APC by Schneider Electric
NetShelter™ SV Cabinet
THIS GUIDE SPECIFICATION IS WRITTEN IN ACCORDANCE WITH THE CONSTRUCTION SPECIFICATIONS
INSTITUTE (CSI) MASTERFORMAT. THIS SECTION MUST BE CAREFULLY REVIEWED AND EDITED BY THE
ARCHITECT OR THE ENGINEER TO MEET THE REQUIREMENTS OF THE PROJECT. COORDINATE THIS SECTION
WITH OTHER SPECIFICATION SECTIONS IN THE PROJECT MANUAL AND WITH THE DRAWINGS.
WHERE REFERENCE IS MADE THROUGHOUT THIS SECTION TO “PROVIDE”, “INSTALL”, “SUBMIT”, ETC., IT SHALL
MEAN THAT THE CONTRACTOR, SUBCONTRACTOR, OR CONTRACTOR OF LOWER TIER SHALL “PROVIDE”,
“INSTALL”, SUBMIT”, ETC., UNLESS OTHERWISE INDICATED.
THIS SECTION IS WRITTEN TO INCLUDE THE 2004 MASTERFORMAT AND THE 1995 MASTERFORMAT VERSIONS.
WHERE APPLICABLE, THESE ITEMS ARE BRACKETED AND, IN EACH CASE, UNLESS OTHERWISE INDICATED,
THE FIRST CHOICE APPLIES TO THE 2004 MASTERFORMAT AND THE SECOND CHOICE APPLIES TO THE 1995
MASTERFORMAT.
SECTION [27 11 16]
COMMUNICATIONS CABINETS
PART 1 - GENERAL
1.1 SUMMARY
A.
Provide design and engineering, labor, material, equipment, related services, and
supervision required, including, but not limited to, manufacturing, fabrication,
erection, and installation as required for the complete performance of the work,
and as herein specified.
B.
The work specified includes, but shall not be limited to, requirements for cabinets,
in data centers, computer rooms, and communications equipment rooms.
C.
Included in this section are the minimum composition requirements and
installation methods for NetShelter SV Cabinets.
REQUIREMENTS
Page 1
7/23/2014
1.2 QUALITY ASSURANCE
A.
All cable and equipment shall be installed in a neat and workmanlike manner. All
methods of construction that are not specifically described or indicated in the
contract documents shall be subject to the control and approval of the Owner or
Owner Representative. Equipment and materials shall be of the quality and
manufacture indicated. Where “approved equal” is stated, equipment shall be
equivalent in every way to that of the equipment specified and subject to
approval.
B.
Strictly adhere to all Building Industry Consulting Service International (BICSI),
Electronic Industries Alliance (EIA) and Telecommunications Industry Association
(TIA) recommended installation practices when installing communications/data
cabling.
C.
Material and work specified herein shall comply with the applicable requirements
of the following standards and regulations:
1. TIA – 569-B Commercial Building Standard for Telecommunications
Pathways and Spaces, 2004
2. ANSI/ TIA – 568-C Commercial Building Telecommunications Cabling
Standard, 2009
3. ANSI/ NECA/BICSI 568-2006 – Standard for Installing Commercial Building
Telecommunications Cabling
4. TIA – 606-A Administration Standard for Commercial Telecommunications
Infrastructure, 2007
5. ANSI-J-STD – 607-A Joint Standard for Commercial Building Grounding
(Earthing) and Bonding Requirements for Telecommunications, 2002
6. ANSI/TIA-942 Telecommunications Infrastructure Standard for Data
Centers, 2005
7. NFPA 70 – National Electric Code, 2008
1.3 SUBMITTALS
A.
Provide product data for the following:
1. Manufacturer’s data sheets/cut sheets, specifications and installation
instructions for all products (submit with bid).
1.4 DELIVERY, STORAGE, AND HANDLING
A.
Deliver materials to the Project site in supplier’s or manufacturer’s original
wrappings and containers, labeled with supplier’s or manufacturer’s name, material
or product brand name, and lot number, if any.
1. The unit shall be shipped fully assembled as one orderable SKU.
2. Optional unassembled unit shall be shipped for assembly at installation
location.
3. The unit shall ship on a wooden pallet.
4. The unit shall be bolted to the wooden pallet for stability during shipment.
5. The unit shall be protected by corrugated corners, which are stretchwrapped to limit damage during handling.
6. The unit shall have unpacking instructions including manufacturer’s contact
information for customer support.
REQUIREMENTS
Page 2
7/23/2014
B.
1.5
PROJECT CONDITIONS
A.
1.6
The customer shall store materials in their original, undamaged packages and
containers, inside a well-ventilated area protected from weather, moisture, soiling,
extreme temperatures, and humidity.
1. The 42U unit shall roll through a standard 2 meter or seven (7) foot office
doorway.
Environmental Requirements: Do not install equipment until space is enclosed and
weatherproof, wet work in space is completed and nominally dry, work above
ceilings is complete, and ambient temperature and humidity conditions are and will
be continuously maintained at values near those indicated for final occupancy.
WARRANTY
A.
The manufacturer shall warrant the unit to be free from defects in materials and
workmanship for a minimum period of five years from the date of purchase. The
manufacturer’s obligation under this warranty shall be to repair or replace the unit,
at its own sole option. This warranty shall not apply to equipment that has been
damaged by accident, negligence, or misapplication or has been altered or
modified in any way.
B.
The manufacturer shall warrant all accessories and options to be free from
defects in materials and workmanship for a minimum period of two years from the
date of purchase. The manufacturer’s obligation under this warranty shall be to
repair or replace the equipment, at its own sole option. This warranty shall not
apply to equipment that has been damaged by accident, negligence, or
misapplication or has been altered or modified in any way.
PART 2 – PRODUCT
2.1 MANUFACTURER
A.
Product specified is “NetShelter SV” Cabinet as manufactured by Schneider Electric.
Items specified are to establish a standard of quality for design, function, materials,
and appearance.
2.2 DESIGN REQUIREMENTS
A.
Equipment cabinets to store computer, data storage and networking equipment in
the data centers, computer rooms and equipment rooms. Each cabinet shall be
designed to provide a secure, managed environment for server and networking
equipment. Cabinets shall be designed to accommodate power and cable
management accessories that keep network and power cables separate and
organized.
REQUIREMENTS
Page 3
7/23/2014
B.
Physical Specifications:
1. Cabinet dimensions, equipment mounting compatibility and weight load ratings:
The 42U unit shall have exterior maximum height to allow passage through a
standard 2 Meter or 7 ft. (84 in.) doorway without tipping.
2.
3.
4.
Internal
Height
EIA-310
42U
19 in
42U
19 in
42U
19 in
42U
19 in
42U
19 in
42U
19 in
48U
19 in
48U
19 in
48U
19 in
48U
19 in
External
Height
External
Width
External
Depth
Static
Rating
Dynamic
Rating
2057mm
(80.98 in)
2057mm
(80.98 in)
2057mm
(80.98 in)
2057mm
(80.98 in)
2057mm
(80.98 in)
2057mm
(80.98 in)
2324mm
(91.50 in)
2324mm
(91.50 in)
2324mm
(91.50 in)
2324mm
(91.50 in)
600mm
(23.62 in)
800mm
(31.50 in)
600mm
(23.62 in)
800mm
(31.5 in)
600mm
(23.62 in)
800mm
(31.50 in)
600mm
(23.62 in)
800mm
(31.50 in)
600mm
(23.62 in)
800mm
(31.50 in)
1060mm
(41.73 in)
1060mm
(41.73 in)
1060mm
(41.73 in)
1060mm
(41.73 in)
1200mm
(47.24 in)
1200mm
(47.24 in)
1060mm
(41.73 in)
1200mm
(47.24 in)
1200mm
(47.24 in)
1200mm
(47.24 in)
1000 kg
(2205 lb)
1000 kg
(2205 lb)
1000 kg
(2205 lb)
1000 kg
(2205 lb)
1000 kg
(2205 lb)
1000 kg
(2205 lb)
1000 kg
(2205 lb)
1000 kg
(2205 lb)
1000 kg
(2205 lb)
1000 kg
(2205 lb)
460 kg
(1014 lb)
460 kg
(1014 lb)
460 kg
(1014 lb)
460 kg
(1014 lb)
460 kg
(1014 lb)
460 kg
(1014 lb)
460 kg
(1014 lb)
460 kg
(1014 lb)
460 kg
(1014 lb)
460 kg
(1014 lb)
The 42U and 48U units shall support a static load (weight supported by the
casters and leveling feet) of at least 1,000 kg. (2,205 lb) total installed
equipment weight.
The 42U and 48U units shall support a dynamic load (rolling on the casters) of
at least 460 kg. (1,104 lb) total installed equipment weight.
The units (42U, 48U) shall ship with a perforated front door, perforated split
rear doors, two (2) side panels, roof with cable access holes, four (4) adjustable
vertical mounting rails, four (4) vertical 0U accessory mounting brackets, four (4)
leveling feet and four (4) casters, baying and grounding hardware pre-installed
by the manufacturer.
C.
Material Requirements
1. All weight bearing components shall be constructed from steel with a thickness
no less than 1.0mm (19 gauge).
2. All sheet metal parts shall be painted using a powder coat paint process.
3. Plastic materials shall comply with Underwriters Laboratory Specification 94
with HB rating (UL94 V-1) or better.
4. All interior components of the cabinets shall not have electroplated zinc coating
to minimize zinc whiskers near active equipment.
D.
Access and Installation:
1. The unit shall provide 42U or 48U of equipment vertical mounting space.
2. The vertical mounting rails shall be easily adjustable to allow different mounting
depths.
a. Each vertical mounting rail shall be marked with lines showing the top and
bottom of each U and the number U space next to the middle hole. Each
U consists of three square holes and is 1.75 inches (44.45 mm) high.
3. The unit shall include M6 caged nuts, bolts and cup washers, and caged nut
tool for the mounting of equipment inside the unit.
REQUIREMENTS
Page 4
7/23/2014
4.
Both the front and rear doors shall be designed with spring hinges allowing for
quick and easy detachment without the use of tools.
a. The front and rear doors shall open a minimum of 180 degrees to allow
easy access to the interior.
b. The front door of the unit shall be reversible so that it can be mounted on
either side.
c. Split rear doors are provided for increased service clearance.
d. The front door of the unit shall be capable of being installed on the rear of
the unit and the rear doors shall be capable of being installed on the front
of the unit.
The unit shall include full height side panels that are removed without tools
using easy finger latches for fast access to cabling and equipment.
a. The side panels on the unit shall double as privacy panels when the units
are bayed together.
b. Side panels shall be flush with the frame so the overall width of the unit
does not change with the side panels installed.
c. Baying brackets for 600 mm centers shall be pre-installed and a separate
bracket for 24 in. centers shall be provided with the unit.
Grounding:
a. All cabinet components such as doors, side panels, roofs, etc. should be
bonded directly to the frame.
b. Grounding points shall be provided on the cabinet’s frame to externally
bond each unit to the building ground.
5.
6.
2.3 VENTILATION
A.
The cabinet shall have ventilated front and rear doors to provide adequate airflow
required by the major server manufacturers.
B.
The cabinet shall have a minimum total ventilation area for the front door, split rear
doors, and roof as specified in the table below.
Internal
Height
42U
42U
48U
48U
C.
External
Width
600mm
(23.62 in)
800mm
(31.50 in)
600mm
(23.62 in)
800mm
(31.50 in)
External
Depth
1060mm
(41.73 in)
1060mm
(41.73 in)
1200mm
(47.24 in)
1200mm
(47.24 in)
Perforated
Front Door
5930 cm2
(919 in2)
7889 cm2
2
(1222 in )
6758 cm2
(1047 in2)
9004 cm2
2
(1395 in )
Perforated
Rear Doors
2
6689 cm
2
(1036 in )
8669 cm2
2
(1343 in )
2
7626 cm
2
(1182 in )
9892 cm2
2
(1533 in )
The manufacturer shall offer an optional toolless blanking panel kit to prevent the
recirculation of hot exhaust air.
REQUIREMENTS
Page 5
7/23/2014
2.4 CABLE ACCESS
A.
Top cable management openings provided in the cabinet roof.
Internal
Height
42U/48U
External
Width
600mm
(23.62”)
External
Depth
1060mm
(41.7”)
42U/48U
800mm
(31.5”)
1060mm
(41.7”)
42U/48U
600mm
(23.62”)
1200mm
(47.24”)
42U/48U
800mm
(31.5”)
1200mm
(47.24”)
Openings Located on Roof
Two 177mm (6.96”) x 117mm (4.6”),
One 346mm (13.62”) x 72mm (2.83”)
Rectangular Openings
Two 177mm (6.96”) x 117mm (4.6”),
Four 177mm (6.96”) x 58mm (2.28”), and
One 346mm (13.62”) x 72mm (2.83”)
Rectangular Openings
Two 177mm (6.96”) x 117mm (4.6”),
One 346mm (13.62”) x 72mm (2.83”)
Rectangular Openings
Two 177mm (6.96”) x 117mm (4.6”),
Four 177mm (6.96”) x 58mm (2.28”), and
One 346mm (13.62”) x 72mm (2.83”)
Rectangular Openings
B.
Cable opening edges shall be protected with plastic grommets or radiused edges.
C.
A cable management opening shall be provided in the bottom of the cabinet base:
Internal
Height
42U
External
Width
600mm
(23.62”)
External
Depth
1060mm
(41.7”)
42U
800mm
(31.5”)
1060mm
(41.7”)
42U
600mm
(23.62”)
1200mm
(41.7”)
42U
800mm
(31.5”)
1200mm
(41.7”)
Main Base Opening
Two 125mm (4.92”) x 115mm (4.52”),
One 344mm (13.54”) x 72mm (2.83”),
One 660mm (25.98”) x 344mm (13.14”)
Rectangular Openings
Two 125mm (4.92”) x 115mm (4.52”),
One 344mm (13.14”) x 72mm (2.83”),
One 660mm (25.98”) x 544mm (21.37”)
Rectangular Openings
Two 125mm (4.92”) x 115mm (4.52”),
One 344mm (13.14”) x 72mm (2.83”),
One 800mm (31.49”) x 344mm (13.54”)
Rectangular Openings
Two 125mm (4.92”) x 115mm (4.52”),
One 344mm (13.14”) x 72mm (2.83”),
One 800mm (31.49”) x 544mm (21.41”)
Rectangular Openings
2.5 ENVIRONMENTAL
A.
The unit shall have a minimum of IP 20 rating for protection against touch, ingress of
foreign bodies, and ingress of water.
B.
Manufacturer must certify products are RoHS and China RoHS compliant.
C.
The cabinet shall both protect the user from mechanical hazards and generally meet
the requirements (stability, mechanical strength, aperture sizes, etc.) as defined in
IEC 60950 Third Edition
REQUIREMENTS
Page 6
7/23/2014
2.6 SECURITY
A.
The unit shall include a front door lock, rear door lock and two (2) side panel locks.
All four (4) locks shall be configured to use the same key. Two copies of the key
shall be included.
1. Replacement key lock cylinders from the handle manufacturer shall be
available to provide a minimum of 220 unique key combinations on the front
and rear doors.
B.
The manufacturer shall provide optional products and accessories to allow the
cabinet environment to be monitored for temperature, humidity and electronic pass
key door access.
2.7 STABILIZATION
A.
The unit shall ship with provisions for stabilization in the field using the pallet
mounting brackets.
B.
The unit shall have four (4) adjustable leveling feet to help provide a stable base in
the event of an uneven floor surface and to prevent rolling.
2.8 OPTIONAL ACCESSORIES
A.
The manufacturer shall offer the following optional accessories as required to
accommodate customer requirements.
1. RM LCD Monitor/Keyboard drawer: The manufacturer shall offer a 1U high,
rack-mounted LCD monitor/keyboard drawer to maximize space in a data
center environment.
2. Rack Power Distribution Units: The manufacturer shall offer a variety of singlephase and three-phase rack mount power distribution units with current
monitoring outlet switching, and remote management capabilities.
3. Cable Management: The manufacturer shall offer a variety of cable
management accessories to neatly organize the routing of data and power
cables within the cabinet.
4. Shelving: The manufacturer shall offer as optional accessories various fixed
and sliding shelves with the ability to support up to 250 lbs of non-rack mount
equipment.
5. Uninterruptible Power Supplies: The manufacturer shall offer various rack
mounted uninterruptible power supplies (UPS), with user-replaceable and hotswappable batteries, and with extended runtime options available
PART 3- EXECUTION
3.1 EXAMINATION
A.
Verification of Conditions: Examine areas and conditions under which the work is
to be installed, and notify the Contractor in writing, with a copy to the Owner and the
Architect/Engineer, of any conditions detrimental to the proper and timely
completion of the work. Do not proceed with the work until unsatisfactory
conditions have been corrected. Beginning the work shall indicate acceptance of
the areas and conditions as satisfactory by the Installer.
REQUIREMENTS
Page 7
7/23/2014
3.2 INSTALLATION
A.
NetShelter SV Equipment Cabinets
1. Provide all components of the cabinet system (including any optional
accessories).
2. Install and adjust to position all cabinet components including accessories.
Install vertical cable managers, power distribution and equipment-mounting
rails, using the manufacturer’s installation instructions prior to baying and/or
placing the cabinet for attachment to the building and before installing any
rack-mount equipment into the cabinet. Shelves, horizontal cable managers
and filler panels, if used, may be installed after the cabinet is placed.
3. When attached to the structural floor, the installer shall provide installation
hardware.
4. When used in a multi-cabinet bay, cabinets shall be attached side-by-side
using included baying kits according to the manufacturer’s instructions.
5. Optional cable ladders and power cable troughs shall be attached to the top
of the cabinet when required.
6. Cabinets shall be securely bonded to a common ground. Attach a bonding
conductor sized as defined in J-STD-607-A and as defined by local code or
the authority having jurisdiction (AHJ) between the common ground and the
cabinet. Attach the bonding conductor to the cabinet using a ground terminal
block according to the manufacturer’s installation instructions. The installer
shall provide the bonding conductor and other necessary hardware required
to make the connections between the cabinet and the common ground.
3.3 FIELD QUALITY CONTROL
A.
MANUFACTURER FIELD SERVICE
1. Replacement parts: Parts shall be available through the Schneider Electric
Worldwide Customer Service organization.
END OF SECTION