Mitsubishi Electric MXZ-2D 52VA Split-type Air-Conditioner Installation Manual

Below you will find brief information for Split-type Air-Conditioner MXZ-2D 52VA. This manual describes how to install the outdoor unit of the Split-type Air-Conditioner MXZ-2D 52VA. The manual includes detailed instructions on connecting the wires, flaring the pipes, purging the system, and performing the leak test. The manual also includes instructions on how to pump down the system when relocating or disposing of the Split-type Air-Conditioner MXZ-2D 52VA.

PDF Download
Document
Split-type Air-Conditioner MXZ-2D 52VA Installation Manual | Manualzz

Advertisement

Advertisement

Advertisement

Key features

  • Outdoor unit installation
  • Flaring work and pipe connection
  • Purging procedures, leak test, and test run
  • Pumping down

Frequently asked questions

Remove the service panel, loosen the terminal screw, and connect the indoor/outdoor unit connecting wire (B) from the indoor unit correctly on the terminal block. Be careful not to make mis-wiring. Fix the wire to the terminal block securely so that no part of its core is appeared, and no external force is conveyed to the connecting section of the terminal block. Firmly tighten the terminal screws to prevent them from loosening. After tightening, pull the wires lightly to confirm that they do not move. Perform the same steps for each indoor unit. Connect the power supply cord (A). Fix the indoor/outdoor unit connecting wire (B) and power supply cord (A) with the cable clamps. Close the service panel securely. Make sure that 3-2. PIPE CONNECTION is completed.

Cut the copper pipe correctly with a pipe cutter. Completely remove all burrs from the cut cross section of the pipe. Aim the copper pipe downward while removing burrs to prevent burrs from dropping in the pipe. Remove flare nuts attached to indoor and outdoor units, then put them on the pipe having completed burr removal (Not possible to put them on after flaring work). Perform flaring work. Firmly hold the copper pipe in the dimension shown in the table. Select A mm from the table according to the tool selected. Check the flared work by comparing it to the figure in the manual. If the flare is defective, cut off the flared section and do the flaring work again.

Remove the service port cap of the stop valve on the side of the outdoor unit gas pipe. Connect the gauge manifold valve and vacuum pump to the service port of the stop valve on the gas pipe side of the outdoor unit. Run the vacuum pump for more than 15 minutes. Check the vacuum with the gauge manifold valve, then close the gauge manifold valve and stop the vacuum pump. Leave the system as it is for one or two minutes. Make sure the pointer of the gauge manifold valve remains in the same position, and that the pressure gauge shows -0.101 MPa [Gauge] (-760 mmHg). Remove the gauge manifold valve quickly from the service port of the stop valve. Fully open all stop valves on the gas pipe and the liquid pipe. Charge the prescribed amount of refrigerant if needed. Be sure to charge slowly with liquid refrigerant. Tighten the cap of the service port to obtain the initial status.
Preparing document for printing…
0%