W2VS SIGNAL TRANSMITTER BEFORE USE .... INSTRUCTION MANUAL

W2VS SIGNAL TRANSMITTER BEFORE USE .... INSTRUCTION MANUAL
W2VS
INSTRUCTION MANUAL
SIGNAL TRANSMITTER
BEFORE USE ....
Thank you for choosing M-System. Before use, please check
contents of the package you received as outlined below.
If you have any problems or questions with the product,
please contact M-System’s Sales Office or representatives.
■ PACKAGE INCLUDES:
Signal conditioner (body + base socket + input resistor)...... (1)
Input resistor is provided only with current input type.
■ MODEL NO.
Confirm that the model number described on the product is
exactly what you ordered.
■ INSTRUCTION MANUAL
This manual describes necessary points of caution when
you use this product, including installation, connection and
basic maintenance procedures.
POINTS OF CAUTION
■ NONINCENDIVE APPROVAL OPTION
•This equipment is suitable for use in Class I, Div. 2, Groups
A, B, C and D or Non-Hazardous Locations only.
•WARNING!Before You Remove the Unit from Its Base
Socket or Mount It, Turn Off the Power Supply and Input
Signal for Safety.
•WARNING!– Explosion Hazard –
Substitution of any Components May Impair Suitability
for Class I, Div. 2.
•WARNING!– Explosion Hazard –
Do Not Disconnect Equipment Unless Power Has Been
Switched Off or The Area is Known To Be Non-Hazardous.
•The equipment was evaluated for use in the ambient temperature and relative humidity as mentioned in ‘ENVIRONMENT’ section.
•The input and output wiring must be in accordance with
Class I, Div. 2 wiring methods and in accordance with the
authority having jurisdiction for use in these hazardous
locations.
■ CONFORMITY WITH EC DIRECTIVES OR UL
• This equipment is suitable for Pollution Degree 2 and Installation Category II. Reinforced insulation (signal input
or output 1 or output 2 to power input: 300V) and basic
insulation (signal input to output 1 or output 2: 300V) are
maintained. Prior to installation, check that the insulation class of this unit satisfies the system requirements.
•Altitude up to 2000 meters
•The equipment must be mounted inside a panel.
•The equipment must be installed such that appropriate
clearance and creepage distances are maintained to conform to CE/UL requirements. Failure to observe these requirements may invalidate the CE/UL conformance.
■ POWER INPUT RATING & OPERATIONAL RANGE
•Locate the power input rating marked on the product and
confirm its operational range as indicated below:
100 – 240V AC rating: 85 – 264V (90 – 264V for UL),
47 – 66 Hz, approx. 4 – 6VA
24V DC rating: 24V ±10%, approx. 3W
11 – 27V DC rating: 11 – 27V, approx. 3W
110V DC rating: 85 – 150V (110V ±10% for UL), approx. 3W
■ GENERAL PRECAUTIONS
•Before you remove the unit from its base socket or mount
it, turn off the power supply and input signal for safety.
MODEL
W2VS
■ ENVIRONMENT
•Indoor use
•When heavy dust or metal particles are present in the air,
install the unit inside proper housing with sufficient ventilation.
•Do not install the unit where it is subjected to continuous
vibration. Do not subject the unit to physical impact.
•Environmental temperature must be within -5 to +55°C (23 to 131°F) with relative humidity within 30 to 90% RH
in order to ensure adequate life span and operation.
•Be sure that the ventilation slits are not covered with cables, etc.
■ WIRING
•Do not install cables (power supply, input and output)
close to noise sources (relay drive cable, high frequency
line, etc.).
•Do not bind these cables together with those in which
noises are present. Do not install them in the same duct.
■ AND ....
•The unit is designed to function as soon as power is supplied, however, a warm up for 10 minutes is required for
satisfying complete performance described in the data
sheet.
•With voltage output, do not leave the output terminals
shortcircuited for a long time. The unit is designed to endure it without breakdown, however, it may shorten appropriate life duration.
COMPONENT IDENTIFICATION
Body
Fixing Screw
Base Socket
Model
Input Resistor
Output 1
Zero Adj.
Span Adj.
ZERO
SPAN
Connection
Diagram
ZERO
Output 2*
Zero Adj.
SPAN
Specifications
Span Adj.
*Provided only for dual output.
INSTALLATION
Loosen the fixing screw at the front of the unit in order to
separate the body from the base socket.
■ DIN RAIL MOUNTING
Set the base socket so that
its DIN rail adaptor is at
the bottom. Position the
upper hook at the rear side
of base socket on the DIN
rail and push in the lower.
When removing the socket,
push down the DIN rail
adaptor utilizing a minus
screwdriver and pull.
■ WALL MOUNTING
Refer to “EXTERNAL DIMENSIONS.”
5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201 Fax: +81(6)6659-8510 E-mail: [email protected]
DIN Rail
35mm wide
Spring Loaded
DIN Rail Adaptor
EM-5518 Rev.6
P. 1 / 2
W2VS
TERMINAL CONNECTIONS
ADJUSTMENT PROCEDURE
Connect the unit as in the diagram below or refer to the connection diagram on the side of the unit.
When an input resistor is provided with the module, attach
it together with input wiring to the input screw terminals.
This unit is calibrated at the factory to meet the ordered
specifications, therefore you usually do not need any calibration.
For matching the signal to a receiving instrument or in case
of regular calibration, adjust the output as explained in the
following.
+
INPUT
–
R
*
1
7 +
2
8 –
OUTPUT 1
3 +
6 –
OUTPUT 2
10 U(+)
POWER
11 V(–)
The section enclosed by broken line is only with 2nd output option.
*Input shunt resistor attached for current input.
■ HOW TO CALIBRATE THE OUTPUT SIGNAL
Use a signal source and measuring instruments of sufficient
accuracy level. Turn the power supply on and warm up for
more than 10 minutes.
1) ZERO: Apply 0% input and adjust output to 0%.
2) SPAN: Apply 100% input and adjust output to 100%.
3) Check ZERO adjustment again with 0% input.
4) When ZERO value is changed, repeat the above procedure 1) – 3).
5) Go through the same procedure for the Output 2.
MAINTENANCE
CHECKING
1) Terminal wiring: Check that all cables are correctly connected according to the connection diagram.
2) Power input voltage: Check voltage across the terminal
10 – 11 with a multimeter.
3) Input: Check that the input signal is within 0 – 100% of
the full-scale.
4) Output: Check that the load resistance meets the described specifications.
Regular calibration procedure is explained below:
■ CALIBRATION
Warm up the unit for at least 10 minutes. Apply 0%, 25%,
50%, 75% and 100% input signal. Check that the output
signal for the respective input signal remains within accuracy described in the data sheet. When the output is out of
tolerance, recalibrate the unit according to the “ADJUSTMENT PROCEDURE” explained earlier.
EXTERNAL DIMENSIONS unit: mm (inch)
■ TERMINAL ASSIGNMENTS
19 (.75)
INPUT RESISTOR
(model: REM2)
6 (.23)
5 4
9
29.5 (1.16)
21.5(.87)
10 (.39)
9
8 7
8 7
11 10
11 10
22 (.87)
5 4
72 (2.83)
6
6
4
(.16)
11–M3
SCREW
3 2 1
3 2 1
59 (2.32)
2–4.2x5
(.17x.20)
MTG HOLE
6 (.24) deep
53 (2.09)
88.5 (3.48)
DIN RAIL
35mm wide
Input shunt resistor attached
for current input.
84 (3.31)
114 (4.49)
[4 (.16)]
• When mounting, no extra space is needed between units.
5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201 Fax: +81(6)6659-8510 E-mail: [email protected]
EM-5518 Rev.6
P. 2 / 2
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement