advertisement
◉
Touch to zoom
Priority Assembly Instructions TM 1 T-Leg and Post-Leg Bases 1. Tools Required 4, 5 and 6 MM Allen Wrench/Driver 2. Hardware Required 3. M6 x 12 Countersink Head Screw M6 x 12 Socket Head Screw M10 x 20 Button Head Screw 4. When installing a frame with 90” or 96” Support Rails, first assemble smaller Support Rails with the Support Rail Connector using M6 x 12 Socket Head Screws (12 per Support Rail Connector). (Figure A) Assemble Support Rails to Column (2 per Column) using M6 x 12 Socket Head Screws (4 or 6 per Column depending on type of Column). (Figure A) Assemble Top Support to Column using M6 x 12 Countersink Head Screws (2 per Column). (Figure A) Assemble T Leg Foot to Column using M10 x 20 Button Head Screws (4 per Column). Important: After all screws are tightened on T Leg Foot, re-tighten each screw in same order. (Figure A) Installation Important: - All fasteners using tapped holes should be started by hand to prevent cross-threading. - Bases are easiest to assemble when upside-down. - For Electric Height-Adjustable T-Leg and Post-Leg Bases see Priority Assembly Instruction 2383883 for proper initialization. - Set Bases to standard 27 3/4” height unless otherwise specified. 6 MM Allen Wrench is used to make adjustment on Bases with machine screw adjustment. Tips 1. 2. 3. 4. Support Rails are to be oriented as shown in Figure B. Support Rails and Top Support may be left loose on Column until both are assembled for ease of assembly. Support Rails are approximately 5” shorter than nom size. For installing Worksurfaces to Bases, see Priority Worksurface Assembly Instructions 2383879. Figure A Support Rail Connector (90” & 96” Support Rails Only) Support Rail (2 per Column) Top Support M6 x 12 Socket Head Screw (4 or 6 per Column depending on type of Column) M6 x 12 Countersink Head Screw (2 per Top Support) M6 x 12 Socket Head Screw (12 per Support Rail Connector) Column Figure B Worksurface M10 x 20 Button Head Screw (4 per Column) T Leg Foot Proper product installation, in accordance with these instructions, is the responsibility of the installing agent. If you have any questions concerning these instructions, please call Kimball Office Customer Care. 2383872, Revision B Support Rail Orientation
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement