Advertisement
Advertisement
Installation Guide
CVCJBB / CVCJBBW
Bullet Junction Box
Compatible Model s
• CVC5100BPVF, CVC5200BPVF
• CVC5815DNV, CVC5915DNV
• HTINTB8, HTINTB9, HTINTB10
• HTINTB8G, HTINTB10G
• HTB11FFi
• HT5100BPVFG, HT5200BPVFG
• OB1, OINT56B1G
Package Contents
The following items are included in this package.
• CVCJBB / CVCJBBW
• 1 Base Sponge Gasket
• 4 Tapping Screws #8 x 25
• 4 Hexagon Socket Screws M5 x 10
Dimensions
Front View
1.18” dia
Side View
1.73”
1.69”
Optional Accessories
INTCM
200 New Highway, Amityville NY 11701
800.645.5516 / www.specotech.com
Pole/Corner Mount
Installation Instruction Diagram
1-1. Install junction box onto the wall by using the screws provided.
WALL
JUNCTION BOX ASSEMBLY
SPONGE
TAPPING SCREW #8X25, 4EA
Installation Guide
CVCJBB / CVCJBBW
Installation Instruction Diagram
1-2. Install INTCM onto pole or wall.
1-3. Install junction box onto INTCM as shown in the image below.
JUNCTION BOX ASSEMBLY
SPONGE
HEXAGON SOCKET SCREW M5X10, 4EA
2. Arrange each piece as shown in the image below.
3. Fasten the camera onto the junction box.
BRACKET ASSEMBLY
HEXAGON SOCKET SCREW M5X10, 4EA
200 New Highway, Amityville NY 11701
800.645.5516 / www.specotech.com

Public link updated
The public link to your chat has been updated.
Advertisement