.22
0
310.8
317.02
;ksx &
,Q-
laiks"k.k dk;Z ¼"k"Ve o"kZ½
,d fudkSuh ,oa dksM+uh
vU;kU; O;; & 2 %
gs0
gs0
;ksx &
th- laiks"k.k dk;Z ¼lIre o"kZ½
1 ,d fudkSuh ,oa dksM+uh
2 lSEifyax IykWV dk j[kj[kko ,oa iqutZuu
losZ{k.k dk;Z
3 lqj{kk & vfXu] pjkbZ ,oa voS/k ikru ls lqj{kk
¼ou lfefr ds ek/;e ls Hkqxrku½
vU;kU; O;; & 2 %
;ksx &
dqy ;ksx &
uksV
&
1- xÔk ?ksjku nj ujsxk ekxZn'kZu ij vk/kkfjr gSA
2- vU; nj ;kstuk nj ij vk/kkfjr gSA
2.8
0
2.8
gs0
gs0
2.8
1
0
310.8
310.8
200
111
311
gs0
31.25
0
3468.75
3468.75
gs0
0
0
0
81.81
35.05
313.15
200
1883.48
3890.55
34759.65
4172.36
36643.13
{kfriwjd oujksi.k ¼dSEik½ ds vUrxZr Hkw laj{k.k ,oa oujksi.k ;kstuk
nj rkfydk ¼izfr gs0½
jdck
?ksjku dh ya0
ikS/kksa dh la0
ikS/kksa dh nwjh
etnwjh nj
Øe la0
dk;Z dh fooj.kh
1
2
&
&
&
&
&
&
&
&
&
&
dk;
Z
bdk
bZa
3
ekuo
fnol@
gs0 ¼la0½
lkexzh@gs
0 ¼:0½
dqy etnwjh
¼:0½
dqy O;; ¼:0½
4
5
6
8
1
5
1666
3m x
111.00
vfxze dk;Z ¼izFke o"kZ½
gs0
gs0
psu
5
va'k ikS/k'kkyk dk;Z jkf= izgjh lfgr
6
7
daVwj Vsaªfpax
flYV MhVsa'ku MSe] psd Mse] jhVsfuax ,oa czsLV
oky] Vks oky] Lij ,oa VksjsaV fu;a=.k dk;Z
vkfn
8
fofo/k dk;Z ¼Nk;kad.k] ,oa izlkj] eqnz.k lfgr½
4
vU;kU; O;; & 2 %
;ksx &
lekiu dk;Z ¼f}rh; o"kZ½
9
1
va'k ikS/k'kkyk dk;Z jkf= izgjh lfgr
o`{kkjksi.k ,oa moZjd
nks fudkSuh ,oa dksM+uh dk;Z
Vªsap ds oeZ ij ?ksjku gsrq cht jksi.k
ikS/kksa dh lqj{kk
fofo/k dk;Z ¼lkbZucksMZ] Nk;kad.k] vkfn½
vU;kU; O;; & 2 %
;ksx &
laiks"k.k dk;Z ¼r`rh; o"kZ½
2
3
4
5
6
7
vH;qfDr
9
111
losZ{k.k ,oa fMekjds'ku
>kM+h lQkbZ
xÔk ?ksjku& uhps dh pkSM+kbZ 1-22 eh0] mij
dh pkSM+kbZ 1-83 eh0 ,oa xgjkbZ 1-22 eh iRFkj
fnokj ?ksjku&uhps dh pkSM+kbZ 1-75 eh0] mij
dh pksM+kbZ 0-30 eh0 ,oa m¡pkbZ 1-00 eh0 Mªsflax
lfgr & dqy ---------- psu
e`nk dk;Z & ihV [kqnkbZ ¼0-30 eh0 x 0-30 eh0
x 0-30 eh0½
1
2
3
gs0
psu
izfr gsDVs;j
2m
:0 izfr ekuo fnol
3.00
30.00
333.00
363.00
7.00
0.00
777.00
777.00
25.00
0.00
13875.00
13875.00
gs0
33.00
0.00
3663.00
3663.00
gs0
69.00
1784.00
7659.00
9443.00
55.00
0.00
6105.00
6105.00
gs0
25.00
0.00
2775.00
2775.00
gs0
0.00
50.00
0.00
50.00
gs0
0.00
741.02
0.00
741.02
217.00
2605.02
35187.00
37792.02
gs0
21.00
0.00
2331.00
2331.00
gs0
gs0
gs0
gs0
gs0
gs0
37.00
280.00
4107.00
4387.00
37.00
0.00
4107.00
4107.00
2.00
0.00
222.00
222.00
7.00
0.00
777.00
777.00
0.00
30.00
0.00
30.00
0.00
237.08
0.00
237.08
104.00
547.08
11544.00
12091.08
dqy etnwjh
,oa dqy O;;
izfr gs0 5
psu ds vk/kkj
ij
,d fudkSuh ,oa dksM+uh
moZjd
lqj{kk ij O;;
?ksjku dh ejEer
e`r ikS/kksa dk izfrLFkkiu
vU;kU; O;; & 2 %
;ksx &
laiks"k.k dk;Z ¼prqFkZ o"kZ½
gs0
gs0
gs0
gs0
gs0
gs0
,d fudkSuh ,oa dksM+uh
lqj{kk ij O;;
vU;kU; O;; & 2 %
;ksx &
laiks"k.k dk;Z ¼iape o"kZ½
gs0
gs0
gs0
,d fudkSuh ,oa dksM+uh
lqj{kk ij O;;
vU;kU; O;; & 2 %
;ksx &
laiks"k.k dk;Z ¼"k"Ve o"kZ½
gs0
gs0
gs0
,d fudkSuh ,oa dksM+uh
lqj{kk ij O;;
vU;kU; O;; & 2 %
;ksx &
laiks"k.k dk;Z ¼lIre o"kZ½
gs0
gs0
gs0
1
2
3
4
5
6
1
2
3
1
2
3
1
2
3
1
2
3
,d fudkSuh ,oa dksM+uh
lqj{kk ij O;;
vU;kU; O;; & 2 %
;ksx &
dqy ;ksx &
gs0
gs0
gs0
20.00
0.00
2220.00
2220.00
0.00
140.00
0.00
140.00
10.00
0.00
1110.00
1110.00
5.00
0.00
555.00
555.00
4.00
290.00
444.00
734.00
0.00
95.18
0.00
95.18
39.00
525.18
4329.00
4854.18
20.00
0.00
2220.00
2220.00
10.00
0.00
1110.00
1110.00
0.00
66.60
0.00
66.60
30.00
66.60
3330.00
3396.60
20.00
0.00
2220.00
2220.00
10.00
0.00
1110.00
1110.00
0.00
66.60
0.00
66.60
30.00
66.60
3330.00
3396.60
20.00
0.00
2220.00
2220.00
10.00
0.00
1110.00
1110.00
0.00
66.60
0.00
66.60
30.00
66.60
3330.00
3396.60
20.00
0.00
2220.00
2220.00
10.00
0.00
1110.00
1110.00
0.00
66.60
0.00
66.60
30.00
66.60
3330.00
3396.60
480.00
3943.68
64380.00
68323.68
uksV & 1- xÔk ?ksjku nj ujsxk ekxZn'kZu ij vk/kkfjr gSA
2- vU; nj ;kstuk nj ij vk/kkfjr gSA
3- jksi.k ds fy, 1 o"kZ iqjkus ikS/kksa dk izko/kku fd;k x;k gSA