Installation guide High Output

Horticulture
LED Solutions
GreenPower
LED toplighting high output
Quick installation guide
WARNING
Turn power off before installation. All work
should be done according to appropriate
electrical codes.
Dimensions Philips GreenPower LED toplighting - high output (in mm)
Product
Dimensions (in mm)
Length
Width
Height
GreenPower LED toplighting - high output module
1269.75
50
110
GreenPower LED toplighting module mounting bracket (continuous line)
118
85
47.5
GreenPower LED toplighting module mounting bracket (non-continuous line)
102
55
35.7
1269.75
1249
1208.4
50
40
40
110
100
June 2015
Mounting into the greenhouse
The module can be fixed to the greenhouse structure using the existing technology that is used for greenhouse installations.
The GreenPower LED toplighting - high output can be fitted very easily without the need for any tools and has been
designed together with installers and growers to deliver optimum results.
The 40x40 mm C-profile is integrated into the module. This way less light will be blocked by the LED modules cabling and
suspension structure. Thanks to the head-to-tail inter-connection and the stainless steel clips, it is virtually a plug-and-play
module.
Continuous line installation
2
1
3
1 Mount
40x40 mm C-profiles to the green house
structure on the desired height. During assembly use
a fixation that only uses the inside of the C-profile
(green area) (see drawing).
Do not use hooks that are mounted around the profile
(red area) (see drawing)!
5
4
6
2 Click the plastic part with the snap fingers on the
stainless steel clips (see drawing).
3 Hook on 2 stainless steel clips onto the C-profile at 1,25
m pitch (see drawing).
4 Put the LED module over the C-profile.
5 Take the clip and slide and press the locking plate into
the module at both sides.
6 Hook on one stainless steel clip onto the C-profile at 1,25
m distance.
8
7
9
7 Put the second module over the C-profile.
8 Click the second module on the clip of the first module.
9 Slide the clip on the back in the second module. Check if
the locking plate snaps into the module.
10 Hook on one stainless steel clip onto the C-profile at 1,25
m distance.
11 Put the third module over the C-profile.
12 Click the third module on the clip of the second module.
13 Slide the clip back in the third module. Check if the
10
11
12
locking plate snaps into the module. You can continue
like this for the rest of the modules. Max 15 pcs per
phase!
14 IMPORTANT: Put the connector stop on the end of a
through wire line to make the
line IP66.
15 Connect the female connector to the main power cable
and connect this main power cable to the power grid.
13
14
15
Important note:
The maximum amount of GreenPower LED toplighting - high output
modules is 15 pcs per phase on a 16 A C-type circuit breaker.
Not allowed to use >16 A circuit breakers and increasing the module
amounts per phase due to internal wire dimensions and higher
current!
Non-continuous line installation
2
1
3
1 Mount 40x40 mm C-profiles to the green house structure
on the desired height. During assembly use a fixation
that only uses the inside of the C-profile (green area)
(see drawing).
Do not use hooks that are mounted around the profile
(red area) (see drawing)!
5
4
6
2 Take 1 stainless steel clip.
3 Hook on 1 stainless steel clip onto the
C-profile at left side (see drawing).
4 Put the LED module over the C-profile.
5 Take the clip and slide and press the locking plate into
the module at left side.
6 Take the connection cable and put the plug onto the
appropriate socket.
7 Hook on 1 stainless steel clip onto the
8
7
9
C-profile at the right side of the module
(see drawing).
8 Take the connection cable and put the plug onto the
appropriate socket.
9 An example of the connection cable with a female socket
and a male socket.
10 IMPORTANT: Put the connector stop on EVERY last
module (or module with no through-wiring), to make the
line IP66.
10
11
11 Connect the female connector to the main power cable
and connect this main power cable to the power grid.
Important note:
The maximum amount of GreenPower LED toplighting - high output
modules is 15 pcs per phase on a 16 A C-type circuit breaker.
Not allowed to use >16 A circuit breakers and increasing the module
amounts per phase due to internal wire dimensions and higher
current!
Risk group 2
Photo Biological Hazard (EN 62471)
GreenPower LED toplighting - high
output module DR/B is for retinal blue
in the riskgroup 2 and for the rest in
Risk group EXEMPT.
Ordering data and specifications Philips GreenPower LED toplighting - high output (continuous line)
GreenPower LED toplighting
mounting bracket for
continuous line installation
GreenPower LED toplighting
mounting bracket for
non-continuous line installation
GreenPower LED toplighting
connection cable for non
continuous line installation
Philips GreenPower
Photon
Power
LED toplighting - high output module
flux * / **
consumption
μmol/s
W
GreenPower LED toplighting
connector for connection to
mains power cable
Lifetime * Ingress
Power
protection factor
(typical) **
GreenPower LED toplighting
connector stop
Input
Order code
voltage
rating
cos ϕ
hours
VAC
12 NC
Deep red/blue (DR/B)
GreenPower LED toplighting mod. DR/B LB 400V
520
190
25,000
IP66
0.95
400
9290 009 88506
GreenPower LED toplighting mod. DR/B MB 400V
520
195
25,000
IP66
0.95
400
9290 009 88606
GreenPower LED toplighting mod. DR/B HB 400V
520
200
25,000
IP66
0.95
400
9290 009 88706
Deep red/white (DR/W)
GreenPower LED toplighting mod. DR/W LB 400V
520
195
25,000
IP66
0.95
400
9290 009 88806
GreenPower LED toplighting mod. DR/W MB 400V
520
200
25,000
IP66
0.95
400
9290 009 88906
GreenPower LED toplighting mod. DR/W Vision 400V
430
190
25,000
IP66
0.95
400
9290 009 89006
410
175
25,000
IP66
0.95
400
9290 009 89106
Deep red/white/far red (DR/W/FR)
GreenPower LED toplighting mod. DR/W/FR_2 MB 400V
Accessories
GreenPower LED toplighting mounting bracket (continuous line) 1)
9290 009 15106
GreenPower LED toplighting mounting bracket (non-continuous line)
9290 009 15206
GreenPower LED toplighting jumper cable (1,0 mtr) 2)
9290 009 15306
GreenPower LED toplighting jumper cable (2,0 mtr) 2)
9290 009 16006
GreenPower LED toplighting male connector
9290 009 15406
GreenPower LED toplighting female connector
9290 009 15506
GreenPower LED toplighting end cap 3)
9290 009 15606
* Lifetime and maintenance values are given at an ambient temperature of 25 °C.
1)
Stainless steel ø2.0 mm wire clip including ‘locking plate’ to fix the modules in an axial direction to prevent the modules working loose as a result of vibrations
2)
3 x 1.5 mm2 conductors, 2-sided ‘male / female connector
3)
To ensure IP66 rating for every single mounted or last module in a continuous line!
© 2015 Royal Philips N.V. All rights reserved. Philips reserves the right to
make changes in specifications and/or to discontinue any product at any
time without notice or obligation and will not be liable for any
consequences resulting from the use of this publication.
Document order number: 3222 635 70067 - HO international
06/2015
Data subject to change.
For more information about
Philips horticulture LED Solutions visit:
www.philips.com/horti
Write us an e-mail:
horti.info@philips.com
Or tweet us:
@PhilipsHorti