BAND-IT Band-Lok Installation Instructions

BAND-IT Band-Lok Installation Instructions
Installation
Instructions
BAND-LOK Ties
Warning:
Always wear safety glasses when assembling and tensioning ties.
2. Wrap tie around object. Insert
tail end of tie through slot at
opposite end.
4. Using tin snips cut tail end
so that approximately 1/4”
extends out from the hood.
3. With needle nose pliers
pull tie to desired tension.
1. Bend tail back over the hood.
5. With needle nose pliers tuck tail end
under the hood (bend hood up slightly
if necessary).
6. Tap the tail and hood down
lightly for a lower profile.
For consistent automatic tensioning of multiple ties, use the A95079 hand tool. This
tool will insure consistency by automatically cutting off after a desired tension in
reached.
Refer to website for warranty information:
http://www.band-it-idex.com/warranty.html
WWW.CABLEJOINTS.CO.UK
THORNE & DERRICK UK
TEL 0044 191 490 1547 FAX 0044 477 5371
TEL 0044 117 977 4647 FAX 0044 977 5582
WWW.THORNEANDDERRICK.CO.UK
BAND-IT-IDEX, Inc.
A Unit of IDEX Corporation
4799 Dahlia Street
Denver, CO 80216-3070 USA
P: 1-800-525-0758
F: 1-800-624-3925
www.BAND-IT-IDEX.com
Page 1 of 1
Document # P98187 rev. B
© Copyright
BAND-IT-IDEX, Inc. 2006
All rights reserved
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement