WP101 WP102 WP103 WP104 WP105 WP106


Add to my manuals
1 Pages

advertisement

WP101 WP102 WP103 WP104 WP105 WP106 | Manualzz
Product Specifications
S MPS
Type
Operating Voltage
Rocker Switch Poles
Rocker Switch Rating
Operating Temperature
Integral BS1362 Fuse
Trip Speed
RCD Contact Break
230V AC
230V 13 Amp (3kW)
0° to 40° C
Continues to Protect With
Cable Capacity
Conforms To BS
Dimensions (mm)
BS7288 - 40ms
Double Pole
Lost neutral & pulsating
DC earth fault
3 x 2.5mm2
BS1363, BS7288 (RCD)
Height x Width x Depth
WP101
WP102
WP103
WP104
WP105
WP106
Switched
•
2
•
•
Isolated
Switched
•
2
•
•
Spur
Fused
•
2
•
•
•
RCD
Fused
•
DIN
Timer
•
Solar
Timer
•
•
•
•
•
2 Pole
•
•
•
•
•
•
130 x 135 x 80
•
•
130 x 135 x 80
•
•
130 x 135 x 80
•
•
130 x 135 x 80
•
BSEN60730
130 x 135 x 80
•
BSEN60730
130 x 135 x 80
•
S MPS S MPS
Type
Operating Voltage
Rocker Switch Poles
Rocker Switch Rating
Operating Temperature
Trip Speed
RCD Contact Break
230V AC
Cable Capacity
Conforms To BS
Dimensions (mm)
230V 13 Amp (3kW)
0° to 40° C
BS7288 - 40ms
Double Pole
Lost neutral & pulsating
DC earth fault
3 x 2.5mm2
BS1363, BS7288 (RCD)
Height x Width x Depth
Type
Operating Voltage
Switch Rating 230V AC
Operating Temperature
Cable Capacity
Conforms To BS
Dimensions (mm)
Single Gang
230V AC
10 A X
0° to 40° C
3 x 2.5mm2
BS60669
Height x Width x Depth
Continues to Protect with
WP201
WP202
WP203
WP204
WP205
WP401
Switched
Isolated
Switched
•
2
•
•
Isolated
Timer
•
RCD
Latching
•
1
•
•
•
2 Pole
RCD
Connector Box
•
1
•
•
•
2 Pole
•
•
•
•
•
130 x 195 x 80
•
•
130 x 195 x 80
•
2
•
•
•
•
130 x 195 x 80
•
•
•
•
130 x 195 x 80
•
•
130 x 195 x 80
•
5 x 2.5mm2
•
335 x 220 x 107
WPL01
WPL02
WPL03
WPL04
2 Way
•
•
•
•
•
92 x 92 x 64
2 Gang/2 Way
•
•
•
•
•
92 x 92 x 64
Bell
•
•
•
•
•
92 x 92 x 64
DP Switch
•
•
•
•
•
92 x 92 x 64
Timeguard Limited
Victory Park, 400 Edgware Road, London NW2 6ND Tel: 020 8452 1112 Fax: 020 8450 0635
Email: [email protected] Website: www.timeguard.com

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

advertisement