CE EMC test report of EG-PWC
Report No. ATE20122242
Page 1 of 29
EMC TEST REPORT
for
Gembird Europe B.V.
POWER INVERTER
Model No.:
EG-PWC-032,EG-PWC-033,
EG-PWC-034,EG-PWC-035
Prepared for
Address
:
:
Gembird Europe B.V.
Wittevrouwen 56, 1358CD Almere, The Netherlands
Prepared by
:
Accurate Technology Co., Ltd.
F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd.
Science & Industry Park, Nanshan District, Shenzhen
518057, P.R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
Report No.
Date of Test
Date of Report
:
:
:
ATE20122242
September 21, 2012
October 8, 2012
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 2 of 29
TABLE OF CONTENT
Description
Test Report Declaration
Page
1.
TEST RESULTS SUMMARY ........................................................................................ 5
2.
GENERAL INFORMATION........................................................................................... 6
2.1.
2.2.
2.3.
2.4.
3.
MEASURING DEVICE AND TEST EQUIPMENT ......................................................... 8
3.1.
3.2.
3.3.
3.4.
4.
Block Diagram of Test .......................................................................................................18
Test Standard....................................................................................................................18
Severity Levels and Performance Criterion .......................................................................19
EUT Configuration on Test ................................................................................................19
Operating Condition of EUT ..............................................................................................19
Test Procedure..................................................................................................................19
Test Results ......................................................................................................................19
MAGNETIC FIELD IMMUNITY TEST ......................................................................... 21
7.1.
7.2.
7.3.
7.4.
7.5.
7.6.
7.7.
8.
Block Diagram of Test Setup.............................................................................................15
Test Standard....................................................................................................................15
Severity Levels and Performance Criterion .......................................................................15
EUT Configuration .............................................................................................................16
Operating Condition of EUT ..............................................................................................16
Test Procedure..................................................................................................................16
Test Results ......................................................................................................................16
RF FIELD STRENGTH SUSCEPTIBILITY TEST ....................................................... 18
6.1.
6.2.
6.3.
6.4.
6.5.
6.6.
6.7.
7.
Block Diagram of Test .........................................................................................................9
Measuring Standard ............................................................................................................9
Radiated Emission Limits (Class B) ..................................................................................10
Conditional Testing Procedure ..........................................................................................10
EUT Configuration on Test ................................................................................................10
Operating Condition of EUT ..............................................................................................11
Test Procedure..................................................................................................................11
Measuring Results.............................................................................................................12
ELECTROSTATIC DISCHARGE IMMUNITY TEST ................................................... 15
5.1.
5.2.
5.3.
5.4.
5.5.
5.6.
5.7.
6.
For Radiated Emission Measurement .................................................................................8
For Electrostatic Discharge Immunity Test..........................................................................8
For RF Strength Susceptibility Test.....................................................................................8
For Magnetic Field Immunity Test .......................................................................................8
RADIATED EMISSION MEASUREMENT..................................................................... 9
4.1.
4.2.
4.3.
4.4.
4.5.
4.6.
4.7.
4.8.
5.
Description of Device (EUT) ................................................................................................6
Accessory and Auxiliary Equipment ....................................................................................6
Description of Test Facility ..................................................................................................7
Measurement Uncertainty ...................................................................................................7
Block Diagram of Test Setup.............................................................................................21
Test Standard....................................................................................................................21
Severity Levels and Performance Criterion .......................................................................21
EUT Configuration .............................................................................................................22
Operating Condition of EUT ..............................................................................................22
Test Procedure..................................................................................................................22
Test Results ......................................................................................................................22
PHOTOGRAPHS ........................................................................................................ 24
8.1.
8.2.
8.3.
Photos of Radiated Emission Measurement .....................................................................24
Photos of Electrostatic Discharge Test .............................................................................24
Photos of RF Field Strength susceptibility Test.................................................................25
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 3 of 29
8.4.
8.5.
Photos of Magnetic Field Susceptibility Test.....................................................................25
Photo of EUT .....................................................................................................................26
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 4 of 29
Test
Report
Declaration
Applicant:
Gembird Europe B.V.
Manufacturer:
Gembird Electronics Ltd.
Product:
POWER INVERTER
(A) Model No.: EG-PWC-032/033/034/035
(B) Rating: DC 12V
Measurement Procedure Used:
EN 55022: 2010
EN 55024: 2010 (IEC61000-4-2: 2008
IEC61000-4-3: 2010
IEC61000-4-8: 2009)
The device described above is tested by Accurate Technology Co., Ltd. to determine
the maximum emission levels emanating from the device and the severe levels of the
device can endure and its performance criterion. The measurement results are
contained in this test report and Accurate Technology Co., Ltd. is assumed full of
responsibility for the accuracy and completeness of these measurements. Also, this
report shows that the EUT (Equipment Under Test) is technically compliant with the
EN55022 and EN 55024 requirements.
This report applies to above tested sample only and shall not be reproduced in part
without written approval of Accurate Technology Co., Ltd.
Date of Test :
September 21, 2012
Prepared by :
(Jane Lü, Engineer)
Approved & Authorized Signer :
(Sean Liu, Manager )
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 5 of 29
1. TEST RESULTS SUMMARY
Test Items
Radiated Emission
Electrostatic Discharge Immunity
Radiated Electromagnetic Fields Immunity
Magnetic Field Immunity
Test Standard
EN 55022: 2010
EN 55024: 2010
(IEC61000-4-2: 2008)
EN 55024: 2010
(IEC 61000-4-3: 2010)
EN 55024: 2010
(IEC 61000-4-8: 2009)
Test
Results
Pass
Pass
Pass
Pass
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 6 of 29
2. GENERAL INFORMATION
2.1.Description of Device (EUT)
Product
: POWER INVERTER
Model No.
: EG-PWC-032/033/034/035
(Note: These samples are same except their appearance is different. So we
prepare EG-PWC-032 for test only.)
Rating
: DC 12V
Applicant
Address
: Gembird Europe B.V.
: Wittevrouwen 56, 1358CD Almere, The Netherlands
Manufacturer
Address
: Gembird Electronics Ltd.
: Building B, ShiFeng Industry District, Huaning Road,
LongHuaDaLang Street, Baoan District, Shenzhen, China
Date of sample
received
Date of Test
: September 21, 2012
: September 21, 2012
2.2.Accessory and Auxiliary Equipment
n.a.
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 7 of 29
2.3.Description of Test Facility
EMC Lab
:
Accredited by TUV Rheinland Shenzhen, May 10, 2004
Listed by FCC
The Registration Number is 253065
The Registration Number is 752051
Listed by Industry Canada
The Registration Number is 5077A-1
The Registration Number is 5077A-2
Accredited by China National Accreditation Committee for
Laboratories
The Certificate Registration Number is L3193
Name of Firm
Site Location
:
:
Subcontracted
Items
Subcontractor
Site Location
:
:
:
Accurate Technology Co., Ltd.
F1, Bldg. A, Changyuan New Material Port, Keyuan Rd.
Science & Industry Park, Nanshan, Shenzhen, Guangdong
P.R. China
RF Field Strength Susceptibility Test
Shenzhen Academy of Metrology and Quality Inspection
Bldg. of Shenzhen Academy of Metrology and Quality
Inspection, Longzhu Road, Nanshan, Shenzhen, China.
2.4. Measurement Uncertainty
Conducted Emission Expanded Uncertainty
=
2.23dB, k=2
Power Disturbance Expanded Uncertainty
=
2.92 dB, k=2
Radiated emission expanded uncertainty
(9kHz-30MHz)
=
3.08dB, k=2
Radiated emission expanded uncertainty
(30MHz-1000MHz)
=
4.42dB, k=2
Radiated emission expanded uncertainty
(Above 1GHz)
=
4.06dB, k=2
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 8 of 29
3. MEASURING DEVICE AND TEST EQUIPMENT
3.1.For Radiated Emission Measurement
Item Equipment
1. Spectrum
Analyzer
2. Test Receiver
3. Bilog Antenna
4. 50 Coaxial
Switch
5. RF Coaxial Cable
6. RF Coaxial Cable
7. RF Coaxial Cable
8. RF Coaxial Cable
9. Pre-Amplifier
Manufacturer
Model No.
Serial No.
Last Cal.
ANRITSU
MS2651B
6200238856 Jan. 7, 2012
Cal.
Interval
1 Year
Rohde&Schwarz ESCS30
100307
Jan. 7, 2012
Schwarzbeck
VULB9163 9163-194
Jan. 7, 2012
Anritsu Corp
MP59B
6200237248 Jan. 7, 2012
1 Year
1 Year
1 Year
Schwarzbeck
Schwarzbeck
Schwarzbeck
RESENBERGER
Agilent
1 Year
1 Year
1 Year
1 Year
1 Year
N-5m
N-1m
N-1m
N-0.5m
8447D
No.1
No.6
No.7
No.12
294A10619
Jan. 7, 2012
Jan. 7, 2012
Jan. 7, 2012
Jan. 7, 2012
Jan. 7, 2012
3.2.For Electrostatic Discharge Immunity Test
Item Equipment
1. ESD Tester
Manufacturer
HAEFELY
Model No. Serial No.
Last Cal. Cal. Interval
PESD1610 H4001552 Jan.11, 2012 1 Year
3.3. For RF Strength Susceptibility Test
Item Equipment
1.
2.
3.
4.
5.
6.
Manufacturer
Model No.
Serial
No.
Signal Generator Rohde&Schwarz SMT03
100059
Voltage Probe
Rohde&Schwarz URV5-Z2
100013
Power Amplifier
AR
150W1000
300999
Power Amplifier
AR
25S1G4AM1 305993
Bilog Antenna
Chase
CBL6111C
2576
Anechoic chamber Albatross Projects MCDC
----
Last Cal.
Jan. 23, 2012
Jan. 23, 2012
Jan. 23, 2012
Mar. 10, 2012
Jan. 23, 2012
Mar. 20, 2012
Cal.
Interval
1 Year
1 Year
1 Year
2 Year
1 Year
2 Year
3.4.For Magnetic Field Immunity Test
Item Equipment
1. Magnetic Field
Tester
Manufacturer
HAEFELY
Model No. Serial No. Last Cal.
MAG100 150577
Jan. 7, 2012
Cal. Interval
1 Year
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 9 of 29
4. RADIATED EMISSION MEASUREMENT
4.1.Block Diagram of Test
4.1.1.Block diagram of connection between the EUT and simulators
Power Supply
EUT
Load
(EUT: POWER INVERTER)
4.1.2.Block diagram of test setup (In chamber)
Antenna Elevation Varies From 1 to 4 Meters
3 Meters
EUT System
0.8 Meter
GROUND PLANE
(EUT: POWER INVERTER)
4.2.Measuring Standard
EN 55022: 2010
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 10 of 29
4.3.Radiated Emission Limits (Class B)
4.3.1.Limit below 1GHz
Frequency
Quasi-peak limits
(MHz)
dB(V/m)
30 – 230
40
230 - 1000
47
Note: (1) The smaller limit shall apply at the combination point between two
frequency bands.
(2) Distance refers to the distance in meters between the measuring
instrument antenna and the closed point of any part of the EUT.
4.3.2.Limit above 1GHz
Frequency
Average Limit
(GHz)
dB(V/m)
1–3
50
3-6
54
Note: The lower limit applies at the transition frequency.
Peak Limit
dB(V/m)
70
74
4.4.Conditional Testing Procedure
If the highest frequency of the internal sources of the EUT is less than 108MHz,
the measurement shall only be made up to 1GHz.
If the highest frequency of the internal sources of the EUT is between 108MHz
and 500MHz, the measurement shall only be made up to 2GHz.
If the highest frequency of the internal sources of the EUT is between 500MHz
and 1GHz, the measurement shall only be made up to 5GHz.
If the highest frequency of the internal sources of the EUT is above 1GHz, the
measurement shall only be made up to 5 times the highest frequency or 6GHz,
whichever is less.
4.5.EUT Configuration on Test
Test equipment is installed to meet the standards and operating in a manner,
which tends to maximize its emission characteristics in a normal application.
4.5.1. POWER INVERTER (EUT)
Model No.: EG-PWC-032/033/034/035
Manufacturer: Gembird Electronics Ltd.
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 11 of 29
4.6.Operating Condition of EUT
4.6.1. Turn on the power.
4.6.2. Let the EUT work in test mode (Full Load) and measure it.
4.7.Test Procedure
The EUT is placed on a turntable, which is 0.8 meter high above the ground. The
turntable can rotate 360 degrees to determine the position of the maximum
emission level. The EUT is set 3 meters away from the receiving antenna, which
is mounted on an antenna tower. The antenna can be moved up and down from
1 to 4 meters to find out the maximum emission level. Bilog antenna (calibrated
by Dipole Antenna) is used as a receiving antenna. Both horizontal and vertical
polarizations of the antenna are set on test.
The bandwidth of the Receiver (ESCS30) is set at 120 kHz in 30-1000MHz, and
1MHz in above 1000MHz.
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 12 of 29
4.8.Measuring Results
PASS.
The highest frequency of the internal sources of the EUT is less than 108MHz;
the measurement shall only be made up to 1GHz.
Test Mode: Full Load
Polarization
Horizontal
Vertical
Note: Emissions attenuated more than 20 dB below the permissible value are
not reported.
The spectral diagrams are attached as below.
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 13 of 29
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 14 of 29
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 15 of 29
5. ELECTROSTATIC DISCHARGE IMMUNITY TEST
5.1.Block Diagram of Test Setup
5.1.1. Block diagram of connection between the EUT and simulators
Power supply
EUT
Load
(EUT: POWER INVERTER)
5.1.2. Block diagram of test setup
EUT System
ESD
Tester
0.8 m
AC Mains
(EUT: POWER INVERTER)
5.2.Test Standard
EN 55024: 2010 (IEC61000-4-2: 2008, Severity Level: 2
Contact Discharge: ±4kV, Severity Level: 3/ Air Discharge: ±8kV)
Testing shall also be satisfied at the lower levels.
5.3.Severity Levels and Performance Criterion
5.3.1. Severity level
Level
1.
2.
3.
4.
X
Test Voltage
Contact Discharge (kV)
±2
±4
±6
±8
Special
Test Voltage
Air Discharge (kV)
±2
±4
±8
±15
Special
5.3.2. Performance Criterion: B
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 16 of 29
5.4.EUT Configuration
The configuration of EUT is listed in Section 4.4.
5.5.Operating Condition of EUT
Same as conducted emission measurement, which is listed in Section 4.5 except
for the test set up replaced by Section 5.1.
5.6.Test Procedure
5.6.1.Contact discharges to the conductive surfaces and to coupling planes:
The EUT shall be exposed to at lease 200 discharges, 100 each at
negative and positive polarity, at a minimum of four test points (a
minimum of 50 discharges at each point). One of the test points shall be
subjected to at least 50 indirect discharges (contact) to the centre of the
front edge of the horizontal coupling plane. The remaining three test
points shall each receive at least 50 direct contact discharges. If no direct
contact test points are available, then at least 200 indirect discharges
shall be applied in the indirect mode [see IEC 61000-4-2 for use of the
Vertical Conducting Plane (VCP)]. Tests shall be performed at a
maximum repetition rate of one discharge per second.
5.6.2.Air discharge at slots and apertures, and insulating surfaces:
On those parts of the EUT where it is not possible to perform contact
discharge testing, the equipment should be investigated to identify user
accessible points where breakdown may occur; examples are openings at
edges of keys, or in the cover of keyboards and telephone handsets.
Such points are tested using the air discharge method. See also IEC
61000-4-2 regarding painted surfaces. This investigation should be
restricted to those areas normally handled by the user. A minimum of 10
single air discharges shall be applied to the selected test point for each
such area.
The application of electrostatic discharges to the contacts of open
connectors is not required by this publication.
5.7.Test Results
PASS
Please refer to the following page.
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 17 of 29
Electrostatic Discharge Test Results
Accurate Technology Co., Ltd.
Applicant:
Gembird Europe B.V.
Test Date:
September 21, 2012
EUT:
POWER INVERTER
Temperature:
25ºC
M/N:
EG-PWC-032/033/034/035
Humidity:
46%
Air discharge:
±2.0kV, ±4.0kV, ±8.0kV
Criterion:
B
Contact discharge: ±2.0kV, ±4.0kV
Test Mode:
Test Engineer: Alen
Full Load
Kind
A-Air Discharge
C-Contact
Discharge
Result
Nonconductive Enclosure
A
PASS
Conductive Enclosure
C
PASS
Metal
C
PASS
HCP
C
PASS
VCP of front
C
PASS
VCP of rear
C
PASS
VCP of left
C
PASS
VCP of right
C
PASS
Location
Note:
Test Equipment: ESD Simulator (HAEFELY, PESD1610)
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 18 of 29
6. RF FIELD STRENGTH SUSCEPTIBILITY TEST
6.1.Block Diagram of Test
6.1.1. Block diagram of connection between the EUT and simulators
Power supply
Load
EUT
(EUT: POWER INVERTER)
6.1.2. Block diagram of R/S test setup
3 Meters
EUT system
Anechoic
Chamber
0.8 Meter
Measurement
Room
Power Amp
Signal
Generator
(EUT: POWER INVERTER)
6.2.Test Standard
EN 55024: 2010 (IEC61000-4-3: 2010, Severity Level: 2, 3V/m)
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 19 of 29
6.3.Severity Levels and Performance Criterion
6.3.1. Severity Level
Level
Field Strength V/m
1.
1
2.
3
3.
10
X
Special
6.3.2. Performance Criterion: A
6.4.EUT Configuration on Test
The configuration of the EUT is same as Section 4.4.
6.5.Operating Condition of EUT
6.5.1. Turn on the power.
6.5.2. Let the EUT work in test mode (Full Load) and measure it.
6.6.Test Procedure
The EUT are placed on a table, which is 0.8 meter high above the ground. The
EUT is set 3 meters away from the transmitting antenna, which is mounted on an
antenna tower. Both horizontal and vertical polarizations of the antenna are set
on test. Each of the four sides of the EUT must be faced this transmitting antenna
and measured individually.
In order to judge the EUT performance, a CCD camera is used to monitor its
screen.
All the scanning conditions are as following:
Condition of Test
---------------------------------------------1. Fielded Strength
2. Radiated Signal
3. Scanning Frequency
4. Sweep time of radiated
5. Dwell Time
Remark
--------------------------------------3V/m (Severity Level 2)
Unmodulated
80-1000MHz
0.0015 Decade/s
1 Sec.
6.7.Test Results
PASS.
Please refer to the following page.
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 20 of 29
RF Field Strength Susceptibility Test Results
Accurate Technology Co., Ltd.
Applicant:
Gembird Europe B.V.
Test Date:
September 21, 2012
EUT:
POWER INVERTER
Temperature:
25ºC
M/N:
EG-PWC-032/033/034/035
Humidity:
46%
Field Strength:
3 V/m
Criterion:
A
Frequency Range: 80 MHz to1000 MHz
Power Supply: DC 12V
Test Mode:
Test Engineer: SMQ
Modulation:
Steps
Full Load
 None
 Pulse
Frequency Range 1: 80- 1000MHz
#
/
%
Horizontal
Vertical
Front
PASS
PASS
Right
PASS
PASS
Rear
PASS
PASS
Left
PASS
PASS
 AM 1kHz 80%
Frequency Range 2:
#
Horizontal
/
%
Vertical
Test Equipment :
1. Signal Generator : SMT03 (Rohde & Schwarz)
2. Power Amplifier : 150W1000 (AR)
3. Bilog Antenna : CBL6111C (Chase)
Note:
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 21 of 29
7. MAGNETIC FIELD IMMUNITY TEST
7.1.Block Diagram of Test Setup
7.1.1. Block diagram of connection between the EUT and simulators
Power supply
Load
EUT
(EUT: POWER INVERTER)
7.1.2. Block Diagram of Test Setup
Induction Coil
EUT
0.1 m
Magnetic Field
Tester
AC
Transformer
AC Mains
Wood
Ground Reference Support
(EUT: POWER INVERTER)
7.2.Test Standard
EN 55024: 2010 (IEC61000-4-8: 2009, Severity Level 1: 1A/m)
7.3.Severity Levels and Performance Criterion
7.3.1.Severity level
Level
1.
2.
3.
4.
5.
X
Magnetic Field Strength A/m
1
3
10
30
100
Special
7.3.2. Performance Criterion: A
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 22 of 29
7.4.EUT Configuration
The configuration of the EUT is same as Section 4.4.
7.5.Operating Condition of EUT
7.5.1. Turn on the power.
7.5.2. Let the EUT work in test mode (Full Load) and measure it.
7.6.Test Procedure
1) Set up the EUT system as shown on Section 7.1.2.
2) The Induction coil is set up in horizontal or vertical.
3) Let the EUT work in test mode and measure it.
7.7.Test Results
PASS.
Please refer to the following page.
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 23 of 29
Magnetic Field Immunity Test Results
Accurate Technology Co., Ltd.
Applicant :Gembird Europe B.V.
Test Date : September 21, 2012
EUT :
Temperature :
POWER INVERTER
25ºC
M/N : EG-PWC-032/033/034/035
Humidity :
Test Mode : Full Load
Test Level
Testing Duration
Test Engineer: Alen
Criterion
Coil Orientation
46%
Result
1A/m
5 mins
Horizontal
A
PASS
1A/m
5 mins
Vertical
A
PASS
Remark:
Test Equipment:
Magnetic Field Tester: MAG100
AC Transformer: TDGC2J-5
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 24 of 29
8. PHOTOGRAPHS
8.1.Photos of Radiated Emission Measurement
8.2.Photos of Electrostatic Discharge Test
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 25 of 29
8.3.Photos of RF Field Strength susceptibility Test
8.4.Photos of Magnetic Field Susceptibility Test
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 26 of 29
8.5.Photo of EUT
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 27 of 29
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 28 of 29
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Report No. ATE20122242
Page 29 of 29
Accurate Technology Co., Ltd.
Address: F1, Bldg. A&D, Changyuan New Material Port, Keyuan Rd., Science & Industry Park, Nanshan District, Shenzhen 518057 , P. R. China
Tel: +86-755-26503290
Fax: +86-755-26503396
E-mail: [email protected]
Http://www.atc-lab.com
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement