advertisement
◉
Touch to zoom
ASSEMBLY INSTRUCTIONS MODEL# : RL8065/1 NOTE: Only the technical personnel can be allorto fix and meintain. IMPORTANT! Make sure that the power is switch off at the electricity mains supply before commencing work. FIXING INSTRUCTIONS 1, Open parts according to the bag as shown in figure B shows, installed hangs Taiwan screw, and should be fized to the ceiling in the right place. 2.Ground Connection (See picture 1): there are one tapping hole & two dimples. Wind the supply ground wire (2) on the green ground screw (15) and then put it into tapping hole. Connect the fixture ground wire (3) with supply ground wire (2) by connecting terminal (12). Ceution: DO NOT connect ground wire with supply power wire. 3. Connect fixture supply wire with power supply wire . Caution: Remember to distinguish the positive and negative charges. (See picture 2) 4. Push canopy up to the ceiling and Lock cuttlefish mut REPLACEMENT BULB Do not exceed the maximum wattage. Light bulbs recommended: RL80G5/1 GO-1%40W Max. Type G9. CLEANING CARE Clean with a soft dry cloth SAFETY INFORMATION 1. Lamp used must in rated voltage, and do not touch the bulb with bare hands « Always switch off the electricity supply and allow to cool for 10 minutes befors changing the light bulbs. 2. If the external cables have been demaged, Pls change or repair by manufacturer or service agency or professional electrician, In order to avoid the danger, A |
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project