IVC US Light Commercial Flooring Installation guide

IVC US Light Commercial Flooring Installation guide

Below you will find brief information for Light Commercial Flooring. This document covers the preparation and installation of all IVC US light commercial flooring products. The guide provides instructions for handling, acceptable substrates, moisture testing, floor preparation, recommended adhesives, and a detailed step-by-step installation process. It also outlines acceptable and unacceptable surfaces for the flooring.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

Light Commercial Flooring Installation Guide - IVC US | Manualzz
Light Commercial Installation Guide
Page 1 of 3
IVC US recommends the following guidelines for preparation and installation of all IVC US commercial
products. Please contact IVC US Technical Services at 888-225-8287 with any questions or visit
www.ivcgroup.us.
Section 1: Installation Preparation
Handling procedures: The job site and all flooring material and adhesive must be kept between 65°F
and 85°F for 48 hours before, during, and after installation.
PLEASE NOTE: If removal of existing resilient floor covering is required, follow all recommended
Resilient Covering Flooring Institute (RFCI) work practices at www.rfci.com.
Acceptable Substrates
Wood underlayment: Wood underlayment panels must be American Plywood Association (APA) rated
underlayment grade as specified and warranted by the manufacturer. All wood subfloors require a double
i
layer construction .
Concrete: See Grade Levels
Gypsum concrete: Seal gypsum concrete with FLEX-PRIM Acrylic Latex Primer prior to applying floor
ii
patch and adhesive to stabilize the surface for adhesive bond .
Grade Levels
Suspended: An acceptable suspended floor is a concrete or wood substrate with a minimum of 18”
(460mm) of well-ventilated air space beneath it. IVC US recommends that a moisture vapor barrier be
placed on the ground below the air space.
On-Grade: An acceptable on-grade floor is a concrete substrate in direct surface contact with the ground
at the surrounding ground level. The concrete slab should be protected from moisture penetration and
incorporate a proven moisture vapor barrier.
Below-Grade: An acceptable below-grade floor is a concrete substrate partially or completely in contact
with the ground below the average surrounding ground level. The concrete slab should be protected from
moisture penetration and incorporate a proven moisture vapor barrier.
Acceptable surfaces
 VCT (well bonded on or above grade only – in the absence of waxes or sealers)
 Ceramic (well bonded & properly prepared)
 Terrazzo (well bonded & properly prepared)
 Self-leveling and patching compounds (Portland cement based only)
 Resilient floor (no more than 1 layer, well bonded, non-cushioned)
 Radiant heat floors (not exceeding 85°F)
iii
Unacceptable Surfaces
 Inter-flex and any perimeter bonded products
 Soft-back vinyl
 Cork
 Carpet
 Any floating floor system
 Resilient tile installed below grade
LC 11142011
Light Commercial Installation Guide
Page 2 of 3
Concrete Testing
Moisture Testing: It is the responsibility of the flooring contractor and the installer to confirm all concrete
substrates, both old and new, for moisture transmission using the Calcium Chloride Moisture Test
according to ASTM F-1869. Moisture vapor transmission should not exceed the recommended levels of 8
lbs. or less per 1,000 sq. ft. in 24 hours. This test should be performed and documented prior to
installation. A second testing option determines relative humidity in concrete floor slabs using In-Situ
Probes, which should be less than 90% RH per ASTM F-2170 before, during and after installation. These
acceptable moisture readings are only applicable when using iGrip adhesive.
PH LEVELS: PH must be between 5 and 9
Floor Preparation
 Remove all foreign substances such as wax, grease, dirt and any substance or chemical that
could interfere with a good bond.
 Fill all holes and cracks with a latex fortified Portland cement based patching compound. IVC US
only recommends use of latex fortified Portland cement based products as a satisfactory
patching or leveling compound.
 IVC US recommends priming the floor with FLEX-PRIM Acrylic Latex Primer to prevent over
absorption of adhesives, contain dust, and to insure a better bond of adhesive to the subfloor.
 Inspect all material prior to installation. Report any defects to the location where the flooring was
iv
purchased .
Recommended adhesive and seam sealer
iGrip Adhesive
infuze seam sealer
FLEX-PRIM Acrylic Latex Primer
TROWEL SPECIFICATIONS
Trow el Application
w idth x depth x spacing
Spread Rate
Type of installation
1/16"x 1/32" x 1/32" U Trow el
1.6m m x 0.8m m x 0.8m m U
Up to 350 sq. ft./gal
Up to 8.6 sq. m eters/liter
Porous Substrate
1/16" x 1/32" x 5/64" U trow el
1.6m m x 0.8m m x 2m m U
Up to 400 sq. ft./gal
Up to 8.9 sq. m eters/liter
Non-Porous Substrate
LC 11142011
Light Commercial Installation Guide
Page 3 of 3
Section 2: Installation
*Full-spread is the required installation method for all IVC US commercial products.
Full-Spread Installation
1. Align the pattern with the most dominant wall, and using a sharp utility knife trim away excess
material along the walls, cabinet and other permanent objects, leaving approximately 2” of
material to be trimmed off later.
2. Make relief cuts at corners to allow the material to lay flat before the final cuts are made. Final
trimming should be done by cutting in with a utility knife, leaving a 1/8” to 1/4” expansion gap.
Ensure material does not touch the walls or corners at any point.
3. Fold back half of the material and apply iGrip Adhesive to the substrate using the appropriate
trowel. If a seam is required, leave an 18” dry zone at the edge of the seam. Then follow the
seaming section.
4. Do not immediately place the material into wet adhesive. To avoid bubbling, allow time for the
adhesive to flash before positioning the material. There will be a slight transfer of adhesive to the
skin when it’s ready for installation. Do not allow the adhesive to dry completely.
5. Slide the material in place and remove air and vapors under the material using a 75 lb. roller over
the entire adhered vinyl.
6. Repeat steps 3-5 for the remaining half of the flooring material.
Seaming
1. After positioning the flooring, over-lap the seam edges.
2. Place a 4”-5” wide scrap of the vinyl between the substrate and vinyl, under the seam area.
3. Double cut through the two layers of vinyl, creating a compression fit when the seam edges are
joined.
4. Fold back both sides of the seam area and apply the iGrip Adhesive to the dry zone. Allow the
adhesive to flash before placing the material into the adhesive.
5. Place one side of vinyl into the adhesive and roll the seam using a 75 lb roller.
6. Apply 1/8” bead of infuze seam sealer along the edge of the installed vinyl.*
7. Place the edge of the uninstalled vinyl against the edge of the installed vinyl and press into place.
8. Wipe the seam area using a clean dry cloth followed immediately with a clean cloth dampened
with mineral spirits.
9. Using a clean cloth, remove the mineral spirit from the surface of the vinyl and protect the seam
for six hours.
Radiant Heat Floors
IVC US commercial products may be installed over radiant heating floors, provided the operating
temperature does not exceed 85°F.
Contact IVC US Technical Services at 888-225-8287 with any questions or visit www.ivcgroup.us.
i
Any failure of the underlayment or flooring due to the underlayment is NOT the responsibility of IVC US.
IVC US does not recommend installing resilient flooring over wood flooring or wood subfloors applied
directly over concrete or sleeper–construction subfloors.
ii
All conditions associated with gypsum concrete, including but not limited to cracking, crumbling,
powdering and moisture, that result in bond failure are NOT warranted by IVC US.
iii
IVC US will not warrant or accept responsibility of any kind for flooring failures related to the use of
unacceptable substrates & surfaces.
iv
The installer is responsible for labor costs to repair or replace material with defects that were apparent
before the start of the installation.
LC 11142011

advertisement

Key Features

  • Detailed installation instructions
  • Acceptable substrates
  • Moisture testing
  • Floor preparation
  • Recommended adhesives
  • Proper seaming techniques
  • Radiant heat floor compatibility
  • Guidance on acceptable and unacceptable surfaces

Frequently Answers and Questions

What are the acceptable substrates for installing IVC US light commercial flooring?
The document lists several acceptable substrates, including wood underlayment, concrete, gypsum concrete, VCT, ceramic, terrazzo, self-leveling and patching compounds, resilient floor, and radiant heat floors.
How do I test for moisture in the concrete substrate?
The document recommends using the Calcium Chloride Moisture Test according to ASTM F-1869 or the In-Situ Probes according to ASTM F-2170 to test for moisture transmission in the concrete substrate.
What type of adhesive should I use for installing IVC US light commercial flooring?
The recommended adhesive is iGrip Adhesive.
What is the proper seaming technique for IVC US light commercial flooring?
The document provides a detailed step-by-step guide for seaming the flooring, including the use of infuze seam sealer.
Can I install IVC US light commercial flooring over radiant heat floors?
Yes, IVC US light commercial flooring can be installed over radiant heating floors, provided the operating temperature does not exceed 85°F.