advertisement
Installation and maintenance instructions
For the competent person
Installation and maintenance instructions
Publisher/manufacturer
ecoTEC pro
VUW
GB, IE
Contents
6.2
6.3
6.4
6.5
7
7.1
5.7
5.8
6
6.1
7.2
7.3
7.4
4
4.1
4.2
4.3
4.4
3
3.1
3.2
3.3
3.4
3.5
2
2.1
2.2
2.3
2.4
2.5
1
1.1
1.2
1.3
1.4
1.5
5.1
5.2
5.3
5.4
4.5
4.6
4.7
4.8
4.9
4.10
5
Contents
5.5
5.6
Safety .................................................................... 4
Action-related warnings ......................................... 4
Intended use ......................................................... 4
General safety information .................................... 4
Related documents................................................ 6
Related documents................................................ 7
Notes on the documentation .............................. 8
Observing other applicable documents ................. 8
Storing documents................................................. 8
Validity of the instructions...................................... 8
Benchmark............................................................. 8
Local regulations.................................................... 8
Product description............................................. 8
Product design....................................................... 8
Information on the identification plate.................... 8
Serial number ........................................................ 9
CE label ................................................................. 9
Energy Saving Trust Endorsed Products .............. 9
Installation............................................................ 9
Unpacking the product........................................... 9
Checking the scope of delivery.............................. 9
Transporting the product ....................................... 9
Dimensions .......................................................... 10
Minimum clearances............................................ 11
Clearance from combustible components ........... 11
Using the installation template............................. 11
Wall-mounting the product................................... 11
Removing the front casing................................... 11
Removing the side section .................................. 12
Installation.......................................................... 12
Installation requirements ..................................... 12
Installing the gas connection ............................... 13
Installing the hot and cold water connection........ 13
Connecting the heating flow and heating return ................................................................... 13
Connecting the condensate drain pipework ........ 14
Installing the discharge pipe on the expansion relief valve............................................................ 14
Flue gas installation ............................................. 14
Electrical installation ............................................ 15
Operation............................................................ 17
Operating concept ............................................... 17
Installer level overview......................................... 17
Calling up the installer level................................. 17
Live Monitor (status codes) ................................. 17
Setting the hot water temperature ....................... 18
Start-up ............................................................... 18
Carrying out the initial start-up............................. 18
Switching the product on and off ......................... 18
Using check programmes.................................... 18
Checking and treating the heating water/filling and supplementary water .................................... 18
7.7
7.8
7.9
7.10
7.11
7.12
7.13
7.5
7.6
8
Preventing low water pressure ............................ 19
Flushing the heating installation for the first time ("cold") ......................................................... 19
Filling the heating installation .............................. 19
Purging the heating installation ........................... 20
Filling and purging the hot water system ............. 20
Filling the condensate trap .................................. 20
Gas ratio setting................................................... 20
Checking function and leak-tightness.................. 23
Thoroughly flushing the heating installation
("hot")................................................................... 23
Adapting the unit to the heating installation.......................................................... 23
8.5
8.6
9
9.1
9.2
8.1
8.2
8.3
8.4
Calling up diagnostics codes ............................... 23
Burner anti-cycling time ....................................... 23
Setting the maintenance interval ......................... 24
Setting the pump output....................................... 24
Setting the bypass valve...................................... 24
Handing the product over to the operator............ 25
Troubleshooting ................................................ 25
Checking service messages................................ 25
Rectifying faults ................................................... 25
10.1
10.2
10.3
10.4
10.5
10.6
9.3
9.4
9.5
9.6
9.7
10
10.7
10.8
Calling up and clearing the fault memory ............ 25
Resetting parameters to factory settings ............. 25
Preparing the repair work .................................... 25
Replacing defective components......................... 25
Completing repair work........................................ 27
Inspection and maintenance ............................ 28
Removing the compact thermal module .............. 28
Cleaning the heat exchanger............................... 29
Checking the burner ............................................ 29
Cleaning the condensate trap.............................. 29
Cleaning the filter in the cold water inlet.............. 29
Installing the compact thermal module ................ 30
Draining the product ............................................ 30
10.9
11
11.1
11.2
12
13
Checking the pre-charge pressure for the internal expansion vessel .................................... 30
Completing inspection and maintenance work .... 30
Decommissioning.............................................. 30
Temporarily decommissioning the product.......... 30
Decommissioning the product ............................. 30
Recycling and disposal..................................... 30
Customer service............................................... 30
B
C
Appendix ............................................................................ 31
A Overview of diagnostics codes........................ 31
Status codes – Overview .................................. 34
Overview of fault codes .................................... 35
D
D.1
E
F
Connection diagrams ........................................ 38
Product connection diagram with integrated hot water generation ............................................ 38
Inspection and maintenance work –
Overview............................................................. 39
Commissioning Checklist................................. 40
2 Installation and maintenance instructions ecoTEC pro 0020209589_02
G
G.1
Opening of the flue pipe.................................... 44
Positioning of the opening of a fan-supported flue gas pipe ........................................................ 44
I
H Text from BS 5440-1 on fan-supported flue gas pipes ............................................................ 45
Opening of the flue pipe below eaves and balconies ............................................................ 45
J Technical data.................................................... 45
Index ................................................................................... 49
Contents
0020209589_02 ecoTEC pro Installation and maintenance instructions 3
1 Safety
1 Safety
1.1
Action-related warnings
Classification of action-related warnings
The action-related warnings are classified in accordance with the severity of the possible danger using the following warning signs and signal words:
Warning symbols and signal words
Danger!
Imminent danger to life or risk of severe personal injury
Danger!
Risk of death from electric shock
Warning.
Risk of minor personal injury
Caution.
Risk of material or environmental damage
1.2
Intended use
There is a risk of injury or death to the user or others, or of damage to the product and other property in the event of improper use or use for which it is not intended.
The product is intended as a heat generator for closed heating installations and for hot water generation.
The products referred to in these instructions must only be installed and operated in conjunction with the air/flue pipe accessories listed in other applicable documents.
Exceptions: For C63 and B23P installation types, follow the specifications in these instructions.
Intended use includes the following:
– observance of accompanying operating, installation and servicing instructions for the product and any other system components
– installing and fitting the product in accordance with the product and system approval
– compliance with all inspection and maintenance conditions listed in the instructions.
Any other use that is not specified in these instructions, or use beyond that specified in this document shall be considered improper use. Any direct commercial or industrial use is also deemed to be improper.
Caution.
Improper use of any kind is prohibited.
1.3
General safety information
1.3.1 Risk caused by inadequate qualifications
Assembly and disassembly, installation, startup, maintenance, repairs and decommissioning must only be carried out by a competent person who is sufficiently qualified to observe all of the instructions that come with the product, to proceed in accordance with the current state of the art, and to comply with all applicable directives, standards, laws and other regulations.
1.3.2 Risk of death from escaping gas
What to do if you smell gas in the building:
▶ Avoid rooms that smell of gas.
▶ If possible, open doors and windows fully and ensure adequate ventilation.
▶ Do not use naked flames (e.g. lighters, matches).
▶ Do not smoke.
▶ Do not use any electrical switches, mains plugs, doorbells, telephones or other communication systems in the building.
▶ If it is safe to do so, close the emergency control valve or the main isolator.
▶ If possible, close the gas isolator cock on the product.
▶ Warn other occupants in the building by yelling or banging on doors or walls.
▶ Leave the building immediately and ensure that others do not enter the building.
▶ Notify the gas supply company or National
Grid Transco +44 (0) 800 111999 by telephone from outside of the building.
1.3.3 Risk of death from leaks if the product is installed below ground level!
Liquid gas is accumulating at floor level. If the product is installed below ground level, liquid gas may accumulate at floor level if there
4 Installation and maintenance instructions ecoTEC pro 0020209589_02
Safety 1 are any leaks. In this case, there is a risk of explosion.
▶ Make sure that liquid gas cannot escape from the product or the gas line under any circumstance.
1.3.4 Risk of death due to blocked or leaking flue gas routes
Installation errors, damage, tampering, unauthorised installation sites or similar can cause flue gas to escape and result in a risk of poisoning.
What to do if you smell flue gas in the property:
▶ Open all accessible doors and windows fully to provide ventilation.
▶ Switch off the product.
▶ Check the flue gas routes in the product and the flue gas diversions.
1.3.5 Risk of poisoning and burns caused by escaping hot flue gases
▶ Only operate the product if the air/flue pipe has been completely installed.
▶ With the exception of short periods for testing purposes, only operate the product when the front casing is installed and closed.
1.3.6 Risk of death due to explosive and flammable materials
▶ Do not use or store explosive or flammable materials (e.g. petrol, paper, paint) in the installation room of the product.
1.3.7 Risk of death due to cabinet-type casing
Cabinet-type casing can give rise to dangerous situations when used on a product which is operated with an open flue.
▶ Ensure that the product is supplied with sufficient combustion air.
1.3.8 Risk of poisoning caused by insufficient supply of combustion air
Conditions : Open-flued operation
▶ Ensure that the air supply to the product's installation room is permanently unobstructed and sufficient in accordance with the relevant ventilation requirements.
Compartment ventilation
The boilers are very high efficiency appliances. As a consequence the heat loss from the appliance casing during operation is very low. Compartment ventilation is required if the flue used is not concentric and air is supplied from the room or compartment the boiler is installed in.
1.3.9 Risk of death due to lack of safety devices
The schematic drawings included in this document do not show all safety devices required for correct installation.
▶ Install the necessary safety devices in the system.
▶ Observe the applicable national and international laws, standards and guidelines.
1.3.10 Risk of death from electric shock
There is a risk of death from electric shock if you touch live components.
Before commencing work on the product:
▶ Disconnect the product from the power supply by switching off all power supplies
(electrical partition with a contact opening of at least 3 mm, e.g. fuse or line protection switch).
▶ Secure against being switched back on again.
▶ Wait for at least 3 minutes until the capacitors have discharged.
▶ Check that there is no voltage.
1.3.11 Risk of being burned or scalded by hot components
▶ Only carry out work on these components once they have cooled down.
0020209589_02 ecoTEC pro Installation and maintenance instructions 5
1 Safety
1.3.12 Risk of death from escaping flue gas
If you operate the product with an empty condensate trap, flue gas may escape into the room air.
▶ In order to operate the product, ensure that the condensate trap is always full.
1.3.13 Risk of material damage caused by
▶
▶ using an unsuitable tool
Use the correct tool to tighten or loosen screw connections.
1.3.14 Risk of material damage caused by frost
Do not install the product in rooms prone to frost.
1.3.15 Risk of corrosion damage due to unsuitable combustion and room air
Sprays, solvents, chlorinated cleaning agents, paint, adhesives, ammonia compounds, dust or similar substances may lead to corrosion on the product and in the air/flue pipe.
▶ Ensure that the supply of combustion air is always free of fluorine, chlorine, sulphur, dust, etc.
▶ Ensure that no chemical substances are stored at the installation site.
▶ Ensure that the combustion air is not routed through chimneys which have previously been used with floor-standing oil-fired boilers, or with other boilers, which could cause soot to build up in the chimney.
▶ If you are installing the product in hairdressing salons, painter's or joiner's workshops, cleaning businesses or similar locations, choose a separate installation room in which a combustion air supply is ensured that is technically free of chemical substances.
1.4
Related documents
Installation and maintenance of the boiler must only be performed by a competent person with valid accreditation from the Health and Safety Executive in accordance with the
"Gas Safety (Installation and Use) Regulations 1998" (hereinafter abbreviated to "competent person" or "heating specialist company"). The existing regulations, rules and guidelines must be observed when doing so.
Any special requirements of Local Authorities, gas undertakings or insurers must be complied with. The competent person is also responsible for inspection, maintenance and repairs to the boiler, and for checking gas volume setting and flue gas analysis.
Installers shall carryout a full site risk assessment and put into place all necessary steps and procedures to comply with Health and safety at work act and ensure safety of themselves and others with regard to manual handling and working at height requirements.
During the appliance installation (and any subsequent work, such as, the replacement of major parts ) it will be necessary to employ caution. All installers and operatives involved from unloading the appliance until it is fully mounted on the wall in its final installed location must exercise full duty of care for themselves and others with regard to safety.
When lifting and handling this appliance, operatives should employ assistance. In certain situations it may be necessary to use mechanical handling aids. Take care to avoid trip hazards, slippery or wet surfaces.
Employers and installers should refer to the HSE web site for full advice and manual handling assessment charts
(MAC) tool.
In addition where no specific instructions are given then reference shall be made, but not restricted to, all applicable and relevant British Standards and codes of practice such as the following:
– Gas Safety (Installation and Use) regulations.
– All current Building Regulations for England, Northern Ireland and Wales, (as amended). This includes Approved Codes of Practice and approved documents and
6 Installation and maintenance instructions ecoTEC pro 0020209589_02
Safety 1 guidance for building regulations. (A to P and 7)
– The Building Standards, Scotland, and any requirements determined by the local authorities within.
– The Health and safety at work act
– COSHH Control of Substances Hazardous to Health.
– BS 7671 Requirements for electrical installations. IEE Wiring Regulations
– The Electricity at Work Regulations.
– The Water supply (water fittings) regulations 1999.
– Water bylaws 2000 (Scotland)
– BS 5854 Code of practice for flues and flue structures in buildings.
– BS EN 12828 Design of water-based heating systems.
– BS EN 806 Parts 1 - 5.
– BS 8558 Guide to the design, installation, testing and maintenance of services supplying water for domestic use within buildings and their curtilages.
– BS 6880 Code of practice for low temperature heating systems with outputs above
45 kW, Part 1, 2, and 3.
– BS 6891 Installation of low pressure gas pipe work of up to 35mm in domestic premises.
– BS 4814 Specification for: Expansion vessels using an internal diaphragm, for sealed hot water and heating systems.
– BS 7074 Application, selection and installation of expansion vessels and ancillary equipment for sealed water systems., Part
1 and 2.
– BS 7593 Code of practice for treatment of water in domestic hot water central heating systems.
– BS 12831 Heating systems in buildings.
Method for calculating design heat load.
– BS EN 13831 Closed expansion vessels with built in diaphragm.
– EN 14336 Heating systems in buildings.
Installation and commissioning of water based heating systems.
– BS 5440 – 1 Installation of flues and ventilation for gas appliances of rated input not exceeding 70kW*
– BS 5440
70kW*
– 2 Flueing and ventilation for gas appliances of rated input not exceeding
* 1st 2nd and 3rd family gases.
– BS 5449 Forced circulation hot water systems up to 45kW.
– BS EN 6798 Installation & maintenance of gas fired hot water boilers of rated input not exceeding 70kW net.
– BS 5482 - Part 1 Domestic butane and propane gas burning installations
Institute of Gas Engineers Publications:
– IGE/UP/1B (Edition 2) Tightness testing and direct purging of small natural gas installations.
– IGE/UP/ 7 (Edition 2) Gas in timber and light steel framed buildings.
Additionally for gas boilers systems with outputs greater than 70KW.
– BS 6644 Installation of gas boilers between 60 kW and 2 MW (2nd and 3rd family gases)
– BS 5449
– IGE/UP/1 (Edition 2) Strength testing, tightness testing and direct purging of industrial and commercial gas installations.
– IGE/UP/1A (Edition 2) Strength testing, tightness testing and direct purging of small, low pressure industrial and commercial natural gas installations.
– IGE/UP/10 Installation of gas appliances in industrial and commercial premises.
Part 1 Flued appliances.
– The installation must comply with the current version of the Clean Air Act.
