Feiss F2052/6+3GBZ Instructions / Assembly

Add to my manuals
1 Pages

advertisement

Feiss F2052/6+3GBZ Instructions / Assembly | Manualzz
ASSEMBLY I NSTR UCTI ONS FOR F2052/6+3, F2053/6+3, F2054/3+6+6, F2055/5 (E) 9/05
IMPORTANT
TURN OFF THE POWER AT THE MAIN FUSE
OR CIRCUIT BREAKER BOX
BEFORE STARTING INSTALLATION
Carefully unpack and identify all
parts before assembly. Bulbs are not
included.
1. Install fixture loop by screwing onto
threaded pipe which is located at top of
fixture.
Fixture Loop
Bulb
(not included)
Top Center Body
Ball Cap Nut
Counter
Ring
Arm
Shade
Socket
Fitter
2 . Secure arms:
A. Temporarily remove ball cap nuts
which are located at top center body.
Set them aside.
B. Turn arms in upright position, as
shown in illustration. Then while
slightly pulling arm forward lock into
threaded studs. Make certain not to
scrape back of arms.
C. Secure arms by fastening back the
ball cap nuts.
NOTE: Extra ball cap nuts can be
found in a plastic pouch attached inside
of box.
3. Follow enclosed “Chain Suspended
Fixture Installation Instructions” for
electrical and fixture installation onto
ceiling outlet box.
4. Install shades onto fitters by fastening
counter rings onto threaded sockets.
5. Install bulbs (not included). See
relamping label located at socket area
for type and maximum allowed wattage.
© MURRAY FEI SS I MPORT LLC.
M U R R A Y
F E I S S

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement