Remeha Avanta Plus HPKI_K Maintenance and Cleaning Instructions
Add to my manuals
41 Pages
Remeha Avanta Plus HPKI_K is a condensing boiler with a high efficiency of 108%. It is designed to be environmentally friendly and to save energy. The boiler is also easy to install and maintain, making it a great choice for both residential and commercial applications.
advertisement
▼
Scroll to page 2
of 41
MAINTENANCE Ash container Maintenance Ash removal Placement On the boiler´s side Procedure Check up the ash content in the container, empty it when necessary. Maitenance period When necessaryd Pos. MAINTENANCE-01 MAINTENANCE Igniter Maintenance Igniter Placement On the side of heating boiler procedure Unscrew the ignition tube and clean it Maintenance period Half a year Pos. MAINTENANCE-02 CLEANING Multicyclone Maintenance Multicyclone Placement Maintenance cover on the side of heating boiler Procedure Open the cover plate and clean the multicyclone using industrial vacuum cleaner Maintenance period Quarterly Pos. MAINTENANCE-03 MAINTENANCE Ash removal from rost Maintenance Ash removal from rost Placement On the heating boiler´s back side, near the stocker Procedure Open the cover plates, or door and remove the ash from the rost. Maintenance period Quarterly Pos. MAINTENANCE-04 MAINTENANCE Cleaning of the combustion chamber Maintenance Combustion chamber UTSK- under stocker Placement ‚Front side of the heating boiler Procedure 1. Cleaning of retort and combustion chamber 2. Cleaning of the surface over the fire bricks Maintenance period Quarterly Pos. MAINTENANCE-05a MAINTENANCE Cleaning of combustion chamber Maintenance Combustion chamber UTSK- step grate Placement ‚Front side of the heating boiler Procedure 3. Cleaning of the combustion surface 4. Cleaning of the surface over the fire bricks Maintenance period Quarterly Pos. MAINTENANCE-05c MAINTENANCE Cleaning of burning grate Maintenance Burning grate UTSK- understocker Placement Front side of the heating boiler Procedure 1. Remove the ash from the combustion space 2. Cleaning of the burning grate Maintenance period Quarterly Pos. MAINTENANCE-06a MAINTENANCE Cleaning of burning grate Maintenance Burning grate UTSK-Step grate Placement Front side of the heating boiler Procedure 3. Remove the ash from beneath of the step grate 4. Clean the gragesurface and the buring space Maintenance period Quarterly Pos. MAINTENANCE-06c MAINTENANCE Cleaing of heat exchanger Maintenance Heat exchanger Placement Front side of the heating boiler Procedure Clean the heat exchanger using the delivered brush. Maintenance period Quarterly Pos. MAINTENANCE-07 MAINTENANCE Cleaning of suction blowers Maintenance Suction blower Placement Back side of the heating boiler Procedure Clean the suction blower from ash using an industrial vacuum cleaner. Pay attention to the flue gas sensor, also when cleaning the flue gas pipe. Maintenance period Quarterly Pos. MAINTENANCE-08 MAINTENANCE Cleaning of flue gas tube Maintenance Flue gas tube and chimney Placement Down the suction blower Procedure 1. Clean and exhaust the flue gas tube 2. Clean the chimney Maintenance period Quraterly Pos. MAINTENANCE-09 CLEANING Compressor Maintenance Compressor Placement In the heating room near the switch box Procedure Empty the condensed water vessel on the compressor Maitenance period Half a year Pos. CLEANING-02 CLEANING Maintenance Cleaning Place Heating room Procedure Cleaning of all motors and blowers Maintenance period Half a year Pos. CLEANING-03 CLEANING Hydraulic aggregate Maintenance Hydraulic aggregate Placement In the heating room near the heating boiler Procedure 1. 2. 3. 4. Check Check Check Check up up up up the the the the oil level equipment pressure operational temperature sealing of cylinder and hoses Maintenance period Once a month Pos. CLEANING-05 LUBRICATION Silo discharge Maintenance Replacement of gear smear in the silo discharging system Emptying of silo is necessary When working in silo, observe the safety rules for works in silo room The permission for works is imperatively required. Placement Beneath the tapered part of silo room Grease substance Smear for gears Amount of grease substance See the Operation instruction to discharge systems Maintenance period Every 2 years Pos. SILO-01 LUBRICATIONCross feed worm screw Maitenance Lubrication of the flange bearings of cross feed worm screw Placement Behind the gear motor( on the motor side) Grease substance Roller bearings grease K2K-20-DIN 51502 Drop point 160°C/132°F at least Amount of grease substance 1-2 pump strokes for each greased place Maintenance period Quarterly Pos. PUSH R-01 LUBRICATION Cross feed worm screw Maitenance Lubrication of the flange bearings of cross feed worm screw Placement Vis a vis the driving side Grease substance Roller bearings grease K2K-20-DIN 51502 Drop point 160°C/132°F at least Amount of grease substance 1-2 pump strokes for each greased place Maintenance period Quarterly Pos. PUSH-02 MAINTENANCE Hydraulic push rods Maintenance hydraulic aggregate 5. Check up of the oil level 6. Check up of the device pressure 7. Check up fo the operational temperature Place Hydraulic room Maintenance period Once a month Pos. PUSH-03 MAITENANCE Hydraulic push rods Maintenance of hydraulic aggregate Check up of the cylinder and hoses tightness Placement Hydraulic space Maitenance period Once a month Pos. PUSH-04 LUBRICATION PLAN conveyor view from above side view Maintenance Lubrication of the worm screw flange bearing on the side of motor Placement Behind the gear motor Grease substance Roller bearings grease K2K-20-DIN 51502 Drop point 160°C/132°F at least Amount of grease substance 1-2 pump strokes for each greased point Maintenance period Quarterly Pos. WORM SCREW-01 LUBRICATION Ash worm conveyor Multicyclone Maintenance Lubrication of bearings on the ash worm conveyor on multicyclone Placement Vis a vis the driving side Grease substance Roller bearings grease K2K-20-DIN 51502 Drop point 160°C/132°F at least Amount of grease substance 1-2 pump strokes for each greased place Maintenance period Quarterly Pos. LUBRIC-01 LUBRICATION Ash conveying rising worm screw Maintenance Lubrication of rising worm screw bearing Maintenance Lubrication of bearing on the ash worm conveyor on multicyclone Placement Vis a vis the driving side Grease substance Roller bearings grease K2K-20-DIN 51502 Drop point 160°C/132°F at least Amount of grease substance 1-2 pump strokes for each greased place Pos. LUBRIC-02 LUBRICATION Grate ash removal Maintenance Lubrication of bearing on worm screw removing ash from grate Maintenance Lubrication of bearing on the ash worm conveyor on multicyclone Placement Vis a vis the driving side Grease substance Roller bearings grease K2K-20-DIN 51502 Drop point 160°C/132°F at least Amount of grease substance 1-2 pump strokes for each greased place Pos. LUBRIC-03 LUBRICATION Suction blowers Maintenance Lubrication of the bearing between the suction casing and the motor for suction blowers. Place On the suction blowers placed on the backside of boiler Grease substance Roller bearings grease K2K-20-DIN 51502 Drop point 160°C/132°F at least Amount of grease substance 1-2 pump strokes for each greased place Maintenance period Quarterly Pos. LUBRIC-04 CLEANING Cleaning of heat exchanger Maitenance Cleaning of heat exchanger Placement Front side od heat exchanger Procedure Remvoe the condensed water by pressure vessel of heat exchanger Maitenance period Half a year Pos. CLEANING-01 CLEANING Compressor Maintenance Compressor Placement In the heating room near the switch box Procedure Empty the condensed water vessel on the compressor Maitenance period Half a year Pos. CLEANING-02 CLEANING Maintenance Cleaning Place Heating room Procedure Cleaning of all motors and blowers Maintenance period Half a year Pos. CLEANING-03 CLEANING Underpressure tube Maintenance Cleaning of the underpressure tube Placement Underpressure switch Procedure Pull the hose from the underpressure switch connector and clean it by suction – WARNING – do not blow through it – you could damage the undepressure switch connector, Or pull out the hose from the underpressure switch connector and measuring unit in switch box and flush the hose. Maintenance period Half a year Pos. CLEANING -04 CLEANING Hydraulic aggregate Maintenance Hydraulic aggregate Placement In the heating room near the heating boiler Procedure 8. 9. 10. 11. Check Check Check Check up up up up the the the the oil level equipment pressure operational temperature sealing of cylinder and hoses Maintenance period Once a month Pos. CLEANING-05 LUBRICATION Elbow discharge Maitenance Lubrication of the flange bearings of elbow discharging worm screw Placement Behind the gear motor Grease substance Roller bearings grease K2K-20-DIN 51502 Drop point 160°C/132°F at least Amount of grease substance 1-2 pump strokes for each greased place Maintenance period Quarterly Pos. ELBOW-01 LUBRICATION Elbow discharge Maintenance Replacement of the gear oil in the elbow discharge system Emptying of silo is necessary When working in silo, observe the safety rules for works in silo room The permission for works is imperatively required Placement Beneath the discharge plate in silo room Grease subsatnce ‚Gear oil Amount of grease substance See the Operation instruction to gears Maintenance period Every 5 years Pos. ELBOW-02 Notices: Gear motors – Oil replacement, periods, inbuilt parts, filling quantities, venting screws, filling openings, oil condition considering..... Sensor cleaning Combustion temperature sensor – take of carefully, wipe, install again carefully .... Examine fire extinguishers according the rule TRVB 118 Notice on maintenance contract Notice on protective clothing during cleaning works Notice on manipulation and disposal of used oil, detergents Control – battery replacement - required? GREASE-04 Grease for higher temperatures Hydraulics Replacement of hydraulic oil MAINTENANCE AND LUBRICATIONS PLAN Maintenance You have bought Gilles heating facility – that means, you have obtained solid equipment, requiring minimum maintenance. Nevertheless, you should pay attention to the following instructions on maintenance, in order to assure a long operational life of your equipment. Attention An imperative requirement: Before starting cleaning and lubricating the equipment, its operation must be stopped and the main current supply switched off and assured against an unintentional or unwitting switching on. Only trained and authorised skilled personal is competent to carry out maintenance works. Regular and sound maintenances and operation are the best presuppositions of high efficiency and reliability of the equipment. Only original spare parts used for replacement assure a due performance of the complete facility and assure a claim for guarantee. Namely in case of works in silo, there is highly important to observe duly all the operation instructions and safety rules, as the works in silo are considered as „dangerous works“, imperatively requiring permission for these works. Grease lubrication Places not adequately protected against penetration of water and dirty particles must be greased, because the grease substance functions as sealing substance. In addition, the greases can better damp stroke impacts on bearings. The bearings are filled with grease upon the installation, so they are prepared for operation. The used grease should be suitable for the temperature range from -30 °C to + 90 °C. Use the pressure oiler for greasing. The storage temperature may be 50 °C over the room temperature at maximum and must not exceed 90 °C. Check up it once a week at least. Quality of grease Roller bearing grease K2K-20-DIN 51502 – drop point 160°C/132°F at least. Quantity of grease The conveying parts are equipped with various driving devices and bearings depending on their dimensions and fuel quantities delivered, therefore the specified quantities and stroke specifications are only informative. Lubricated places The remarked lubricated places must be lubricated ca. once a month (every 200 operation hours). Use pressure oilers for greasing substances (1 – 2 pump strokes for each lubricated point’). Lubrication greases Type of lubrication grease: K, G, OG, M • Data for field of use Consistency class NLGI Lower