1.5
Related documents
– I.S. 813 Domestic Gas Installations
– I.S. 820 Non Domestic Gas Installations
– Building Control Act 2007
– ETCI Regulations for installing electrical systems
0020209589_02 ecoTEC pro Installation and maintenance instructions 7
2 Notes on the documentation
2 Notes on the documentation
2.1
Observing other applicable documents
▶
You must observe all the operating and installation instructions included with the system components.
2.2
Storing documents
▶
Pass these instructions and all other applicable documents on to the system operator.
2.3
Validity of the instructions
These instructions apply only to:
Product article number
Article number
Gas Council
Number
0010018494 47-044-54 24 (VUW GB 246/5 ‑ 3 A) ecoTEC pro
28 (VUW GB 286/5 ‑ 3 A) ecoTEC pro
28 (VUW GB 286/5 ‑ 3 A
LPG) ecoTEC pro
30 (VUW GB 306/5 ‑ 3) ecoTEC pro
0010018495 47-044-55
0010018496 47-044-56
0010016538 47-044-52
3
4
3
2
1
Product description
3.1
Product design
3.1.1
Functional elements, product with integrated hot water generation
12
13
10
11
5
6
7
8
9
14
19
15
2.4
Benchmark
Vaillant is a licensed member of the Benchmark Scheme which aims to improve the standards of installation and commissioning of domestic heating and hot water systems in the
UK and to encourage regular servicing to optimise safety, efficiency and performance.
Benchmark is managed and promoted by the Heating and
Hotwater Industry Council.
18
17
3
4
1
2
Gas valve
Water pressure sensor
5
6
7
Heat exchanger
Connection for the flue pipe
Flue gas analysis point
Expansion vessel
Air intake pipe
8
9
Compact thermal module
Ignition electrode
10 Fan
For more information visit www.centralheating.co.uk
2.5
Local regulations
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure that customers are provided with the correct equipment for their needs, that it is installed, commissioned and serviced in accordance with the manufacturer’s instructions by a competent person approved at the time by the Health and Safety Executive and that it meets the requirements of the appropriate Building Regulations. The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and should be provided to the customer for future reference.
Installers are required to carry out installation, commissioning and servicing work in accordance with the Benchmark
Code of Practice which is available from the Heating and
Hotwater Industry Council who manage and promote the
Scheme.
→ "CE label" section
Read the instructions.
11 Automatic air vent
12 Pressure gauge
13 Internal pump
14 Diverter valve
15 Expansion relief valve
16 Electronics box
17 Impeller sensor (hot water)
18 Bypass valve
19 Secondary heat exchanger
3.2
Information on the identification plate
The identification plate is mounted on the underside of the product in the factory.
Information on the identification plate
Meaning
16
8 Installation and maintenance instructions ecoTEC pro 0020209589_02
Installation 4
P
Q
D
Information on the identification plate
VUW…
..6/5-3 ecoTEC pro
2H, G20 – 20 mbar
(2.0 kPa) ww/yyyy
Cat.
Types
PMS
PMW
T max.
ED 92/42
V Hz
W
IP
Meaning
Vaillant gas-fired wall-hung boiler for heating and hot water generation
Calorific value output/product generation equipment
Product designation
Gas group and gas connection pressure as set at the factory
Date of manufacture: Week/year
Permissible gas categories
Approved gas-fired units
Permissible total overpressure in heating mode
Permissible total overpressure during hot water generation
Max. flow temperature
Current efficiency directive fulfilled with
4* rating
Mains voltage and mains frequency
Max. electrical power consumption
Level of protection
Heating mode
Hot water generation
Nominal heat output range
Heat input range
Nominal hot water draw-off rate
Proper disposal of the product
Bar code with serial number,
7th to 16th digit = product article number
Note
Make absolutely sure that the product is compatible with the gas group at the installation site.
3.5
Energy Saving Trust Endorsed Products
Only the most energy efficient products can carry the
‘Energy Saving Trust Endorsed Product’ brandmark making it easy for consumers to choose products that have met strict energy performance criteria.
Available for: Boilers, Heating controls and chemical inhibitors, the Energy Saving Trust endorsed product brandmark gives consumers confidence that a product will cost less to run, help lower energy bills and reduce carbon emissions.
About the Energy Saving Trust
Energy Saving Trust is an independent and impartial organisation that provides trusted energy saving advice to empower millions of people to lead affordable, low energy lifestyles. For more information visit energysavingtrust.org.uk
4 Installation
4.1
Unpacking the product
1.
Remove the product from its box.
2.
Remove the protective film from all parts of the product.
4.2
Checking the scope of delivery
▶
Check that the scope of delivery is complete and intact.
4.2.1
Scope of delivery
1
1
1
4
3
1
1
1
1
1
Number
Description
Heat generator
Installation kit containing the following:
- Product retainer
- Expansion relief valve connector
- Hot water connector
- Service valve
- Bag with small parts
Installation template
Condensate drain hose
Enclosed documentation
3.3
Serial number
The serial number can be found on a plastic label at the bottom of the front casing and on the identification plate.
3.4
CE label
The CE label shows that the products comply with the basic requirements of the applicable directives as stated on the identification plate.
The declaration of conformity can be viewed at the manufacturer's site.
4.3
Transporting the product
4.3.1
General
▶
Hold the load as close as possible to your body. Do not twist your body – instead, reposition your feet.
▶
If the unit is being lifted by two persons, ensure your movements are coordinated during lifting.
▶
Avoid bending your upper body – do not lean forwards or to the side.
▶
Wear appropriate cut-resistant and non-slip gloves to protect yourself against sharp edges and maintain a safe and secure grip.
▶
If required, get somebody to assist you in this.
0020209589_02 ecoTEC pro Installation and maintenance instructions 9
4 Installation
4.3.2
Unloading the box from the delivery van
▶
It is recommended that two people lift the unit together.
▶
Lift the box using the straps provided.
▶
Use safe lifting techniques – keep your back straight and bend your legs at the knee.
▶
Hold the load as close as possible to your body.
▶
If the unit is being lifted by two persons, ensure your movements are coordinated during lifting.
▶
If required, get somebody to assist you in this.
4.3.3
Transporting the box from the delivery point to the installation site – ground floor
▶
It is recommended that two people lift the unit together.
▶
Use safe lifting techniques – keep your back straight and bend your legs at the knee.
4.4
Dimensions
3 4 5
440
6 7 12
11 10
1
2
10
6
7
3
4
5
35 35
100 100
188 8
9
4
5
1
2
3
6
7
Flue pipe wall duct
Product holder
Heating flow (22 × 1.5
diameter)
Hot water connection
(15 × 1.5 diameter)
Gas connection
(15 × 1.5 diameter)
Cold water connection
(15 × 1.5 diameter)
Heating return (22 × 1.5
diameter)
8
9
R1 tundish/condensate trap connection
Flue pipe connection
10 Condensate discharge connection, 19 mm diameter
11 Condensate trap
12 Drain line/heating expansion relief valve connection, 15 mm diameter
Installation and maintenance instructions ecoTEC pro 0020209589_02
Consult the installation template that is supplied to find the dimension A.
4.5
Minimum clearances
C C D
Installation 4
2.
Check if the supplied fixing material may be used for the wall.
Conditions : The load-bearing capacity of the wall is sufficient, The fixing material may be used for the wall
▶
Wall-mount the product as described.
▶
Install the product bracket (1) on the wall.
▶
Hang the product on the product bracket from above using the suspension bracket.
Conditions : The fixing material may not be used for the wall
▶
Wall-mount the product as described using the permitted fixing material provided on-site.
4.9
Removing the front casing
B
C
D
A
Minimum clearance
165 mm: Air/flue pipe, 60/100 mm diameter
275 mm: Air/flue pipe, 80/125 mm diameter
180 mm; optimum approx. 250 mm
5 mm; optimum approx. 50 mm
500 mm in front of the heat generator to enable easy access for maintenance work (may be provided by an opening door).
4.6
Clearance from combustible components
It is not necessary to maintain a clearance between the product and components made of combustible materials.
4.7
Using the installation template
▶
Use the installation template to ascertain the locations at which you need to drill holes and make breakthroughs.
4.8
Wall-mounting the product
▶
Remove the front casing as shown in the illustration.
1
1.
Check whether the wall has sufficient load-bearing capacity to bear the operational weight of the product.
0020209589_02 ecoTEC pro Installation and maintenance instructions 11
5 Installation
4.10
Removing the side section
2x
▶
If, during gas leak-tightness tests, you also place the gas lines and the gas valve in the product under pressure, use a max.
test pressure of 11 kPa (110 mbar).
▶
If you cannot limit the test pressure to
11 kPa (110 mbar), close any gas isolator cocks that are installed upstream from the product before you carry out the gas leaktightness test.
▶
If, during gas leak-tightness tests, you have closed the gas isolator cock that is installed upstream of the product, relieve the gas line pressure before you open this gas isolator cock.
Caution.
Risk of material damage due to corrosion.
If non-diffusion-tight plastic pipes are used in the heating installation, this may cause air to enter the heating water and corrosion of the heat generation circuit and the heat generator.
▶
If using non-diffusion-tight plastic pipes in the heating installation, partition the system by installing an external heat exchanger between the heat generator and the heating installation.
Caution.
Risk of material damage caused by mechanical deformation.
Removing both side sections may cause mechanical distortion in the product, which may cause damage to the piping, for example, and potentially result in leaks.
▶
Always only remove one side section – never both side sections at the same time.
Caution.
Risk of material damage due to heat transfer during soldering.
▶
Do not solder the connection pieces if the connection pieces are screwed to the service valves.
▶
5
Remove the side section as shown in the illustration.
Installation
Danger!
Risk of scalding and/or risk of material damage due to incorrect installation leading to escaping water.
Stresses in supply lines can cause leaks.
▶
Install the supply lines without tension.
Caution.
Risk of material damage due to the gas leak-tightness test.
At a test pressure of >11 kPa (110 mbar), gas leak-tightness tests may cause damage to the gas valve.
5.1
Installation requirements
5.1.1
Information on liquid gas operation
In the as-delivered condition, the product is preset for operation with the gas group indicated on the identification plate.
If you have a product that has been preset for operation with natural gas, you must convert it to run on liquid gas. You will need a conversion kit for this. The conversion procedure is described in the manual supplied with the conversion kit.
5.1.2
Purging the liquid gas tank
If the liquid gas tank is not purged properly, this may result in ignition problems.
▶
Ensure that the liquid gas tank has been purged properly before installing the product.
▶
If required, contact the filler or the liquid gas supplier.
5.1.3
Using the correct type of liquid gas
Using the incorrect type of liquid gas may cause fault shutdowns in the product. Ignition and combustion noise may occur in the product.
▶
Only use the gases listed on the identification plate.
12 Installation and maintenance instructions ecoTEC pro 0020209589_02
Installation 5
Installing the hot and cold water connection 5.1.4
Required preliminary work
1.
Install a stop cock in the gas line.
2.
Make sure that the existing gas meter is capable of passing the rate of gas supply required.
3.
Check that the volumetric capacity of the expansion vessel is sufficient for the system volume.
Conditions : The volume of the installed expansion vessel is insufficient
▶
Install an additional expansion vessel, connected as close to the product as possible, in the heating return.
Conditions : External expansion vessel installed
▶
Install a non-return valve in the product outlet (heating flow) or decommission the internal expansion vessel in order to prevent the warm start function from being increasingly activated due to backflow.
4.
Install a tundish with siphon for the condensate discharge and the exhaust pipe on the expansion relief valve. Lay as short a drain line as possible, at a downward gradient away from the tundish.
5.
Insulate bare pipes exposed to environmental influences to protect them from frost using suitable insulating material.
5.2
Installing the gas connection
5.3
1.
Make the water connections as shown in accordance with the relevant standards.
2.
Ensure correct water pressure and flow requirements and that any expansion can be accommodated with the cold supply pipe work.
5.4
Connecting the heating flow and heating return
1.
Install the gas pipe in accordance with the recognised rules of technology.
2.
Connect the product to the gas pipe as shown in accordance with the recognised rules of good engineering practice.
3.
Remove the residues from the gas pipe by blowing through the gas pipe beforehand.
4.
Purge the gas pipe before start-up.
5.
Check the gas pipe for leak-tightness.
▶
Make the heating connections as shown in accordance with the relevant standards.
0020209589_02 ecoTEC pro Installation and maintenance instructions 13
5 Installation
5.5
Connecting the condensate drain pipework
Danger!
Risk of death from escaping flue gases!
The condensate drain pipework for the siphon must not be connected tightly to wastewater piping because, otherwise, the internal condensate trap may be drained fully and flue gas may escape.
▶
Do not connect the condensate drain pipework tightly to the waste-water piping.
▶
Leave an installation space of at least 180 mm beneath the condensate trap.
5.6
Installing the discharge pipe on the expansion relief valve
1.
Install the discharge pipe for the expansion relief valve so that it does not interfere with the removal and fitting of the lower section of the condensate trap.
min.
180
Internal stackpipe
Internal discharge system
Gulley
11
2
3
Soakaway
The product is equipped with a condensate trap (2) . (The filling height is 145 mm). The condensate trap collects the condensate that has formed in a vessel with a capacity of approximately 200 ml, and intermittently releases the contents into the discharge pipe. This minimises the risk of the discharge pipe freezing.
▶
Connect the condensate discharge (1) to condensate drain pipework (3) which has a minimum internal diameter of 19 mm (22 mm outside diameter for all external pipes) and is made from an acid-resistant material (e.g.
plastic overflow pipe).
– The condensate discharge pipework must have a continuous fall (45 mm per metre) and should whenever possible terminate at a suitable discharge point within the heated envelope of the building that will remain frost free under long periods of low external temperatures.
▶
During installation remove all burs from inside of cut pipe work and avoid excessive adhesive which may trap small pockets of water close to the pipe wall which can freeze and build into a larger ice plug.
▶
As with other pipe work insulate the condensate discharge pipe to minimise any risk of freezing and beware when crossing cavities that the fall is maintained and the pipe sleeved.
▶
Ensure that the condensate drain pipework terminates in a suitable location. Further information can be obtained from BS 6798 Specification for installation of gas – fired boilers of rated input not exceeding 70 kW net.
2.
Install the discharge pipe as shown (do not shorten).
3.
Make sure that the end of the pipe is visible.
4.
Ensure that discharged water or steam cannot cause injury to persons or damage to electronic components.
5.
Ensure the discharge pipe work is installed, routed and terminated correctly to minimise the risk of freezing up.
5.7
Flue gas installation
5.7.1
Installing and connecting the flue pipe
1.
You can find out which flue pipes may be used by consulting the enclosed flue pipe installation manual.
2.
Observe the information on positioning the opening for the flue pipe. This information can be found in the appendix.
Conditions : Installation in damp rooms
▶
You must connect the product to a room-sealed air/flue gas installation. The combustion air must not be taken from the installation site.
Caution.
Risk of poisoning due to escaping flue gas.
Mineral-oil-based greases can damage the seals.
▶
Instead of grease, use only water or commercially available soft soap to aid installation.
3.
Install the flue pipe using the installation manual.
14 Installation and maintenance instructions ecoTEC pro 0020209589_02
Installation 5
5.7.2
Replacing the connection piece for the air/flue pipe as required
1.
Replace the connection piece for the air/flue pipe as required. The product-specific standard equipment is listed under Technical data.
2.
Remove the connection piece for the air/flue pipe – this is installed at the factory. ( → Page 15)
3.
3.
Alternatives 1 / 2
▶
If required, install the connection piece for the air/flue pipe, 80/125 mm diameter. ( → Page 15)
Alternatives 2 / 2
▶
If required, install the connection piece with offset for the air/flue pipe, 60/100 mm diameter.
