MITSUBISHI
ELECTRIC <The model which can be combined with this ZCT >
ZERO PHASE CURRENT TRANSFORMER ı * Mitsubishi Electronic Multi-Measuring Instrument:ME110NSFL, ME110SSFL ,
MODEL CZ-22S, CZ-30S, CZ-55S, CZ-77S, CZ-112S * Mitsubishi Programmable Controller MELSEC-Q |
! nsulation Monitoring Module:QE82LG
INSTRUCTION MANUAL '. Energy Measuring Unit !
Read this manual carefully, and use this instrument properly. Insulation Monitoring Model:EMU4-LG1-MB
eRead this manual thoroughly before using the equipment for proper handling. ' Don't use this ZCT in state connected besides the model т
eThis manual should be retained for the future reference. ı mentioned above. ;
eBe sure that the manual is delivered to the end users. A ee en ee eee eee eee eens
1. Safety Precautions
1.1 Precautions concerning working environment and conditions
Do not use the unit in any of the following places. Doing so may cause malfunctions or a reduction in service life.
+ Places where the ambient temperature exceeds the working temperature range (-20°C to +50°C) * Places where the unit may be exposed to rain or drops of water, and direct sunlight
(Places where the daily average temperature exceeds +35°C) * Places where the circuit with many harmonics.
* Places where the relative humidity is 85%RH or more or where condensation occurs « Places with strong electromagnetic field or noise
* Places with a lot of dust, corrosive gas, salt or oily smoke * Places where the out of the cabinet.
* Places with а lot of vibration or impacts * Place where the altitude exceeds 2000m
1.2 Precautions concerning preparations before using the equipment
° Use the unit in the specified usage environment and conditions.
* Check the current ratings of the equipment.
1.3 Precautions concerning installation and connection
For safety, the unit must be installed and connected by experts in electrical work.
e Don't give this product vibration, a shock at the time of the transportation as much as possible.
A Danger | : Perform installation, disassembly, the wiring work after intercepting a power supply by all means. There might be the damage of an electric shock or the product.
<Precautions concerning installation and connection>
* Carry out the clamping of the crimp-type terminal lugs by prescribed torque (refer to figure 1). The excessive clamping becomes the ruination of a terminal and the screw.
* After tightening, be sure to check that all screws have been tightened. Failure to tighten any screw can cause unit malfunctions, fires, and electric shocks.
° Connect the wires carefully, checking the wiring diagram. Incorrect wiring can cause unit failures, fires, and electric shocks.
* Use an electric wire of the size of penetrating this ZERO PHASE CURRENT TRANSFORMER (ZCT) for primary side cable, do not use a non-insulation electric wire or a
metal for a primary cable
* Lay the connection of the second terminal so that vibration / a shock does not depend on the terminal part directly.
* Use an electric wire of the size of penetrating this ZCT for a primary side cable, do not use a non-insulation electric wire or a metal for a primary cable
A Caution * Use the M4 screws crimp type terminals appropriate for for which is suitable for electric wire size (1.2to 2.0mnt ). The use of the infelicity causes malfunction of the
machinery, trouble, a damage by a fire, the fire by outbreak of the poor disconnection and contact.
* To avoid the influence of external magnetic fields, the installation shall be at least 45cm away from large current bus bars with serveral 1000A.
* Read the manual of measuring units which is used with this ZCT , and is used well, and follow it
* Use this ZCT in cabinet certainly.
* Arrange an electric wire so that the weight of the electric wire does not depend on ZCT.
<To avoid getting shock>
* As for the panel, it be assumed that it was given the following matters
* It is necessary to attach a key to the cabinet.
° The structure that a power supply is intercepted automatically is necessary when opening a cabinet.
* Degrees of protection (IP code) needs to higher than IP2X level.
<Precautions concerning usage>
e Dust or rust on the split part can degrade the performance of the ZCT. Wipe the dirt from the surface with soft dry cloth.
. * Use this ZCT within the rated range stated here. Using the unit out of the rated range may cause not only malfunctions or unit failure, but also fires or burnout.
A Caution * Do not open the secondary side of the ZCT while the primary current is running. When the secondary side of the ZCT is open, the primary current runs while the secondary
current does not, which induces high voltage on the secondary side and increases the temperature. This may cause an insulation breakdown of the secondary winding and
results in burnout.
1.4 Precautions concerning maintenance
* Protect the unit from a power failure. Failure to do so can cause unit failures, fires, or electric shocks.
IN Caution * Wipe off the surface dirt with tender cloth. Don't let chemical cloths touch it for a long time, and do not wipe it with benzine or thinner.
+ Wipe off the separate surface on cores with tender cloth. Don’t use wet cloth.
1.5 Precautions concerning inspection
A Cauti « Perform the care for ZCT at the time of a periodic inspection with the blackout.
aution « When there is the loosen screws in a joint, fasten it again.
1.6 Precautions concerning storage
When storing the ZCT, disconnect cables and wires, and put them in vinyl bags or the like.
When storing the ZCT for a long time, avoid keeping it in the places shown below.
-Places where the ambient temperature is out of the range from -30°C to +60°C
(Places where the daily average temperature exceeds +35°C)
* Places where the relative humidity is 90%RH or more or where condensation occurs.
Places with a lot of dust, corrosive gas, salt or oily smoke.
1.7 Precautions concerning disposal
Dispose this product appropriately in accordance with the national or community rule. mounting bracket can be recycled as iron.
«Places with a lot of vibration or impacts.
«Places where the unit is exposed directly to rain, water droplets.
2.2 Installation points
1) Unscrew the short bar and take off the one side of the short bar.
2) Loosen a joining screw of ZCT in right and left side alternation equality and take off upper core.
Hole 3) Puta primary wire through lower core.
2.1 The name of each part
Test terminals
Upper core Joining screws 4) Install lower core in the setting position and tighten screws with mounting bracket.
ap ©) Please prepare the screws for mounting bracket in the table below.
a Secondary 5) After confirming in dust not sticking to the separate surface on cores, put upper core and lower core
Short bar fis ky) (e) “==> terminal together and assembling joining screws. Tighten a joining screw in right and left equality.
6) Tighten up short bar
7) Wiring secondary terminal (k,l). Wiring the test terminals (kt, It) if necessary.
Lower core 2.3 Torque
Г - Tighten the screw by the following prescribed torque Tightening too much or the lack of unpleasant
clamping influences damage and the characteristic of the instrument.
Mounting
bracket Secondary Terminals Screws ог]
Joining screws Test terminalsU .
Short bar mounting bracket
Model Size TorquelN+m] Size TorquelN+m] Size Quantity
CZ-22S M4 0.54~0.66
CZ-30S 0.59~0.72 M5 2
CZ-55S M5 0.95~1.16 M4 0.98~1.35
CZ-77S 2
Cz-1125 M6 1.32~1.62 M6 7
2.4 Instructions for use
:ZCT is a highly precise magnetic material. Don't give a shock.
* Dust or rust on the split part can degrade the performance of the ZCT. Wipe the dirt from the surface with soft dry cloth.
"Ве sure to attach the short circuit plate. If you forget to install the short circuit plate, you will not be able to detect leaks correctly.
2.5 Instructions for wiring
“Refer to the wiring diagram of the instruction manual of the measurement units combine with the ZCT.
- The electric wire diameter which go through hole is as follows. (Nominal cross-sectional area of conductor IV:Indoor PVC, CV:Cross linked polyethylene PVC) Because there is the case
that | cannot penetrate by a finish external form, the transformation (curves) of the electric wire, Confirm dimensions.)
The biggest electric wire diameter and the tolerance current
Nominal cross-sectional area of conductor [mm?](Current tolerance[A])
Phase system | wires Cable CZ-22S CZ-30S CZ-55S CZ-77S CZ-112S
Single phase 2 wire 2 IV 22(115) 60(217) 250(556) 500 (842) —
gle P CV 22(130) 38(190) 200 (545) 500 (920) 10001470)
Single phase 3 wire 3 IV 22(115) 38(162) 200 (469) 500 (842) =
Three phase 4 wire CV 14(100) 22(130) 150(455) 325 (725) 800 (1285)
Three phase 4 wire 4 IV 14(88) 38 (162) 150 (395) 325 (650) —
р CV 8(72) 22(130) 150 (455) 325 (725) 600 (1005)
«About the connection of the polarity (K, L) of ZCT, confirm it by the wiring diagram of the instruction manual of the measurement units put it together, and to use;
" Test terminals ( kt, It ) are terminals for movement test with the measurement units. It is convenience at the time of the maintenance check, if it draws wiring to the surface of the cabinet with a terminal
symbol.
-Do not be made to short-circuit at test terminals, the grounding is unnecessary, too. (ZCT cannot detect a leakage current definitely when it is grounding.)
O Instructions for penetrating wiring through ZCT
1. In the case of single-phase 3 wire system or three phase 4 | 2. Do not let penetrate the grounding wire when there is a | 3. Because it may give ZCT mechanical stress when a severe
wire system, let wiring including neutral wire by all means be | grounding dedicated line in the electric circuit, go through | electric current flows by short circuit accidents, the electric
through ZCT hole. ZCT hole. Do not let penetrate the electric wire which is wire penetrating ZCT bundles it up and tie it up by bands.
; not aimed at to turn on a load electric current, through ZCT
Neutral wire through the ZCT _
hole. —— Do not pass the grounding wire
4. Do not bend an electric wire penetrating ZCT in a closely of ZCT.
When it let ZCT penetrate primary wiring over 300A, keep wiring straight in line more than one side 30cm.
3. Specification
Model CZ-22S CZ-30S CZ-55S CZ-77S CZ-112S
Hole dimensions (mm) $22 $30 $55 77 $112
Rating primary current 50A AC 100A AC 300A AC 600A AC 1000A AC
Maximum voltage 600V AC
Frequency 50-60Hz
Rated short time current (Peak value) 50kA (100kA)
Measurement (installation) category CATI
Pollution degree 2
EN61010-2-032
This ZCT conform to CE marking standard in a condition use with QE82LG (Mitsubishi MELSEC-Q series programmable
controllers Insulation Monitoring Module
This aT conform to CE marking standard in a condition use with EMU4-LG1-MB (Energy Measuring Unit Insulation Monitoring
Model
Mass 0.5kg | 0.6kg | 1.8kg | 2.8kg | 6.0kg
CE marking conformity standard
CE marking conformity combination unit
<Usage as the CE marking conformity article>
- Аз for the Maximum voltage 600V AC, measurement category II, Install the current sensor in the cabinet
pollution degree 2. ‘Use the PVC insulation electric wire (less than heat-resistant temperature +70°C.)
-Install the ZCT to the secondary of the circuit breaker.
4. Dimensions 5. Customer Service
A\ Caution
Except 02-1128 For 02-125 MITSUBISHI ELECTRIC CORPORATION
dh [ami] LL Eh hai] LL HEAD OFFICE: TOKYO BUILDING, 2-7-3, MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, Japan
A ] a > Please refer to "catalog" for more detail.
| © Oye =| |1© eae | |
= 5 When exported from Japan, this manual dose noto require
— 7 = == => == = application to the Ministry of Economy, Trade and Industry
Ss es = с for service transaction permission.
С D Specifications subject to change without notice.
D E
E
Dimensions [mm]
CZ-22S | CZ-30S | CZ-55S | CZ-77S |CZ-112S
A @ 22 ® 30 ф55 ф77 ® 112
B 27 27 32 41 57
C 100 114 148 198 234
D 112 130 160 210 246
x E 128 144 177 232 268
F 5 5 9 10 8
| R неее
© ® J 41 47 66 90 109
K 77 89 124 171 207