RFP for procurement of Network Switches for Backup

Registered Office - 1001A, B Wing, 10th Floor, ‘The Capital’, Bandra Kurla Complex, Bandra (E),
Mumbai - 400 051
Date: 15.02.2017
Corrigendum-1
Notification
This is with reference to NPCI’s RFP # NPCI/RFP/2016-17/IT/16 dated 03.02.2017 for RFP for procurement of
Network Switches for Backup Consolidation Project. The prospective bidders may please note that:
S.No
Document Reference
Description
Existing RFP Clause
Amended clause
1
Section 1
Bid schedule & address
Sr. No 6
Last Date & Time for bid
submission
16.02.2017
5.00 pm
22.02.2017
5.00 pm
2
Section 1
Bid schedule & address
Sr. No 8
Date and Time of Eligibility
bid (Envelope A) and
Technical bid (Envelope B)
opening
16.02.2017
05.30 pm
22.02.2017
5.30 pm
Section 9 & Section 11
Technical specifications for 10G switch
Section #
Section 9 and
Section 11
S.No
1
Section 9 and
Section 11
18
Section 9 and
Section 11
20
Section 9 and
Section 11
21
Section 9 and
Section 11
24
Section 9 and
Section 11
47
Existing clause
b
6 x 40GbE QSFP Fiber Interface (Two Wire
Multi Mode-LC/Two Wire Single Mode- LC Fiber
Interface using OM4 minimum distance of 150
Mtr)
IEEE 802.1s/w Rapid Spanning Tree Protocol
(RSTP) and Multiple Spanning Tree Protocol
(MSTP), Per-VLAN Rapid Spanning Tree
(PVRST+)
Switch should support Phython, NetConf, XML,
Bash, etc
Switch should support container to run
customize application agent like Puppet, Chef,
Ansible, Salt etc
Support for Automatic Negotiation of Trunking
Protocol, to help minimize the configuration &
errors.
Switch should support Multicast routing of
minimum 16 way Equal Cost Multipath load
splitting
Updated clause
Minimum of 2 x 40GbE QSFP
Multimode Fiber Interface
IEEE 802.1s/w Rapid Spanning Tree
Protocol (RSTP) and Multiple
Spanning Tree Protocol (MSTP),
PVST or equivalent
Removed
Removed
Removed
Switch should support IPV4 and
IPV6 routing of minimum 16 way
Equal Cost Multi Path load splitting
Section 9 and
Section 11
56
Section 9 and
Section 11
87
A.
a
Support for Automatic Quality of Service for
easy configuration of QoS features for critical
applications.
Support for Quality of Service for
easy configuration of QoS features
based on critical applications, Src/
dst IP addresses, Src/dst port
numbers etc.
HSRP
Removed
Technical specification for 1G switch
Section 9 and
Section 11
Section 9 and
Section 11
Section 9 and
Section 11
1
The switch should have minimum 48 x
10/100/1000 Ports, auto negotiating ,and four
1 Gb Ethernet SFP and optional two 10Gb
Ethernet SFP uplink network modules
The switch should have minimum
48 x 10/100/1000 Ports, auto
negotiating ,and four 1/10 Gb
Ethernet SFP/SFP+ interfaces
3
The stacking ports should be separate from the
normal uplink ports
Removed
6
Support for up to 10,000 MAC addresses, up to
10,000 unicast routes & 1000 IGMP groups and
multicast routes
Section 9 and
Section 11
8
Section 9 and
Section 11
10
Section 9 and
Section 11
31
IEEE 802.1s/w Rapid Spanning Tree Protocol
(RSTP) and Multiple Spanning Tree Protocol
(MSTP), Per-VLAN Rapid Spanning Tree
(PVRST+)
Support for Automatic Negotiation of Trunking
Protocol, to help minimize the configuration &
errors.
Support for Automatic Quality of Service for
easy configuration of QoS features for critical
applications.
Support for up to 10,000 MAC
addresses, up to 5,000 unicast
routes & 1000 IGMP groups and
multicast routes
IEEE 802.1s/w Rapid Spanning Tree
Protocol (RSTP) and Multiple
Spanning Tree Protocol (MSTP),
PVST or equivalent
Removed
Support for Quality of Service for
easy configuration of QoS features
based on critical applications, Src/
dst IP addresses, Src/dst port
numbers etc.
Section 8
Section 8
8.7
Delivery schedule and location
Supply, installation, commissioning and
integration of Network Switches. Delivery of
equipment & licenses should be within 4
weeks. Installation and commissioning should
be within 2 weeks after delivery.
Delivery schedule and location
Supply, installation, commissioning
and integration of Network
Switches. Delivery of equipment &
licenses should be within 6 weeks.
Installation and commissioning
should be within 2 weeks after
delivery.
All other terms and conditions of aforesaid RFP remain unchanged.
MD & CHIEF EXECUTIVE OFFICER
NATIONAL PAYMENTS CORPORATION OF INDIA
1001A, B wing 10th Floor, The Capital, Bandra-Kurla Complex,
Bandra (East), Mumbai - 4
Download PDF
Similar pages