Installation Manual
.
.
Vanvex 185 S
Vanvex 285 S
Sanitary hot water
Version 1.03 - 0410
Table of contents
1.1 Cooling system .......................................................... 3
1.2 Electrical circuit ......................................................... 3
1.3 Water circuit ............................................................... 3
2.1 Deliverance ................................................................ 4
2.2 Transport .................................................................... 4
2.3 Installing ..................................................................... 4
2.4 Connection of water pipes. ....................................... 5
2.5 Connecting condense water drain ........................... 6
2.6 Electrical connection ................................................ 7
2.7 Air connections ......................................................... 7
3.1 Demands to the hot water circuit ............................. 8
3.2 Starting to use of the water circuit .......................... 8
3.3 Heat exchanger operation ........................................ 8
3.4 Hints to energy savings ............................................ 9
3.5 Hints to fan operation ............................................... 9
3.6 Checking .................................................................... 9
2
Subject to Technical Modifications
Installation
1. Demands / Security advices
Generally
When construction and building the heat pump all relevant
EU guidelines have been followed. (Also se EU-declaration of conformity)
Any work carried out on this unit may only be done by skilled personnel. Take all necessary precautions to avoid accidents.
1.1 Cooling system
The skilled technician must make sure that all refrigerant carrying parts are emptied to a level where work may be carried out without any risk to people or materials, before repairs and services are carried out.
When repairing and servicing the heat pump in which the refrigerant system has to be opened, always take extra care. If the use of an open flame is needed, (Welding, soldering etc.) special care must be taken in order to prevent fire.
1.2 Electrical circuit
When work is carried out on the heat pump, the main supply must be disconnected. (Pull the plug)
When the unit is connected to the supply all local and national regulations must be followed, along with the demands from the power supplier.
1.3 Water circuit
Only water in drinking quality may be used. During installation the choice of material must be taken into account, and made sure those are compatible in the entire circuit. Safety equipment must be installed to prevent over pressure in the system.
All pipe work must comply with water safety regulations.
3
4
Installation
2. Installation
2.1 Deliverance
Heat pump including controller
Installation manual with technical data
User manual for controller
2.2 Transport
Transport and storage of heat pump
In general the heat pump must be stored upright without water and in its packing while stored.
When carefully transporting the unit over short distances, the heat pump may be tilted up to 45 degrees.
Transport and storing may take place at temperatures between -20 C° and +70 C°.
Transport with pallet truck
For transport with pallet truck the heat pump must be places upright on the transport frame.
Lifting must be done slowly. Due to the high position of the centre of gravity the heat pump must be secured against tipping over during transportation.
Transport with trolley
The heat pump must be secured against sliding on the trolley. Water connections may not be used for transportation purposes. Make sure the trolley does not damage the cabinet and connections.
2.3 Installing
Guidelines for installing the heat pump:
The heat pump may only be installed in an frost free environment.
The installation location should comply with the following criteria:
Room temperature between +8 C° and +35 C° for running on extract air.
Room temperature between -20 C° and +35 C° for running on fresh air.
Well insulated walls to rooms next to the installation location.
Drain for condensate water.
No abnormal dust concentration in the air.
Solid base (approx. 500 kg)
To achieve a problem free function of the heat pump, and to allow access to repairs and services, it is advised to keep 0,5 m free space on each side of the unit.
Remove the packaging from the unit.
Remove the corner protectors.
Take off the transportation brackets on the frame.
Take the heat pump off the frame and place it on the desired location.
Adjust the heat pump to vertical position by adjusting the feet.
Sun collector outlet Sun collector inlet
Installation
2.4 Connection of water pipes.
During installation the actual pressure and pressure losses must be taken into account regarding pipe dimensions to assure sufficient pressure and water flow rates.
The plumbing must be carried out according to regulations.
The piping can be made of flexible or solid materials. Care must be taken in respect to corrosion to avoid damages.
As for all pressurerized containers the heat pump must also be equipped with safety and check valves on the supply side.
Cold water inlet and hot water outlet is located under the tank (3/4” Thread connectors).
The maximum working pressure is 10 bars, and the maximum working temperature is 65 C°.
If necessary, the supply pipe must be equipped with a pressure reduction valve and eventually a filter.
When installing the pipe work in the house any dirt in the pipes must be avoided. (Eventually flush the pipes with clean water before the heat pump is installed)!
When the pipes are connected make sure the pipes are not twisted. Use tools to hold the pipes against twisting!
If no recirculation is needed make sure the recirculation connector is closed!
Water connection
Under the heat pump the connections are located:
Condenswater drain hose
Cold water inlet / Recirculation / Hot water outlet
No holes may be drilled. It cut damage the winded condenser
Warm water Cirkulation Cold water
5
6
Installation
Electrical water Sensor Anode
heater
100 mm
Possible connection af heat exchanger
In the heat boiler (S-model) the can be a heat exchanger of 0,8 m2 installed, which is enamelled outside. The connection is in ¾” RG. In the sensor pipe for the thermostat sensor there can also be placed a sensor to control the external connection fx a solar cells, wood burner etc. The sensor can max. have a diameter on 6 mm.
By installation of the tube system in the residence please do not soil. (Rinse through the tube system with clean water before connecting to the heat pump)!
By installation of the tubes please assure that the tube connection is not wrung. Use proper tools.
If the recirculation is not use it must be assured the recirculation boss is fastened.
2.5 Connecting condense water drain
Due to cooling of the air passing through the evaporator coil water will condense. The condense water drain is equipped with a hose which will lead the water to a drain.
Depending of the humidity and temperatures 0,5 l/h of water is not unusual.
It is necessary to install a tight siphon with a minimum height of 60 mm., to allow the water to flow away from the heat pump. If the heat pump is not installed with such siphon, the water can not leave the drain tray because of under pressure, and damage to the unit and the house may be the result. Also air will be sucked through the drain, and as this air may contain ammonia and other aggressive components the cooling system will be damaged. The connection between the condense water tray and the siphon must be air tight. If the siphon is not installed correctly, the warranty will not cover damages!
2.6 Air connections
Inlet air
The inlet air may not be polluted with aggressive components! (Ammonia, sulphur, chlorine etc.)
Parts in the system may be damaged.
Air connectors
Inlet and outlet ducts must be made of smooth pipes to minimize pressure losses. Consider the fan working pressure and the duct resistance during installation. (See technical data).
It is advised to install the air ducts that are placed near the heating pump, levelled or with a light fall towards the extract air outlet to avoid leaking of condensed water, easy to cut of. This will avoid leaking of condensed water from the ducts.
When air ducts are placed outside the building the back
Installation
pressure valve (with a small resistance) should be placed to ensure no cold air is entering the room in the winter time and when the heating pump is standing still.
We recommend to mount a flexible connecting link between the pipe and the duct connection, in consideration of a future service.
The heating pump may only be used with the tank filled up!
The unit must always be disconnected from the power before the front door is removed. When the unit is disconnected from the power please wait until the fan has stopped before opening the front doors!
Before starting up the unit please ensure that all cables and electric plugs are connected correctly and the cable and plug between the display in the door and the circuit board are connected!
It is advised to insulate all ducts to lower heat loss and to lower the noise level.
7
8
Installation
3. Starting the heat pump
The heat pump may only be started with a full water tank!
The unit must always be disconnected from the power supply when the front cover is opened!
When the unit is disconnected, wait for the fan to stop completely before the cover is opened!
Before starting the unit makes sure all connectors are in place, and make sure the cable between display and controller is mounted correctly!
3.1 Demands to the hot water circuit
In the hot water system the following materials may be used:
- Copper
- Stainless steel
- Brass
- Plastics
Depending on the used materials in the water circuit (in the house) wrong combinations of materials may lead to corrosion damages. Special attention is required when using galvanized steel or aluminium materials.
3.2 Starting to use of the water circuit
- Fill the tank using the valve on the supply line, and let the air out through one of the upper hot tap water valves until air no longer is present in the tapped water.
- Check the entire water circuit for tightness.
- Connect the heat pump to the power supply.
After starting to use the system the entire water circuit must be checked for tightness.
Cooling circuit
The heat pump is delivered ready to use. No work is needed on the refrigerant circuit. The controller automatically takes over all functions and makes sure the compressor, fans etc. is started to maintain the set water temperature.
3.3 Heat exchanger operation
1) Boiler
Heat exchanger operation is used if it is desired to heat the water by using an external boiler during wintertime (oil burner etc.).
The heat pump is then set to step 0 to disable its operation.
Hereafter the oil burner takes over operation using its thermostat to decide when to heat the water.
In this operation mode an extra thermostat sensor is needed in the tank to operate the burner. The maximum water temperature must be limited to 80 C°. Exceeding this temperature shortly is allowed in connection to removal of germs and bacteria etc.
Installation
If the burner has to operate as an extra heat source for the heat pump the temperature on the burner operation should be set 5K lower than the temperature setting in the heat pump. This means the burner will only assist when more water is used than the heat pump can cover.
When the system is started make sure the settings of the thermostats are as desired.
2) Wood burner or solar collector
This connection can be used if a wood burner or a solar collector shall assist the heat pump function. Sensor T9 (se diagram) measures the temperature in the wood burner or in the solar collector. If the temperature is higher than in the tank, the controller can activate a circulation pump which will circulate the water through the heat exchanger build into the tank. The hystereses can be adjusted between 0-5 K. The maximum temperature accessible is
80 C°, in which case the controller stops the pump to avoid damages to the system.
3.4 Hints to energy savings
Do not use higher water temperatures than needed. The lower the water temperature the better the efficiency of the heat pump is achieved. Use only high temperatures when needed.
3.5 Hints to fan operation
When using ductwork it may be necessary to run the fan on a higher speed to compensate for the pressure losses.
3.6 Checking
After completing installation it is advised to check all connections etc. to ensure they are tight and to check that condensate water can flow to the drain unrestricted.
For servicing please refer to user manual.
9
T9 er ng lfa So
Kv
T8
Vv al pir mes Var er or old sat en beh nd på
Ko
T7 ser nd old mva beh
Var t sta sso pre yks jtr Hø
HP
r so res mp Ko
uft skl Fri
) per am ord e (f lad lef Kø
T5
T6
ast Afk
el an gsp in jen Bet
Flow diagram
Cooling coil (evaporator)
Exhaust air
T6
T5
Fresh air
HP
High-pressure switch
MA4
Hot water tank
Compressor
Condenser on tank
Heating coil
T5: Fresh air or surrounding temperature
T6: Cooling coil
T7: Tank top
T8: Tank bottom
T9: Solar panel
Vv
T8
Kv
T7
Solar panel
T9
10
Hydraulic figure
Varmekreds/
Heizkreis/ heat curcuit
Luftvarmepumpe/
Abluft-Wärmepumpe/
Air heat pump
Fyrkedel/
Heizkessel/ kettle
Varmepumpe/
Heizungspumpe/ heat pump
Varmtvandscirkulationspumpe/
Boilerladepumpe/ hot water curculation pump
Udluftning/
Entlüftung/
Exhausting
Følerledning/Fühlerleitung/sensor conn.
Entleerung/draining
Koldtvandstilslutning/
Kaltwasseranschluss/ cold water conn.
3
4
5
7
TKW nach
DIN 1988
1
2
1
6
1: Hovedventil/Absperrventil/main valve
2: Trykreduktionsventil/Druckminderventil/reduction valve
3: Prøveventil/Prüfventil/testvalve
4: Kontraventil/Rückflussverhinderer/contra valve
5: Manometer tilslutningsstuds/Manometeranschlussstutzen/manometer adapter
6: Aftapningsventil/Entleerungsventil/draining valve
7: Sikkerhedsventil/Membran Sicherheitsventil, Abblasedruck 6,0 bar/safety valve
Ventil an tiefster Stelle für Entleerung Behälter/ valve at the lowest point for draining
Trinkwasserfilter gem. DIN 1988 in Hausanschlussleitung /drinking water filter (DIN 1988) in house service connexion
Please assure if you assemble your heat pump with a heating-boiler or a solid fuel kettle the maximum temperature of the sanitary hot water does not transgress 65°C and the pressure in the accessory heat exchanger is not more than 3 bar!
11
Electrical diagram
12
13
14
15
Genvex World Wide:
Denmark
Genvex A/S
DK - 6100 Haderslev
Tel.: +45 73 53 27 00
Fax: +45 73 53 27 07
E-Mail: [email protected]
Norwegian
Varmeteknikk Norge
N - 2240 Magnor
Tel.: +47 62 83 21 50
Fax: +47 62 83 21 59
E-Mail: [email protected]
Germany
Novelan GmbH
D-95359 Kasendorf
Tel.: +49 (0) 92 28 / 99 60 7-0
Fax: +49 (0) 92 28 / 99 60 7-189
E-Mail: [email protected]
Belgium
Artiklima bvba
B - 9220 Hamme
Tel.: +32 (0) 52 41 25 41
Fax: +32 (0) 52 41 29 66
E-Mail: [email protected]
Great Britain
Total Home Environment Ltd
GB- Moreton in Marsh, GL 56 0JQ
Tel.: +44 (0) 845 260 0123
Fax: +44 (0) 1608 652490
E-Mail: [email protected]
Ireland / N.I.
ECO Systems Ireland Ltd
Co. Antrim BT54 6PH
Tel.: (UK 028) (ROI 048) +44 2076 8708
Fax: (UK 028) (ROI 048) +44 2076 9781
E-Mail: [email protected]
Schwitzerland
Wesco AG
CH-5430 Wettingen
Tel.: +41 (0) 56 438 11 11
Fax: +41 (0) 56 438 12 10
E-Mail: [email protected]
Austria
J.Pichler Lufttechnik GmbH
A-9021 Klagenfurt
Tel.: +43 (0) 463 / 3 27 69
Fax: +43 (0) 463 / 3 75 48
E-Mail: [email protected]
Slovenia
Pichler & CO d.o.o.
2000 Maribor
Tel.: +386/ (0) 2/460 13 50
Fax: +386/ (0) 2/460 13 55
E-Mail: [email protected]
Croatia
Pichler & CO d.o.o.
10000 Zagreb
Tel.: + 385/ (0) 1/ 65 45 407
Fax: + 385/ (0) 1/ 65 45 409
E-Mail: [email protected]
Portugal
Iberterm
PT-4475-493 Nogueira Maia
Tel: +351 229 065 123/4
Fax: +351 229 065 125
E-Mail: [email protected]
Web: www.iberterm.com
Billund
Hamburg
Copenhagen
Intelligent ventilation system from Genvex
As ventilation specialists, we offer a product range that covers all aspects of modern ventilation equipment, from passive ventilation units with highly effective counter current exchangers to units with integrated heat pumps that are extremely power efficient for heating or cooling.
We can also provide units for ceiling mounting for installation in existing office buildings, high-rise buildings and industrial buildings.
Presented by:
Published by Genvex A/S, Sverigesvej 6, DK-6100 Haderslev
www.genvex.dk
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 3 1.1 Cooling system
- 3 1.2 Electrical circuit
- 3 1.3 Water circuit
- 4 2.1 Deliverance
- 4 2.2 Transport
- 4 2.3 Installing
- 5 2.4 Connection of water pipes
- 6 2.5 Connecting condense water drain
- 7 2.6 Electrical connection
- 7 2.7 Air connections
- 8 3.1 Demands to the hot water circuit
- 8 3.2 Starting to use of the water circuit
- 8 3.3 Heat exchanger operation
- 9 3.4 Hints to energy savings
- 9 3.5 Hints to fan operation
- 9 3.6 Checking