Sulzer Synconta 801, 901, 901L, 902, 902L Lifting Station Installation and Operating Instructions
Below you will find brief information for Synconta 801, Synconta 901L, Synconta 902L. The Synconta lifting station is a prefabricated, corrosion-resistant sump designed for wastewater disposal in buildings that are below the backflow level. It can be installed outside the building on open ground with suitable lid for vehicular traffic. The station includes a submersible pump, control unit, and discharge line, and should be inspected and maintained regularly in accordance with EN 12056.
advertisement
Assistant Bot
Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.
Lifting Station Type ABS Synconta 801 - 902L
EN
Installation and Operating Instructions
www.sulzer.com
2 Installation and Operating Instructions
Lifting Station Type ABS Synconta 801 - 902L
Lifting Station Type ABS Synconta
801 901 901L
902 902L
Contents
1 General ...................................................................................................................................................3
1.1 Application areas .....................................................................................................................................3
1.2
1.3
Layout of the Synconta tank and installation example as single pumping station in accordance with EN 12056 for drainage of buildings and sites. ................................................................................. 3
Commentary on the legal DIN EN regulations covering the use of lifting stations for the pumping of effluent containing faecal matter. .......................................................................................... 4
1.4 Sulzer high level coupling with discharge pipe pump suspension.
(Synconta 901-902 only) .........................................................................................................................5
1.5 Description ..............................................................................................................................................5
4.2
4.3
4.4
4.5
2 Safety .....................................................................................................................................................6
3 Transport ................................................................................................................................................6
4
4.1
Set-up and installation ..........................................................................................................................6
Installation of the collection tank .............................................................................................................6
Opening of the collection tank inlet ports ................................................................................................ 6
Filling in of the pit ....................................................................................................................................7
Discharge line .........................................................................................................................................7
Level control (Synconta 901 and 902 only) ............................................................................................. 8
4.6 Installation of the control unit ..................................................................................................................8
5 Commissioning .....................................................................................................................................8
6 Maintenance ..........................................................................................................................................9
6.1 Maintenance of lifting stations in accordance with EN 12056 ................................................................. 9
6.2 General maintenance hints .....................................................................................................................9
Sulzer reserves the right to alter specifications due to technical developments
Installation and Operating Instructions 3
Lifting Station Type ABS Synconta 801 - 902L
1 General
1.1 Application areas
Synthetic, prefabricated, corrosion-resistant sump for Sulzer submersible pumps designed as a single pumping station for automatic pumping of wastewater and sewage in accordance with EN 12056 from locations and areas below the backwash level.
m These lifting stations may not be used for the collection or pumping of flammable or corrosive liquids.
Effluent containing grease, petrol, or oil should only be brought to the lifting station via a separation device.
1.2 Layout of the Synconta tank and installation example as single pumping station in accordance with EN 12056 for drainage of buildings and sites.
Figure 1: Installation example Synconta 901 and 902
Legend
1 Sulzer submersible pump
2 Sulzer coupling above water level, self sealing
3 Ball checkvalve
4 Ball shut-off valve
5 Measuring device (submerged tube) for pneumatic level control
6 Pressure line
7 Four inlet pipes DN 150
8 Vent/cable pipe DN 100, lead to above roof level
9 Cable duct
10 Sulzer control unit, can be chosen with cabinet
ATTENTION The regulations of DIN 1986/100 EN 12050 and 12056 should be observed!
4 Installation and Operating Instructions
Lifting Station Type ABS Synconta 801 - 92L
Figure 2: Installation example Synconta 801. Version with manhole cover suitable for light vehicular traffic.
Legend
1 Sulzer submersible pump
2
3
4
5
Synthetic collection tank
Three DN 150 inlet ports, one DN 100 inlet port
Ball shut-off valve
Ball checkvalve
8
9
6
7
10
Discharge line
Cable duct
Vent/cable pipe DN 100, lead to above roof level
Control unit
Backwash level
1.3 Commentary on the legal DIN EN regulations covering the use of lifting stations for the pumping of effluent containing faecal matter.
Automatically operated lifting stations are prescribed if:
- the water level in the odour lock of the effluent source lies below the sewer backwash level.
- rainwater gullies are present where the upper edge of the inlet grid lies below the sewer backwash level.
The sewer backwash level is the maximum possible water level in the public sewer network. Information on this can be obtained from your local authority. If the backwash level has not been fixed by the local authority, then the surface level of the roadway at the connection point is taken to be the level.
The regulations also require that all wastewater which can cause offensive odours must be collected in closed, odour-tight, and free-standing collection tanks.
The collection tanks must be vented by vent pipes which are brought above roof level.
1.4
Installation and Operating Instructions 5
Lifting Station Type ABS Synconta 801 - 902L
Sulzer high level coupling with discharge pipe pump suspension.
(Synconta 901-902 only)
Legend
The Sulzer high level coupling ensures a quick and easy installation.
The special connection unit with coupling piece is installed and secured in the sump together with the valves before the sump itself is installed. The complete pump unit is lowered with a chain by hand down the guide tube. The unit automatically aligns and locates itself in the correct position, effecting a seal on the Sulzer high level discharge coupling without the need to enter the sump. This automatic coupling process is especially useful where checking or inspection work is needed. The pump unit can be lifted out and lowered down even if the sump is flooded
A Bracket fixed installation
D
E
F
B
C
Guide tube
Bracket with guide claws
Chain to withdraw and lower pump for inspection
Ball-type, non-return valve
Shut-off valve
G
H
Discharge line connection G 2”
Flushing connection
J Pneumatic level control
Figure 3: Sulzer high level coupling with discharge pipe pump suspension
1.5 Description
The fully equipped prefabricated synthetic Synconta tank can be used where a medium amount or steady flow of waste water is present.
The Synconta is intended for wastewater disposal in buildings, which are built below the back-flow and cannot depend on the natural gradient to allow the wastewater to flow directly into the sewage system.
The tank is installed outside the building on open ground and is an effective, quick and economical solution to the sewage problems of the contractor and architect. Suitable for vehicular traffic if used with appropriate lid.
The Synconta 901 is suitable for installations according to DIN EN 124 Group 1 permissible traffic tonnage
5 kN/m 2 . Maximum permissible outside pressure 0.4 bar.
with all electrical devices, this product may fail due to operating errors, absence of mains voltage, or even a technical defect. Such a failure may result in medium or water escaping. If damage may occur due to the specific usage, measures are required to avoid such damage arising. In this respect, taking account of the conditions in question, particularly use of an off-grid alarm system, use of an emergency generator, and provision of an additional and appropriately connected second unit are to be considered.
6 Installation and Operating Instructions
Lifting Station Type ABS Synconta 801 - 92L
2 Safety
The general and specific health and safety hints are described in detail in the “Safety Instructions for Sulzer
Products Type ABS” booklet. If anything is not clear or you have any questions as to safety make certain to contact the manufacturer Sulzer.
This unit can be used by children aged 8 years and above, and persons with reduced physical, sensory, or mental capabilities, or lack of experience and knowledge, when they have been given supervision or instruction concerning the safe use of the device and understand the hazards involved. Children must not play with the appliance. Cleaning and user maintenance should not be performed by children without supervision.
3 Transport
m During transport the unit should not be dropped or thrown.
4 Set-up and installation
4.1 Installation of the collection tank
The inlet lines must be laid in such a manner that there is a continuous fall of the prescribed magnitude to the inlet ports of the collection tank.
ATTENTION The regulations for underground engineering work should be observed.
The pit must be approximately 30 cm deeper than the unit and care taken that no soil can slide back in.
The pit is to be filled with sand (grain size up to 2 mm) up to the point where the unit is installed.
ATTENTION The unit is secured against floating up, to a water table of 0,5 m above the tank floor.
If the water table is higher, additional protection against floating up is necessary.
This can be achieved by setting the bottom area of the tank in concrete (see Fig. 4).
Lower the unit into the pit and align on the prepared foundation.
NOTE The foundation must be free of stone or other large objects. Additional filling may be required.
Fill the pit with sand to the upper edge of the tank bottom. Put on tank cover, connect inlet ports and discharge lines.
4.2 Opening of the collection tank inlet ports
Only open the inlet ports that are to be used. Only saw off as little as possible so that as much neck as possible is left for the plug connection (note the notch on the port neck).
File down sharp edges inside and outside.
Installation and Operating Instructions 7
Lifting Station Type ABS Synconta 801 - 902L
4.3 Filling in of the pit
ATTENTION The filling material should be filling sand or sand from a gravel pit. Maximum particle size is 32 mm. Marly soil, rubble, stones or sharp particles should not be used. Care should be taken that the pit is filled in evenly from all sides in order to avoid pushing in the side of the tank.
The material should be filled in layers of maximum 30 cm. The individual layers should be evenly compacted using a hand rammer. Do not use a mechanical compactor. If the surrounding area is a marl soil or the water table is high the unit should be secured in position with sand or concrete in order to stop it from floating up. The concrete should only be used for securing the base section of the tank. Any device for lowering the water table should only be switched off after the pit has been filled and compacted.
ATTENTION
ATTENTION
Do not use more than one extension. The maximum allowable depth is 2200 mm. Do not compress the filling sand with a vibrator plate.
A minimum gap of 100* mm must be maintained between the extension sleeve and the top of the tank. This is required to prevent surface loading through the tank
(Synconta 801 only).
Legend
1 Tank cover with support ring
2 Extension sleeve*
5
6
7
8
3
4
Tank
Pit
Discharge line
Inlet port
Inflow line
Floatation protection
9 Filling sand
10 Anchor bolts (Synconta 801 only)
11 Discharge cap
Figure 4: Synconta tank installation
4.4 Discharge line
The discharge line must be installed in compliance with the relevant regulations.
DIN 1986/100 and EN 12056 applies in particular to the following:
- The discharge line should be fitted with a backwash loop (180° bend) located above the backwash level and should then flow by gravity into the collection line or sewer.
- The discharge line should not be connected to a down pipe.
- No other inflows or discharge lines should be connected to this discharge line.
- Where provided the discharge cap must be fitted between the coupling and the tank.
ATTENTION The discharge line should be installed so that it is not affected by frost.
The vent line is connected by means of a push-on sleeve to the vertical outlet at the top of the collection tank.
It should be of constant cross-section (min. DN 70) and should have a continuous rise to above roof level.
8 Installation and Operating Instructions
Lifting Station Type ABS Synconta 801 - 92L
4.5 Level control (Synconta 901 and 902 only)
The level control is a pneumatic device with a submerged tube for measuring and the control line (plastic tube to control panel).
The measuring vessel is built into the Synconta tank. The required switch and control units are mounted outside in the control unit.
ATTENTION When applying a static level control (without compressor or aeration) the height of the submerged tube for measuring should be adjusted so that it is 20 cm above the middle of the volute of the pump. The run-on time, set at 30 seconds when delivered, is to be set so that the submerged tube is empty when the pump is switched off.
4.6 Installation of the control unit
ATTENTION The control unit should be fitted above possible flood level in a well ventilated room and in an easily accessible position. Protection Class of the control unit is IP 54.
The control unit should be secured at all fixing points. The fixing holes are accessible after unscrewing the lower housing cover.
ATTENTION
NOTE
NOTE
Do not drill through the housing of the control unit itself.
The mounting location of the control unit should be chosen in such a manner that the control line rises in a continuous manner to the control unit. The control line must not be kinked.
A number of different control box models exist. Please check the wiring diagram/ instruction manual in the control box.
5 Commissioning
m The safety hints in the previous sections must be observed!
Before commissioning, the unit should be checked and a functional test carried out. Particular attention should be paid to the following:
- Have the electrical connections been carried out in accordance with regulations?
- Have the thermal sensors been connected?
- Is the seal monitoring device (where fitted) correctly installed?
- Is the motor overload switch correctly set?
- Have the power and control circuit cables been correctly fitted?
- Was the sump cleaned out?
- Have the inflow and outflows of the pump station been cleaned and checked?
- Is the direction of rotation correct, even if run via an emergency generator?
- Are the level controls functioning correctly?
- Are the required gate valves (where fitted) open?
- Do the non-return valves (where fitted) function easily?
- Have the hydraulics been vented in the case of dry-installed pumps?
ATTENTION Before commissioning, the collection tank should be cleaned of any large particles and filled with water. If the control line (rubber hose) was connected to the retaining pipe after the collection tank was fitted the collection tank has to be emptied manually once by setting the selector switch to “Hand”. After commissioning, the lifting unit is normally operated with the selector switch in position “Auto”.
Installation and Operating Instructions 9
Lifting Station Type ABS Synconta 801 - 902L
6 Maintenance
c c
To avoid danger if the power cable is damaged, it must be replaced by the manufacturer or its service agent or a similarly qualified person.
Before commencing any maintenance work the unit should be completely disconnected from the mains by a qualified person and care should be taken that it cannot be inadvertently switched back on.
Servicing must only be carried out by qualified personnel.
m
NOTE
When carrying out any repair or maintenance work, the safety regulations covering work in enclosed areas of sewage installations as well as good general technical pratices should be followed.
The maintenance hints given here are not designed for “do-it-yourself” repairs as special technical knowledge is required.
NOTE A maintenance contract with our Service Department will guarantee you the best technical service under all circumstances.
6.1 Maintenance of lifting stations in accordance with EN 12056
It is recommended that the lifting station be inspected monthly and its function checked.
In accordance with EN regulations, the lifting station should be maintained by a qualified person at the following intervals:
- in commercial premises every three months.
- in apartment blocks every six months.
- in a single family home once a year.
In addition we recommend that a maintenance contract be taken out with a qualified company.
6.2 General maintenance hints
Sulzer submersible pumps are reliable quality products, each being subjected to careful final inspection.
Lubricated-for-life ball bearings, together with monitoring devices, ensure optimum pump reliability provided that the pump has been connected and operated in accordance with the operating instructions.
Should nevertheless a malfunction occur, do not improvise but ask your Sulzer Customer Service Department for assistance.
This applies particularly if the unit is continually switched off by the current overload in the control panel, by the thermal sensors of the thermo-control system, or by the seal monitoring system (DI).
Regular inspection and care is recommended to ensure a long service life.
NOTE
NOTE
The Sulzer Service Organisation would be pleased to advise you on any applications you may have and to assist you in solving your pumping problems.
The Sulzer warranty conditions are only valid provided that any repair work has been carried out in a Sulzer approved workshop and where original Sulzer spare parts have been used.
10 Installation and Operating Instructions
Lifting Station Type ABS Synconta 801 - 92L
Installation and Operating Instructions 11
Lifting Station Type ABS Synconta 801 - 902L
Sulzer Pump Solutions Ireland Ltd. Clonard Road, Wexford, Ireland
Tel. +353 53 91 63 200 Fax +353 53 91 42335. www.sulzer.com
advertisement
Key Features
- Corrosion-resistant
- Prefabricated
- Automatic operation
- Vehicular traffic
- Submersible pump
- Control unit
- Discharge line
- Level control
Frequently Answers and Questions
What is the purpose of a lifting station?
What are the different types of lifting stations available?
What are the maintenance requirements for a lifting station?
What should I do if my lifting station is not working properly?
Related manuals
advertisement
Table of contents
- 3 1 General
- 3 Application areas
- 3 with EN 12056 for drainage of buildings and sites
- 4 pumping of effluent containing faecal matter
- 5 (Synconta 901-902 only)
- 5 1.5 Description
- 6 2 Safety
- 6 3 Transport
- 6 Set-up and installation
- 6 Installation of the collection tank
- 6 Opening of the collection tank inlet ports
- 7 Filling in of the pit
- 7 Discharge line
- 8 Level control (Synconta 901 and 902 only)
- 8 Installation of the control unit
- 8 5 Commissioning
- 9 6 Maintenance
- 9 Maintenance of lifting stations in accordance with EN
- 9 General maintenance hints