Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
1 of 25
Title:
GOME2-calibration:
Calibration execution procedures
Prepared by:
Checked by:
Verified by:
Authorised by:
L. van Riel
M. Eschen
J. Hopman
G. Otter
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
2 of 25
Others
OG
R. Veratti
B. Ricciarelli
ESA
A. Lefèbvre
J. Callies
Issue Date
1
2
3
4
DISTRIBUTION LIST
Copies
1x
1x
TPD
Archive
Calibration Execution Team
DOCUMENT CHANGE RECORD
20 September 2000
11 March 2002
16 August 2002
See header
Number of pages
Short description
1-23 First issue
New document
26 FM1 update
See header FM2 update
Pages
All
All
All
All
Copies
1x
1x
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation
Table of Contents
DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
3 of 25
1.
SCOPE ..................................................................................................................................................................... 5
2.
DOCUMENTS AND ACRONYMS....................................................................................................................... 6
2.1
A PPLICABLE DOCUMENTS .................................................................................................................................. 6
2.2
R EFERENCE DOCUMENTS .................................................................................................................................. 6
2.3
A CRONYMS ....................................................................................................................................................... 6
3.
SUPPORTING PROCEDURES APPLICABLE DURING CALIBRATION EXECUTION........................... 8
3.1
O PERATION AND H ANDLING P ROCEDURE .......................................................................................................... 8
3.2
E MERGENCY P ROCEDURE ................................................................................................................................. 8
3.3
A LIGNMENT P ROCEDURE S TIMULI AND MGSE ................................................................................................. 8
3.4
O PERATION OF TVC.......................................................................................................................................... 8
3.5
S WITCH ON / OFF PROCEDURE FOR G OME 2 (GAL ATP’ S ) .................................................................................. 8
3.5.1
Switch on procedure for Gome 2 ................................................................................................................. 8
3.5.2
Change_context.tal .................................................................................................................................... 10
3.5.3
History_decoder.tal ................................................................................................................................... 10
3.5.4
Switch off procedure for Gome 2 ............................................................................................................... 10
3.6
G OME 2 CONSOLE ............................................................................................................................................ 11
3.7
R UNNING ATP' S .............................................................................................................................................. 11
3.8
L OGGING ......................................................................................................................................................... 12
3.9
B ACK UP OF DAPB DATA ................................................................................................................................ 13
3.10
Q UICK L OOK ................................................................................................................................................... 13
3.11
LVM MONITORING .......................................................................................................................................... 13
4.
STEP-BY-STEP PROCEDURE .......................................................................................................................... 14
4.1
G ENERAL ........................................................................................................................................................ 14
4.2
PREPARATIONS ................................................................................................................................................ 15
4.3
A MBIENT BLOCK 1 .......................................................................................................................................... 15
4.4
A MBIENT BLOCK 2 .......................................................................................................................................... 15
4.5
I NSTALL GOME2 IN TVC ............................................................................................................................... 16
4.6
TVC/G OME TB2 ( NOMINAL TEMP ) CAMPAIGN ............................................................................................... 16
4.6.1
Gome.......................................................................................................................................................... 16
4.6.2
LRS in White light mode............................................................................................................................. 17
4.6.3
LRS in filter mode (TB2) ............................................................................................................................ 17
4.6.4
LRS in slit mode (TB2) ............................................................................................................................... 17
4.6.5
LRS in monochromator mode (TB2) .......................................................................................................... 17
4.6.6
HCL stimulus (TB2) ................................................................................................................................... 17
4.6.7
ORIEL stimulus (TB2)................................................................................................................................ 17
4.6.8
Zenith sky measurements (TB2) ................................................................................................................. 18
4.6.9
Rad/Irrad in sun mode (TB2) and Sun simulator at nadir (TB2).............................................................. 18
4.6.10
Rad/Irrad in nadir mode (TB2) and Sun simulator at sun (TB2)........................................................... 18
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
4 of 25
4.6.11
Sphere in nadir (TB2) ............................................................................................................................ 18
4.7
TVC/G OME TB1 ( NOMINAL -10 TEMP ) CAMPAIGN .......................................................................................... 18
4.7.1
LRS in white light mode (TB1) ................................................................................................................... 19
4.7.2
Oriel stimulus (TB1)................................................................................................................................... 19
4.7.3
HCL stimulus (TB1) ................................................................................................................................... 19
4.7.4
Rad/Irrad in sun mode (TB1) and Sun simulator at nadir (TB1)............................................................... 19
4.7.5
Rad/Irrad in nadir mode (TB1) and Sun simulator at sun (TB1)............................................................... 19
4.8
TVC/G OME TB3 ( NOMINAL +10 TEMP ) CAMPAIGN ......................................................................................... 19
4.8.1
LRS in white light mode (TB1) ................................................................................................................... 20
4.8.2
HCL stimulus ............................................................................................................................................. 20
4.8.3
Oriel stimulus (TB3)................................................................................................................................... 20
4.8.4
Rad/Irrad in sun mode (TB3) and Sun simulator at nadir (TB3)............................................................... 20
4.8.5
Rad/Irrad in nadir mode (TB3) and Sun simulator at sun (TB3)............................................................... 20
4.9
CATGAS MEASUREMENTS AT TB2 ................................................................................................................ 21
4.10
P OST TEST AND PACKING ................................................................................................................................. 21
4.11
N ON CONFORMANCE R EPORTING .................................................................................................................... 22
4.12
D EVIATIONS FROM THE P ROCEDURE ............................................................................................................... 22
5.
PROCEDURE SIGN-OFF SHEET ..................................................................................................................... 23
6.
PROCEDURE VARIATION SHEET ................................................................................................................. 24
7.
GOME 2 NCR'S AFFECTING CALIBRATION EXECUTION (GAL INFO) .............................................. 25
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
5 of 25
1. Scope
This document presents the calibration execution procedure including the step-by-step procedure to be applied for the calibration of the Gome2 instrument.
This procedure is applicable for Gome2 FM1; FM2 and FM3
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation
2. Documents and Acronyms
2.1 Applicable documents
[AD1] Gome2 Calibration Requirements Specification
MO-RS-GAL-GO-0003
[AD2] Gome2 Calibration Plan
MO-PL-TPD-GO-0004
[AD3] Gome2 handling transportation and installation procedure
MO-PR-TPD-GO-0025, latest issue
[AD4] Gome2 emergency procedure for the VCF
MO-PR-TPD-GO-0029, latest issue
[AD5] Optical and mechanical alignment procedure
OPR020003
[AD6] List of applicable Gome2 FMx instrument NCR's
(To be provided by GAL)
[AD7] ATP report
MO-RP-TPD-GO-0037, latest issue
[AD8] TVC user manual
[AD9] Gome2 safety guideline for Calibration
MO-NT-GAL-GO-0025, latest issue
2.2 Reference documents
None
2.3 Acronyms
Acronym Description
AIRR Ambient Irradiance/Radiance set-up
ATP Automated Test Procedure
BEPNT ODBH Bus Probe, New Technology
CTB
DAPB
EGSE
ESA
Command and Telemetry Block
Data Acquisition and Processing Block
Electrical Ground Support Equipment
European Space Agency
FMUSIM Fast Multiplexer Unit Simulator
FPA Focal Plane Assembly
GAL
Gome
Galileo Avionica
Global Ozone Monitoring Experiment
GSE
HCL
LRS
LVM
Ground Support Equipment
Hollow Cathode Lamp
Low Radiance Stimulus
Low Voltage Mode
MGSE
NCR
Mechanical Ground Support Equipment
Non Conformance Report
This document contains proprietary information of TNO-TPD.
All rights reserved.
DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
6 of 25
TPD
Space Instrumentation
Acronym Description
OGSE Optical Ground Support Equipment
PMD
PVS
Polarisation Measurement Device
Procedure Variation Sheet
QTH
SMU
Quartz Tungsten Hydrogen Lamp
Scan Mirror Unit
SLS Spectral Light Source
TBC/TBD To Be Confirmed / To Be Determined
TVC Thermal Vacuum Chamber
VCF
WLS
Xe
Vacuum Calibration Facility
White Light Source
Xenon Lamp
DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
7 of 25
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
8 of 25
3. Supporting procedures applicable during Calibration Execution
3.1 Operation and Handling Procedure
[AD3] Gome2 handling transportation and installation procedure
MO-PR-TPD-GO-0025, latest issue
3.2 Emergency Procedure
[AD4] Gome2 emergency procedure for the VCF
MO-PR-TPD-GO-0029, latest issue
3.3 Alignment Procedure Stimuli and MGSE
[AD5] Optical and mechanical alignment procedure
OPR020003
3.4 Operation of TVC
[AD8] TVC user manual
3.5 Switch on/off procedure for Gome2 (GAL ATP’s)
3.5.1 Switch on procedure for Gome 2 step
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18. description turn 19" rack on set red switch to OFF (0) turn safety button at the bottom of the rack to the right turn on switch that is located directly above the safety button (should be directed upwards now) turn red switch to ON (1) boot up the BEPNT push the power button on the rightmost PC (located under the desk) login as 'administrator' double-click icon 'start_bep.bat' double-click icon 'BEP MMI' wait for red indicators in the application window to become green check all "acquiring panel" checkboxes to ON boot up FMUSIM push the power button on the leftmost PC (located under the desk) login as 'administrator' double-click icon 'FMU SIM MMI' (ignore error message "FMU SIM Core not present" --> OK)
Start from menu bar: 'menu' --> 'core' --> 'start FMUSIM' (you have to click 'OK' twice)
Start from menu bar: 'menu' --> 'core' --> 'connect to FMUSIM' in the application window, section 'panel', subsection 'input', click 'nominal 2' in the application window, section 'panel', subsection 'output', click 'nominal 1' in the application window, section 'panel', subsection 'commands', click 'acquisition on'
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
9 of 25
34.
35.
36.
37.
38.
39.
40. step
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
41.
42.
43.
44.
45.
46.
47. description in the application window, section 'panel', subsection 'commands', click 'distribute on' check 19" rack all numbers in the digital displays should be close to zero boot up CTB push the power button on the PC (located under desk) login as 'administrator', double-click icon 'GOME2 CTB_MMI' user: 'TPD_operator' ; working dir: 'GOME2FM2
Start from menu bar: 'menu' --> 'modes' --> 'online'
à ‘yes’
Start from menu bar: 'menu' --> 'tools' --> 'ATP' --> 'start'
Checksum control
Switch N and ICU on buttons on power supply (19” rack) on
Switch on Gome with ATP “Power_on28”
Run ATP “Low_level_p_d_c”
Input: Operator name (use your initials for this) à ‘OK’
Switch Off Gome with ATP “Power_supply_off”
Control the values of the checksums in the ATP trace file, refer to [AD9]
Switch on Gome with ATP: 'Og_start' (no parameters) (Og_start will now appear in ATP status window: should be yellow now, i.e. the ATP is waiting)
Input: N and ICU on buttons on power supply à’yes’
19” rack push buttons 'EQ ON' and 'ICU ON' lift cap, push button, close cap (do nothing if buttons are already green)
ICU display should read:
EQT display should read:
+/- 28.00 V
+/- 28.00 V
Wait for approximately 1 minute
+/- 0.43 A
+/- 0.00 A
CTB
Input: Operator name (use your initials for this) à ‘OK’
Input: Context_FPA_cooling_enabled (y/n)
à ‘n’ (safe mode) à ‘OK’
Be sure about yes (FPA vacuum on!).
Remark: use the console ATP for switching on FPA/PMD coolers
Input: Context_PMD_cooling_enabled (y/n)
à ‘n’ (safe mode) à ‘OK’
Be sure about yes (in vacuum only!)
Input: Context_PMD_flight_line_enabled (y/n) à ‘n’ (safe mode) à ‘OK’
Input: Context_QTH_high_current_enabled (y/n) à ‘n’ (=360 mA); ‘y’ (=420 mA TBC) à ‘OK’
Input: Continue with BIT (y/n) à ‘n’à ‘OK’
BIT = Built In Test, this procedure does not work properly, results always in a failure, use checksum procedure mentioned above instead
Input: Choose monitoring (see log msg): 0,1,2 à ‘0’à ‘OK’
Input: Choose mon.par set (0=air, 1=TV)
à air or TV à ‘OK’
Use the appropriate parameter for the environment Gome is in
Input: ATP 'Get_packet' in ATP status window. From the options 1=RTR, 2=RT, 3=RTE, select option 3 (i.e. everything)
Send Idle command (y/n) à ‘y’ à ‘OK’ 48.
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
10 of 25 step
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13. step
49.
50.
51.
52. description
DAPB push the power button on the DAPB (below desk) login and password are not needed double-click icon 'GOME-2 DAPB Version 1.xx' verify/set values in the DAPB start-up window:
Station type: DAPB-1
Instrument model:
Level:
Company:
User:
Session description.:
FM1 (1, 2 or 3)
INSTRUMENT
TPD
EZ short description of measurement, this description will appear in data file name
The subsystems are now ready for running calibration ATPs
3.5.2 Change_context.tal
A GAL ATP for switching on/off FPA and PMD coolers. Use preferably the console.tal
3.5.3 History_decoder.tal
An GAL ATP for resetting the history decoder. This ATP is used for monitoring anomalies. This
ATP shall be frequently executed (at least after each ATP)
3.5.4 Switch off procedure for Gome 2 description shut down CTB start ATP 'OG_stop' (menu bar: 'menu' --> 'tools' --> 'ATP' --> 'start') wait for all ATP's to be stopped set CTB to local mode: ('menu' --> 'modes' --> 'local') exit CTB application: ('menu' --> 'file' --> 'exit') shutdown CTB computer (power switch under the desk) turn off 19" rack set red switch to OFF (0) turn OFF the switch located directly above the big red safety button (should be directed downward now) turn big red safety button to the left shut down FMUSIM stop FMUSIM core ('menu' --> 'core' --> 'stop FMUSIM core' ; OK) close FMUSIM application ('menu' --> 'file' --> 'close program') shutdown FMUSIM computer (power switch under desk) shutdown BEPNT close BEPNT application ('menu' --> 'file' --> 'exit') shutdown BEPNT computer (power switch under desk)
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
11 of 25
3.6 Gome2 console
703
704
705
800
900
901
902
903
998
600
601
602
603
699
700
701
702
This feature comprises initialisation/de-initialisation commands for Gome2, such as: FPA/PMD coolers on/off, set SMU angle etc.
The following procedure/settings are applicable (TBC):
1. Start Gome2_console.atp (see section 3.7)
2. Enter SMU angle [°]
3. Enter code for:
200
201
300
301
400
401
500
501
Gome2 LED FPA off
Gome2 LED FPA on
Gome2 LED PMD off
Gome2 LED PMD on
Gome2 SLS off
Gome2 SLS on
Gome2 WLS off
Gome2 WLS on
Gome2 FPA cooler off
Gome2 FPA cooler cold
Gome2 FPA cooler disable
Gome2 FPA cooler enable
Set target temperature FPA [K]
Gome2 PMD cooler off
Gome2 PMD cooler cold
Gome2 PMD cooler disable
Gome2 PMD cooler enable
Gome2 PMD cooler line 1 ground (do not use)
Gome2 PMD cooler line 2 in-flight
Set integration time (closest to Gome2 values is chosen) for FPA/PMD
Close Gome2 Shutter (sun port)
Open Gome2 Shutter
Shutter Gome2 disable
Shutter Gome2 enable
Gome 2 in stand-by (idle) mode
999 End
3.7 Running ATP's
For information concerning ATP's (i.e. structure, settings etc) reference is made to [AD7]. step description
1.
2.
Start from CTB menu bar: 'menu' --> 'tools' --> 'ATP' --> 'start' select ATP; enter 'Y'; click 'OK
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
12 of 25
List of applicable measurement ATP's (For information only!):
AETA.tal
ATP FM1
AIRR.tal
BREWSTERSCAN.tal
FILTER.tal
IFOV_.tal
FELRAD.tal
FELIRR.tal
SUNRAD.tal
SUNIRR.tal
LINEARITY.tal
MONITOR.TAL
MONITOR.TAL
MONITOR.TAL
DIFFUSERMON.TAL
ORIEL.tal
MONOSCAN_.tal
HCL.tal
SPHERE.tal
SPHERE.tal
OGSE
LRS
SunSim
LRS
LRS
LRS
FEL
FEL
SunSim
SunSim
INT-LED
INT-LED
INT-WLS
INT-SLS
INT-SLS
LRS
LRS
SLS-RAD
SPHERE-IRR
SPHERE-RAD
AETA
MGSE
AIRR
TVC
TVC
TVC
TVC
TVC
TVC
TVC
NA
TVC
TVC
TVC
TVC
TVC
TVC
NADIR
SUN
NA
TVC/AETA/AIRR NA
TVC/AETA/AIRR NA
TVC/AETA/AIRR NA
NA
NADIR
NADIR
NADIR
SUN
NADIR
NADIR port
SUN
NADIR
NADIR
NADIR
NADIR
SUN
ZENITH.tal ZENITH TVC NADIR
Note: This list can be changed throughout the calibration campaign
TB2
3.8 Logging
TB123
TB123
TB123
TB2
TB123
TB2
TB123
TB2
TB2 ambient
TB ambient
TB123
TB2
TB2
TB123
TB123
TB123
TB123
TB2
TD
Logging shall be applicable during the calibration campaign. The following log forms shall be used:
1. Hand written Log (free format)
2. Electronic Log (predefined format)
3. Measurement Log (tracking of measurements, i.e. ATP's), excerpt of the electronic log
Parameters to be frequently monitored and to be logged: parameter
Instrument SLS voltage
Instrument SLS scan mirror angle
Instrument WLS current
Instrument temperature
LRS SLS voltage
Sun simulator output stability during AIRR
TVC cold finger temperature
TVC pressure
FPA vacuum pump pressure
Radiator Cooler temperature
QCM reading
History decoder value
220±5V
13°
Typical 360 mA
FPA's
PMD's
Tref
220±5V
±10% (TBC)
< -180°C
<1x10
-5
mbar
<1x10
-5
mbar
Typical 14°C in ambient and 6°C in TV
As-is
- remark check Low Voltage Mode
FM
Tref = Pre-disperser Prism Temperature check Low Voltage Mode check output detector
At <1x10
-4
mbar automatic switch-off of instrument
At the end of each ATP or more frequently when necessary w.r.t. file size
This document contains proprietary information of TNO-TPD.
All rights reserved.
TD12
TD12
TD12
TD1
TD1
TD1
TD1
TD1
TD1
TD1
TD1
TD1
TD1
TD1
TD1
TD1
TD1
TD1
TD1
TD12
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
MO-PR-TPD-GO-0027
4
11 November 2002
13 of 25
Built In test
Other
3.9 Back up of DAPB data
-
TBD
Before OG-start
The DAPB raw data, i.e. the archived measurements, shall be frequently archived (back-up) on
CD-ROM identified with:
•
Source (including Gome2 FMx)
•
Date/Time
•
Made by
The obtained back-up shall be indicated in the logbook.
3.10 Quick Look
Quick look analysis shall be carried out:
•
Inspection of DAPB Science Panels before execution of an ATP by dry-run of the ATP
•
Inspection of DAPB Science Panels during ATP run
•
Using conversion tool off line after execution of ATP
The parameters to be monitored for quick look analysis:
•
General insight before/during/after ATP execution
•
Signal to noise ratio
•
Saturation (<50000 counts, typical 40000)
•
Signal (>10000 counts)
•
Instrument condition (temperatures, environment etc)
Before a set-up change (ambient to vacuum, OGSE change etc) a successful executed ATP is required.
3.11 LVM monitoring
The SLS internal source is sensitive to operating in Low Voltage Mode (LVM). The following procedure is applicable for monitoring LVM and measuring in LVM mode:
1. After Gome2 has been switched on execute SLS-watchdog.tal
2. Start normal ATP with SLS use: e.g. SLS-scan.tal and Monitor.tal
3. When LVM behaviour is detected by the watchdog, the running ATP will be suspended
(SLS lamp should stay on) and an acoustic signal is generated (automatic activity)
4. Verify that all relevant ATP’s have been suspended.
5. Check, using the Macro Command Editor, integration times for sufficient signal/noise ratio for SLS direct and SLS over diffuser (in LVM behaviour). Be sure that the SLS should stay on.
6. Start SLS-LVM.tal, this ATP will measure SLS direct and SLS over diffuser
7. Open CU shutter using Macro Command Editor with DAPB archiver on. Indicate effect on
LVM behaviour.
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
14 of 25
4. Step-by-step procedure
4.1 General
The following shall be taken into account prior and during Calibration Execution (not in order of importance):
Operation and Handling Procedure [AD1] shall be present
Check
Emergency Procedure [AD4] shall be present
Gome2 safety Procedure [AD9] shall be present
Alignment Procedure [AD5] shall be present
Stand-by operator for TVC and VCF shall be arranged
SMS service for TVC alarm/warnings assigned
Implications of GAL NCR's checked (section 7)
Gome 2 automatic shut off system for TVC pressure installed and tested
Never use PMD coolers = ON during ambient conditions and during –5°C calibration
QCM software installed for monitoring
Coffee Machine shall be present and working
Log sheets shall be present
It shall be noted that the following step-by-step procedure wr.r.t. the sequence is not mandatory. Measurements order may be changed when convenient.
This document contains proprietary information of TNO. All rights reserved.
TPD
Space Instrumentation
Date: Location: Operator:
FM identification:
No. Calibration Step-description Nominal
Value
Actual
Value
Reference
4.2 preparations
1. Arrival of GOME2 EGSE and other equipment
OK
2. Unpack EGSE and other equipment
3. Incoming inspection
[AD1] 4. Install EGSE and other equipment OK
(CTB/DAPB/Pump/Cooler)
5. Install sub-network to interconnect all
EGSE systems
OK
6. Install router
9. Arrival of Gome2 FM1 OK
7. Connect OAC to EGSE-sub network
8. Check network performance
[AD1]
4.3
Ambient block 1
[AD1]
[AD5]
15. Connect GOME2 to CTB [AD1]
16. Connect FPA vacuum pump OK [AD1]
17. Connect Radiant Cooler OK [AD1]
Section 3.5
19. Set detector temperature at TD1 and stabilise
OK Section 3.6
22. Optical alignment of LRS with respect to GOME2 entrance slit
OK
23. MONITOR.TAL
24. AETA.TAL with QTH
25. AETA.TAL with Xe
26. MONITOR.TAL
27. Decision to proceed
4.4
Ambient block 2
OK
OK
OK
OK
OK
[AD5]
Section 3.7
Section 3.7
Section 3.7
Section 3.7
30. Mechanical alignment of AIRR MGSE OK
This document contains proprietary information of TNO. All rights reserved.
Section 3.5
[AD1]
[AD5]
DOC.NO.
ISSUE
DATE
PAGE
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
15 of 25
Remarks
PA:
P N
Log IP adresses
Document in acceptance report
PMD cooling must be OFF!
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
16 of 25
Date: Location: Operator: PA:
FM identification:
No. Calibration Step-description Nominal
Value
Actual
Value
Reference
31. Connect GOME2 to CTB [AD1]
32. Connect FPA vacuum pump
33. Connect Radiant Cooler
OK
OK
[AD1]
[AD1]
35. Set detector temperature at TD1 and stabilise
OK
Section 3.5
Section 3.6
Remarks
PMD cooling must be OFF!
38. Optical alignment Sun Simulator with OK respect to GOME2 sun port
39. AIRR.TAL
40. MONITOR.TAL
OK
OK
[AD5]
Section 3.7
Section 3.7
41. Decision to proceed
4.5
OK
Install GOME2 in TVC
P N
45. Install Gome2 in TVC
48. Connect FPA vacuum pump
49. Connect Radiant Cooler
OK
OK
OK
Section 3.5
[AD1]
[AD1]
[AD1]
[AD5]
[AD1]
[AD1]
[AD1]
Section 3.5
[AD5]
[AD1]
[AD4]
[AD5]
52. Close TVC door
53. Check warning/alarm system
OK
OK
54. Optical pre-alignment of LRS with OK respect to GOME2 entrance slit
55. Switch Gome2 off
56. Gome2 to vacuum
OK
<10
-5 mbar
4.6
Section 3.5
[AD8]
[AD8]
TVC/Gome TB2 (nominal temp) campaign
58. Start Cool down to TB2
59. Switch on GOME2 when temperature <303K has decreased below 303 K
60. LRS mechanical alignment
4.6.1
OK
Gome
61. Set detector temperature to TD2
62. Set PMD temperature to ground line
This document contains proprietary information of TNO. All rights reserved.
OK
OK
[AD8]
Section 3.5
[AD5]
Section 3.6
Section 3.6
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
:
Date: Location: Operator: PA:
FM identification:
No. Calibration Step-description
63. LINEARITY.TAL
64. MONITOR.TAL
65. Set detector temperature to TD1
66. Set PMD temperature to flight line
67. LINEARITY.TAL
68. MONITOR.TAL
Nominal
Value
OK
OK
OK
OK
OK
OK
Actual
Value
Reference
Section 3.7
Section 3.7
Section 3.6
Section 3.6
Section 3.7
Section 3.7
Remarks
After stabilisation
69. DIFFUSERMON.TAL
4.6.2
OK Section 3.7 Diffuser monitoring
LRS in White light mode
MO-PR-TPD-GO-0027
4
11 November 2002
17 of 25
P N
70. BREWSTERSCAN.TAL with QTH
71. BREWSTERSCAN.TAL with Xe
OK
OK
72. MONITOR.TAL
4.6.3
LRS in filter mode (TB2)
OK
Section 3.7
Section 3.7
Section 3.7
Includes ETA/ZETA
Includes ETA/ZETA
74. FILTER.TAL with Xe
75. FILTER.TAL with QTH
OK
OK
Section 3.7
Section 3.7
Dispersion and cross dispersion
Dispersion and cross dispersion
76. MONITOR.TAL
4.6.4
LRS in slit mode (TB2)
OK Section 3.7
78. IFOV.TAL with Xe OK
79. MONITOR.TAL
4.6.5
OK
LRS in monochromator mode (TB2)
Section 3.7
Section 3.7
81. MONOSCAN.TAL with Xe
82. MONOSCAN.TAL with QTH
83. MONITOR.TAL
84. Decision to proceed
4.6.6
HCL stimulus (TB2)
OK
OK
OK
OK
Section 3.7
Section 3.7
Section 3.7
For straylight
For straylight
86. HCL.TAL OK Section 3.7 For FPA wavelength calibration
87. MONITOR.TAL
4.6.7
ORIEL stimulus (TB2)
OK Section 3.7
89. ORIEL.TAL OK Section 3.7 For PMD wavelength calibration
90. MONITOR.TAL OK Section 3.7
This document contains proprietary information of TNO. All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
Date: Location: Operator: PA:
FM identification:
No. Calibration Step-description
4.6.8
Nominal Actual
Value
Zenith sky measurements (TB2)
Value
Reference Remarks
[AD5]
[AD5]
Section 3.7
Section 3.7 94. MONITOR.TAL OK
95. Decision to proceed
4.6.9
OK
Rad/Irrad in sun mode (TB2) and Sun simulator at nadir (TB2)
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
18 of 25
