PW 6080

PW 6080
Installation recommendations
Washer-extractor
PW 6080 EL AV/LP
en - GB
11.09
Mat. no. 07 780 680 / 01
It is essential to read the operating and installation instructions before
installing, commissioning or using the machine.
This avoids the risk of accidents or damage.
All rights reserved
Mat. no. 07 780 680 / 01
2
Technical Datasheet
Washer-extractor:
Heating:
PW 6080 AV/LP
Electric (EL)
Legend:
Circled, bold-type abbreviations:
Connection required
Abbreviations surrounded by broken circle:
Connection optional or required, depending on model
Optional extras:
UM
BS
Miele plinth
Concrete plinth
UO 6008 (UO = Open plinth)
Height
Width
Depth
mm
mm
mm
305
680
679
UG 6008 (UG = Closed plinth)
Height
Width
Depth
mm
mm
mm
305
692
685
US 6008 (US = Plinth with drawer)
Height
Width
Depth
mm
mm
mm
320
692
685
mm
mm
mm
mm
300
70
≥700
≥700
1. Standard voltage (as supplied)
Frequency
Rated load
Fuse rating
Connection cable cross-sectional area
Connection cable length
Connection cable without plug
(supplied as standard)
V
Hz
kW
A
mm²
mm
3N AC 400
50
8.2
3 × 16
5 × 1.5
2000
1. Standard voltage (as supplied)
Frequency
Rated load
Fuse rating
Connection cable cross-sectional area
Connection cable length
Connection cable without plug
(supplied as standard)
V
Hz
kW
A
mm²
mm
1N AC 220 - 240
50
5.05 – 6.0
1 × 25
3 × 2.5
2000
1. Standard voltage (as supplied)
Frequency
Rated load
Fuse rating
Connection cable cross-sectional area
Connection cable length
Connection cable without plug
(supplied as standard)
V
Hz
kW
A
mm²
mm
3 AC 230
50
8.2
3 × 20
4 × 2.5
2000
Concrete plinth (min. quality C12/15)
Recommended height
Minimum height
Recommended width
Recommended depth
It must be ensured that the om-site concrete plinth is
anchored to the floor!
Machine connections:
Electrical
connection
Country variations:
Technisches Datenblatt / Technical datasheet: PW 6080 EL AV/LP
Datum / Date: 28.10.2009
Seite / Page: 8
Non-standard voltages:
OS 440
1. Standard voltage (as supplied)
Frequency
Rated load
Fuse rating
Connection cable cross-sectional area
Connection cable length
Connection cable without plug
(supplied as standard)
V
Hz
kW
A
mm²
mm
3 AC 440
60
7.9
3 × 16
4 × 1.5
2000
kPa
kPa
l/min
Inch
mm
100
1000
11
¾" external thread
1550
l/h
Approx. 70
°C
kPa
kPa
l/min
Inch
mm
70
100
1000
11
¾" external thread
1550
l/h
Approx. 70
kPa
kPa
l/min
Inch
mm
100
1000
11
¾" external thread
1550
l/h
Not yet available
Electrical connection must be in accordance with local and
national regulations.
Plug and socket connection in accordance with IEC/EN
60309 and IEC/EN 60947 recommended to facilitate
electrical safety tests.
If the machine is connected via a fixed connection, a multipole switch must be provided on site to ensure complete
isolation. Switches with a contact opening of more than 3 mm
should be used. Such switches are, e.g., LS switches, fuses
and contactors (IEC/EN 60947).
A wall socket or mains isolator must be visible and accessible
after installation.
A new connection, modification of an existing installation or
earth checking, including the determination of suitable fuse
rating, may only be carried out by a suitably qualified
electrician in accordance with all local and national
regulations.
Cold water
(soft water)
Min. flow pressure
Max. pressure
Max. throughput
On-site connection thread according to DIN 44 991
Length of connection hose
(parts supplied: 1 connection hose)
Water requirements (average for 60°C programme)
With standard connection (with hot water)
If hot water supply is not available, a sufficient supply of cold
water must be ensured.
If connected to an alternative water supply (optional), subtract
cold water volume.
Hot water
(soft water)
Max. temperature
Min. flow pressure
Max. pressure
Max. throughput
On-site connection thread according to DIN 44 991
Length of connection hose
(parts supplied: 1 connection hose)
Water requirements (average for 60°C programme)
It is possible to connect the machine to a very hot water
supply with temperature from 70°C to max. 85°C. For this a
special connection hose is required. This special hose is
available from the Miele Spares Dept.
In addition, the Miele Service Dept. or an authorised dealer
must reprogram the machine accordingly.
If a hot water supply is not available, connect the hot water
hose to a cold water supply!
Alternative water
supply
(Optional)
Min. flow pressure
Max. pressure
Max. throughput
On-site connection thread according to DIN 44 991
Length of connection hose
(parts supplied: 1 connection hose)
Water requirements (average for 60°C programme)
Technisches Datenblatt / Technical datasheet: PW 6080 EL AV/LP
Datum / Date: 28.10.2009
Seite / Page: 9
Waste water
Model with dump
valve
Max. temperature
Machine waste water connection (external diameter)
On-site drain (internal diameter)
Max. transient throughput
°C
mm
mm
l/min
70
75 [DN 70]
75 [sleeve DN 70]
62
°C
mm
mm
70
22 [DN 22]
22 × 30
l/min
mm
26
1000
Vented drainage required. If ventilation is insufficient, fit Miele
kit, Mat. no. 05238090.
Drain manifolds serving several machines must be of
sufficient cross-section.
Drainage via
drain pump
Max. temperature
Drain hose (inner diameter)
On-site hose sleeve for drain hose
(inner diameter x length)
Max. transient throughput
Max. head height (measured from base of unit)
Vented drainage required. If ventilation is insufficient, fit Miele
kit, Mat. no. 05238090. .
Drain manifolds serving several machines must be of
sufficient cross-section.
Fittings
(supplied)
Machine data
Miele plinth UG/UO 6008
4 × fasteners (to secure machine to plinth)
4 × screws DIN 571 (Ø × length)
mm
4 × rawl plugs (Ø × length)
mm
Machine must be bolted to the floor!
Fixing materials for floating screed floor to be provided on site
8 × 65
12 × 60
Miele plinth US 6008
4 × fasteners (to secure machine to plinth)
4 × screws DIN 571 (Ø × length)
mm
4 × rawl plugs (Ø × length)
mm
Machine must be bolted to the floor!
Fixing materials for floating screed floor to be provided on site
6 × 50
8 × 40
On concrete plinth
2 × metal brackets
2 × screws DIN 571 (Ø × length)
mm
2 × rawl plugs (Ø × length)
mm
Machine must be bolted to the floor!
Fixing materials for floating screed floor to be provided on site
6 × 50
8 × 40
Machine width
Machine depth
Machine height
Casing width
Casing depth
mm
mm
mm
mm
mm
700
727
1020
692
690
Min. access width to installation site
Minimum rear wall gap (measured to front of machine)
Minimum wall gap (to front edge of machine)
With an installation with the minimum gap, additional work
may be required when service or repair work is necessary.
mm
mm
mm
720
1100
900
Net weight
Dynamic floor load, max.
Static floor load, max.
Dynamic load, max.
Drum frequency, max.
Average heat dissipation
(dependent on ambient room temperature and programme
selected)
kg
N
N
N
Hz
W
140
2600
1850
750
22
Not yet available
Sound pressure level (re 20 mPa),
(measured at a distance of 1 m from the machine and at a
height of 1.6 m)
dB (A)
<70
Installation should only be carried out by authorised fitters in accordance with valid regulations!
Observe installation instructions when installing machine! All rights reserved! Dimensions in mm
Technisches Datenblatt / Technical datasheet: PW 6080 EL AV/LP
Datum / Date: 28.10.2009
Seite / Page: 10
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement