Government of AJ&K
CSR-2015,Volume-1
Sadnouti
Updated for 2nd Semi-annual (Jan - June) 2015
Sr. No.
Description
Unit
Rate (Rs.)
Labour
Composite
26.4
Excavation of well in dry and under water level and disposal
of soil within 100 ft. (30m or one chain)
26- 1
a) In ordinary soil or sand
i)
Upto 5 ft. (1.5 m) depth
Cu.m.
Cu.ft.
255.40
7.25
255.40
7.25
ii)
Above 5 ft. to 10 ft. (1.5 m to 3 m) depth
Cu.m.
Cu.ft.
276.70
7.85
276.70
7.85
iii)
Above 10 ft. to 15 ft. (3 m to 4.5 m) depth
Cu.m.
Cu.ft.
297.95
8.45
297.95
8.45
iv)
Above 15 ft. to 20 ft. (4.5 m to 6 m) depth
Cu.m.
Cu.ft.
319.25
9.05
319.25
9.05
v)
Above 20 ft. to 25 ft. (6 m to 7.5 m) depth
Cu.m.
Cu.ft.
340.55
9.65
340.55
9.65
vi)
Above 25 ft. to 30 ft. (7.5 m to 9 m) depth
Cu.m.
Cu.ft.
383.10
10.85
383.10
10.85
vii)
Above 30 ft. to 35 ft. (9 m to 10.5 m) depth
Cu.m.
Cu.ft.
425.65
12.05
425.65
12.05
viii)
Above 35 ft. to 40 ft. (10.5 m to 12 m) depth
Cu.m.
Cu.ft.
468.25
13.25
468.25
13.25
ix)
Above 40 ft. to 45 ft. (12 m to 13.5 m) depth
Cu.m.
Cu.ft.
510.80
14.45
510.80
14.45
x)
Above 45 ft. (13.5 m) to any depth
Cu.m.
Cu.ft.
681.05
19.30
681.05
19.30
xi)
Under water upto 15 ft. depth (upto 4.5 m below water
Cu.m.
Cu.ft.
851.35
24.10
851.35
24.10
b) In hard soil
i)
Upto 5 ft. (1.5 m) depth
Cu.m.
Cu.ft.
297.95
8.45
297.95
8.45
ii)
Above 5 ft. to 10 ft. (1.5 m to 3 m) depth
Cu.m.
Cu.ft.
319.25
9.05
319.25
9.05
iii)
Above 10 ft. to 15 ft. (3 m to 4.5 m) depth
Cu.m.
Cu.ft.
340.55
9.65
340.55
9.65
iv)
Above 15 ft. to 20 ft. (4.5 m to 6 m) depth
Cu.m.
Cu.ft.
361.80
10.25
361.80
10.25
v)
Above 20 ft. to 25 ft. (6 m to 7.5 m) depth
Cu.m.
Cu.ft.
404.40
11.45
404.40
11.45
vi)
Above 25 ft. to 30 ft. (7.5 m to 9 m) depth
Cu.m.
Cu.ft.
446.95
12.65
446.95
12.65
26 - 1 (SINKING OF WELLS)
Ref. Tech.
Specs.
Government of AJ&K
CSR-2015,Volume-1
Sadnouti
Updated for 2nd Semi-annual (Jan - June) 2015
Sr. No.
Description
Unit
Rate (Rs.)
Labour
Composite
vii)
Above 30 ft. to 35 ft. (9 m to 10.5 m) depth
Cu.m.
Cu.ft.
489.50
13.85
489.50
13.85
viii)
Above 35 ft. to 40 ft. (10.5 m to 12 m) depth
Cu.m.
Cu.ft.
532.10
15.05
532.10
15.05
ix)
Above 40 ft. to 45 ft. (12 m to 13.5 m) depth
Cu.m.
Cu.ft.
574.65
16.25
574.65
16.25
x)
Above 45 ft. (13.5 m) to any depth
Cu.m.
Cu.ft.
723.65
20.50
723.65
20.50
xi)
Under water upto 15 ft. depth (upto 4.5 m below water
Cu.m.
Cu.ft.
936.45
26.50
936.45
26.50
Ref. Tech.
Specs.
c) In hard strata including shingle, gravel or equivalent
i)
Upto 5 ft. (1.5 m) depth
Cu.m.
Cu.ft.
553.35
15.65
553.35
15.65
ii)
Above 5 ft. to 10 ft. (1.5 m to 3 m) depth
Cu.m.
Cu.ft.
574.65
16.25
574.65
16.25
iii)
Above 10 ft. to 15 ft. (3 m to 4.5 m) depth
Cu.m.
Cu.ft.
595.95
16.90
595.95
16.90
iv)
Above 15 ft. to 20 ft. (4.5 m to 6 m) depth
Cu.m.
Cu.ft.
617.20
17.50
617.20
17.50
v)
Above 20 ft. to 25 ft. (6 m to 7.5 m) depth
Cu.m.
Cu.ft.
659.80
18.70
659.80
18.70
vi)
Above 25 ft. to 30 ft. (7.5 m to 9 m) depth
Cu.m.
Cu.ft.
702.35
19.90
702.35
19.90
vii)
Above 30 ft. to 35 ft. (9 m to 10.5 m) depth
Cu.m.
Cu.ft.
744.90
21.10
744.90
21.10
viii)
Above 35 ft. to 40 ft. (10.5 m to 12 m) depth
Cu.m.
Cu.ft.
787.50
22.30
787.50
22.30
ix)
Above 40 ft. to 45 ft. (12 m to 13.5 m) depth
Cu.m.
Cu.ft.
830.05
23.50
830.05
23.50
x)
Above 45 ft. (13.5 m) to any depth
Cu.m.
Cu.ft.
893.90
25.30
893.90
25.30
xi)
Under water upto 15 ft. depth (upto 4.5 m below water
Cu.m.
Cu.ft.
936.45
26.50
936.45
26.50
26.4
Dry sinking of well including loading and removing of
excavated material within 100ft (30m.) lead.
26- 2
26.6
a) In ordinary soil or sand
i)
Above 10 ft. to 15 ft. (3 m to 4.5 m) depth
26 - 2 (SINKING OF WELLS)
Cu.m.
Cu.ft.
936.45
26.50
936.45
26.50
Government of AJ&K
CSR-2015,Volume-1
Sadnouti
Updated for 2nd Semi-annual (Jan - June) 2015
Sr. No.
Description
Unit
Rate (Rs.)
Labour
Composite
ii)
Above 15 ft. to 20 ft. (4.5 m to 6 m) depth
Cu.m.
Cu.ft.
1,194.00
33.80
1,194.00
33.80
iii)
Above 20 ft. to 25 ft. (6 m to 7.5 m) depth
Cu.m.
Cu.ft.
1,451.50
41.10
1,451.50
41.10
iv)
Above 25 ft. to 30 ft. (7.5 m to 9 m) depth
Cu.m.
Cu.ft.
1,709.05
48.40
1,709.05
48.40
v)
Above 30 ft. to 35 ft. (9 m to 10.5 m) depth
Cu.m.
Cu.ft.
1,966.60
55.70
1,966.60
55.70
vi)
Above 35 ft. to 40 ft. (10.5 m to 12 m) depth
Cu.m.
Cu.ft.
2,224.10
63.00
2,224.10
63.00
vii)
Above 40 ft. to 45 ft. (12 m to 13.5 m) depth
Cu.m.
Cu.ft.
2,481.65
70.30
2,481.65
70.30
viii)
Above 45 ft. (13.5 m) to any depth
Cu.m.
Cu.ft.
2,739.15
77.55
2,739.15
77.55
b) In hard soil
i)
Above 10 ft. to 15 ft. (3 m to 4.5 m) depth
Cu.m.
Cu.ft.
1,311.05
37.15
1,311.05
37.15
ii)
Above 15 ft. to 20 ft. (4.5 m to 6 m) depth
Cu.m.
Cu.ft.
1,568.60
44.40
1,568.60
44.40
iii)
Above 20 ft. to 25 ft. (6 m to 7.5 m) depth
Cu.m.
Cu.ft.
1,826.10
51.70
1,826.10
51.70
iv)
Above 25 ft. to 30 ft. (7.5 m to 9 m) depth
Cu.m.
Cu.ft.
2,083.65
59.00
2,083.65
59.00
v)
Above 30 ft. to 35 ft. (9 m to 10.5 m) depth
Cu.m.
Cu.ft.
2,341.15
66.30
2,341.15
66.30
vi)
Above 35 ft. to 40 ft. (10.5 m to 12 m) depth
Cu.m.
Cu.ft.
2,598.70
73.60
2,598.70
73.60
vii)
Above 40 ft. to 45 ft. (12 m to 13.5 m) depth
Cu.m.
Cu.ft.
2,856.20
80.90
2,856.20
80.90
viii)
Above 45 ft. (13.5 m) to any depth
Cu.m.
Cu.ft.
3,113.75
88.15
3,113.75
88.15
c) In hard strata including shingle, gravel or equivalent
i)
Above 10 ft. to 15 ft. (3 m to 4.5 m) depth
Cu.m.
Cu.ft.
1,826.10
51.70
1,826.10
51.70
ii)
Above 15 ft. to 20 ft. (4.5 m to 6 m) depth
Cu.m.
2,083.65
2,083.65
Cu.ft.
59.00
59.00
Cu.m.
Cu.ft.
2,341.15
66.30
2,341.15
66.30
iii)
Above 20 ft. to 25 ft. (6 m to 7.5 m) depth
26 - 3 (SINKING OF WELLS)
Ref. Tech.
Specs.
Government of AJ&K
CSR-2015,Volume-1
Sadnouti
Updated for 2nd Semi-annual (Jan - June) 2015
Sr. No.
Unit
Rate (Rs.)
Labour
Composite
iv)
Above 25 ft. to 30 ft. (7.5 m to 9 m) depth
Cu.m.
Cu.ft.
2,598.70
73.60
2,598.70
73.60
v)
Above 30 ft. to 35 ft. (9 m to 10.5 m) depth
Cu.m.
Cu.ft.
2,856.20
80.90
2,856.20
80.90
vi)
Above 35 ft. to 40 ft. (10.5 m to 12 m) depth
Cu.m.
Cu.ft.
3,113.75
88.15
3,113.75
88.15
vii)
Above 40 ft. to 45 ft. (12 m to 13.5 m) depth
Cu.m.
Cu.ft.
3,371.25
95.45
3,371.25
95.45
viii)
Above 45 ft. (13.5 m) to any depth
Cu.m.
Cu.ft.
3,628.80
102.75
3,628.80
102.75
26- 3
26- 4
Description
26.4
26.6
Wet sinking of well in ordinary soil (value of 'c' upto 5) for
depth below spring level including charges of machinery,
shoring, kentledge and removal of excavated material within
100 ft. (30m.) lead.
i)
Upto 10 ft (3 m) depth
Cu.m.
Cu.ft.
386.03
10.95
1,109.62
31.40
ii)
Above 10 ft. to 20 ft. (3 m to 6 m) depth
Cu.m.
Cu.ft.
818.35
23.15
2,352.40
66.60
iii)
Above 20 ft. to 30 ft. (6 m to 9 m) depth
Cu.m.
Cu.ft.
1,003.65
28.40
2,885.00
81.70
iv)
Above 30 ft. to 40 ft. (9 m to 12 m) depth
Cu.m.
Cu.ft.
1,316.01
37.25
3,770.53
106.75
v)
Above 40 ft. to 50 ft. (12 m to 15 m) depth
Cu.m.
Cu.ft.
1,457.32
41.25
4,181.96
118.40
vi)
Above 50 ft. to 60 ft. (15 m to 18 m) depth
Cu.m.
Cu.ft.
1,642.66
46.50
4,704.24
133.20
vii)
Above 60 ft. to 70 ft. (18 m to 21 m) depth
Cu.m.
Cu.ft.
1,682.09
47.65
4,824.40
136.60
viii)
Above 70 ft. to 80 ft. (21 m to 24 m) depth
Cu.m.
Cu.ft.
1,725.60
48.85
4,953.62
140.30
ix)
Above 80 ft. (24 m) to any depth
Cu.m.
Cu.ft.
1,871.02
53.00
5,378.21
152.30
Wet sinking of well in cohesive soil (value of 'C' more than 5)
for depth below spring level including charges of machinery,
shoring, kentledge and removal of excavated material within
30m lead.
i)
Upto 10 ft (3 m) depth
26.4
26.6
Cu.m.
Cu.ft.
582.94
16.50
1,664.40
47.15
ii)
Above 10 ft. to 20 ft. (3 m to 6 m) depth
Cu.m.
Cu.ft.
730.68
20.70
2,094.12
59.30
iii)
Above 20 ft. to 30 ft. (6 m to 9 m) depth
Cu.m.
Cu.ft.
868.56
24.60
2,508.70
71.05
26 - 4 (SINKING OF WELLS)
Ref. Tech.
Specs.
Government of AJ&K
CSR-2015,Volume-1
Sadnouti
Updated for 2nd Semi-annual (Jan - June) 2015
Sr. No.
26- 5
26- 6
26- 7
Description
Unit
Rate (Rs.)
Labour
Composite
iv)
Above 30 ft. to 40 ft. (9 m to 12 m) depth
Cu.m.
Cu.ft.
1,165.75
33.00
3,336.76
94.50
v)
Above 40 ft. to 50 ft. (12 m to 15 m) depth
Cu.m.
Cu.ft.
1,343.82
38.05
3,801.79
107.65
vi)
Above 50 ft. to 60 ft. (15 m to 18 m) depth
Cu.m.
Cu.ft.
1,455.12
41.20
4,150.79
117.55
vii)
Above 60 ft. to 70 ft. (18 m to 21 m) depth
Cu.m.
Cu.ft.
1,590.22
45.05
4,565.68
129.30
viii)
Above 70 ft. to 80 ft. (21 m to 24 m) depth
Cu.m.
Cu.ft.
1,652.17
46.80
4,763.11
134.90
ix)
Above 80 ft. (24 m) to any depth
Cu.m.
Cu.ft.
1,746.82
49.45
5,010.75
141.90
Wet sinking of well in shingle or gravel for depth below
spring level including charges for machinery, shoring,
kentledge and removal of excavated material within 100 ft.
(30 m ) lead
i)
Upto 10 ft (3 m) depth
26.4
26.6
Cu.m.
Cu.ft.
777.23
22.00
2,219.25
62.85
ii)
Above 10 ft. to 20 ft. (3 m to 6 m) depth
Cu.m.
Cu.ft.
972.68
27.55
2,792.17
79.05
iii)
Above 20 ft. to 30 ft. (6 m to 9 m) depth
Cu.m.
Cu.ft.
1,162.53
32.90
3,344.93
94.70
iv)
Above 30 ft. to 40 ft. (9 m to 12 m) depth
Cu.m.
Cu.ft.
1,591.94
45.10
4,570.33
129.40
v)
Above 40 ft. to 50 ft. (12 m to 15 m) depth
Cu.m.
Cu.ft.
1,748.79
49.50
5,023.36
142.25
vi)
Above 50 ft. to 60 ft. (15 m to 18 m) depth
Cu.m.
Cu.ft.
1,943.96
55.05
5,583.68
158.10
vii)
Above 60 ft. to 70 ft. (18 m to 21 m) depth
Cu.m.
Cu.ft.
2,034.80
57.60
5,830.09
165.10
viii)
Above 70 ft. to 80 ft. (21 m to 24 m) depth
Cu.m.
Cu.ft.
2,082.38
58.95
5,975.42
169.20
ix)
Above 80 ft. (24 m) to any depth
Cu.m.
Cu.ft.
2,300.44
65.15
6,605.13
187.05
Making and supplying at site of work Kikar or Chalghoza
wood well curb.
Cu.m.
Cu.ft.
31,739.87 35,784.85
898.80
1,013.35
Laying well curb in position only.
Each
job
26 - 5 (SINKING OF WELLS)
Ref. Tech.
Specs.
519.10
519.10
26.4
26.6
Government of AJ&K
CSR-2015,Volume-1
Sadnouti
Updated for 2nd Semi-annual (Jan - June) 2015
Sr. No.
26- 8
Description
Providing, making and laying R.C.C. well curb in position
using 3/4" (19mm) and down gauge crushed aggregate and
coarse sand including formwork, moulds, shuttering,
rendering the exposed surface including curing. The
reinforcement will be paid separately.
a)
1 : 1.5 : 3
b)
26- 9
26- 10
Unit
Rate (Rs.)
Labour
Composite
Ref. Tech.
Specs.
5.3
Cu.m.
Cu.ft.
1,194.90
33.85
13,935.40
394.60
Cu.m.
Cu.ft.
1,194.90
33.85
12,336.50
349.35
Providing and fixing structural steel for cutting edge.
% Kg.
% Lb.
1,539.05
698.10
13,002.15
5,897.75
26.4
Making and removing false masonry on well including its
dismantling and cost of scraping bricks.
Cu.m.
Cu.ft.
1,744.85
49.40
6,763.90
191.55
4.1
1:2:4
26 - 6 (SINKING OF WELLS)