P N
96. Install Rad/Irrad Set-up OK
102. FELRAD.TAL
103. MONITOR.TAL
OK
OK
104. SUNRAD.TAL OK
[AD5]
[AD5]
[AD5]
[AD5]
[AD5]
[AD5]
Section 3.7
Section 3.7
Section 3.7
105. Decision to proceed
4.6.10
OK
Rad/Irrad in nadir mode (TB2) and Sun simulator at sun (TB2)
110. FELIRR.TAL
111. MONITOR.TAL
112. SUNIRR.TAL
113. Decision to proceed
4.6.11
Sphere in nadir (TB2)
OK
OK
OK
OK
[AD5]
[AD5]
[AD5]
[AD5]
Section 3.7
Section 3.7
Section 3.7
114. Install TVSPH in front of Nadir window
115. Align TVSPH with respect to GOME2 OK entrance slit
117. MONITOR.TAL OK
[AD5]
[AD5]
Section 3.7
Section 3.7
118. Decision to proceed
4.7
OK
TVC/Gome TB1 (nominal-10 temp) campaign
Including SLS over diffuser
119. Switch off PMD cooling
121. Install LRS
122. Optical pre-alignment of LRS with
OK
OK
OK
[AD5]
[AD5]
During –10 campaign no
PMD cooling is allowed!
This document contains proprietary information of TNO. All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
Date: Location: Operator: PA:
FM identification:
No. Calibration Step-description Nominal
Value respect to GOME2 entrance slit
123. Optical alignment (check + fine-tuning) of LRS with respect to GOME2
OK
4.7.1 entrance slit
LRS in white light mode (TB1)
Actual
Value
125. BREWSTERSCAN.TAL with QTH
126. BREWSTERSCAN.TAL with Xe
127. MONITOR.TAL
4.7.2
Oriel stimulus (TB1)
OK
OK
OK
Reference
[AD5]
Section 3.7
Section 3.7
Section 3.7
Remarks
Eta/Zeta only
129. ORIEL.TAL
130. MONITOR.TAL
4.7.3
HCL stimulus (TB1)
OK
OK
Section 3.7
Section 3.7
132. HCL.TAL
133. MONITOR.TAL
OK
OK
Section 3.7
Section 3.7
134. Decision to proceed
4.7.4
OK
Rad/Irrad in sun mode (TB1) and Sun simulator at nadir (TB1)
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
19 of 25
P N
141. FEL_ABS.TAL
142. MONITOR.TAL
OK
OK
[AD5]
[AD5]
[AD5]
[AD5]
[AD5]
[AD5]
Section 3.7
Section 3.7
143. SUSI.TAL
4.7.5
OK Section 3.7
Rad/Irrad in nadir mode (TB1) and Sun simulator at sun (TB1)
148. FEL_ABS.TAL
149. MONITOR.TAL
OK
OK
[AD5]
[AD5]
[AD5]
[AD5]
Section 3.7
Section 3.7
150. SUSI.TAL OK Section 3.7
151. Decision to proceed
4.8
OK
TVC/Gome TB3 (nominal+10 temp) campaign
This document contains proprietary information of TNO. All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
Date: Location: Operator: PA:
FM identification:
No. Calibration Step-description
153. Switch on PMD cooling
154. Install LRS
155. Optical pre-alignment of LRS with
Nominal
Value
OK
OK
OK respect to GOME2 entrance slit
156. Optical alignment (check + fine-tuning) OK of LRS with respect to GOME2
4.8.1 entrance slit
LRS in white light mode (TB1)
Actual
Value
Reference
[AD5]
[AD5]
[AD5]
158. BREWSTERSCAN.TAL with QTH OK Section 3.7
159. BREWSTERSCAN.TAL with Xe OK Section 3.7
160. MONITOR.TAL
4.8.2
OK Section 3.7
HCL stimulus
161. Set-up HCL stimulus (TB3)
162. HCL.TAL
163. MONITOR.TAL
164. Decision to proceed
4.8.3
Oriel stimulus (TB3)
OK
OK
OK
OK
Section 3.7
Section 3.7
Remarks
Eta/Zeta only
166. ORIEL.TAL OK Section 3.7
167. MONITOR.TAL
4.8.4
OK Section 3.7
Rad/Irrad in sun mode (TB3) and Sun simulator at nadir (TB3)
174. FELRAD.TAL
175. MONITOR.TAL
OK
OK
[AD5]
[AD5]
[AD5]
[AD5]
[AD5]
[AD5]
Section 3.7
Section 3.7
176. SUNRAD.TAL OK
4.8.5
Section 3.7
Rad/Irrad in nadir mode (TB3) and Sun simulator at sun (TB3)
181. FELIRR.TAL OK
182. MONITOR.TAL OK
183. SUNIRRTAL OK
[AD5]
[AD5]
[AD5]
[AD5]
Section 3.7
Section 3.7
Section 3.7
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
20 of 25
P N
This document contains proprietary information of TNO. All rights reserved.
TPD
Space Instrumentation
Date: Location: Operator:
FM identification:
No. Calibration Step-description Nominal
Value
Actual
Value
184. Decision to proceed
4.9
OK
CATGAS measurements at TB2
185. CATGAS measurements
4.10
Post test and packing
Reference
188. Pack GOME2 instrument EGSE and other equipment
OK
Section 3.5
[AD1]
DOC.NO.
ISSUE
DATE
PAGE
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
21 of 25
PA:
Remarks
Procedure TBW
P N
This document contains proprietary information of TNO. All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
22 of 25
4.11 Non-conformance Reporting
In failure cases, non-conformance reporting shall follow prescriptions of the Product
Assurance Plan.
4.12 Deviations from the Procedure
Deviations are acceptable as long as test purposes and objectives remain valid. In any case deviations need to be introduced via the “Procedure Variation Sheet”. A form sheet is provided in section 6.
Where a non-conformance was the reason for a procedure deviation, a nonconformance report needs to be generated separately.
This document contains proprietary information of TNO. All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
23 of 25
5. Procedure sign-off sheet
The identified test article has been successfully calibrated in accordance with this procedure and all open items and non-conformance reports are closed except those listed here below:
Date and signatures of:
Test Manager:
Product Assurance:
Customer:
This document contains proprietary information of TNO. All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
24 of 25
6. Procedure Variation Sheet
TNO-TPD
Procedure Variation Sheet
Cal
Step
No.
Project: Gome-2 Instrument Calibration
Test Step description Nominal Value Actual Value P N
Date: Customer: Test
Location:
Operator: PA:
Procedure No.
Date
Issue:
Sheet
PVS No.
Remarks
This document contains proprietary information of TNO-TPD.
All rights reserved.
TPD
Space Instrumentation DOC.NO.
ISSUE
DATE
PAGE
:
:
:
: MO-PR-TPD-GO-0027
4
11 November 2002
25 of 25
7. Gome 2 NCR's affecting Calibration Execution (GAL info)
This information shall be obtained from GAL
This document contains proprietary information of TNO-TPD.
All rights reserved.
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement
Table of contents
- 5 SCOPE
- 6 DOCUMENTS AND ACRONYMS
- 8 SUPPORTING PROCEDURES APPLICABLE DURING CALIBRATION EXECUTION
- 8 Switch on procedure for Gome
- 10 Change_context.tal
- 10 History_decoder.tal
- 10 Switch off procedure for Gome
- 14 STEP-BY-STEP PROCEDURE
- 17 LRS in White light mode
- 17 LRS in filter mode (TB2)
- 17 LRS in slit mode (TB2)
- 17 LRS in monochromator mode (TB2)
- 17 HCL stimulus (TB2)
- 17 ORIEL stimulus (TB2)
- 18 Zenith sky measurements (TB2)
- 18 Rad/Irrad in sun mode (TB2) and Sun simulator at nadir (TB2)
- 18 Rad/Irrad in nadir mode (TB2) and Sun simulator at sun (TB2)
- 18 Sphere in nadir (TB2)
- 19 LRS in white light mode (TB1)
- 19 Oriel stimulus (TB1)
- 19 HCL stimulus (TB1)
- 19 Rad/Irrad in sun mode (TB1) and Sun simulator at nadir (TB1)
- 19 Rad/Irrad in nadir mode (TB1) and Sun simulator at sun (TB1)
- 20 LRS in white light mode (TB1)
- 20 HCL stimulus
- 20 Oriel stimulus (TB3)
- 20 Rad/Irrad in sun mode (TB3) and Sun simulator at nadir (TB3)
- 20 Rad/Irrad in nadir mode (TB3) and Sun simulator at sun (TB3)
- 23 PROCEDURE SIGN-OFF SHEET
- 24 PROCEDURE VARIATION SHEET
- 25 GOME 2 NCR'S AFFECTING CALIBRATION EXECUTION (GAL INFO)