( → Page 15)
5.7.2.1 Removing the connection piece for the air/flue pipe
1
65 mm
2.
Insert the alternative connection piece with offset towards the front.
3.
Use two screws (1) to secure the connection piece to the product.
5.8
Electrical installation
The electrical installation must only be carried out by a qualified electrician.
3.
2.
1.
Danger!
Risk of death from electric shock!
Since mains connection terminals L and N remain live even if the on/off button is switched off:
▶
Switch off the power supply.
▶
Secure the power supply against being switched on again.
1.
Insert a screwdriver into the slot between the measuring stub pipes.
2.
Press the screwdriver carefully down (1.) .
3.
Turn the connection piece anticlockwise (2.) as far as it will go and then remove it by pulling it upwards (3.) .
5.8.1
Opening the electronics box
5.7.2.2 Installing the connection piece for the air/flue pipe, 80/125 mm diameter
1.
Remove the connection piece for the air/flue pipe – this is installed at the factory. ( → Page 15)
2.
Insert the alternative connection piece. In doing so, pay attention to the latching lugs.
3.
Turn the connection piece clockwise until it clicks into position.
5.7.2.3 Installing the connection piece with offset for the air/flue pipe, 60/100 mm diameter
1.
Remove the connection piece for the air/flue pipe – this is installed at the factory. ( → Page 15)
▶
Open the electronics box as shown in the illustration.
5.8.2
Carrying out the wiring
Caution.
Risk of material damage caused by incorrect installation.
Mains voltage at incorrect terminals and plug terminals may destroy the electronics.
▶
Do not connect any mains voltage to the eBUS terminals (+/-).
0020209589_02 ecoTEC pro Installation and maintenance instructions 15
5 Installation
▶
Only connect the mains connection cable to the terminals marked for the purpose.
1.
Route the connection cables of the components to be connected through the cable duct provided on the underside of the product on the left.
2.
Use strain reliefs.
3.
Shorten the connection cables as necessary.
30 mm max.
4.
To prevent short circuits if a strand accidentally comes loose, only strip the outer sheathing of flexible lines to a maximum of 30 mm.
5.
Ensure the inner conductor insulation is not damaged when stripping the outer sheathing.
6.
Only strip inner conductors just enough to establish good, sound connections.
7.
To avoid short circuits resulting from loose individual wires, fit conductor end sleeves on the stripped ends of the conductors.
8.
Screw the respective plug to the connection cable.
9.
Check whether all conductors are sitting mechanically securely in the terminals of the plug. Remedy this if necessary.
10. Plug the plug into the associated PCB slot; see the connection diagram in the appendix.
5.8.3
Establishing the power supply
Caution.
Risk of material damage due to high connected voltage.
At mains voltages greater than 253 V, electronic components may be damaged.
▶
Make sure that the rated voltage of the mains is 230 V.
1.
Make sure that the nominal mains voltage is 230 V.
2.
Provide one common electricity supply for the boiler and for the corresponding controller:
– Power supply: Single-phase, 230 V, 50 Hz
– Fuse protection: ≤ 3 A
3.
Open the electronics box. ( → Page 15)
4.
Connect the product using a fixed connection and a partition with a contact opening of at least 3 mm (e.g.
fuses or power switches).
5.
Route a three-core power supply cable that complies with the relevant standards through the cable duct and into the product.
– Power supply cable: Flexible line
6.
Carry out the wiring. ( → Page 15)
7.
Remove the supplied plug from the bracket in the electronics box and screw the plug onto the power supply cable.
8.
Close the electronics box.
9.
Make sure that access to the power supply is always available and is not covered or blocked.
5.8.4
Installing the product in a moist environment
Danger!
Risk of death from electric shock!
If you install the product in a room with high levels of moisture, e.g. a bathroom, observe the nationally recognised technical standards for electrical installations. If you use the factory-installed connection cable, if installed, with an earthed plug, there is a risk of death from electric shock.
▶
Never use the factory-installed connection cable with earthed plug when installing the product in a moist environment.
▶
Connect the product using a fixed connection and a partition with a contact opening of at least 3 mm (e.g. fuses or power switches).
▶
Use a flexible line for the mains connection line, which is routed through the cable duct into the product.
1.
Open the electronics box. ( → Page 15)
2.
Detach the plug from the PCB slot for the power supply
(X1).
3.
Unscrew the plug of the factory-installed power supply cable, if installed.
4.
Instead of the factory-installed power supply cable, if installed, use a suitable three-core power supply cable which complies with the relevant standards.
5.
Carry out the wiring. ( → Page 15)
6.
Close the electronics box.
7.
Observe the flue-gas connection that is required on a room-sealed air/flue gas installation. ( → Page 14)
5.8.5
Connecting controllers to the electronic system
1.
Install the controller if necessary.
2.
Open the electronics box. ( → Page 15)
3.
Carry out the wiring. ( → Page 15)
4.
Observe the connection diagram in the appendix.
Conditions : Connecting a weather compensator or a room temperature controller via eBUS
▶
Connect the controller to the eBUS connection.
▶
Bridge the 24 V = RT connection (X100 or X106), if there is not already a bridge.
Conditions : Connecting a low-voltage controller (24 V)
▶
Remove the bridge and connect the controller to the
24 V = RT connection (X100 or X106).
Conditions : Connecting 230 volt controller
▶
Connect the switched live supply with the terminal marked RT at X1 (beside the LNPE connections) then remove the link at X100 (do NOT connect 230 volt to any other terminal than the RT connection).
16 Installation and maintenance instructions ecoTEC pro 0020209589_02
Operation 6
Conditions : Connecting a limit thermostat for underfloor heating
▶
Remove the bridge and connect the limit thermostat to the Burner off connection.
5.
Close the electronics box.
6.
For multi-circuit controllers, change D.018
from Eco (intermittently operating pump) to Comfort (continuously operating pump). ( → Page 23)
5.8.6
Connecting additional components via
VR 40 ("2 in 7" multi-functional module)
1.
Install the components in accordance with the respective instructions.
Conditions : Components connected to relay 1
▶
Activate D.027
. ( → Page 23)
Conditions : Components connected to relay 2
▶
Activate D.028
. ( → Page 23)
5.8.7
Actuating the circulation pump according to requirements
1.
Carry out the wiring.
2.
Connect the supply line for the external button using terminals 1 (0) and 6 (functional drawing) on the X41 edge connector, which is supplied with the controller.
3.
Plug the edge connector into the PCB slot X41.
6.2
6 Operation
6.1
Operating concept
The operating concept and the display and setting facilities of the operator level are described in the operating instructions.
An overview of the display and setting options in the installer level can be found in the section "Overview of the installer level". ( → Page 17)
Installer level overview
S.31
Code
D.---
P.--
--/--
PF
D F
DP
6.3
Calling up the installer level
1.
Only call up the installer level if you are a competent person.
2.
Press and ("i") at the same time.
◁
S.xx
appears in the display (current unit status).
3.
Press to access the installer level.
◁
Code and -appear in the display.
4.
Set the value 17 (code) and confirm by pressing .
5.
Press to access the check programmes (P) and the fault codes (F) and to return to the diagnostics codes
(D) .
6.
Use or pressing .
to set the required value and confirm by
7.
Confirm by pressing ( ).
8.
Press to cancel a setting or exit the installer level.
6.4
Live Monitor (status codes)
Menu → Live Monitor
Status codes in the display provide information on the product's current operating status.
Status codes – Overview ( → Page 34)
0020209589_02 ecoTEC pro Installation and maintenance instructions 17
7 Start-up
6.5
Setting the hot water temperature
Conditions : Water hardness: > 3.57 mol/m ³
Danger!
Risk of death from Legionella.
Legionella multiply at temperatures below
60 °C.
▶
Ensure that the operator is familiar with all of the Anti-legionella measures in order to comply with the applicable regulations regarding legionella prevention.
Display Meaning
P.01
P.02
P.06
Maximum load check programme:
After successful ignition, the product is operated at maximum heat input.
Minimum load check programme:
After successful ignition, the product is operated at minimum heat input.
Filling mode check programme:
The diverter valve is moved to the mid-position. The burner and pump are switched off (to fill or drain the product).
▶
Set the hot water temperature to a maximum of 50 °C.
7 Start-up
7.1
Carrying out the initial start-up
Initial start-up must be carried out by a customer service technician or an authorised competent person using the commissioning checklist. The commissioning checklist in the appendix ( → Page 40) of the installation instructions must be filled in and stored carefully along with the unit's documentation.
▶
Carry out the start-up procedure using the commissioning checklist in the appendix.
▶
Fill in and sign the commissioning checklist.
7.2
Switching the product on and off
▶
Press the on/off button on the product.
◁
The basic display appears on the display.
7.3
Using check programmes
Call up the installer level + 1x
Display Meaning
P.00
Purging check programme:
The internal pump is cyclically actuated.
The heating circuit and the hot water circuit are purged via the automatic air vent (the cap of the automatic air vent must be released).
1 x : Start heating circuit purging
2 x (
3 x (
): Start hot water circuit purging
): Restart heating circuit purging
1 x ( Cancel ): End purge programme
Note
The purge programme runs for 7.5 min per circuit and then terminates.
Purging the heating circuit:
Diverter valve in heating position, actuation of internal pump for 9 cycles: 30 sec. on, 20 sec. off.
Display: Active heating circuit .
Purging the hot water circuit:
After the above-mentioned cycles have run or the right-hand selection button has been pressed again:
Diverter valve in the hot water position, actuation of the internal pump as above. Display: Active hot water circuit .
7.4
Checking and treating the heating water/filling and supplementary water
Caution.
Risk of material damage due to poor-quality heating water
▶
Ensure that the heating water is of sufficient quality.
▶
Before filling or topping up the system, check the quality of the heating water.
Checking the quality of the heating water
▶
Remove a little water from the heating circuit.
▶
Check the appearance of the heating water.
▶
If you ascertain that it contains sedimentary materials, you must desludge the system.
▶
Use a magnetic rod to check whether it contains magnetite (iron oxide).
▶
If you ascertain that it contains magnetite, clean the system and apply suitable corrosion-protection measures, or fit a magnet filter.
▶
Check the pH value of the removed water at 25 °C.
▶
If the value is below 8.2 or above 10.0, clean the system and treat the heating water.
▶
Ensure that oxygen cannot get into the heating water.
▶
Ensure that oxygen cannot get into the heating water.
( → Page 23)
Checking the filling and supplementary water
▶
Before filling the system, measure the hardness of the filling and supplementary water.
Treating the filling and supplementary water
▶
Observe all applicable national regulations and technical standards when treating the filling and supplementary water.
Provided the national regulations and technical standards do not stipulate more stringent requirements, the following applies:
You must treat the heating water in the following cases:
– If the entire filling and supplementary water quantity during the operating life of the system exceeds three times the nominal volume of the heating installation, or
– If the guideline values listed in the following table are not met, or
– If the pH value of the heating water is less than 8.2 or more than 10.0.
18 Installation and maintenance instructions ecoTEC pro 0020209589_02
Start-up 7
Total heating output kW
< 50
Water hardness at specific system volume
1)
≤ 20 l/kW
> 20 l/kW
≤ 50 l/kW
> 50 l/kW ppm
CaCO ₃ mol/ m
< 300 < 3
³ ppm
CaCO
200
₃
2 mol/ m ³ CaCO
2 ppm
₃ mol/ m
0.02
³
> 50 to ≤ 200
> 200 to ≤ 600
> 600
200
150
2
1.5
150
2
1.5
0.02
2
2
0.02
0.02
2 0.02
2 0.02
2 0.02
1) Nominal capacity in litres/heating output; in the case of multiboiler systems, the smallest single heating output is to be used.
Caution.
Risk of material damage if the heating water is treated with unsuitable additives.
Unsuitable additives may cause changes in the components, noises in heating mode and possibly subsequent damage.
▶
Do not use any unsuitable frost and corrosion protection agents, biocides or sealants.
7.5
Preventing low water pressure
To ensure that the heating installation operates smoothly, the indicator on the pressure gauge must point to the upper half of the grey area or to the middle of the bar graph display in the display (marked by the dashed limit values) when the heating installation is cold. This corresponds to a filling pressure of between 0.1 MPa and 0.2 MPa (1.0 bar and 2.0 bar).
If the heating installation extends over several storeys, higher filling pressures may be required to avoid air entering the heating installation.
If the filling pressure falls below 0.08 MPa (0.8 bar), the product indicates low pressure by displaying a flashing pressure value. If the filling pressure falls below 0.05 MPa
(0.5 bar), the product switches off. The display shows F.22
.
▶
Top up the heating water to start the product up again.
The pressure value flashes in the display until a pressure of
0.11 MPa (1.1 bar) or higher has been reached.
7.6
Flushing the heating installation for the first time ("cold")
Note
The complete heating system must be flushed at least twice: Once with cold water and once with hot water in accordance with the following instructions.
No incompatibility with our products has been detected to date with proper use of the following additives.
▶
When using additives, follow the manufacturer's instructions without exception.
We accept no liability for the compatibility of any additive or its effectiveness in the rest of the heating system.
Additives for cleaning measures (subsequent flushing required)
– Fernox F3
– Sentinel X 300
– Sentinel X 400
Additives intended to remain permanently in the system
– Fernox F1
– Fernox F2
– Sentinel X 100
– Sentinel X 200
Additives for frost protection intended to remain permanently in the system
– Fernox Antifreeze Alphi 11
– Sentinel X 500
▶
If you have used the above-mentioned additives, inform the operator about the measures required.
▶
Inform the operator about the measures required for frost protection.
1.
Check whether all thermostatic radiator valves and both service valves on the product are open.
2.
Connect a hose to the drain valve that is located at the lowest position in the heating system.
3.
Open the radiator valves and the drain valves so that the water can drain quickly. Start at the next point in the system and open the purging valves on the radiators so that the contaminated water can completely drain.
4.
Close the drain cocks.
5.
Refill the heating system with water.
6.
Check that the expansion relief valve of the heating system is functioning correctly by turning the handle on the valve.
7.
Check the pressure in the heating system and top up with water if necessary.
8.
Close the filling valve and the cold water valve.
7.7
Filling the heating installation
1
0020209589_02 ecoTEC pro Installation and maintenance instructions
1.
Flush the heating installation through.
2.
Undo the cap of the automatic air vent (1) by one to two rotations and leave it open, as the product purges itself via the automatic air vent even in continuous mode.
19
7 Start-up
3.
Select the check programme P.06
.
◁
The diverter valve moves to the mid-position, the pumps do not run and the product does not switch to heating mode.
4.
Observe the information on treating heating water.
( → Page 18)
5.
Connect the filling and drainage tap in the heating installation to a heating water supply, if possible with the cold water valve, in accordance with the relevant standards.
6.
Open the heating water supply.
7.
Open all radiator valves (thermostatic radiator valves) of the heating installation.
8.
If necessary, check that both service valves on the product are open.
9.
Slowly open the filling and drainage tap so that the water flows into the heating system.
10. Purge the lowest radiator until water flows out of the purging valve without bubbles.
11. Purge all other radiators until the entire heating system has been filled with water.
12. Close all purging valves.
13. Monitor the rising filling pressure in the heating installation.
14. Fill with water until the required filling pressure is reached.
15. Close the filling and drainage tap and the cold water valve.
16. Check all connections and the entire system for leaks.
7.8
Purging the heating installation
1.
Select the check programme P.00
.
◁
The product does not start up, the internal pump operates intermittently and purges either the heating circuit or the hot water circuit.
◁
The display shows the filling pressure of the heating installation.
2.
Make sure that the filling pressure of the heating installation does not fall below the minimum filling pressure.
– ≥ 0.08 MPa ( ≥ 0.80 bar)
◁
At the end of the filling procedure, the filling pressure of the heating installation should be at least
0.02 MPa (0.2 bar) above the counter-pressure of the expansion vessel ("Exp") (P
Installation
≥ P
Exp
0.02 MPa (0.2 bar)).
+
3.
If there is still too much air in the heating installation at the end of the check programme P.00
, repeat the check programme.
7.9
Filling and purging the hot water system
1.
Open the cold water stop valve on the product.
2.
Fill the hot water system by opening all the hot water draw-off valves until water escapes.
7.10
Filling the condensate trap
1
1.
Remove the lower section from the condensate trap (1) .
2.
Fill the lower section with water up to 10 mm below the upper edge.
3.
Attach the lower section to the condensate trap.
7.11
Gas ratio setting
7.11.1 Checking the factory-set gas ratio setting
Caution.
Risk of material damage caused by making unauthorised settings.
▶
Never modify the factory setting of the gas pressure regulator of the gas valve.
▶
Before you start up the product, compare the gas group information on the identification plate with the gas group available at the installation site.
Conditions : The product design is not compatible with the local gas group
Only Vaillant Service Solutions may perform a gas conversion.
If a gas conversion to liquid gas has been carried out, the smallest possible partial load is higher than is shown on the display. The correct values can be found in the Technical data in the appendix.
▶
Call Vaillant Service Solutions (0330 1003 143).
▶
Do not start up the product.
20 Installation and maintenance instructions ecoTEC pro 0020209589_02
Start-up 7
Conditions : The product design is compatible with the local gas group
▶
Proceed as described below.
7.11.2 Checking the leak-tightness of the flue gas system and for flue gas recirculation
1.
Check the integrity of the flue gas system.
2.
If the flue gas system is longer than 2 m, we urgently recommend that you test the system for flue gas recirculation as described below.
3.
Use the air analysis point to check for flue gas recirculation.
4.
Use the flue gas measuring instrument.
5.
If you discover CO or CO2 in the fresh air, search for a leak in the flue gas system or for the flue gas recirculation.
6.
Eliminate the damage.
7.
Repeat the above-mentioned test to determine if the fresh air contains CO or CO2.
8.
If you cannot eliminate the damage, you must not start up the boiler.
Conditions : Gas flow rate in the permissible range
▶
End the check programme P.01
.
▶
Allow the boiler to cool down by allowing pump overrun to operate for a minimum of two minutes.
▶
Record the boiler maximum gas flow rate onto the
Benchmark gas boiler commissioning checklist.
7.11.4 Checking the gas flow pressure
1.
Ensure that the gas inlet working pressure can be obtained with all other gas appliances in the property working.
2.
Close the gas isolator cock.
7.11.3 Checking the gas flow rate
The boiler is fitted with a multifunctional automatic gas valve which ensures that the precise air/gas ratio is provided under all operating conditions. The gas flow rate has been set during production and does not require adjustment. With the front casing fitted check the gas flow rate of the boiler as follows:
▶
Start up the product with the check programme P.01
.
▶
In addition, ensure that maximum heat can be dissipated into the heating system by turning up the room thermostat.
▶
Wait at least 5 minutes until the boiler has reached its operating temperature.
▶
Ensure that all other gas appliances in the property are turned off.
▶
Measure the gas flow rate at the gas meter.
▶
Compare the measured values with the corresponding values in the table.
Nominal value for the net heat supply in kW in accordance with
BS EN 483
24
28
30
H gas in m ³ /h
Nom.
+5%
P gas in kg/h
− 10% Nom.
+5% − 10%
2,61 2,74 2.35
1,92 2,02 1,73
3,10 3,26 2,79 2,25 2,36 2,03
3,27 3,43 2,94 2,40 2,52 2,16
Conditions : Gas flow rate not in the permissible range
▶
Check all of the piping and ensure that the gas flow rates are correct.
▶
Only put the product into operation once the gas flow rates have been corrected.
1
2
3.
Use a screwdriver to undo the measuring nipple screw
(1) (lower screw) at the gas valve.
4.
Connect a pressure gauge (2) to the measuring nipple
(1) .
5.
Open the gas isolator cock.
6.
Start up the product with the check programme P.01
.
7.
In addition, ensure that maximum heat can be dissipated into the heating system by turning up the room thermostat.
8.
With the boiler operating at full load check that the gas inlet working pressure at the reference test point complies with the requirements.
– Permissible gas flow pressure for operation with
G20 natural gas: 1.3 … 2.3 kPa (13.0 … 23.0 mbar)
– Permissible gas flow pressure for operation with
G31 liquid gas: 2.3 … 4.3 kPa (23.0 … 43.0 mbar)
9.
Should the pressure recorded at the reference test point in the boiler be lower than indicated check if there is any blockage in the pipework or if the pipework is undersized.
0020209589_02 ecoTEC pro Installation and maintenance instructions 21
7 Start-up
Conditions : Gas flow pressure not in the permissible range
Caution.
Risk of material damage and operating faults caused by incorrect gas connection pressure.
If the gas connection pressure lies outside the permissible range, this can cause operating faults in and damage to the product.
▶
Do not make any adjustments to the product.
▶
Do not start up the product.
▶
If you cannot correct the failure, notify the gas supply company and proceed as follows:
▶
End the check programme P.01
.
▶
Allow the boiler to cool down by allowing pump overrun to operate for a minimum of two minutes.
▶
Close the gas isolator cock.
▶
Remove the pressure gauge and retighten the sealing screw (1) for the measuring nipple.
▶
Open the gas isolator cock.
▶
Check the measuring nipple for gas tightness.
▶
Close the gas isolator cock.
▶
Install the front casing.
▶
Disconnect the product from the power mains.
▶
You must not start up the boiler.
Conditions : Gas flow pressure in the permissible range
▶
End the check programme P.01
.
▶
Allow the boiler to cool down allowing pump overrun to operate for a minimum of two minutes.
▶
Close the gas isolator cock.
▶
Remove the pressure gauge and retighten the sealing screw (1) for the measuring nipple.
▶
Open the gas isolator cock.
▶
Check the measuring nipple for gas tightness.
▶
Install the front casing.
▶
Reset boiler controls for normal operation.
▶
Record the appliance gas inlet working pressure (kPa resp. mbar) in the Benchmark gas boiler commissioning checklist.
7.11.5 Checking the CO ₂ content and, if necessary, adjusting it (air index setting)
1.
Start up the product with the check programme P.01
.
2.
Wait at least five minutes until the product reaches its operating temperature.
3.
Measure the CO ₂ and CO/CO ₂ content at the flue gas analysis point.
4.
Compare the measured value with the corresponding value in the table.
Settings Unit G20 natural gas
G31 liquid gas
CO ₂ after 5 minutes in full load mode with front casing closed
Vol.
– % 9.2
± 1.0
10.4
± 0.5
Settings Unit G20 natural gas
G31 liquid gas
CO ₂ after 5 minutes in full load mode with front casing removed
Set for Wobbe index
W ₀
O ₂ after 5 minutes in full load mode with front casing closed
Vol.
– % kWh/m
Vol.
CO value with full load ppm
CO/CO ₂
– %
³
9.0
± 1.0
14.09
4.5
≤
≤
± 1.8
250
0.0031
10.2
5.1
≤
± 0.5
21.34
≤
± 0.8
250
0.0026
Conditions : The CO ₂ content must be adjusted
1
2
▶
Remove the yellow sticker.
▶
Remove the covering cap (1) .
▶
Set the CO ₂ content (value with front casing removed) by turning the screw (2) .
– Higher CO ₂ content: Turn anti-clockwise
– Lower CO ₂ content: Turn clockwise
▶
For natural gas only: Only perform the adjustment in small increments of a 1/8 turn and wait approx.
one minute after each adjustment until the value stabilises.
▶
For liquid gas only: Only perform the adjustment in extremely small increments (approx. 1/16 turn), and wait approx. one minute after each adjustment until the value stabilises.
▶
After you have implemented the settings, press ( ).
▶
If an adjustment is not possible in the specified adjustment range, you must not start up the product.
▶
If this is the case, inform Customer Service.
▶
Refit the covering cap.
▶
Install the front casing.
22 Installation and maintenance instructions ecoTEC pro 0020209589_02
Adapting the unit to the heating installation 8
7.12
Checking function and leak-tightness
Before you hand the product over to the operator:
▶
Check the gas line, the flue gas installation, the heating installation and the hot water pipes for leaks.
▶
Check that the air/flue pipe and condensate drain pipework have been installed correctly.
▶
Check that the front casing has been installed correctly.
7.12.1 Checking the heating mode
1.
Make sure that there is a heat requirement.
2.
Call up the Live Monitor .
◁
If the product is working correctly, the display shows
S.04
.
8 Adapting the unit to the heating installation
8.1
Calling up diagnostics codes
You can find the setting options in the diagnostics codes in the installer level.
Overview of diagnostics codes ( → Page 31)
▶
Call up the installer level. ( → Page 17)
8.2
Burner anti-cycling time
To prevent frequent switching on and off of the burner and thus prevent energy losses, an electronic restart lockout is activated for a specific period each time the burner is switched off. The burner anti-cycling time is only active for the heating mode. Hot water handling during a burner anti-cycling time does not affect the time function element
(default setting: 20 mins).
7.12.2 Checking the hot water generation
1.
Open a hot water valve all the way.
2.
Call up the Live Monitor .
◁
If the hot water generation is working correctly, appears in the display.
8.
Install the front casing.
S.14
7.13
Thoroughly flushing the heating installation
("hot")
1.
Operate the appliance until the boiler and the heating system are up to temperature.
2.
Check the heating system for leaks.
3.
Connect a hose to the drain valve located at the lowest position of the heating system.
4.
Shut off the boiler, open the drain valve and all purge valves on the radiators and allow the water to flow out of the heating system and the boiler quickly and fully.
5.
Close the drain valve.
6.
Fill the heating system again with water as described in
Filling the heating installation ( → Page 19) and Purging the heating installation ( → Page 20).
7.
Re-fill the system until the system design pressure of
0,1 MPa (1,0 bar) is attained.
Note
The actual reading on the digital pressure gauge should ideally be 0,05 MPa (0,5 bar) plus an additional pressure corresponding to the highest point of the system above the base of the boiler – 10 m head equals an additional 1 bar reading on the pressure gauge.
The minimum pressure should not be less than 0,1 MPa (1 bar) in any installation. If the system is to be treated with an inhibitor it should be applied at this stage in accordance with the manufacturer’s instructions. Further information can be obtained from Sentinel,
Betz Dearborn Ltd., Tel: 0151 420 9595, or
Fernox, Alpha – Fry technologies. Tel: 0870
8700362.
45
50
55
60
30
35
40
65
70
75
T
Flow
(target)
[°C]
8.2.1
Setting the burner anti-cycling time
1.
Navigate to diagnostics code D.002
in the installer level and confirm by pressing .
2.
Set the burner anti-cycling time and confirm by pressing
.
Set maximum burner anti-cycling time [min]
65
70
75
45
50
55
60
T
Flow
(target)
[°C]
30
35
40
1 5 10 15 20 25 30
2.0
4.0
8.5
12.5
16.5
20.5
25.0
2.0
4.0
7.5
11.0
15.0
18.5
22.0
2.0
3.5
6.5
10.0
13.0
16.5
19.5
2.0
3.0
6.0
8.5
11.5
14.0
17.0
2.0
3.0
5.0
7.5
9.5
12.0
14.0
2.0
2.5
4.5
6.0
8.0
10.0
11.5
2.0
2.0
3.5
5.0
6.0
7.5
9.0
2.0
1.5
2.5
3.5
4.5
5.5
6.5
2.0
1.5
2.0
2.5
2.5
3.0
3.5
2.0
1.0
1.0
1.0
1.0
1.0
1.0
Set maximum burner anti-cycling time
[min]
35 40 45 50 55 60
29.0
33.0
37.0
41.0
45.0
49.5
25.5
29.5
33.0
36.5
40.5
44.0
22.5
26.0
29.0
32.0
35.5
38.5
19.5
22.5
25.0
27.5
30.5
33.0
16.5
18.5
21.0
23.5
25.5
28.0
13.5
15.0
17.0
19.0
20.5
22.5
10.5
11.5
13.0
14.5
15.5
17.0
7.0
4.0
1.0
8.0
4.5
1.0
9.0
10.0
11.0
11.5
5.0
5.5
6.0
6.5
1.0
1.0
1.0
1.0
0020209589_02 ecoTEC pro Installation and maintenance instructions 23
8 Adapting the unit to the heating installation
8.2.2
Resetting the remaining burner anti-cycling time
▶
Press .
8.3
Setting the maintenance interval
1.
Navigate to diagnostics code D.084
in the installer level and confirm by pressing .
2.
Set the maintenance interval (operating hours) until the next maintenance work is due and confirm by pressing
.
Heat demand
5.0 kW
10.0 kW
15.0 kW
20.0 kW
25.0 kW
> 27.0 kW
Number of persons
1 ‑ 2
2 ‑ 3
1 ‑ 2
2 ‑ 3
2 ‑ 3
3 ‑ 4
3 ‑ 4
4 ‑ 5
3 ‑ 4
4 ‑ 6
3 ‑ 4
4 ‑ 6
1800 h
1900 h
2600 h
2700 h
2800 h
2900 h
3000 h
3000 h
Guideline value for burner operating hours until the next inspection/maintenance work is due for an average operating time of one year
(dependent upon the system type)
1050 h
1150 h
1500 h
1600 h
8.4.1.2 Pump characteristic line for VUW 306
400
300
200
100% PWM
85%
70%
60%
53%
100
0
0 200 400 600 800 1000 1200 1400 1600 1800
Flow rate [l/hr]
8.5
Setting the bypass valve
Caution.
Risk of material damage caused by incorrect setting of the high-efficiency pump
If the pressure at the bypass valve is increased (by turning it clockwise) and the pump output is set to less than 100%, the product may not operate correctly.
▶
In this case, set the pump output to
5 = 100% using diagnostics code D.014.
▶
Remove the front casing. ( → Page 11)
1
8.4
Setting the pump output
1.
Navigate to diagnostics code D.014
in the installer level and confirm by pressing .
2.
Set the required pump output.
Conditions : Low loss header installed
▶
Switch off the speed regulation and set the pump output to a fixed value.
8.4.1
Remaining feed head of the pump
8.4.1.1 Pump characteristic line for VUW 246, VUW
286
400
350
300
250
200
150
100
50
0
0 200 400 600 800 1000 1200 1400
Flow rate [l/hr]
100% PWM
80%
70%
60%
53%
▶
Regulate the pressure using the adjusting screw (1) .
Position of the adjusting screw
Pressure in MPa
(mbar)
Notes/application
Right-hand stop
(turned all the way down)
0.035
(350)
If the radiators do not heat up sufficiently at the default setting. In this case, you must set the pump to the maximum speed.
Mid-position
(5 turns to the left)
0.025
(250)
5 further turns to the left from the
0.017
(170) mid-position
▶
Install the front casing.
Default setting
If noises are produced in the radiators or radiator valves
24 Installation and maintenance instructions ecoTEC pro 0020209589_02
Troubleshooting 9
8.6
Handing the product over to the operator
▶
When you have finished the installation, affix the enclosed sticker (which requests that the user reads the instructions) to the front of the product in the operator's language.
▶
Explain to the operator how the safety devices work and where they are located.
▶
Inform the operator how to handle the product.
▶
In particular, draw attention to the safety information which the operator must follow.
▶
Inform the operator of the necessity to have the product maintained according to the specified intervals.