temperature of field of use (for synthetic oil additional letters according to oil type: HC,E,PG,S) Additional letter marks: Additional letter marks: C to U • Data for upper D,E.F,L,M,S,P,V • Data for usage possibililies 1 Type of grease Greases for roller bearings, sliding bearings and surfaces according DIN 51825 Greases for closed gears according DIN 51826 Greases for open gears, toothings (adhesive greasing materials without bitumen) Greases for sliding bearings and sealings2) Greases on the synthetic basis upon their basic properties are marked as greases on the mineral oil basis. temperature of field of use 2 Letter marks 3 Symbol K1) For greases on the mineral oil basis G OG M For greases on the synthetic oil basis Insert the marking letter acc. Table 1, substance kind 3 1) In ISO/TR 3498:1986 the letters „XM “ are used instead of „K“. 2) Minor requirements than on greases of type. 1 Additional letter marks 2 Greasing substances For greasing oils with detergent addition agents D e.g. hydraulic oil HLPD For greasing oil used as mixture with water e.g. cooling lubricants that may be mixed with water – E e.g. cooling lubricant SE Greasing material added by solid greasing substances (e.g. graphite, molybdenum disulphide), e.g. greasing F oil CLPPF For greasing substances containing addition agents increasing the corrosion resistance of material, and/or L extending its service life e.g. greasing oil DIN 51217 – CL 100 For cooling water mixed lubricants containing mineral M oils, e.g. cooling greasing substance SEM For cooling water mixed lubricants on the synthetic S basis, e.g. cooling greasing substance SES For greasing substances that contain agents eliminating frictions or abrasions or increasing the P endurance resistance of materials, e.g. greasing oil CLP 100 For greasing substances reduced by diluents 1) V Greasing oil DIN 51315 – BB-V Marking letter V shall be added by an abbreviation indicating dangerous materials (in accordance with ordinance on dangerous materials) 1 Consistency mark (NLGIclasses acc. DIN 51813 2 Fulling penetration specified according units DIN ISO 21371) 000 00 0 1 2 3 4 5 6 445 to 475 400 to 430 355 to 385 310 to 340 265 to 295 220 to 250 175 to 205 130 to 160 85 to 115 2) 1) 1 unit = 0,1 mm / 2) resting penetration 1 Additional letter marks 2 3 Action against water acc. DIN 51807 Part 1: Evaluation steps DIN 51807 2) 0-40 or 1-40 Upper temperature used 1) C D E F G H K M N P R S T U + 60 °C 2-40 or 3-40 0-40 or 1-40 + 80 °C 2-40 or 3-40 0-90 or 1-90 + 100 °C 2-90 or 3-90 0-90 or 1-90 + 120 °C 2-90 or 3-90 + 140 °C + 160 °C + 180 °C according agreement + 200 °C + 220 °C over + 220 °C 1) The „upper temperature used“ for permanent greasing is identical with the highest testing temperature used for tests according to DIN 51806 Part 2 (at present the Draft) and/or according to DIN 51821, Part 2. if the test procedures are performed: 2) 0 means no change 1 means minor change 2 means mean change 3 means great change 1 Additional number marks - 10 - 20 - 30 - 40 - 50 - 60 2 Lower temperature used - 10 - 20 - 30 - 40 - 50 - 60 Additional marks for synthetic oils E EF HC PH PG SI X Organic esters Perfluorine - fluids Synthetic hydrocarbons Esters of phosphoric acid Polyglycol oils Silicone oils Others Care Use a soft, wet cloth for removing impurities from boiler, facings and operational parts. For damping the cloth, use only soft cleaning agents in order to prevent surface scrapping. Do not use diluents, alcohol or cleaning spirit in any case. Operation and maitenance logbook Date Time Operation hours <60% >60% Output Course Combustion % T°C T°C Flue gas T°C Cleaning By oneself Chimney sweeper Remarks Silo filling (m3) In – out operation defect/mainten. Validation Maintenace Gilles - Heating facility Facility: Date: Customer: Only qualified skilled personal may carry out the maintenance works, while observing all the operation instructions and any currently valid rules. The use of this check list, way, scope and periods of maintenance works shall be specified and adapted to the local prevailing conditions. Pos. Description