- Industrial & lab equipment
- Electrical equipment & supplies
- Maxon
- GPSS 33 X1
- Installation manual
- 13 Pages
Maxon GPSS 33 X1 Installation manual
Maxon GPSS 33 X1 provides you with a highly functional and reliable solution for lifting and transporting heavy loads of up to 3,300 lbs. This versatile liftgate is constructed with a durable powder-coated steel frame, ensuring longevity and resilience even under demanding conditions. The platform dimensions of 86.6" x 57" offer ample space for accommodating various types of cargo.
The Maxon GPSS 33 X1 boasts a maximum lifting height of 57" and a generous tilt angle of 70 degrees when fully extended. This feature allows for effortless loading and unloading operations, even in confined spaces. Whether it's heavy equipment, construction materials, or bulky items, this liftgate handles the task with ease.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
Slidelift
Installation manual
Lift CORP.
11921 Slauson Avenue.
Santa Fe Springs, CA 90670
(800) 227 - 4116
GPSS 33 X1
Document no.: S 20 907 783
Version 11.05.2005
Installation Manual
GPSS 33 X1
Introduction
This installation manual contains all instructions necessary to install the Slidelift and adjust it to the chassis or trailer it was designed for. To determine whether the Slidelift may be installed on a certain vehicle, please contact us. We will provide the necessary information.
If the Slidelift needs to be modified or if it is necessary to deviate from these installation instructions, a written approval from MAXON Lift Corp. needs to be obtained first. Unapproved modifications and deviations from this installation manual may lead to failure and to operating interruptions as well as to hazards for the operator. The warranty for the Slidelift will be voided by "unapproved modifications" and
"deviations from the installation directions."
The mounting guidelines of the chassis manufacturer need to be complied with!
Check for damages after arrival
For damages on the liftgate which occurred during transportation, the shipping/forwarding company will be responsible. The lift needs to be checked for damages upon arrival. If any damages occurred during transportation, they need to be recorded on the waybill, so that claims can be raised. Insurance claims can be settled only by Maxon Lift CORP. and the shipping/forwarding company or its insurance.
Trailer hitch
If the vehicle has a trailer hitch, the clearance of the shaft axle to the liftgate and the overall length need to be guaranteed by the installer.
Installation-Safety Precautions
• Before installing, the battery of the vehicle needs to be disconnected. The vehicle needs to be secured against all unintentional shifting.
• The plugs for electronic systems as for example ABS needs to be pulled before welding. Fuel lines, air hoses of the brake system, and cables in the installation area need to be protected against damages.
• Any special safety regulations (if applicable) need to be complied with.
• Safety gear, like protective goggles, work gloves and work boots, need to be made available before installing and are to be used if necessary.
• Safety devices on cranes, forklifts, and other lifting gear necessary for installing are to be checked to see if they are in proper working condition before they are used.
Document no.: S 20 907 783
Installation manual Page 1
Modell GPSS 33 X1
Version 11.05.2005
Vehicle preparation
Remove the underride bumper and the tail lights. If there are any U-shaped mounting brackets with threads on both sides, brackets, rivets, spare wheels, or couplings in the installation area of the mounting plates, they need to be removed. If necessary, remove hinges and latches. Cut out openings in the rear frame according to our suggestions chapter "openings in the Rear Frame" on pages 3.
The cabin of the truck should be protected against dirt using protective cloth material
Document no.: S 20 907 783
Installation manual Page 2
Modell GPSS 33 X1
Version 11.05.2005
Rear frame cut outs
Document no.: S 20 907 783
Installation manual Page 3
Modell GPSS 33 X1
Version 11.05.2005
Installation
Standard Platform
Heavy Duty Platform
Standard Platform + 4”
Document no.: S 20 907 783
Installation manual Page 4
Modell GPSS 33 X1
Version 11.05.2005
Installation instructions
Installation of the electrical equipment
The installation of the electrical equipment should be done before the mounting of the Slidelift itself because at this stage it will be easier to do so (more space available) . scematic Æ page no.: 3
Connect the set "main circuit fuse" to the battery terminal clip at the positive pole of the battery.
Connect the main circuit cable (positive from the main circuit fuse) to the pump box of the Slidelift.
Connect it to the power relay. Connect the earth cable from the motor to the negative pole of the battery or, if authorized by the vehicle manufacturer, to the chassis at a scraped clean spot. Take the platform foot control cable along the lifting arm to the pump box and connect it according to the wiring diagram.
The mounting guidelines of the chassis manufacturer need to be complied with!
Document no.: S 20 907 783
Installation manual Page 5
Modell GPSS 33 X1
Version 11.05.2005
Slidelift Installation
The Slidelift is completely pre-mounted. The installation is fast and easy. Simply load the Slidelift onto a forklift truck or a pallet jack, drive it under the vehicle's chassis and adjust it according to the maximum vehicle measurements (see installation table underneath) in height and length.
The Slidelift must be installed parallel to the truck's and/or trailers loading platform.
Weld the mounting plates located on beam 1 and 2 on both sides and in addition from underneath or from above on their full length.
If you obtained an installation drawing from Maxon Lift Corp. (serial number of the Slidelift stated on the drawing) the installation must be performed according to the measurements given with that drawing.
Finel adjustments of the platform to the vehicle bed (A):
ove the hoisting gear with the opened platform hydraulically behind the rear frame. For the adjustment, the lift arms are not to touch the rear frame. Between the rear frame and lift arms, there should be a space of 3/8”. With the adjusting screws, the hoisting gear will be adjusted until try vehicle floor and the platform are parallel. After the adjustment, both screws of the anti-underride fastening are to be tightened.
A
B
A
B
Adjusting the liftheight (B).
After the installation of the Slidelift, please slide out the frame completely, lift the platform to the same height than the vehicle floor and, in that position, slide it back against the chassis frame of the vehicle.
Then slide the stops on both sides against the sliding frame of the lift and secure them.
Document no.: S 20 907 783
Installation manual Page 6
Modell GPSS 33 X1
Version 11.05.2005
A A
A
Warning
Welding
Prior to any welding operations, the battery and additional equipment such as anti-blocking and anti-slide controls are to be disconnected (see instructions given by the vehicle manufacturer).
For steel, please use E 5153 B 10 DIN 1913 as additional welding material.
Model
GPSS 33-X1
Joint thickness a min
¼”
Warning
The ground clamp of the welding device must be attached directly to one of the parts to be welded.
Otherwise, the hydraulic cylinders may be damaged.
Document no.: S 20 907 783
Installation manual Page 7
Modell GPSS 33 X1
Version 11.05.2005
Operating the Slidelift
First operation
Check operation readyness. Check all moving parts for free move (no abrasion on hoses, cables, etc.).
Check the hydraulics for leaks.
Hydraulic oil – recommendations
OIL SPECIFICATIONS
Grade ISO - (32)
Gravity, API - 29.5 Degrees
Pour Point, F - (-54 Degrees)
VISCOSITY
@ 40 Degrees C - 31.2 cSt
@ 100 Degrees C - 6.2 cSt
VISCOSITY INDEX - 154 VI
Flash Point, F - 325 Degrees
Oil fill up or change
1. sliding out
2. lower max.
min.
4. oil fill up
1.
2.
3.
Hydrau lic oil
Painting the lift gear
The lift gear is powder-coated black. If another color is required, the bodybuilder or installer needs to provide for this. (Note that the powder-coated surface needs to be roughened before it can be painted.)
Warning
Please observe that the black cylinder rods need to be covered before they can be painted; remove color paint and covering material from the cylinder rods after painting. Otherwise, the Cylinder seals get damaged and the warranty will be void.
Operating information’s
Stick "Operating Information" decal on the hand control box.
For problems please contact our Technical Service Department.
Document no.: S 20 907 783
Installation manual Page 8
Modell GPSS 33 X1
Version 11.05.2005
Load trial run
Static test
Move the platform vertically to the ground. Place a test load of up to 50% of the rated capacity within the loading distance onto the platform. The loading distance and the rated capacity are engraved on the identification plate which should be fixed to the Slidelift. The loading diagram shows the possible load when changing the loading distance. Test to capacity additional 5 times.
The installer must check the Slidelift for deformation after the static test.
Dynamic test
The functions lifting, lowering, and tilting are to be checked using loads as indicated in the loading diagram.
For problems please contact our Technical Service Department.
Check against lifting an overload
A test needs to guarantee that a load of more than 125% of the maximum rated capacity can not be lifted off the ground.
Safety device check
Let all functions reach their maximum points until the safety devices respond.
Prior to delivery to customer, make sure the platform carriage moves smoothly out without side to side interference and locks into the Quick Lock position. See page (8) for drawings.
Document no.: S 20 907 783
Installation manual Page 9
Modell GPSS 33 X1
Version 11.05.2005
Torque table for all supplied and installed screws on Maxon liftgates
Screw Size
8.8
Tightening
Torque
in ft. lb
Screw
Connections
Tightening
Torque in ft. lb
M12
M14
59
96
Nuts
M16 x 1.5
M18 x 1.5
10.9
M14 132
M16 202
M20 398
Y1 – Y3 – YA - YN - YM 18
Starter Solonoid
M8 8
Battery Capacity
Model GPS 33 X1
Size 2 groupe 31 - 12VDC - parallel
44
44
Document no.: S 20 907 783
Installation manual Page 10
Modell GPSS 33 X1
Version 11.05.2005
PLATFORM left lamp is out, if FH is pressed and
S2 switched at horizontal platform position.
left lamp is out also, if FS is pressed and
S4 switched if platform is on ground (lift-cylinder is without pressure).
right lamp is out, if foot switch FH or FS is pressed or handheld controlbox is in use.
WARNING - LAMPS
S7
Hg-switch for warning lamps
PLATFORM-CABLE
-with warning lamps and foot-control : 20 906 373
-only with S2 : 20 906 374
FH
FS
FOOT-CONTROL-UNIT
20 903 572 mercury-switch
Hg - switch
S2
1
20 906 378 CONTROL-UNIT GPS 12 V
ON-OFF SWITCH lamp + test S2,S4
40 cm 40 cm
DRIVE-OUT
DRIVE-IN
1 - YA
2 - KM
3 - YN
4 - YM
5 - 31
1
YM YN sliding-cylinders
Y1 tilt-cylinder
Y3 lift-cylinder
P
S4 pressureswtich lamp + test FH,FS
LIFT
TILT-UP
LOWER
TILT DOWN
DRIVE IN
DRIVE OUT
TILT-UP
LIFT
LOWER
TILT-DOWN
YM YN KM YA
X
Y1 Y3
X
S2 S4
X X
X X X
X
X
X
X X
X X
X
X
X X
X
X
X
X
X X
X
X
50 cm
50 cm
1 - lift
2 - lower
3 - + (gr/ye)
1
1 - +
2 - +
3 - Y3
4 - Y1
5 - 31
1
1
2
SWITCH
POWER-PACK 1
POWER-PACK 2
HANDHELD CONTROLBOX
20 906 387
1 - +
2 - FH
3 - FS
4 - S2
5 - 31
6 - frei 30 - batteryplus
31 - batteryminus
KM - motorrelay
YA - solenoid in power-pack
Y1 - solenoid tilt-cylinder
Y3 - solenoid lift-cylinder
YM - solenoid sliding-cylinder
YN - solenoid sliding-cylinder
S2 - Hg-switch lift
S4 - pressure-switch tilt down
S7 - Hg-switch warning lamps
Th - motor-thermoswtich
FH - footcontrol lift
FS - footcontrol lower
®
YM YN
SERVICE-SWITCH
YA Y3
Th
KM
SERVICE-SWITCH
Y1
YA1
POWER-PACK
31
KM1 motor-relay
FUSE 250 A
Th
KM2 motor-relay
FUSE 250 A
30
YA2
31 31
SERIE X1
DATE:
Ini.:
CONTROL-UNIT GPS
27.08.2007
20 907 148
advertisement