▶
Pass all of the instructions and documentation for the product to the operator for safe-keeping.
▶
Inform the operator about measures taken to ensure the supply of combustion air and flue gas guiding, and instruct the operator that he must not make any changes.
▶
Inform the operator that they must not store or use explosive or highly flammable substances (such as petrol, paper or paint) in the installation room of the product.
▶
Complete and sign off the Benchmark commissioning check list.
▶
Complete and sign off the guarantee documentation.
9 Troubleshooting
9.1
Checking service messages appears if you have set a maintenance interval, for example, and this has passed or a service message is issued.
The product is not in fault mode.
▶
Call up the Live Monitor. ( → Page 17)
Conditions : S.46
is displayed
The product is in Comfort protection mode. The product continues to run with restricted comfort after it has detected a fault.
▶
To establish whether or not a component is defective, read the fault memory. ( → Page 25)
Note
If no fault message is present, the product will automatically switch back to normal operating mode after a certain time.
9.3
Calling up and clearing the fault memory
The last 10 fault messages are stored in the fault memory.
▶
Call up the installer level. ( → Page 17)
▶
Navigate to the fault codes .
◁
The number of faults that have occurred is shown in the display and the faults that are currently called up are displayed with their fault numbers F.xx
.
▶
Press or to call up individual fault messages.
▶
To delete the entire fault list, navigate to diagnostics code
D.094
in the installer level.
▶
Set the diagnostics code to 1 , and confirm by pressing
.
9.4
Resetting parameters to factory settings
1.
Navigate to diagnostics code D.096
in the installer level.
2.
Set the diagnostics code to 1, and confirm by pressing
.
9.5
Preparing the repair work
1.
Decommission the product.
2.
Disconnect the product from the power mains.
3.
Remove the front casing. ( → Page 11)
4.
Close the gas isolator cock.
5.
Close the service valves in the heating flow and in the heating return.
6.
Close the service valve in the cold water pipe.
7.
Drain the product if you want to replace water-bearing components of the product.
8.
Make sure that water does not drip on live components
(e.g. the electronics box).
9.
Use only new seals.
9.5.1
Procuring spare parts
The original components of the product were also certified as part of the declaration of conformity. If you do not use certified Vaillant original spare parts for maintenance or repair work, this voids the conformity of the product. We therefore strongly recommend that you fit Vaillant genuine spare parts.
Information about available Vaillant original spare parts is available by contacting the contact address provided on the reverse of this document.
▶
If you require spare parts for maintenance or repair work, use only Vaillant genuine spare parts.
9.6
Replacing defective components
9.6.1
Replacing the burner
1.
Remove the compact thermal module. ( → Page 28)
9.2
Rectifying faults
▶
If fault messages ( F.xx
) appear, rectify the fault by referring to the table in the appendix or using the function menu for the check programmes. ( → Page 18)
Overview of fault codes ( → Page 35)
If several faults occur at the same time, the display shows the corresponding fault messages for two seconds each in alternation.
▶
Press (max. three times) to restart the product.
▶
If you are unable to remedy the fault and the fault recurs despite fault clearance attempts, contact customer service.
0020209589_02 ecoTEC pro Installation and maintenance instructions 25
9 Troubleshooting
1
2
2.
Undo the four screws (1) on the burner.
3.
Remove the burner.
4.
Install a new seal (2) on the new burner.
5.
Install the compact thermal module. ( → Page 30)
9.6.2
Replacing the fan or gas valve
1.
Remove the air intake pipe.
2.
Remove the plug from the gas valve (7) .
3.
Remove the plug from the fan motor (6) by pushing in the latching lug.
4.
Unscrew either the cap nut (2) on the gas valve or the cap nut (8) between the gas pipes. Secure the gas pipe against twisting.
5.
Unscrew the three screws (2) (4) between the mixture pipe (1) and the fan flange.
4
5
6
7
8
1
2
3
2
3
1
1
2
6.
Remove the entire fan/gas valve unit from the product.
7.
If you want to replace the gas valve, unscrew the cap nut (2) if the gas pipe is still secured to the gas valve.
8.
Unscrew both fixing screws (1) on the gas valve and remove the fan from the gas valve.
9.
Replace the defective fan or the defective gas valve.
10. Install the gas valve and the fan in the same position as before. Use new seals.
11. Screw the fan to the gas valve.
12. If you had removed the gas pipe, screw the cap nut of the gas pipe (2) only loosely to the gas valve. Only tighten the cap nut on the gas valve after the installation work has been completed.
13. Refit the entire fan/gas valve unit in reverse order. You must use a new seal (5) for this.
14. Ensure that the order in which the three screws are screwed in between the fan and the mixture pipe corresponds to the numbering (3) , (2) and (4) .
15. Tighten the cap nut (2) on the gas valve and the cap nut (8) between the gas pipes. In the process, secure the gas pipe against twisting. Use new seals.
16. After you have completed this work, carry out a leaktightness test (function check). ( → Page 23)
17. If you have installed a new gas valve, adjust the gas ratio setting. ( → Page 20)
9.6.3
Replacing the heat exchanger
1.
Drain the product. ( → Page 30)
2.
Remove the compact thermal module. ( → Page 28)
3.
Detach the condensate drain hose from the heat exchanger.
26
4.
Remove the clamps (2) and (3) from the flow connection and the return connection.
5.
Detach the flow connection.
Installation and maintenance instructions ecoTEC pro 0020209589_02
6.
Detach the return connection.
7.
Remove two screws (1) on each of the two retainers.
1
2
Troubleshooting 9
3.
Remove both screws (1) on the support plate (2) .
4.
Remove the support plate (2) .
5.
Pull out the expansion vessel (3) towards the front.
6.
Insert the new expansion vessel into the product.
7.
Screw the new expansion vessel to the water connection. Use a new seal for this.
8.
Attach the support plate using both screws (1) .
9.
Fill and purge the product and, if necessary, the heating installation. ( → Page 19)
9.6.5
Replacing the PCB or the display
Note
If you only replace one component, when the product is switched on, the new component adopts the parameters that were previously set from the component that was not replaced.
1.
Open the electronics box. ( → Page 15)
2.
Replace the PCB or display according to the assembly and installation instructions supplied.
3.
Close the electronics box.
8.
Remove the lower three screws (2) on the rear section of the retainer.
9.
Swing the retainer to the side around the top screw (1) .
10. Pull the heat exchanger downwards and to the right, and remove it from the product.
11. Install the new heat exchanger in reverse order.
12. Replace the seals.
Note
Instead of grease, use only water or commercially available soft soap to aid installation.
13. Insert the flow and return connections into the heat exchanger as far as they will go.
14. Make sure that the brackets are seated correctly on the flow and return connections.
15. Install the compact thermal module. ( → Page 30)
16. Fill and purge the product and, if necessary, the heating installation. ( → Page 19)
9.6.4
Replacing the expansion vessel
1.
Drain the product. ( → Page 30)
9.6.6
Replacing the PCB and the display
1.
Open the electronics box. ( → Page 15)
2.
Replace the PCB and display according to the assembly and installation instructions supplied.
3.
Close the electronics box.
4.
Press the on/off button on the product. ( → Page 18)
◁
You are automatically taken to D.093
to set the device specific number.
5.
Set the correct value for the relevant product type in accordance with the table below and confirm by pressing
.
Product type number
24 (VUW GB 246/5 ‑ 3 A) ecoTEC pro
28 (VUW GB 286/5 ‑ 3 A) ecoTEC pro
7
22
30 (VUW GB 306/5 ‑ 3) ecoTEC pro 26
◁
The electronics are now set to the product type and the parameters of all diagnostics codes are set to default settings.
6.
Make the system-specific settings.
1
2
3
4
9.7
Completing repair work
1.
Establish the power supply.
2.
Switch the product back on if this has not yet been done. ( → Page 18)
3.
Install the front casing.
4.
Open all service valves and the gas isolator cock.
5.
Check that it works correctly and is leak-tight.
( → Page 23)
2.
Undo the screwed connection (4) .
0020209589_02 ecoTEC pro Installation and maintenance instructions 27
10 Inspection and maintenance
10 Inspection and maintenance
▶
You must carry out an annual inspection of the product.
The annual inspection can be effectively performed without removing components by requesting data from the DIA system, carrying out the simple visual checks indicated in the table in the appendix and performing a flue gas measurement. The maintenance intervals and their scope are determined by the heating engineer based on the condition of the boiler found during the inspection. All inspection and maintenance work should be performed in the order specified in the table in the appendix.
Inspection and maintenance work – Overview
( → Page 39)
During any inspection and maintenance or after change of parts of the combustion circuit, the following must be checked:
– The boiler has been installed in accordance with the relevant installation instructions.
– The integrity of the flue gas installation and flue seals is in accordance with the relevant flue installation instructions enclosed.
– Visual, the integrity of the boiler combustion circuit and relevant seals (paying particular attention to the burner door seal).
– The gas inlet working pressure at maximum rate.
– The gas flow rates.
– Correctness of electrical, water and gas connections.
– Correctness of the water pressure.
– The condition of the whole system, in particular the condition of radiator valves, evidence of leakage from the heating system and dripping taps.
▶
Correct any faults before proceeding.
10.1
Removing the compact thermal module
Note
The compact thermal module consists of four main components:
– Speed-regulated fan,
– Gas/air connection,
– Gas supply (mixture pipe) with burner flange,
– Premix burner.
6
5 shows signs of damage, replace the insulating mat.
1.
Switch off the product using the on/off button.
2.
Close the gas isolator cock.
3.
Remove the front casing.
4.
Tilt the electronics box forward.
5.
Unscrew the retaining screw (2) and remove the air intake pipe (1) from the intake stub.
6.
Unscrew either the cap nut on the gas valve (3) or the cap nut (4) between the gas pipes.
7
4
3
1
2
1
2
3
Danger!
Risk of death and risk of material damage caused by hot flue gas.
The seal, insulating mat and self-locking nuts on the burner flange must not be damaged.
Otherwise, hot flue gases may escape and cause personal injury and material damage.
▶
Replace the seal each time you open the burner flange.
▶
Replace the self-locking nuts on the burner flange each time you open the burner flange.
▶
If the insulating mat on the burner flange or on the back wall of the heat exchanger
4
7.
Remove the ignition line plug (5) and the earth line plug
(6) from the ignition electrode.
8.
Remove the plug (3) from the fan motor.
9.
Remove the plug (4) from the gas valve.
10. Unscrew the four nuts (7) .
11. Remove the entire compact thermal module (2) from the heat exchanger (1) .
12. Check the burner and the heat exchanger for damage and dirt.
13. If necessary, clean or replace the components according to the following sections.
28 Installation and maintenance instructions ecoTEC pro 0020209589_02
Inspection and maintenance 10
14. Fit a new burner flange seal.
15. Check the insulating mat on the burner flange and on the back wall of the heat exchanger. If you notice any signs of damage, replace the relevant insulating mat.
10.2
Cleaning the heat exchanger
1.
Protect the folded down electronics box against sprayed water.
10.4
Cleaning the condensate trap
1.
Remove the lower section of the condensate trap (1) .
2.
Flush out the lower section with water.
3.
Fill the lower section with water up to about 10 mm below the upper edge.
4.
Attach the lower section to the condensate trap.
10.5
Cleaning the filter in the cold water inlet
Applicability: Product with integrated hot water generation 2
3
1 4
2.
Never undo the four nuts on the stud bolt (1) or tighten them.
3.
Clean the heating coil (3) of the heat exchanger (4) using water or, if required, vinegar (to a maximum of 5% acid). Allow the vinegar to act on the heat exchanger for
20 minutes.
4.
Rinse away any loose dirt with a sharp jet of water or use a plastic brush. Do not point the water jet directly at the insulating mat (2) on the back of the heat exchanger.
◁
The water flows out of the heat exchanger through the condensate siphon.
1
2
1.
Close the cold water stop valve.
2.
Drain the product on the hot water side.
3.
Unscrew the cap nut (2) and the lock nut (1) from the product's casing.
10.3
Checking the burner
1
3 2
1.
Check the surface of the burner (1) for damage. If you see any damage, replace the burner.
2.
Fit a new burner flange seal (3) .
3.
Check the insulating mat (2) on the burner flange. If you notice any signs of damage, replace the insulating mat.
2
4.
Tilt the electronics box forward.
5.
Remove the clamp (2) .
6.
Remove the pipe (1) from the product.
7.
Rinse the filter under a jet of water, holding it against the direction of flow.
8.
If the filter is damaged or it can no longer be cleaned sufficiently, you must replace the filter.
9.
Refit the pipe.
10. Reinsert the clamp.
11. Always use new seals and retighten the cap nuts and the lock nut.
12. Open the cold water stop valve.
1
0020209589_02 ecoTEC pro Installation and maintenance instructions 29
11 Decommissioning
10.6
Installing the compact thermal module
7
1
2
10.9
Completing inspection and maintenance work
Once you have completed all maintenance work:
▶
Check the gas flow pressure. ( → Page 21)
▶
Check the CO ₂ content and, if necessary, adjust it (air index setting). ( → Page 22)
▶
If required, reset the maintenance interval. ( → Page 24)
6
5
4
3
1.
Connect the compact thermal module (2) to the heat exchanger (1) .
2.
Tighten the four nuts (7) in a cross-wise pattern until the burner flange fits closely and uniformly onto the mating surfaces (if a torque spanner is available, set at 6 Nm).
3.
Connect the plugs (3) to (6) again.
4.
Connect the gas line using a new seal. In the process, secure the gas pipe against twisting.
5.
Open the gas isolator cock.
6.
Make sure that there are no leaks.
7.
Check that the sealing ring in the air intake pipe is positioned correctly in the seal seat.
8.
Reconnect the air intake pipe to the intake nozzle.
9.
Secure the air intake pipe with the retaining screw.
10. Check the gas flow pressure.
10.7
Draining the product
1.
Close the service valves of the product.
2.
Start the check programme P.06
(diverter valve midposition).
3.
Open the drain valves.
4.
Make sure that the cap of the automatic air vent on the internal pump is open so that the product can be drained fully.
10.8
Checking the pre-charge pressure for the internal expansion vessel
1.
Close the service valves and drain the product.
2.
Measure the pre-charge pressure of the expansion vessel at the vessel valve.
Conditions : Pre-charge pressure < 0.075 MPa (0.75 bar)
▶
Ideally, you should top up the expansion vessel with nitrogen. Otherwise, top it up with air. Ensure that the drain valve is open when topping up.
3.
If water escapes from the valve of the expansion vessel, you must replace the expansion vessel.
( → Page 27)
4.
Fill the heating installation. ( → Page 19)
5.
Purge the heating installation. ( → Page 20)
11 Decommissioning
11.1
Temporarily decommissioning the product
▶
Press the on/off button.
◁
The display goes out.
▶
Close the gas isolator cock.
▶
On combination products and products with a connected domestic hot water cylinder, you must also close the cold water stop valve.
11.2
Decommissioning the product
▶
Press the on/off button.
◁
The display goes out.
▶
Disconnect the product from the power mains.
▶
Close the gas isolator cock.
▶
Close the cold water stop valve.
▶
Drain the product. ( → Page 30)
12 Recycling and disposal
Disposing of the packaging
▶
Dispose of the packaging correctly.
▶
Observe all relevant regulations.
13 Customer service
To ensure regular servicing, it is strongly recommended that arrangements are made for a Maintenance Agreement.
Please contact Vaillant Service Solutions for further details.
Vaillant Service Solutions: 0330 100 3461
30 Installation and maintenance instructions ecoTEC pro 0020209589_02
Appendix
Appendix
A Overview of diagnostics codes
Code Parameter
D.000
Heating partial load
Values or explanations
Adjustable heating partial load in kW
Auto: Product automatically adjusts max. partial load to current system demand
1 … 60 min D.001
Overrun time of internal heating pump for heating mode
D.002
Max. burner anti-cycling time heating at 20 °C flow temperature
D.003
Outlet temp. actual value
2 … 60 min
In °C
D.004
Measured value of hot water sensor
D.005
Flow temperature target value (or return target value)
D.006
Hot water temperature target value
(only products with integrated hot water generation)
D.007
Warm start temperature target value
(only products with integrated hot water generation)
Cylinder temperature target value
(only products with heating mode only)
D.008
Room thermostat at terminal RT
In °C, max. of the value set in D.071, limited by an eBUS controller if connected
35 … 65 ℃
‑
35 … 65 ℃
Frost protection is at 15 °C, then 40 to 70 °C (max.
temperature can be adjusted under D.020
)
Room thermostat open (no heat requirement)
Room thermostat closed (heat requirement)
In °C D.009
Target value from external eBUS controller
D.010
Status of internal heating pump 1= On, 0 = Off
D.011
Status of external heating pump
D.012
Status of cylinder charge pump
1-100 = On, 0 = Off
1 = on, 0 = off
D.013
Status of hot water circulation pump 1 = on, 0 = off
Default setting
Auto
5 min
20 min
D.014
Target pump speed (high-efficiency pump)
D.015
Actual pump speed (high-efficiency pump)
D.016
24 V DC room thermostat open/closed
D.017
Heating flow/return flow temperature control changeover
Target value of internal high-efficiency pump in %. Possible settings:
0 = Auto
1 = 53
2 = 60
3 = 70
4 = 85
5 = 100
Actual value for internal high-efficiency pump in %
0 = Room thermostat open/heating mode off
1 = Room thermostat closed/heating mode on
Control type:
0 = Flow, 1 = Return
Return: Automatic detection function for heating output inactive. Max. possible heating partial load when D.000
is on Auto .
0 = Auto
0 = Flow
Own setting
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
0020209589_02 ecoTEC pro Installation and maintenance instructions 31
Appendix
Code Parameter
D.018
Pump operating mode setting
Values or explanations
1 = Comfort (continuously operating pump)
Internal pump is switched on when the heating flow temperature is not at Heating off and the heat requirement is enabled via an external controller
3 = Eco (intermittently operating pump)
Internal pump is switched on every 25 minutes for 5 minutes once the overrun time has elapsed
Not relevant
Default setting
3 = Eco
D.019
Operating mode of 2-stage pump
D.020
Max. setting for cylinder target value Adjustment range: 50 - 70 °C (actoSTOR 65 °C)
D.022
Hot water requirement (via C1/C2, impeller or APC)
0 = On, 1 = Off
D.023
Summer/winter mode (heating off/on) 1 = Heating on, 0 = Heating off (summer mode)
65 °C
D.025
Hot water generation enabled by eBUS controller
D.026
Auxiliary relay control
D.027
D.033
Switching of relay 1 on the VR 40 "2 in 7" multi-functional module
D.028
Switching of relay 2 on the VR 40 "2 in 7" multi-functional module
Fan speed target value
1 = on, 0 = off
Not relevant
1 = Circulation pump
2 = External pump
3 = Cylinder charging pump
4 = Extractor hood
5 = External solenoid valve
6 = External fault message
7 = Solar pump (not active)
8 = eBUS remote control (not active)
9 = Legionella protection pump (not active)
10 = Solar valve (not active)
1 = Circulation pump
2 = External pump
3 = Cylinder charging pump
4 = Extractor hood
5 = External solenoid valve
6 = External fault message
7 = Solar pump (not active)
8 = eBUS remote control (not active)
9 = Legionella protection pump (not active)
10 = Solar valve (not active)
In rpm
2 = External pump
2 = External pump
D.034
D.035
Fan speed actual value
Position of the diverter valve
In rpm
0 = Heating mode
40 = Parallel operation (mid-position)
100 = Hot water handling mode
In l/min
Own setting
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
D.036
Hot water flow volume (impeller sensor)
D.039
Solar feed temperature
D.040
Flow temperature
D.041
D.044
D.046
Return temperature
Digitised ionisation value
Pump type
Actual value in °C
Actual value in °C
Actual value in °C
Display field 0 to 1020
> 800 no flame
< 400 good flame
0 = Relay with disable facility
1 = PWM with disable facility
0 = Relay with disable facility
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
32 Installation and maintenance instructions ecoTEC pro 0020209589_02
Appendix
Code Parameter
D.047
Outside temperature (with Vaillant weather compensator)
D.050
Offset for minimum speed
D.071
Target value maximum heating flow temperature
D.072
Internal pump overrun after cylinder charging
D.073
Warm start target offset
D.074
actoSTOR anti-legionella function
Values or explanations
Actual value in °C
Adjustable from 0-10 minutes in increments of 1 minute
Adjustable from -15 K to 5 K
0 = Off
1 = On
20 - 90 min
Default setting
2 mins
0
1 = On
45 mins
Own setting
Not adjustable
D.051
D.058
D.060
D.061
D.064
D.065
D.067
D.068
D.069
Offset for maximum speed
Activating solar post-heating ( only products with integrated hot water generation)
Number of temperature limiter shutdowns
Number of ignition device cutoffs
Average ignition time
Maximum ignition time
Remaining burner anti-cycling time
Unsuccessful ignitions at 1st attempt
Unsuccessful ignitions at 2nd attempt
D.070
Set diverter valve position
In rpm, setting range: 0 to 3000
In rpm, setting range: -990 to 0
0 = Solar post-heating deactivated
3 = DHW activation target value minimum 60 °C, thermostatic mixer valve required between product and draw-off point
Number of shutdowns
Nominal value set in factory
Nominal value set in factory
0 = Solar post-heating deactivated
Number of unsuccessful ignitions in the last attempt
In seconds
In seconds
In minutes
Number of unsuccessful ignitions
Number of unsuccessful ignitions
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
Not adjustable
0 = Normal operating mode
1 = Parallel operation (mid-position)
2 = Permanent heating mode position
40 … 80 ℃
0 = Normal operating mode
75 ℃
D.075
Max. charging time for domestic hot water cylinder without independent control system
D.076
Device Specific Number Device specific number = DSN)
7 = 24 (VUW GB 246/5-3A)
22 = 28 (VUW GB 286/5-3A)
26 = 30 (VUW GB 306/5-3)
Adjustable cylinder charging output in kW
Not adjustable
D.077
Limit on cylinder charging output in kW
D.078
Limit on cylinder charging temperature in °C
D.080
Operating hours, heating
50 °C - 80 °C
Note
The chosen value must be at least 15 K or 15 °C above the set cylinder target value.
In hours (h)
75 °C
D.081
D.082
D.083
Operating hours, hot water generation
Number of burner start-ups in heating mode
Number of burner start-ups in hot water mode
D.084
Maintenance indicator: Number of hours until the next maintenance
In hours (h)
Number of burner start-ups
Number of burner start-ups
Adjustment range: 0 to 3000 hrs and "---" for deactivated „---”
Not adjustable
Not adjustable
Not adjustable
Not adjustable
0020209589_02 ecoTEC pro Installation and maintenance instructions 33
Appendix
Code Parameter
D.088
Start delay for hot water draw-off detection via impeller (only products with integrated hot water generation)
D.090
Status of digital controller
Values or explanations
0 = 1.5 l/min and no delay,
1 = 3.7 l/min and 2 sec. delay
1 = recognised, 0 = not recognised
D.091
Status of DCF with external temperature sensor connected
D.092
actoSTOR module recognition
0 = No reception
1 = Reception
2 = Synchronised
3 = Valid
Not relevant
D.093
Setting the Device Specific Number
(DSN)
D.094
Delete fault history
Setting range: 0 to 99
D.095
Software version of PeBUS components
D.096
Default setting
Delete fault list
0 = No
1 = Yes
PCB (BMU)
Display (AI)
HBI/VR34
Reset all adjustable parameters to factory setting
0 = No
1 = Yes
B Status codes – Overview
Status code Meaning
Heating mode
S.00
S.01
Heating: No heat demand
Heating mode: Fan start-up
S.02
S.03
S.04
S.05
S.06
S.07
S.08
DHW mode
S.10
S.11
S.13
Heating mode: Pump pre-run
Heating mode: Ignition
Heating mode: Burner on
Heating mode: Pump/fan overrun
Heating mode: Fan overrun
Heating mode: Pump overrun
Heating mode: Remaining anti-cycling time
Hot water requirement via flow sensor
DHW mode: Fan start-up
DHW mode: Ignition
S.14
S.15
S.16
S.17
DHW mode: Burner on
DHW mode: Pump/fan overrun
DHW mode: Fan overrun
DHW mode: Pump overrun
Comfort mode, warm start or hot water handling mode with cylinder
S.20
S.21
DHW demand
DHW mode: Fan start-up
S.22
S.23
S.24
S.25
DHW mode: Pump pre-run
DHW mode: Ignition
DHW mode: Burner on
DHW mode: Pump/fan overrun
Default setting
1.5 l/min and no delay
Own setting
Not adjustable
Not adjustable
Not adjustable
Not adjustable
34 Installation and maintenance instructions ecoTEC pro 0020209589_02
Appendix
Status code Meaning
S.26
DHW mode: Fan overrun
S.27
S.28
DHW mode: Pump overrun
Hot water burner anti-cycling time
Others
S.30
S.31
S.32
S.34
S.37
S.39
S.41
S.42
Room thermostat (RT) is blocking heating mode
Summer mode active or no heat requirement from eBUS controller
Waiting period because of fan speed deviation
Frost protection mode active
Waiting time: Fan failure in operation
"Burner off contact" has responded (e.g. contact thermostat or condensate pump)
Water pressure > 2.8 bar
S.46
S.53
S.54
S.57
S.58
S.76
S.96
S.97
S.98
Flue non-return flap return signal blocks burner operation (only in connection with VR
40 accessories) or condensate pump faulty, heat requirement is blocked
Comfort protection mode, flame loss at minimum load
Product is within the waiting period of the modulation block/operation block function as a result of low water pressure (flow/return spread too large)
Product is within the waiting period of the operation blocking function as a result of low water pressure (temperature gradient)
Waiting period, comfort safety mode
Modulation limitation due to noise/wind
System pressure too low. Top up water.
Return sensor test running, heating demands are blocked.
Water pressure sensor test running, heating demands are blocked.
Flow/return sensor test running, heating demands are blocked.
C Overview of fault codes
Code
F.00
F.01
F.10
F.11
F.20
F.22
F.23
F.24
Meaning
Flow temperature sensor interruption
Return temperature sensor interruption
Cause
NTC plug not plugged in or has come loose, multiple plug on the PCB not plugged in correctly, interruption in cable harness, NTC defective
NTC plug not plugged in or has come loose, multiple plug on the PCB not plugged in correctly, interruption in cable harness, NTC defective
NTC defective, short circuit in cable harness, cable/casing Flow NTC short circuit
Return NTC short circuit
Safety switch-off: Temperature limiter
Safety switch-off: Low water pressure
NTC defective, short circuit in cable harness, cable/casing
Incorrect earth connection between cable harness and product, flow or return NTC defective (loose connection), black discharge via ignition cable, ignition plug or ignition electrode
No or insufficient water in the product, water pressure sensor defective, cable to pump or water pressure sensor loose/not connected/defective
Safety switch-off: Temperature difference too great
Pump blocked, insufficient pump output, air in product, flow and return
NTC connected the wrong way round
Safety switch-off: Temperature rise too fast Pump blocked, insufficient pump output, air in product, system pressure too low, non-return valve blocked/incorrectly installed
0020209589_02 ecoTEC pro Installation and maintenance instructions 35
Appendix
Code
F.25
F.26
F.27
F.28
F.29
F.32
F.49
F.61
F.62
F.63
F.64
F.65
F.67
F.68
F.70
F.71
F.72
F.73
F.74
F.75
F.77
Meaning
Safety switch-off: Flue gas temperature too high
Fault: Gas valve without function
Safety switch-off: Flame simulation
Failure during start-up: Ignition unsuccessful
Failure during operation: Re-ignition unsuccessful
Fan fault
Fault: eBUS
Gas valve actuation fault
Gas valve switch-off delay
Fault: EEPROM
Fault: Electronics/NTC
Fault: Electronics temp.
Fault: Electronics/flame
Fault: Unstable flame signal
Invalid device specific number (DSN)
Flow NTC fault
Flow/return NTC fault
Water pressure sensor signal in the wrong range (too low)
Water pressure sensor signal outside correct range (too high)
Fault: No pressure change detection when starting pump
Fault: Flue non-return flap/condensate pump
Cause
Break in plug connection for optional flue gas safety temperature limiter
(STB), break in cable harness
Gas valve stepper motor not connected, multiple plug on the PCB not plugged in correctly, interruption in cable harness, gas valve stepper motor defective, electronics defective
Moisture on the electronics, electronics (flame monitor) defective, gas solenoid valve leaking
Gas meter defective or gas pressure monitor has triggered, air in gas, gas flow pressure too low, thermal isolator device (TAE) has triggered, condensate duct blocked, incorrect gas restrictor, incorrect spare part gas valve, fault on the gas valve, multiple plug on PCB incorrectly plugged in, break in cable harness, ignition system (ignition transformer, ignition cable, ignition plug, ignition electrode) defective, ionisation current interrupted (cable, electrode), incorrect earthing of product, electronics defective
Gas supply temporarily stopped, flue gas recirculation, condensate duct blocked, defective earthing of product, ignition transformer has spark failure
Plug on fan not correctly plugged in, multiple plug on PCB not correctly plugged in, break in cable harness, fan blocked, Hall sensor defective, electronics defective
Short circuit on eBUS, eBUS overload or two power supplies with different polarities on the eBUS
The gas valve cannot be actuated
– Cable harness supply line to the gas valve is defective (short to earth, short circuit)
– Gas valve defective
– PCB defective
Delayed shutdown of gas valve detected
– Secondary light (ignition and monitoring electrode indicates delayed extinguishing of the flame signal)
– Gas valve defective
– PCB defective
Electronics defective
Flow or return NTC short circuited, electronics defective
Electronics overheating due to external influences, electronics defective
Implausible flame signal, electronics defective
Air in gas, gas flow pressure too low, incorrect air ratio, condensate duct blocked, incorrect gas restrictor, ionisation flow interruption (cable, electrode), flue gas recirculation, condensate duct
If spare parts fitted: Display and PCB replaced at same time and DSN not reset, incorrect or missing output range coding resistance
Flow temperature sensor signalling constant value:
– Flow temperature sensor incorrectly positioned at supply pipe
– Flow temperature sensor defective
Flow/return NTC temperature difference too great → flow and/or return temperature sensor defective
Interruption/short circuit of water pressure sensor, interruption/short circuit to GND in supply line to water pressure sensor or water pressure sensor defective
Line to water pressure sensor has a short circuit to 5 V/24 V or internal fault in the water pressure sensor
Water pressure sensor and/or pump defective, air in the heating installation, insufficient water in the product; check adjustable bypass, connect external expansion vessel to the return
No response from flue non-return flap or condensate pump defective
36 Installation and maintenance instructions ecoTEC pro 0020209589_02
Appendix
Code
F.78
F.83
F.84
F.85
Communication fault
Meaning
Interruption to DHW outlet sensor at the external controller
Fault: Flow and/or return temperature sensor temperature change
Fault: Flow/return temperature sensor temperature difference implausible
Fault: Flow and return temperature sensors incorrectly installed
No communication with the PCB
Cause
UK link box is connected, but hot water NTC not bridged
When the burner starts, the temperature change registered at the flow and/or return temperature sensor is non-existent or too small.
– Insufficient water in product
– Flow or return temperature sensor not in correct position at pipe
Flow and return temperature sensors returning implausible values.
– Flow and return temperature sensors have been inverted
– Flow and return temperature sensors have not been correctly installed
The flow and/or return temperature sensors have been installed on the same pipe/incorrect pipe
Communication fault between display and PCB in the electronics box
0020209589_02 ecoTEC pro Installation and maintenance instructions 37
Appendix
D Connection diagrams
D.1
Product connection diagram with integrated hot water generation
2
X51
X51
X22
4
2
X41 3
4
5
6
1
2
X20
8
7
5
17
3
16
4
15
2
12
13
1
X90
X40 X51
X30
X35
X31
X20
X22
X106
X2 X106
18
7
17
8
X2
14
13
11
12
4
3
2
6
1
2
3
1
3
4
1
3
4
6
M
1
2
+24V
Hallsignal
4
5
PWM
Masse
8
5
6
7
9
10
11
12
13
14
15
3
4
2 1
T2
X18
X12
X1
6
7
4
5
8
09
1
2
3
Main PCB
Operator control panel PCB
Outside temperature sensor, flow temperature sensor (optional, external), DCF receiver
Circulation pump remote control
Gas valve
Return temperature sensor
Flow temperature sensor
Fan
Contact thermostat/burner off
24V
230V~
X18 N
L
X1
RT
L
N
*
16
10
11
12
13
14
15
16
17
*
17
24 V DC room thermostat
Bus connection (digital room thermostat/controller)
Diverter valve
Water pressure sensor
Impeller sensor
Warm start sensor
Internal pump
Ignition electrode
Depending on product type
38 Installation and maintenance instructions ecoTEC pro 0020209589_02
Appendix
E Inspection and maintenance work – Overview
The table below lists the manufacturer requirements with respect to minimum inspection and maintenance intervals. If national regulations and directives require shorter inspection and maintenance intervals, you should observe these instead of the intervals listed in the table.
No.
Work
Inspection
(annual)
Maintenance
(must be carried out at regular intervals)
1
2
3
4
5
6
7
Check the air/flue pipe for leak-tightness and to ensure that it is fastened correctly. Make sure that it is not blocked or damaged and has been installed in accordance with the relevant Installation Manual.
Check the general condition of the product. Remove dirt from the product and from the vacuum chamber.
Visually inspect the general condition of the Thermoblock. In doing so, pay particular attention to signs of corrosion, rust and other defects. If you notice any damage, carry out maintenance work.
Check the gas flow pressure at maximum heat input. If the gas flow pressure is not within the correct range, carry out maintenance work.
Check the CO ₂ content (the air ratio) of the product and, if necessary, adjust it. Keep a record of this.
Disconnect the product from the power mains. Check that the electrical plug connections and other connections are seated correctly and correct these if necessary.
Close the gas isolator cock and the service valves.
8
Drain the product on the water side (observe the pressure gauge). Check the pre-charge pressure of the expansion vessel, and top up the vessel if necessary (approx. 0.03 MPa/0.3 bar under the system filling pressure).
Remove the compact thermal module.
9
10
Check the insulating mats in the combustion area. If you notice any damage, replace the insulating mats. Replace the burner flange seal each time it is opened and accordingly each time maintenance work is carried out.
11 Clean the heat exchanger.
12 Check the burner for damage and replace it if necessary.
13 Check the condensate trap in the product, clean and fill this, if required.
14 Install the compact thermal module.
Caution: Replace the seals.
15
16
If the volume of water is insufficient or the outlet temperature is not reached, replace the secondary heat exchanger if necessary.
Clean the filter in the cold water inlet. Replace the filter if impurities can no longer be removed or if the filter is damaged. In this case, also check the impeller sensor for dirt and damage, clean the sensor (do not use compressed air for this) and replace the sensor if it is damaged.
17 Open the gas isolator cock, reconnect the product to the power mains and switch the product on.
18
Open the service valves, fill up the product/heating installation to 0.1-0.2 MPa/1.0-2.0 bar (depending on the static height of the heating installation) and start the purging programme P.00
.
19
Perform a test operation of the product and heating installation, including hot water generation, and purge the system once more if necessary.
20 Visually inspect the ignition and burner behaviour.
21 Check the CO ₂ content (the air ratio) of the product again.
22 Check the product for gas, flue gas, hot water and condensate leaks, and repair if necessary.
23 Record the inspection/maintenance work carried out.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
0020209589_02 ecoTEC pro Installation and maintenance instructions 39
Appendix
F Commissioning Checklist
Benchmark Commissioning and
Servicing Section
It is a requirement that the boiler is installed and commissioned to the completed in full.
www.centralheating.co.uk
40
© Heating and Hotwater Industry Council (HHIC)
Installation and maintenance instructions ecoTEC pro 0020209589_02
Appendix
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
CONTROLS
ALL SYSTEMS
CENTRAL HEATING MODE
COMBINATION BOILERS ONLY
DOMESTIC HOT WATER MODE
CONDENSING BOILERS ONLY
ALL INSTALLATIONS
Optimum start control
Fitted
Fitted
Fitted
Fitted
Yes
Yes mbar
OR
OR mbar
Yes
Yes mbar OR
AND
AND
OR
²
²
Yes Temperature
Yes
Ratio
Ratio
Yes
Yes
Yes
Yes mbar
0020209589_02 ecoTEC pro Installation and maintenance instructions 41
Appendix
SERVICE RECORD
It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed.
Service Provider
SERVICE 01 SERVICE 02
AND
AND
² %
² %
AND
AND
² %
² %
SERVICE 03 SERVICE 04
AND
AND
² %
² %
AND
AND
² %
² %
SERVICE 05 SERVICE 06
AND
AND
² %
² %
AND
AND
² %
² %
SERVICE 07 SERVICE 08
AND
AND
² %
² %
AND
AND
² %
² %
SERVICE 09 SERVICE 10
AND
AND
² %
² %
AND
AND
² %
² %
42 Installation and maintenance instructions ecoTEC pro 0020209589_02
NOTE
THE AIR GAS RATIO VALVE IS FACTORY
SET AND MUST NOT BE ADJUSTED
DURING COMMISSIONING UNLESS THIS
ACTION IS RECOMMENDED FOLLOWING
CONTACT WITH THE MANUFACTURER.
If any such adjustment is recommended and further checking of the boiler is required the installer/service engineer must be competent to carry out this work and to use the flue gas analyser accordingly.
If the boiler requires conversion to operate with a different gas family (e.g. conversion from natural gas to LPG) separate guidance will be provided by the boiler manufacturer
VERIFY FLUE INTEGRITY
Analyser readings indicate that combustion products and inlet air must be mixing. Further investigation of the flue is therefore required.
Check that flue components are assembled, fixed and supported as per boiler/flue manufacturer’s instructions.
Check that flue and flue terminal are not obstructed.
Is
O
2
20.6% and
CO
2
< 0.2%
YES
NO
TURN OFF APPLIANCE AND CALL
MANUFACTURER’S TECHNICAL HELPLINE
FOR ADVICE.
THE APPLIANCE MUST NOT BE
COMMISSIONED UNTIL PROBLEMS ARE
IDENTIFIED AND RESOLVED.
Check all seals around the appliance burner, internal flue seals, door and case seals.
Rectify where necessary.
Is
CO less than
335ppm and
CO/CO
2
ratio less than 0.004
YES
NO
TURN OFF APPLIANCE AND CALL
MANUFACTURER’S TECHNICAL HELPLINE
FOR ADVICE.
THE APPLIANCE MUST NOT BE
COMMISSIONED UNTIL PROBLEMS ARE
IDENTIFIED AND RESOLVED. IF
COMMISSIONING CANNOT BE FULLY
COMPLETED, THE APPLIANCE MUST BE
DISCONNECTED FROM THE GAS SUPPLY IN
ACCORDANCE WITH THE GSIUR.
NOTE: Check and record CO and combustion ratio at both max. and min. rate before contacting the manufacturer.
NO
Appendix
PRIOR TO CO AND COMBUSTION RATIO CHECK
The boiler manufacturer’s installation instructions should have been followed, gas type verified and gas supply pressure/rate checked as required prior to commissioning.
As part of the installation process, especially where a flue has been fitted by persons other than the boiler installer , visually check the integrity of the whole flue system to confirm that all components are correctly assembled, fixed and supported. Check that manufacturer’s max. flue lengths have not been exceeded and all guidance has been followed (e.g. Gas Safe Technical Bulletin TB008).
The flue gas analyser should be of the correct type, as specified by BS 7967
Prior to its use, the flue gas analyser should have been maintained and calibrated as specified by the manufacturer. The installer must have the relevant competence for use of the analyser.
Check and zero the analyser IN FRESH AIR as per analyser manufacturer’s instructions.
SET BOILER TO MAXIMUM RATE
In accordance with boiler instructions, set boiler to operate at max. rate
(full load condition). Allow sufficient time for combustion to stabilise.
NOTE - Do not insert analyser probe during this period to avoid possible “flooding” of sensor.
CARRY OUT FLUE INTEGRITY CHECK USING ANALYSER
Insert analyser probe into air inlet test point and allow readings to stabilise.
NOTE - where no air inlet test point is provided then a flue integrity check with the analyser is not possible. The installer should verify that flue integrity has been visually checked in accordance with the “Prior to
CO and combustion ratio check” box above before proceeding to the
“Check CO and combustion ratio at maximum rate” stage below.
NO
Is
O
2
20.6% and
CO
2
< 0.2%
YES
CHECK CO AND COMBUSTION RATIO AT MAX. RATE
With boiler still set at maximum rate, insert analyser probe into flue gas sampling point. Allow readings to stabilise before recording.
NOTE - If no flue gas sampling point is present and the correct procedure is not specified in the manual, consult boiler manufacturer for guidance.
NO
Is
CO less than
350ppm and
CO/CO
2
ratio less than 0.004
YES
SET BOILER TO MINIMUM RATE
In accordance with boiler instructions, set boiler to operate at minimum rate (to minimum load condition). Allow sufficient time for combustion to stabilise.
NOTE - If manufacturer’s instructions do not specify how to set boiler to minimum rate contact Technical Helpline for advice.
CHECK CO AND COMBUSTION RATIO AT MINIMUM RATE
With boiler still set at minimum rate, insert analyser probe into flue gas sampling point. Allow readings to stabilise before recording.
NOTE - If no flue gas sampling point is present and the correct procedure is not specified in the manual, consult boiler manufacturer for guidance.
Is
CO less than
350ppm and
CO/CO
2
ratio less than 0.004
YES
BOILER IS OPERATING SATISFACTORILY no further actions required.
Ensure test points are capped, boiler case is correctly replaced and all other commissioning procedures are completed.
Complete Benchmark Checklist, recording CO and combustion ratio readings as required.
0020209589_02 ecoTEC pro Installation and maintenance instructions 43
Appendix
G Opening of the flue pipe
J L
G
B
A
II
C
P
R
S
T
D, E
H
O
H
N
N
K
A
B
C
D
I
G
H
J
K
E
F
L
M
N
O
P
Q
R
S
T
G.1
Positioning of the opening of a fan-supported flue gas pipe
Installation site
Directly below an opening, air bricks, opening windows, etc., that can be opened.
Above an opening, air bricks, opening windows, etc., that can be opened.
Horizontally to an opening, air bricks, opening windows, etc., that can be opened.
Below temperature-sensitive building components, e.g. plastic gutters, down pipes or wastewater pipes
Below eaves
Below balconies or car port roofs
From vertical wastewater pipes or down pipes
From external or internal corners
Above floors, roofs or balconies
From a surface facing a terminal
From a terminal facing a terminal
From an opening in the car port (e.g. door, window) which leads into the dwelling
Vertical from a terminal on the same wall
Horizontal from a terminal on the same wall
From the wall on which the terminal has been installed
From a vertical structure on the roof
Above the roof area
Horizontal from adjacent windows on pitched or flat roofs
Above adjacent windows on pitched or flat roofs
Below adjacent windows on pitched or flat roofs
Minimum dimensions
300 mm
300 mm
300 mm
75 mm
200 mm
200 mm
150 mm
200 mm
300 mm
600 mm
1200 mm
1200 mm
1500 mm
300 mm
0 mm
N/A
300 mm
600 mm
600 mm
2000 mm
44 Installation and maintenance instructions ecoTEC pro 0020209589_02
Appendix
H Text from BS 5440-1 on fan-supported flue gas pipes
BS 5440 – 1: It is recommended that the fanned flue gas system terminal is positioned as follows:
– At least 2 m from an opening in the building directly opposite, and
– So that the combustion products are not discharged directly across a property boundary.
– Dimensions D, E, F and G: These clearances may be reduced to 25 mm without affecting the performance of the boiler.
In order to ensure that the condensate vapour plume does not damage adjacent surfaces, the terminal should be extended as shown.
– Dimension H: This clearance may be reduced to 25 mm without adversely affecting the performance of the boiler. However, in order to ensure that the condensate vapour plume does not damage adjacent surfaces, a clearance of 300 mm is preferred. For IE, recommendations are given in the current issue of the IS 813.
I Opening of the flue pipe below eaves and balconies
Balcony/eaves
Gutter
Adequately secured air/flue gas pipe
The flue pipe must protrude beyond any overhang
J Technical data
Technical data – General
24 (VUW GB
246/5 ‑ 3 A) ecoTEC pro
Designated country (designation in accordance with ISO 3166)
GB (Great
Britain), IE
(Ireland)
Approved unit categories II
2H3P
15 mm Gas connection, boiler side
Flow/return heating connections, boiler side
Hot and cold water connection, boiler side
Expansion relief valve connector (min.)
Air/flue gas connection
22 mm
G 3/4 ″
15 mm
60/100 mm
Condensate drain pipework (min.)
G20 natural gas flow pressure
G31 propane gas flow pressure
Gas flow rate at 15 °C and 1013 mbar (based on hot water generation, if applicable), G20
19 mm
2.0 kPa
(20.0 mbar)
3.7 kPa
(37.0 mbar)
2.5 m ³ /h
28 (VUW GB
286/5 ‑ 3 A) ecoTEC pro
GB (Great
Britain), IE
(Ireland)
II
2H3P
15 mm
30 (VUW GB
306/5 ‑ 3) ecoTEC pro
GB (Great
Britain), IE
(Ireland)
II
2H3P
15 mm
22 mm
G 3/4 ″
15 mm
60/100 mm
19 mm
2.0 kPa
(20.0 mbar)
3.7 kPa
(37.0 mbar)
2.9 m ³ /h
22 mm
G 3/4 ″
15 mm
60/100 mm
19 mm
2.0 kPa
(20.0 mbar)
3.7 kPa
(37.0 mbar)
3.2 m ³ /h
0020209589_02 ecoTEC pro Installation and maintenance instructions 45
Appendix
24 (VUW GB
246/5 ‑ 3 A) ecoTEC pro
Gas flow rate at 15 °C and 1013 mbar (based on hot water generation, if applicable), G31
Min. flue gas mass rate
(G20)
Min. flue gas mass rate
(G31)
1.9 kg/h
2.47 g/s
3.49 g/s
Max. flue gas mass rate 10.8 g/s
Min. flue gas temperature 40 ℃
Max. flue gas temperature
70 ℃
Approved gas-fired units C13, C33,
C43, C53
30% efficiency 108 %
NOx class
SEDBUK (2005)
SEDBUK (2009)
(G20/G31)
Boiler dimension, width
5
A
89.3 %
440 mm
Boiler dimension, height 720 mm
Boiler dimension, depth
Approx. net weight
338 mm
38 kg
28 (VUW GB
286/5 ‑ 3 A) ecoTEC pro
2.2 kg/h
2.47 g/s
3.49 g/s
12.6 g/s
40 ℃
70 ℃
5
A
C13, C33,
C43, C53
108 %
89.3 %
440 mm
720 mm
338 mm
38 kg
Technical data – G20 power/loading G20
Nominal heat output range P at 50/30 °C
Nominal heat output range P at 80/60 °C
Maximum heat output for hot water generation
Maximum heat input for hot water generation
Maximum heat input, heating side
Minimum heat input
24 (VUW GB
246/5 ‑ 3 A) ecoTEC pro
5.7
… 19.9 kW
5.2
… 18.9 kW
23.4 kW
23.7 kW
19.1 kW
5.5 kW
28 (VUW GB
286/5 ‑ 3 A) ecoTEC pro
5.7
… 19.9 kW
5.2
… 18.9 kW
27.2 kW
27.8 kW
19.1 kW
5.5 kW
Heating adjustment range 5 … 19 kW 5 … 19 kW
Technical data – Power/loading G31
Nominal heat output range P at 50/30 °C
Nominal heat output range P at 80/60 °C
Maximum heat output for hot water generation
Maximum heat input for hot water generation
24 (VUW GB
246/5 ‑ 3 A) ecoTEC pro
5.7
… 19.9 kW
5.2
… 18.9 kW
23.4 kW
23.7 kW
28 (VUW GB
286/5 ‑ 3 A) ecoTEC pro
6.9
… 25.7 kW
5.2
… 18.9 kW
27.2 kW
27.8 kW
30 (VUW GB
306/5 ‑ 3) ecoTEC pro
2.4 kg/h
2.96 g/s
3.94 g/s
13.9 g/s
40 ℃
70 ℃
5
A
C13, C33,
C43, C53
108 %
89.3 %
440 mm
720 mm
338 mm
39 kg
30 (VUW GB
306/5 ‑ 3) ecoTEC pro
6.9
… 25.7 kW
8.0
… 24.7 kW
30.0 kW
30.6 kW
25.0 kW
8.5 kW
6 … 24 kW
30 (VUW GB
306/5 ‑ 3) ecoTEC pro
9.0
… 25.7 kW
6.2
… 24.4 kW
30.0 kW
30.6 kW
46 Installation and maintenance instructions ecoTEC pro 0020209589_02
24 (VUW GB
246/5 ‑ 3 A) ecoTEC pro
19.1 kW
28 (VUW GB
286/5 ‑ 3 A) ecoTEC pro
18.8 kW
30 (VUW GB
306/5 ‑ 3) ecoTEC pro
25.0 kW Maximum heat input, heating side
Minimum heat input 7.7 kW 7.7 kW 8.7 kW
Technical data – Heating
24 (VUW GB
246/5 ‑ 3 A) ecoTEC pro
85 ℃ Maximum flow temperature
Max. flow temperature adjustment range (default setting: 75 °C)
Permissible total overpressure
Minimum pressure for full operation
Expansion vessel capacity
Circulation water volume
(with reference to
Δ T= 20 K)
Approx. condensate rate
(pH value 3.5 to 4.0) in
50/30 °C heating mode
Remaining feed head of pump (at nominal circulation water volume)
30 … 80 ℃
0.3 MPa
(3.0 bar)
0.08 MPa
(0.80 bar)
10 l
813 l/h
1.9 l/h
0.025 MPa
(0.250 bar)
28 (VUW GB
286/5 ‑ 3 A) ecoTEC pro
85 ℃
30 … 80 ℃
0.3 MPa
(3.0 bar)
0.08 MPa
(0.80 bar)
10 l
813 l/h
1.9 l/h
0.025 MPa
(0.250 bar)
Technical data – Hot water handling
24 (VUW GB
246/5 ‑ 3 A) ecoTEC pro
2.0 l/min Lowest water volume
Water volume (at
Δ T = 30 K)
Water volume (at
Δ T = 35 K)
Water volume (at
Δ T = 42 K)
Permitted overpressure
11.0 l/min
9.6 l/min
8.0 l/min
Required connection pressure
Hot water output temperature range
1.0 MPa
(10.0 bar)
0.035 MPa
(0.350 bar)
35 … 65 ℃
28 (VUW GB
286/5 ‑ 3 A) ecoTEC pro
2.0 l/min
13.4 l/min
11.1 l/min
9.3 l/min
1.0 MPa
(10.0 bar)
0.035 MPa
(0.350 bar)
35 … 65 ℃
Technical data – Electrics
Electric connection
24 (VUW GB
246/5 ‑ 3 A) ecoTEC pro
230 V/50 Hz
Permissible connected voltage
190 … 253 V
Built-in fuse (slow-blow) 2 A
Min. electrical power consumption
35 W
2 A
35 W
30 (VUW GB
306/5 ‑ 3) ecoTEC pro
85 ℃
30 … 80 ℃
0.3 MPa
(3.0 bar)
0.08 MPa
(0.80 bar)
10 l
1,049 l/h
2.5 l/h
0.025 MPa
(0.250 bar)
30 (VUW GB
306/5 ‑ 3) ecoTEC pro
2.0 l/min
14.3 l/min
12.3 l/min
10.2 l/min
1.0 MPa
(10.0 bar)
0.035 MPa
(0.350 bar)
35 … 65 ℃
28 (VUW GB
286/5 ‑ 3 A) ecoTEC pro
230 V/50 Hz
30 (VUW GB
306/5 ‑ 3) ecoTEC pro
230 V/50 Hz
190 … 253 V 190 … 253 V
2 A
35 W
0020209589_02 ecoTEC pro Installation and maintenance instructions
Appendix
47
Appendix
24 (VUW GB
246/5 ‑ 3 A) ecoTEC pro
50 W Max. electrical power consumption
Standby electrical power consumption
Level of protection
< 2 W
IP X4 D
28 (VUW GB
286/5 ‑ 3 A) ecoTEC pro
80 W
< 2 W
IP X4 D
30 (VUW GB
306/5 ‑ 3) ecoTEC pro
80 W
< 2 W
IP X4 D
48 Installation and maintenance instructions ecoTEC pro 0020209589_02
Index
Index
6
60/100 mm diameter unit connection piece with offset, installing .............................................................................. 15
8
80/125 mm diameter unit connection piece, installing ........ 15
A
Air index setting................................................................... 22
Air/flue pipe ......................................................................... 14
Air/flue pipe, installed ............................................................ 5
Article number ....................................................................... 9
Automatic air vent................................................................ 19
B
Burner anti-cycling time....................................................... 23
Burner anti-cycling time, resetting ....................................... 24
Burner anti-cycling time, setting .......................................... 23
Burner, checking ................................................................. 29
Bypass valve, setting........................................................... 24
C
Calling up, diagnostics codes ............................................. 23
Calling up, fault memory...................................................... 25
Carrying out, inspection work .............................................. 28
Carrying out, maintenance work.......................................... 28
CE label................................................................................. 9
Check programmes ............................................................. 18
Checking, burner ................................................................. 29
Checking, CO ₂ content ........................................................ 22
Checking, pre-charge pressure for the internal expansion vessel .................................................................................. 30
Circulation pump ................................................................. 17
Cleaning, cold water inlet filter ............................................ 29
Cleaning, heat exchanger .................................................. 29
Clearing, fault memory ........................................................ 25
CO ₂ content, checking......................................................... 22
CO ₂ content, setting ............................................................ 22
Cold water connection......................................................... 13
Cold water inlet filter, cleaning ............................................ 29
Combustion air ...................................................................... 6
Comfort protection mode..................................................... 25
Compact thermal module, installing .................................... 30
Compact thermal module, removing ................................... 28
Completing, inspection work ............................................... 30
Completing, maintenance work ........................................... 30
Completing, repair work ...................................................... 27
Condensate drain pipework................................................. 14
Condensate siphon ....................................................... 20, 29
Condensate trap............................................................ 20, 29
Connecting, controller ......................................................... 16
Connection dimensions ....................................................... 10
Controller, connecting ......................................................... 16
Corrosion............................................................................... 6
D
Decommissioning ................................................................ 30
Decommissioning, temporarily ............................................ 30
Diagnostics codes, calling up .............................................. 23
Discharge pipe, expansion relief valve................................ 14
Display and setting options ................................................. 17
Disposal, packaging ............................................................ 30
Disposing of the packaging ................................................. 30
Documents ............................................................................ 8
Draining, product ................................................................. 30
E
Electricity ............................................................................... 5
Electronics box, closing....................................................... 15
Electronics box, opening ..................................................... 15
F
Fan, replacing...................................................................... 26
Fault codes.................................................................... 25, 35
Fault memory, calling up ..................................................... 25
Fault memory, deleting........................................................ 25
Fault messages ................................................................... 25
Filling ................................................................................... 19
Flue gas route ....................................................................... 5
Flue pipe equipment connection piece................................ 15
From the delivery point to the installation site ..................... 10
Front casing, closed .............................................................. 5
Frost ...................................................................................... 6
G
Gas conversion ................................................................... 20
Gas ratio setting .................................................................. 20
Gas valve, replacing............................................................ 26
H
Handing over to the operator............................................... 25
Handling ................................................................................ 9
Heat exchanger, cleaning.................................................... 29
Heat exchanger, replacing .................................................. 26
Heating flow......................................................................... 13
Heating installation, purging ................................................ 20
Heating return...................................................................... 13
Hot water connection........................................................... 13
I
Identification plate ................................................................. 8
If you smell gas ..................................................................... 4
Inspection work, carrying out............................................... 28
Inspection work, completing ................................................ 30
Installation site................................................................... 5 – 6
Installer level ....................................................................... 17
Installer level, calling up ...................................................... 17
Installing, compact thermal module..................................... 30
Intended use.......................................................................... 4
Internal expansion vessel, replacing ................................... 27
Isolator devices ................................................................... 30
L
Liquid gas ........................................................................ 4, 12
M
Maintenance interval, setting............................................... 24
Maintenance work, carrying out .......................................... 28
Maintenance work, completing............................................ 30
Minimum clearance ............................................................. 11
O
Operating concept ............................................................... 17
P
PCB and display, replacing ................................................. 27
PCB or display, replacing .................................................... 27
Power supply....................................................................... 16
Pre-charge pressure for the internal expansion vessel, checking .............................................................................. 30
Preparing, repair work ......................................................... 25
Pressure gauge ..................................................................... 8
Product dimensions............................................................. 10
Product, draining ................................................................. 30
Product, switching off .................................................... 18, 30
Product, switching on .......................................................... 18
0020209589_02 ecoTEC pro Installation and maintenance instructions 49
Index
Pump output, setting ........................................................... 24
Pump, remaining feed head ................................................ 24
Purging, heating installation ................................................ 20
R
Remaining feed head, pump ............................................... 24
Removing, compact thermal module................................... 28
Repair work, completing...................................................... 27
Repair work, preparing ........................................................ 25
Replacing the burner ........................................................... 25
Replacing, fan ..................................................................... 26
Replacing, gas valve ........................................................... 26
Replacing, heat exchanger.................................................. 26
Replacing, internal expansion vessel .................................. 27
Replacing, PCB and display................................................ 27
Replacing, PCB or display................................................... 27
S
Safety device......................................................................... 5
Schematic drawing ................................................................ 5
Scope of delivery................................................................... 9
Serial number ........................................................................ 9
Service message................................................................. 25
Setting, bypass valve .......................................................... 24
Setting, CO ₂ content............................................................ 22
Setting, maintenance interval .............................................. 24
Setting, pump output ........................................................... 24
Side section, installing......................................................... 12
Side section, removing ........................................................ 12
Spare parts.......................................................................... 25
Status codes.................................................................. 17, 34
Supply of combustion air ....................................................... 5
Switching off ........................................................................ 30
Switching off, product .......................................................... 18
Switching on, product .......................................................... 18
T
Tool ....................................................................................... 6
Treating the heating water................................................... 18
U
Unit connection piece for the air/flue pipe, 60/100 mm diameter with offset ............................................................ 15
Unit connection piece for the air/flue pipe, 80/125 mm diameter .............................................................................. 15
Unit connection piece, changing ......................................... 15
Unit connection piece, removing ......................................... 15
Unloading the box ............................................................... 10
V
Voltage .................................................................................. 5
W
Weight ................................................................................. 11
50 Installation and maintenance instructions ecoTEC pro 0020209589_02
0020209589_02 28 .
03 .201
8
© These instructions, or parts thereof, are protected by copyright and may be reproduced or distributed only with the manufacturer's written consent.
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 4 Safety
- 4 Action-related warnings
- 4 Intended use
- 4 General safety information
- 6 Related documents
- 8 Notes on the documentation
- 8 Observing other applicable documents
- 8 Storing documents
- 8 Validity of the instructions
- 8 Benchmark
- 8 Local regulations
- 8 Product description
- 8 Product design
- 8 Information on the identification plate
- 9 Serial number
- 9 CE label
- 9 Energy Saving Trust Endorsed Products
- 9 Installation
- 9 Unpacking the product
- 9 Checking the scope of delivery
- 9 Transporting the product
- 10 Dimensions
- 11 Minimum clearances
- 11 Clearance from combustible components
- 11 Using the installation template
- 11 Wall-mounting the product
- 11 Removing the front casing
- 12 Removing the side section
- 12 Installation
- 12 Installation requirements
- 13 Installing the gas connection
- 13 Installing the hot and cold water connection
- 13 return
- 14 Connecting the condensate drain pipework
- 14 relief valve
- 14 Flue gas installation
- 15 Electrical installation
- 17 Operation
- 17 Operating concept
- 17 Installer level overview
- 17 Calling up the installer level
- 17 Live Monitor (status codes)
- 18 Setting the hot water temperature
- 18 Start-up
- 18 Carrying out the initial start-up
- 18 Switching the product on and off
- 18 Using check programmes
- 18 and supplementary water
- 19 Preventing low water pressure
- 19 time ("cold")
- 19 Filling the heating installation
- 20 Purging the heating installation
- 20 Filling and purging the hot water system
- 20 Filling the condensate trap
- 20 Gas ratio setting
- 23 Checking function and leak-tightness
- 23 ("hot")
- 23 installation
- 23 Calling up diagnostics codes
- 23 Burner anti-cycling time
- 24 Setting the maintenance interval
- 24 Setting the pump output
- 24 Setting the bypass valve
- 25 Handing the product over to the operator
- 25 Troubleshooting
- 25 Checking service messages
- 25 Rectifying faults
- 25 Calling up and clearing the fault memory
- 25 Resetting parameters to factory settings
- 25 Preparing the repair work
- 25 Replacing defective components
- 27 Completing repair work
- 28 Inspection and maintenance
- 28 Removing the compact thermal module
- 29 Cleaning the heat exchanger
- 29 Checking the burner
- 29 Cleaning the condensate trap
- 29 Cleaning the filter in the cold water inlet
- 30 Installing the compact thermal module
- 30 Draining the product
- 30 internal expansion vessel
- 30 Completing inspection and maintenance work
- 30 Decommissioning
- 30 Temporarily decommissioning the product
- 30 Decommissioning the product
- 30 Recycling and disposal
- 30 Customer service
- 31 Appendix
- 31 Overview of diagnostics codes
- 34 Overview
- 35 Overview of fault codes
- 38 Connection diagrams
- 38 hot water generation
- 39 Overview
- 40 Commissioning Checklist
- 44 Opening of the flue pipe
- 44 flue gas pipe
- 45 gas pipes
- 45 balconies
- 45 Technical data
- 49 Index