LUBRICATION – greasing 1 Multicyclone ash removing worm screw 2 Ash rising worm screw (in case of an automatic ash removal) 3 Worm screw remove ash from grate (in case of an automatic ash removal) 4 Between suction casing and motor 5 Bearing of star feeder MAINTENANCE - heating boiler 1 Ash container emptying 2 Unscrew and clean the igniter and igniter tube 3 Cleaning of multicyclone 4 Removal ash from grate 5a 5b 5c 5d quarterly half a year once a year Funct. Carried out quarterly half a year once a year Funct. Carried out quarterly half a year once a year Funct. Carried out quarterly half a year once a year Funct. Carried out Bei Bedarf Cleaning of the complete combustion chamber UTSK-under feeding Cleaning of the complete combustion chamber UTSK-front feeding Cleaning of the complete combustion chamber UTSKstepping grate Cleaning of the complete combustion chamber UTSKcompact 6a Cleaning of the combustion grate UTSK-underfeeding 6b Cleaning of the combustion surface UTSK-front feeding 6c Cleaning of the combustion surface UTSK-stepping grate 6d Cleaning of the combustion grate UTSK-compact 7 Cleaning of the heat exchanger flue gas duct 8 Cleaning of the suction blower 9 Cleaning of the flue gas tube CLEANING 1 Emptying of condensed water when heat exchanger is cleaned 2 Emptying of condensed water vessel on compressor 3 Cleaning of all the motors and blowers 4 Cleaning of the underpressure pipes 5 Maintenance of hydraulic aggregate WORM SCREW – maintenance of worm screw conveyors 20 Maintenance period/ Performance Lubrication of worm screw bearing (on the motor side) 21 Lubrication of the worm screw bearing ELBOW DISCHARGE - maintenance 1 Lubrication of elbow discharge system bearings 2 Replacement of gear oil in angle gear SILO – maintenance of silo discharge system 1 quarterly half a year once a year Funct. Carried out quarterly half a year once a year Funct. Carried out quarterly half a year once a year Funct. Carried out Horizontal discharging – replacement of gear smears PUSH RODS SYSTEM – maintenance 1 Lubrication of the cross feeder worm screw bearing on the side of motor 2 Lubrication of the worm screw bearing 3 Hydraulic aggregate 4 Cylinders and hoses Maintenance Gilles-heating facility Annexes Date: Customer: Lubricants – greasing 1 Multicyclone ash removing worm screw 2 Ash rising worm screw (in case of an automatic ash removal) 3 Worm screw remove ash from grate (in case of an automatic ash removal) 4 Between suction casing and motor 5 Bearing of star feeder MAINTENANCE - heating boiler 1 Ash container emptying 2 Unscrew and clean the igniter and igniter tube 3 Cleaning of multicyclone 4 Removal ash from grate 5a Cleaning of the complete combustion chamber UTSK-under feeding 5b Cleaning of the complete combustion chamber UTSK-front feeding 5c Cleaning of the complete combustion chamber UTSK-stepping grate 5d Cleaning of the complete combustion chamber UTSK-compact 6a Cleaning of the combustion grate UTSK-underfeeding 6b Cleaning of the combustion surface UTSK-front feeding 6c Cleaning of the combustion surface UTSK-stepping grate 6d Cleaning of the combustion grate UTSK-compact 7 Cleaning of the heat exchanger flue gas duct 8 Cleaning of the suction blower 9 Cleaning of the flue gas tube CLEANING 1 Emptying of condensed water when heat exchanger is cleaned 2 Emptying of condensed water vessel on compressor 3 Cleaning of all the motors and blowers 4 Cleaning of the underpressure pipes 5 Maintenance of hydraulic aggregate WORM SCREW – maintenance of worm screw conveyors 20 Lubrication of worm screw bearing (on the motor side) 21 Lubrication of the worm screw bearing ELBOW DISCHARGE - maintenance 1 Lubrication of elbow discharge system bearings 2 Replacement of gear oil in angle gear SILO – maintenance of silo discharge system 1 Horizontal discharging – replacement of gear smears PUSH RODS SYSTEM – maintenance 1 Lubrication of the cross feeder worm screw bearing on the side of motor 2 Lubrication of the worm screw bearing 3 Hydraulic aggregate 4 Cylinders and hoses
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement