- No category
advertisement
Instruction and installation guide
11-C-9100-01 Rev. 3
Switchgear
Answers for industry.
DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep out.
Qualified personnel only.
Disconnect and lock off all power before working on this equipment.
IMPORTANT
The information contained herein is general in nature and not intended for specific application purposes. It does not relieve the user of responsibility to use sound practices in application, installation, operation, and maintenance of the equipment purchased. Siemens reserves the right to make changes in the specifications shown herein or to make improvements at any time without notice or obligations. Should a conflict arise between the general information contained in this publication and the contents of drawings or supplementary material or both, the latter shall take precedence.
QUALIFIED PERSON
For the purpose of this manual and product labels, a qualified person is one who is familiar with the installation, construction, operation or maintenance of the equipment and the hazards involved. In addition, this person has the following qualifications:
(a) is trained and authorized to de-energize, clear, ground, and tag circuits and equipment in accordance with established safety practices.
(b) is trained in the correct care and use of protective equipment such as rubber gloves, hard hat, safety glasses or face shields, flash clothing, etc., in accordance with established safety practices.
(c) is trained in rendering first aid.
NOTE
These instructions do not purport to cover all details or variations in equipment, nor to provide for every possible contingency to be met in connection with installation, operation, or maintenance. Should further information be desired or should particular problems arise which are not covered sufficiently for the purchaser’s purposes, the matter should be referred to the local Siemens sales office.
The contents of this instruction manual should not become part of or modify any prior or existing agreement, commitment, or relationship. The sales contract contains the entire obligation of Siemens Industry, Inc. The warranty contained in the contract between the parties is the sole warranty of Siemens Industry, Inc. Any statements contained herein do not create new warranties or modify the existing warranty.
Table of contents
Introduction and safety
Introduction
Qualified person
Signal words
Dangerous procedure
Field service operation
General description
Introduction
Scope
General description
Receiving, handling and storage
Receiving
Identification
Inspection and unpacking
Shipping damage claims
Lifting and moving
Lifting switchgear
Moving switchgear with rollers and jacks
Final movement of assembly
Storage-indoor switchgear
Storage-outdoor switchgear
Installation
Preparation for installation
Foundation-general requirements
Indoor foundations
Outdoor foundations
Weights of vertical sections
Indoor floor plan dimensions
Outdoor non walk-in plan dimensions
Outdoor walk-in plan dimensions
Installing shipping sections
Setting shipping sections
Leveling of the switchgear
Leveling indoor switchgear
Leveling outdoor switchgear
Installation of traveling crane
Extension of existing switchgear
Extending indoor switchgear
Extending outdoor switchgear
2
2
2
2
2
2
3
3
3
3
4-8
4
5
4
4
5
8
8
5
6
8
16
16
16
16
15
15
15
15
15
9-14
9
9
9
9
10
11
13
14
Electrical connections
Primary connections
Bus bars and connectors
Bolted bus joints
Hardware tightening instructions
Connection to power transformer
Primary power cable connections
Control wiring
Current transformers
Ground connections
Cleaning
Inspection and tests
Inspection and testing
Inspection
Testing
Placing equipment into service
Maintenance
Introduction and maintenance intervals
Recommended hand tools
Recommended maintenance and lubrication
Lubrication
Wiping electrical contacts
Mechanical devices
Circuit breakers
Cleaning insulation
Corrosive atmospheres
Relays and instruments
Equipment surfaces
17-21
17
17
17
20
20
21
21
21
21
21
22-23
22
22
22
23
24-26
24
24
24
25
25
25
25
26
26
26
26
Introduction and safety
Introduction
Type WL low voltage switchgear is designed to meet all applicable
UL, ANSI, NEMA and IEEE standards. Successful application and operation of this equipment depends as much upon proper installation and maintenance by the user as it does upon the careful design and construction by Siemens.
The purpose of this Instruction Manual is to assist the user in developing safe and efficient procedures for the installation, maintenance and use of the equipment.
Contact the nearest Siemens representative if any additional information is desired.
DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep out.
Qualified personnel only.
Disconnect and lock off all power before working on this equipment.
Qualified person
For the purpose of this manual and product labels, a Qualified
Person is one who is familiar with the installation, construction and operation of the equipment and the hazards involved. In addition, this person has the following qualifications:
• Training and authorization to energize, de-energize, clear, ground and tag circuits and equipment in accordance with established safety practices.
• Training in the proper care and use of protective equipment such as rubber gloves, hard hat, safety glasses, face shields, flash clothing, etc., in accordance with established safety procedures.
• Training in rendering first aid.
Signal words
The signal words “Danger,” “Warning” and “Caution” used in this manual indicate the degree of hazard that may be encountered by the user. These words are defined as:
Danger – Indicates an imminently hazardous situation which if not avoided, will result in death or serious injury.
Warning – Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.
Caution – Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury.
Dangerous procedures
In addition to other procedures described in this manual as dangerous, user personnel must adhere to the following:
1. Always work on de-energized equipment. Always de-energize a breaker, and remove it from the switchgear before performing any tests, maintenance or repair.
2. Always discharge energy from closing and opening
(tripping) springs before performing maintenance on circuit breakers.
3. Always let an interlock device or safety mechanism perform its function without forcing or defeating the device.
Field service operation
Siemens Industrial Services Division can provide the following support services for Type WL low voltage switchgear. Call
1-800-241-4453 to obtain additional information and schedule an appointment.
• Start-up and Commissioning
• Component and System Testing
• Maintenance (Scheduled and Preventative)
• Repair and Refurbishing
• On Site Operational Training
2 Type WL Switchgear Instruction and Installation Guide
General description
Figure 1. Typical indoor type WL switchgear
Introduction
The successful performance of Metal-Enclosed Switchgear depends as much on proper installation and maintenance as it does on good design, careful manufacture and correct application.
Siemens Type WL Metal-Enclosed Switchgear is precision built equipment designed to function efficiently under normal operating conditions. It is designed and manufactured to operate within the ANSI C37 standards for Metal-Enclosed
Low Voltage Switchgear. Performance requirements of these standards have been met or exceeded by these designs.
The principal standard which applies is:
C37.20.1 Metal-Enclosed Low Voltage Switchgear
The instructions included in this manual are provided to aid you in obtaining longer and more economical service from your
Siemens switchgear. For proper installation and operation, this information should be distributed to your operators and engineers.
By carefully following these instructions, difficulties should be avoided. However, they are not intended to cover all details of variations that may be encountered in connection with the installation, operation and maintenance of this equipment.
Should additional information be desired, including replacement instruction books, contact your Siemens representative.
Scope
These instructions cover the installation, operation and maintenance of Siemens Type WL metal-enclosed low voltage switch gear assemblies, using Type WL low voltage power circuit breakers. The equipment described in this manual consists of indoor or outdoor designs for application up to 600 Volts. A typical indoor Type WL switchgear assembly is shown in
Figure 1.
Standard construction details of the switchgear, auxiliary equipment and necessary accessories are given in the appropriate sections. Special mechanical and electrical devices, furnished in accordance with purchase order requirements, are covered by supplementary instructions submitted with this instruction book. Ratings described in this manual are in accordance with UL, NEMA, IEEE and ANSI standard requirements.
The equipment furnished has been designed to operate in a system having the circuit capacity specified by the purchaser.
If for any reason the equipment is later used in a different system, or if the short-circuit capacity of the system is increased, the bus bracing (momentary) and short time ratings of the switchgear, the interrupting capacity of the circuit breakers and the bus capacity must be checked. Failure on the part of the user to receive approval of intended changes from Siemens may cause voiding the warranty.
General description
The switchgear described in this manual is of the metal-enclosed type. The switchgear sections described are comprised of full depth structural frames and components providing separate compartments for drawout breakers, buses, and auxiliary equipment. In addition, the section main bus and intersection bus work may be isolated (optional) from the primary entrance cable area with segregating barriers. Interlocks are provided, where necessary, to insure proper sequence and safe operation.
Type WL indoor switchgear consists of one or more vertical sections secured together as a single group. It is completely operational when installed and connected to purchaser’s power supply. When connected directly to a power transformer, a 14.9”
(381.4mm) wide transition section may be provided to adjust connections to the proper elevation. Circuit breaker compartments are provided with hinged access doors for installing or removing circuit breakers. Auxiliary compartments are designed with hinged panels for mounting of instruments, relays and switches.
Type WL outdoor switchgear is similar to indoor switchgear, except that it is enclosed in a weather resistant (NEMA 3R) steel housing. The equipment is designed so that weather conditions will not affect operation of the switchgear. In the walk-in outdoor enclosure, an illuminated service aisle is provided at the front of the switchgear allowing inspection and maintenance without exposure to the elements. An access door is provided at each end of the aisle wall in the walk-in outdoor enclosure with panic bar latch release inside the aisle. The rear of each vertical section is equipped with a door for access to the primary cable entrance area.
Type WL Switchgear Instruction and Installation Guide 3
Receiving, handling and storage
Receiving
Each shipping section of switchgear is securely blocked and braced for shipment. It is crated, boxed or covered as required by shipping conditions. Whatever method of shipment is employed, every precaution is taken to insure its safe arrival.
If special handling is required, it is so indicated on the shipment.
All moving parts are secured; however, relatively delicate instruments are included which requires that each section be handled carefully until installed in its final location. The maximum length of a shipping section is 110 inches (2794mm).
Figure 2 shows a maximum size section composed of five 22 inch (559mm) wide units.
NOTE: When circuit breakers are shipped installed in their respective compartments, they are secured in the fully connected position.
Identification
In the case of unit substations, the low voltage circuit breakers may be key interlocked with the transformer primary switches.
Check substation numbers on packaging of switchgear and primary switches with those noted on applicable general arrangement and floor plan drawings. These numbers insure that all components applying to a particular substation are correctly located before uncrating.
When there are multiple shipping sections, each may be identified by a tag giving a drawing number which also appears on the purchaser’s copy of the shipping list. The shipping list also describes the content of the crate or package as section or unit No. 1-2-3 etc. Refer to the general arrangement drawing for location of each shipping section within a group lineup.
Use this information to simplify the assembly operation and avoid unnecessary handling.
Inspection and unpacking
Inspect the equipment as soon as possible after receiving for any damage that may have occurred in transit. Before unpacking, examine the package itself as a damaged package may indicate an area of damage within. Be careful when unpacking equipment.
The use of sledge hammers and crowbars may damage the finish, if not the equipment itself. Use nail pullers. After unpacking, examine the equipment for any possible damage.
Check the shipping manifest to be certain that all items have been received. Do not destroy any packing material until all items listed on shipping manifest have been accounted for.
Small packages of parts can be lost in packing material. Do not remove identification tags from apparatus until the switchgear is completely installed.
If there are any shortages, or damage not previously noted, make certain it is noted on the delivery receipt and contact the carrier immediately. Notify the Siemens sales office of any shortage or damage.
Spreader Bars
Lifting Bar
LIFTING PROCEDURE
LIFT POINTS ON THE
EQUIPMENT ARE LABELED
AND LIFT CONNECTIONS ARE
TO BE MADE ONLY AT THESE POINTS.
Figure 2. Lifting indoor switchgear
4 Type WL Switchgear Instruction and Installation Guide
SPREADER BAR MUST BE USED
IN CONJUNCTION WITH LIFTING
CABLES. SPREADER BAR IS NOT
FURNISHED WITH EQUIPMENT.
Receiving, handling and storage
Shipping damage claims
Important: The way visible shipping damage is treated by consignee prior to signing the delivery receipt can determine the outcome of the damage claim to be filed.
Notifications to carrier within the 15 day limit on concealed damage is essential if loss resulting from unsettled claims is to be eliminated or minimized.
1. When shipment arrives, note whether equipment is properly protected from the elements. Note trailer number on which the equipment arrived. Note blocking of equipment. During unloading make sure count agrees with delivery receipt.
2. Make immediate inspection for visible damage upon arrival, and prior to disturbing or removing packaging or protective wrapping. This should be done prior to unloading when possible. When total inspection cannot be made on the vehicle prior to unloading, close inspection during unloading must be maintained and visible damage noted on the delivery receipt. Take pictures when possible.
3. Any visible damage must be noted on the delivery receipt and acknowledged with the driver’s signature. The damage should be detailed as much as possible. It is essential that a notation “Possible internal damage, subject to inspection” be included on delivery receipt with damage noted, the shipment should not be signed for by the consignee or his agent.
4. Notify the Siemens sales office immediately of any damage.
5. Arrange for a carrier inspection of damage immediately.
Important: Do not move equipment from the place it was set when unloading. Also, do not remove or disturb packaging or protective wrapping prior to carrier damage inspection. Equipment must be inspected by carrier prior to handling after receipt. This eliminates loss due to claims by carrier that equipment was damaged or further damaged on site after unloading.
8. Obtain the original of the carrier inspection report and forward it along with a copy of the noted delivery receipt to the Siemens sales office. Approval must be obtained by
Siemens from the carrier before any repair work can be preformed. Before approval can be obtained, Siemens must have the documents. The carrier inspection report and/or driver’s signature on the delivery receipt does not constitute approval or repair.
Note: Any adverse judgement as to whether the equipment was properly loaded or properly prepared by shipper for overthe-road travel cannot be made at the destination. Shipments are not released from the factory without a clear bill of lading, blocking and tarping of the equipment before it leaves the
Siemens factory. Therefore, if the equipment is received in a damaged condition, this damage to the equipment had to occur while enroute due to conditions beyond Siemens control. If the procedure outlined above is not followed by the consignee, purchaser, or his agent, Siemens cannot be held liable for repairs. Siemens will not be held liable for repairs in any case where the work was performed prior to authorization from Siemens.
Lifting and moving
There are a number of methods that can be used in handling the switchgear which, when properly employed, will not damage the switchgear sections. The handling method used will be determined by conditions and available equipment at the installation site. Lifting with a crane is the preferred method of handling, however, overhead obstructions or low ceilings often dictate the method to be used. Rollers, jacks or fork lift trucks may be used prior to removal of wooden skids (indoor enclosures only).
Lifting switchgear
WARNING
Heavy weight.
Can cause death, serious personal injury or property damage.
Observe all handling instructions in this instruction manual to prevent tipping or dropping of equipment.
6. Be sure equipment is properly protected from any further damage by covering it properly after unloading.
7. If practical, make further inspection for possible concealed damage while carrier inspector is on site. If inspection for concealed damage is not practical at the time the carrier inspector is present, it must be done within 15 days of receipt of equipment. If concealed damage is found, the carrier must be notified and inspection made prior to taking any corrective action to repair. Also notify the Siemens sales office immediately.
Both indoor and outdoor switchgear are lifted in the same manner. Both types have holes in the top of the equipment for attaching lift cables. These lift holes are located at the division between vertical sections within a shipping group.
The maximum shipping group is five vertical sections, excluding the transition box to liquid transformers if involved (this is not considered a vertical section). Lift points on the equipment are labeled and lift connections are to be made only at these points. (See Figure 3).
Type WL Switchgear Instruction and Installation Guide 5
Receiving, handling and storage
A drawing packet is provided with each lineup of switchgear.
Location of drawing packet is identified at the front top of each switchgear section. This packet includes a general arrangement drawing of the switchgear lineup, plus a drawing with installation and handling instructions for the equipment. A copy of this instruction manual is included. Review this information carefully before moving equipment.
The angle of the lift cable relative to a horizontal plane must not be less than 45 degrees. (See Figures 2 and 3). Also note the tension on each cable of a four cable lift at 45 degrees is 70.7% efficient, that is, 1/4 of the total load divided by .707 will equal the force in pounds on each cable. Lesser angles could damage the switchgear.
Make certain the crane used is of adequate height and capacity.
A safe estimate of required crane capacity would be 4000 lbs.
(1820 kg) per vertical section for indoor equipment, and 5000 lbs. (2275 kg) per vertical section for outdoor equipment.
Moving switchgear with rollers and jacks
Moving switchgear in an obstructed area where a crane cannot be employed can be accomplished by the use of rollers (indoor enclosure only); however, this must be done before the wooden shipping skid is removed. If pipes are used as rollers they should be of sufficient diameter that they will roll with ease without digging into the skid. In placing rollers under the skid, or removing them, it will be necessary to lift the switchgear shipping group by either jacks or a fork lift truck.
If a fork lift truck is used to lift indoor switchgear, it must be used with utmost caution to avoid possible damage to switchgear, and under no circumstances are the points of the lift contact to be other than the following:
• Indoor switchgear: Lift using the optional jacking angle provided near the bottom at each end of the shipping group.
Outdoor switchgear: Use of a fort lift truck to handle or move outdoor switchgear is NOT recommended. Outdoor switchgear should be lifted only from above, using the attachment points shown in Figure 3.
NOTE: A spreader bar must be used in conjunction with the lift cables when lifting all enclosures.
Spreader bar not furnished with equipment.
Figure 3. Lifting points (indoor or outdoor)
6 Type WL Switchgear Instruction and Installation Guide
Receiving, handling and storage
Figure 4
.
Use of jacks for lifting (indoor equipment only)
Figure 5
.
Use of rollers to move switchgear (indoor enclosure only)
Type WL Switchgear Instruction and Installation Guide 7
Receiving, handling and storage
Final movement of assembly
Proper final movement and connection of the assembly requires that several items be completed.
1. Preplan sequence of installation movements and connections.
2. Where equipment must be slid into final location, start with the left end shipping group and continue in sequence.
Secondary conduits which stub-up above floor level may block sliding in either direction. End trim must be removed before attempting slide units into place.
3. Protect equipment and external items from damage during movements. Be sure to have smooth, unobstructed surfaces where the equipment is to be slid. Keep access openings clear.
4. Prepare for the connections across shipping splits before the equipment is moved into final position. Note the mounting position and orientation of any items removed during installation, and save hardware for use in installation.
5. Thread coiled wires across shipping splits into interunit wire trough prior to moving equipment into its final position.
6. Where top lift capability is available, the shipping skid and other packaging materials may be removed before the last move into the final position.
7. Where top lift capability is not available, protect the switchgear bottom with support timbers and move with jacks and rollers just to the side of its final position. Remove rollers, shipping skid, and other packaging materials and remove jacking facilities. Clear any obstructions. The equipment may be slid sideways to join the shipping split. Any sliding force must be carefully applied across the bottom 4 inches
(100mm) of the switchgear side with proper cribbing to fully distribute the force across the full depth of side. The end trim covers must be removed from the last section to keep them from being crushed when sliding the equipment.
Replace end trim when gear is in it’s final position. Watch for conduit stubbing as equipment is slid into place. See
Figure 6.
8. Be sure to install roof channels on outdoor switchgear to make the equipment weather resistant. See Figure 13.
9. See “installation” section for additional important information.
Storage – Indoor switchgear
When switchgear is not to be installed immediately, it should be unpacked, inspected within 15 days of receipt and stored in a clean dry location. Indoor switchgear is neither weather resistant nor drip resistant. Therefore, it should be stored indoors. If it is to be stored outdoors, or in a humid, unheated area, provide an adequate covering, and place a heat source of approximately 400 watts output within each vertical section to prevent condensation. Space heaters are not standard equipment on indoor switchgear. Lubricate any moving parts such as hinges, shutters, etc., if storage is for an extensive period of time.
DANGER
Hazardous voltages.
Will cause death, serious personal injury or property damage.
Before using external source to energize space heaters, disconnect space heater circuit from normal supply to prevent back-energization of control power transformer.
Storage – Outdoor switchgear
When storing outdoor switchgear in an area exposed to the weather or to humid conditions, energize the space heaters provided within the sections and make certain that louvers and vents are uncovered to allow air to circulate. The heater circuit is typically accessible by opening the rear door of the switchgear. Refer to the switchgear wiring diagram to determine where space heater connections can be made.
Lubricate any moving parts such as hinges, shutters, etc., if storage is for an extensive period of time. Be sure to install roof channels during storage to make the equipment weather resistant. See Figure 13.
If the outdoor switchgear lineup consists of multiple shipping groups, it is neither weather resistant or drip resistant and it is strongly recommended that the equipment be stored indoors.
If it must be stored outdoors, an adequate covering must be provided to protect the equipment from the weather.
Figure 6. Final positioning of switchgear in obstructed areas without a crane
8 Type WL Switchgear Instruction and Installation Guide
Installation
Preparation for installation
Prior to installation of switchgear, study this instruction manual and the switchgear drawings, such as general arrangement, one line diagram, schematic drawings, wiring diagrams, installation instruction drawing, panel arrangement, electrical bill of material, nameplate engraving list, and accessories drawing. Special attention should be given to the foundation information contained in this manual as well as the information provided on the equipment drawings. Be sure that the foundation conforms to the requirements described in this manual and the general arrangement drawing.
Foundation – General requirements
Prior to installation of the switchgear, careful design, planning and construction of the foundation or base on which the switch- gear will rest must be made. A thorough analysis and careful construction may alleviate many problems at the time of installation, and during operation. It is important that a true and level surface be provided, that is capable of supporting the weight of the switchgear and other related equipment.
If the switchgear cannot be lowered over conduits because of head room or other restrictions, conduit couplings may be grouted in flush with foundation, and conduit nipples added after the switchgear is in place.
Conduits should be capped during construction to prevent entry of dirt, moisture and vermin.
Indoor foundations
As it is difficult to obtain a true and level floor on a concrete slab, it is highly recommended that 3” (minimum) sill channels be grouted into the floor as shown in Figure 7. The surface of the sills should be slightly above floor level. The surfaces of the sills must be level and in the same horizontal plane within 1/16”
(1.6mm). There should be no projection above the plane within the area covered by the switchgear. If the floor or sills do not meet this requirement, it will be necessary to use shims when installing the switchgear on the mounting surface. When shims are required, insure that they are installed at the front, middle and rear of the equipment as a minimum.
Outdoor foundations
Concrete slab, sill channels, piers or pilings, whichever type of foundation is used, must have smooth and level surfaces and be in the same horizontal plane within 1/16” (1.6mm). If these conditions are not met, it will be necessary to use shims when installing the switchgear.
For outdoor switchgear, support shall be provided at each end and at the side of every vertical section. Refer to Figure 8 and the switchgear general arrangement drawing for location of support and anchoring points. If pilings are used, the diameter is to be determined by purchaser; however, they should not be less than 12” (305mm) diameter for sufficient contact, room for anchor bolts, and grouting in of bed plates (if used). All shipping splits must be properly supported.
Any conduits which are installed in concrete must be perpendicular to switchgear mounting surface. Conduits should extend a maximum of 1" on indoor equipment and 3" on outdoor equipment above the equipment mounting surface. This will allow the conduit to enter the vertical section and exclude entry of water and rodents.
Type WL Switchgear Instruction and Installation Guide 9
Installation
FIgure 7. Anchoring indoor switchgear
CLAMP WASHER PROVIDED BY
CUSTOMER. RECOMMENDED
WASHER SPECIFICATION -
ZINC PLATED, 0.250" THICK,
3.00" OUTSIDE DIAMETER
AND 0.813" INSIDE DIAMETER .
FIgure 8. Anchoring outdoor switchgear
10 Type WL Switchgear Instruction and Installation Guide
Weights of vertical sections
The following estimates may be used in foundation loading calculations. These estimated weights are for each vertical section within a shipping group. The estimates are based on maximum conditions; actual equipment weights will probably be lower.
Indoor
22” wide with 4 breakers
32” wide with 2 breakers
2850 lbs. (1300kg)
3050 lbs. (1385kg)
32” wide with 1 breaker and fuse carriage 3150 lbs. (1430kg)
Transition box 680 lbs. (310kg)
Outdoor
22” wide with 4 breakers
32” wide with 2 breakers
4200 lbs. (1910kg)
4550 lbs. (2070kg)
32” wide with 1 breaker and fuse carriage 4650 lbs. (2110kg)
Transition box 680 lbs. (310kg)
These estimates should be increased for unusual secondary or auxiliary equipment, impact loading, or for seismic conditions, if required.
Installation
Indoor floor plan
1.25
(32)
typ.
4.42 (112)
.86
(22)
1.50
(38)
Transformer
Throat
Liquid filled transformers only
.86
(22)
Maximum available space in top or bottom of unit for customer's power cables
.75 (19) typ.
.75 (19) typ.
7.88
(200)
2)
5.86
(149)
B
4.00
(102)
A
D
14.9
(378)
2.37 (60)
1.00 (25)
End Trim Panel (typ.)
End of lineup only
(4) Holes for
.48 (12mm) anchor bolts
Space for secondary leads from above
5.00
(127)
2.00 (51)
Space for secondary leads from below
4.10 (104)
W
W = 22 (559) or 32 (813)
2.12
(54)
3.00 (76)
7.00
(179)
C
4.40 (112)
1.00 (25)
2.00 (51)
A
Equipment depth
60” Non-Fused with
(N, S, H or L Class Breakers)
OR
65” Fused with (F Class Breakers)
70” Non-fused with
(N, S, H or L-Class Breakers)
OR
75” Fused with (F-Class Breakers)
80” Non-fused with
(N, S, H or L-Class Breakers)
80” Fused with
(F-Class Breakers)
Direction of cables
Below
Above
Below
Above
Below
Above
Below
Above
B
21.50 (546)
2 3
21.25 (540)
2
31.50 (800)
2 3
31.25 (794) 2
41.50 (1054)
2 3
41.25 (1048)
2
36.50 (927) 2 3
36.25 (921) 2
C
13.88 (353)
18.88 (480)
13.88 (353)
18.88 (480)
13.88 (353)
18.88 (480)
Note: Dimensions shown in inches and (mm).
1 Space required for upper neutral with cables above or lower neutral with cables below.
2 Reduce by 7.88” if upper neutral is present with cables above or if a lower neutral is present with cables below.
3 Reduce by 4.00” if an 800-3200A breaker is located in the bottom compartment.
4
Reductions per notes 2 & 3 are additive. Example: cables below + lower neutral + 2000A breaker in bottom compartment = B-11.88.
4.10 (104) if W=22; 4.60 (117) if W=32.
Figure 9. Typical indoor floor plan
D
32.59 (828)
37.59 (955)
32.59 (828)
37.59 (955)
32.59 (828)
37.59 (955)
Type WL Switchgear Instruction and Installation Guide 11
Installation
Side view
Optional Hoist
Lifting Holes (3)
24.9
(632) hoist
Extension
Vent stack
4.0 (102)
102.2
(2596) top of
Hoist
Front
Compartment
E
Bus
Compartment
17.8
(452)
Cable
Compartment
F
92.0
(2337)
42.0 (1067)
Minimum
Aisle Space
Recommended
Floor Line
2.37
(60)
G
A
A
Equipment depth
60 (1524) Non-fused breakers
65 (1651) Fused breakers
70 (1778) Non-fused breakers
75 (1905) Fused breakers
80 (2032) Non-fused breakers
80 (2032) Fused breakers
Figure 10. Typical Indoor Side View
E
Breaker compartment depth
19.8 (503)
24.8 (630)
19.8 (503)
24.8 (630)
19.8 (503)
24.8 (630)
F
Rear compartment depth
22.4 (569)
22.4 (569)
32.4 (823)
32.4 (823)
42.4 (1077)
37.4 (950)
12 Type WL Switchgear Instruction and Installation Guide
G
Anchor bolt spacing
59.13 (1502)
64.13 (1629)
69.13 (1756)
74.13 (1883)
79.13 (2010)
79.13 (2010)
Installation
Outdoor non-walk-in floor plan
2
1
3
1)
2)
60" is representative for a 60" deep switchgear internal structure. For other internal structure depths (65 or 75) add extra depth to 60" that is shown.
75.37 is representative for a 60" deep internal structure. For other internal structure depths (65 or 75) add extra depth to 75.37 that is shown.
Outdoor non walk-in side view
3) Refer to appropriate indoor plan view for available customer conduit information.
1)
2)
Dimensions shown in inches (mm)
82.27 dimension is based on 60" internal frame structure and if a deeper internal frame structure is used (65 or 75) the extra depth should be added to the 82.27 dimension.
75.37 dimension is based on 60" internal frame structure and if a deeper internal frame structure is used (65 or 75) the extra depth should be added to the 75.37 dimension.
FIgure 11. Typical non walk-in outdoor floor plan and side view
3)
4)
60.43 dimension is based on 60" internal frame structure and if a deeper internal frame structure is used (65 or 75) the extra depth should be added to the 60.43 dimension.
73.77 dimension is based on 60" internal frame structure and if a deeper internal frame structure is used (65 or 75) the extra depth should be added to the 73.77 dimension.
Type WL Switchgear Instruction and Installation Guide 13
Installation
Outdoor walk-in floor plan
2
Overall Width
1
3
1)
2)
60" is representative for a 60" deep switchgear internal structure. For other internal structure depths (65 or 75) add extra depth to 60" that is shown.
103.8" is representative for a 60" deep internal structure. For other internal structure depths (65 or 75) add extra depth to 103.8" that is shown.
Outdoor walk-in side view
3) Refer to appropriate indoor plan view for available customer conduit information.
Dimensions shown in inches (mm)
1) 110.7 dimension is based on 60" internal frame structure and if a deeper internal frame structure is used (65 or 75) the extra depth should be added to the 110.7 dimension.
2) 103.8 dimension is based on 60" internal frame structure and if a deeper internal frame structure is used (65 or 75) the extra depth should be added to the 103.8 dimension.
Figure 12. Typical outdoor walk-in floor plan and side view
3)
4)
60.43 dimension is based on 60" internal frame structure and if a deeper internal frame structure is used (65 or 75) the extra depth should be added to the 60.43 dimension.
102.2 dimension is based on 60" internal frame structure and if a deeper internal frame structure is used (65 or 75) the extra depth should be added to the 102.2 dimension
.
14 Type WL Switchgear Instruction and Installation Guide
Installation
Installing shipping sections
The proper method of installation depends on whether the switchgear has been shipped as one complete group, or in two or more shipping sections. The general arrangement drawings will indicate the shipping sections, vertical section numbers and their location within the switchgear lineup. Sections are assembled and wired in accordance with the arrangement as in the final installation.
Mounting surfaces (sills, slab, piers or pilings) must be level and in the same plane. Conduits must be properly located and installed so that they will clear the floor plate cutouts. Mounting surfaces must be swept free of stones, chips and other debris.
Setting shipping sections
After checking each shipping section for its proper location sequence, as shown on the general arrangement drawing, move the first section of the switchgear to its location. When a throat-connected transformer is part of the installation and in its current location, the switchgear is positioned next to the transformer as shown in Figures 20 and 21. The switchgear shipping section should be kept high enough to just clear any conduits, and then moved toward the transformer throat to conform to the dimensions shown on the general arrangement drawing.
Align the switchgear with the anchor bolt locations and
(simultaneously) with the conduit locations. With all points aligned and with conduit caps and floor plate covers removed, carefully lower the section to its permanent location.
It is important that the first section be accurately positioned and leveled as each successive section will depend on the first.
Leveling of the switchgear
The floor, sills, piers, or pilings must be true and in a level plane. Within the area of the switchgear, there should be no projections (such as pebbles, concrete or debris) protruding above this plate.
To make certain that there has been no distortion of the switch- gear in shipping or handling, each shipping section should be checked with a plumb line after it is resting on the permanent (level) foundation. A plumb line dropped from the top front corner at each end of the shipping section should verify that the section is vertical within 1/8” (3.2mm). Out-ofplumb conditions greater than 1/8” (3.2mm) usually indicate an uneven base, and shimming may be required.
Leveling indoor switchgear
Each section is provided with four anchor bolt locations, as shown in Figures 9, 10, 11 and 12. Examine these anchor bolt locations to make certain that the section is in firm contact with the mounting surface in the area of the anchor bolt. In the absence of firm contact, shims must be added adjacent to the anchor bolt holes. These shims will prevent distortion of the section when anchor bolts are drawn tight. Shims should be approximately three inches square, and sufficient shims should be installed to provide firm contact between the section and the shimmed foundation. Tighten anchoring hardware, and check for plumb. The act of tightening of the anchoring hardware should not cause any distortion of the section. If the section does distort, add additional shims as required. Ensure that the switchgear frame is in firm contact with the mounting surface at the rear of the front compartments (19.8” (503mm) for non-fused breakers or 24.8” (630mm) for fused breakers, see Figure 10, Dimension E). Shim as required in each section.
If the lineup consists of more than one shipping section, each successive shipping section should be installed in a similar manner. Move the second section into place, being certain that the front panels are aligned with those of the first section.
Check for plumb as was done for the first section. Insert hardware for bolting the two sections together, but do not tighten. Repeat the leveling, shimming and tightening of anchoring hardware as on the first section. After this is complete, tighten the hardware holding the two shipping sections together. Repeat this procedure for each shipping section in the line-up
Leveling outdoor switchgear
Plumbing and leveling outdoor equipment is basically the same as for indoor. When resting on its permanent foundation, the sections should be plumb within 1/8” (3.2mm). Unlike indoor switchgear, outdoor equipment is anchored using studs or
J-bolts grouted into the foundation, and with clamp washers gripping the switchgear base. Examine the area adjacent to each anchor bolt to make certain that the base is in firm contact with the mounting surface. If these are areas adjacent to these studs which are not in firm contact with the mounting surface, shims must be added as described for indoor units.
These shims must prevent distortion of the base when anchor hardware is tightened. With all points of contact checked, and shipping section properly located, tighten anchor hardware.
Ensure that the switchgear base is in firm contact with the mounting surface at the front instrument panel location (refer to Figure 12). Shim as required at sides of shipping section.
Type WL Switchgear Instruction and Installation Guide 15
Installation
If the lineup consists of more than one shipping section, each successive shipping section should be installed in the similar manner. Move the second section into place, being certain that the front panels are aligned with those of the first section.
Check for plumb as was done for the first section. Insert hardware for bolting the two sections together, but do not tighten.
Repeat the leveling, shimming and tightening of anchoring hardware as on the first section. After this is complete, tighten the hardware holding the two shipping sections together.
Repeat this procedure for each shipping section in the lineup.
Check the supports to be sure that no shipping split (junction between two shipping sections) is unsupported. If proper support is not present, correct as needed.
Install roof channels as shown in Figure 13.
Angle Stop Track Angle Stop
Figure 13. Installing outdoor roof channels
Installation of traveling crane
DANGER
Heavy weight.
Can cause death, serious personal injury or property damage.
Install traveling crane per the following instructions and tighten all hardware.
The traveling crane is furnished as standard equipment on walk-in outdoor switchgear, and is shipped installed.
For indoor switchgear installations, the traveling crane is an optional accessory. When this option has been ordered, the crane is shipped loose with the accessories. To mount the crane, it is necessary to remove the stop angles from one end of the track, roll the crane onto the track, and reinstall the stop angles. See Figure 14.
Important: Be sure that the crane is properly lubricated before use, as outlined in the “Maintenance” section of the manual.
R.H. End L.H. End
Figure 14. Traveling crane
DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep out.
Qualified personnel only.
Disconnect and lock off all power before working on this equipment.
Extension of existing switchgear
Provisions have been made for future extension of switchgear lineups. The main bus has been terminated with silver-plated copper pads with the necessary holes to splice to the new installation.
Extending indoor switchgear
To extend indoor switchgear, remove the end plate, line up and anchor the new equipment, as covered in the first part of this instruction book, make up the primary and secondary connections, and mount the end plate at its new location.
Extending outdoor switchgear
Before extending the length of outdoor switchgear a new section of foundation should be installed and ready, with anchoring studs and the required conduits in place.
To expand outdoor switchgear, remove the existing end roof channel and the end plate from both aisle and vertical section.
It also will be necessary to relocate the aisle door panel (mounted in the aisle wall) and replace it with a new aisle wall panel which will be shipped with the new equipment. Align the new switchgear with the existing lineup, using the same procedure as discussed earlier in this section.
Tighten the anchoring hardware. Make up primary and secondary connections. Relocate the aisle wall door panel to the end of aisle and install the new aisle panel. Install the roof channels at the split between the existing and new sections. Remount the end plates and reinstall the end channel.
16 Type WL Switchgear Instruction and Installation Guide
Electrical connections
Primary connections
Bus bars and connectors
Horizontal bus bars, risers and various connectors are fabricated using silver-plated copper bus bar as a standard and available in tin-plated copper as an option. Typical bus arrangement is as illustrated in Figure 15.
When copper bus is provided, all joints are of bolted construction, and completely assembled at factory except for shipping split splices and termination points to other equipment. Contact areas are silver-plated or tin-plated and may be coupled to tin-plated bus bars or silver-plated bus bars.
DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep out.
Qualified personnel only.
Disconnect and lock off all power before working on this equipment.
Bolted bus joints
When bus joints are field assembled, the following procedure shall be used.
1. All surfaces must be free of dust dirt, and other foreign material.
2. Do not use any abrasive cleaner on plated contact
surfaces. Cleaning normally is not necessary and should not be done unless parts are badly tarnished. If cleaning is necessary, use a mild cleaner and thoroughly rinse parts to remove all residue.
3. Assemble all joints with parts dry. Do not use any grease or oxide inhibiting compounds.
4. Refer to Figures 16, 17 and 18 for method of bolting joints, and follow hardware tightening instructions which follow.
5. Horizontal main bus joints with two or four laminations of through bus (Figures 17 and 18) may be serviced as follows: a. Remove four bolts, splice plate and shim plates
(Step 2).
b. Torque inner bolts (Step 1) with a long 3/8” hex bit.
Move sliding nut plate on inside of “C” beam to left to torque left side inner bolts. Move sliding nut plate to right to torque right side inner bolts.
c. Reinstall outer four bolts, splice plate and shim plates and torque.
Figure 15. Typical bus bar arrangement
Type WL Switchgear Instruction and Installation Guide 17
Electrical connections
REAR ISOMETRIC VIEW
NOTE:
B-PHASE BUS JOINT SHOWN, A & C PHASES SAME
FIgure 16. One lamination through bus
STEP 1
BOLT HORIZONTAL BUS TO
POWER CONNECTOR SUB-ASSEMBLY
USING SPLICE PLATE AND SHIM
PLATE AS REQUIRED (RIGHT BUS
SECTION SHOWN, THROUGH BUS
DOES NOT REQUIRE SHIM PLATE)
REAR ISOMETRIC VIEW
FULLY ASSEMBLED
REAR ISOMETRIC VIEW
STEP 1
BOLT FRONT SECTION
OF HORIZONTAL BUS
TO POWER CONNECTOR
SUB-ASSEMBLY USING
“C” BEAM AND SHIM
PLATE AS REQUIRED
(RIGHT BUS SECTION
SHOWN, THROUGH BUS
DOES NOT REQUIRE
SHIM PLATE)
REAR ISOMETRIC VIEW
FULLY ASSEMBLED
REAR ISOMETRIC VIEW
NOTE:
B-PHASE BUS JOINT SHOWN, A & C PHASES SAME
STEP 2
BOLT REAR SECTION OF
HORIZONTAL BUS TO “C”
BEAM USING SPLICE PLATE
AND SHIM PLATE AS REQUIRED
(RIGHT BUS SECTION SHOWN,
THROUGH BUS DOES NOT
REQUIRE SHIM PLATE)
Figure 17. Two lamination through bus
18 Type WL Switchgear Instruction and Installation Guide
Electrical connections
STEP 1
BOLT FRONT SECTION OF
HORIZONTAL BUS (DOUBLE
BAR) TO POWER CONNECTOR
SUB-ASSEMBLY USING 4-1/2"
“C”- BEAM AND SHIM PLATES
(DOUBLE THICKNESS) AS
REQUIRED (RIGHT BUS SECTION
SHOWN, THROUGH BUS DOES
NOT REQUIRE SHIM PLATES)
REAR ISOMETRIC VIEW
REAR ISOMETRIC VIEW
Figure 18. Four lamination through bus
NOTE:
B-PHASE BUS JOINT SHOWN, A & C PHASES ASSEMBLE SAME
REAR ISOMETRIC VIEW
FULLY ASSEMBLED
STEP 2
BOLT REAR SECTION OF
HORIZONTAL BUS (DOUBLE
BAR) TO “C”- BEAM USING
SLICE PLATE AND SHIM PLATES
(DOUBLE THICKNESS) AS
REQUIRED (RIGHT BUS SECTION
SHOWN. THROUGH BUS DOES
NOT REQUIRE SHIM PLATES)
Type WL Switchgear Instruction and Installation Guide 19
Electrical connections
Hardware tightening instructions
All bus joint hardware furnished is zinc-plated, dichromate treated, high strength steel. Cap screws are 1/2-13 SAE Grade
5, while nuts are SAE Grade 2. Sizes and grades other than these are not to be used. Refer to Figure 19 for required hardware torque values. When purchaser’s specifications require, special hardware (e.g., stainless steel) may be provided. For such applications, consult the factory for proper torque range.
Torque hardware as described above. Do not exceed the maximum torque value given. Forces within the torque range will produce a low resistance joint, without cold flow of material
Connection to power transformer
Before making the primary connections to a liquid transformer, it will be necessary to remove the transition box cover for access.
See Figure 21. The joints connecting power transformers to the switchgear are the same as joints previously described, except that braided flexible connectors are used to make certain that strain transmitted to the transformer bushings is minimal and as an aid to alignment. See Figure 20. Connections to dry type transformers are normally made within the transformer enclosure.
Torque values for low voltage equipment
Electrical joint hardware except cable terminals
Thread Size
1/4-20
3/8-16
M10
1/2-13
Torque 1) (Lb-Ft)
6-9
20-30
40-50
40-50
1) Values shown are for non lubricated threads.
Field wire connectors – Tightening torque
Torque all wire connectors, where not marked on the device or component, to the values indicated in the table below
Hex Socket Set Screw Size
(Across Flats)
7/32”
1/4”
5/16”
3/8”
1/2”
9/16”
Torque (Lb-In)
150
200
275
375
500
600
Torque values for self-threading screws In plastic
Thread Size
#8
1/4-14
Torque (Lb-In)
10-12
45-55
Figure 19. Torque values
Transition Phase Bus
Transformer
Flange
Transition
Neutral Bus
Flexible Connectors
Figure 20. Transformer throat connection (lower bus shown, upper bus similar)
Transformer connector arrangements are shipped with flexible connectors attached to either the switchgear assembly or the transformer assembly. The flexible connectors contain the required hardware to make the connections to the transformer terminals. Carefully observe how the flexible connectors are mounted to the switchgear (placement of bolts, nuts, washers and spacers) then remove the flexible connectors or carefully spread them to prevent damage to the transformer terminals or connectors while the switchgear is brought into final position.
Carefully connect the flexible connectors to the transformer and switchgear terminals, and torque all connections.
Trim cover slides over transformer flange, overlaps and is bolted to transition box on both sides.
Removable access covers on both sides are bolted to transition box.
Indoor transition box to liquid transformer on left hand end of switchgear group.
Figure 21. Transformer hood
20 Type WL Switchgear Instruction and Installation Guide
Electrical connections
Primary power cable connections
Because of considerable variations in purchaser requirements and available cables, Siemens furnishes mechanical terminal lugs only, unless specified otherwise by the purchaser.
Important: Clearance between bare phase conductors and to ground should be at least one inch. If this requirement is not met, the connections should be insulated with electrical insulating tape to achieve the required dielectric levels.
Primary and secondary cables should enter the switchgear through the space shown on the General Arrangement drawing.
Always arrange cables in smooth curves and anchor securely to cable supports to relieve strain on termination, and to control cable movement under short-circuit conditions. Figure 22 shows the recommended cable lashing installation for supply and load cables. If cable entry is from above, drill the top plate or roof plate to suit. For outdoor installations, drill the cable area cover to suit the conduits. If cable entry for outdoor or drip resistant applications is through the roof, install code-approved hubs or weather seal means.
Before the cable connections are made, phase rotation should be checked.
Nylon Rope –
3/8” (9.5mm)
Dia. Minimum of 5 wraps
6”
(152 mm)
Figure 22. Cable Lashing Instructions
Control wiring
Terminal blocks are provided in the front of the switchgear for purchaser’s control wiring connections. Refer to the master wiring diagram for wire designations. Wiring between sections at shipping splits is connected and tagged as shown on the master wiring diagram for purchaser’s ease in field connection.
Shipping split wiring connections are made in an area on top of the switchgear near the front of the section. A removable cover allows access to these connections.
For ventilated dry transformer installations, a conduit is furnished for wiring between switchgear and the temperature control system box on the transformer. This conduit is installed and wired by the purchaser in the field
For liquid filled transformer installations, the conduit is furnished with the transformer for connecting to the switchgear in the field.
Current transformers
DANGER
Hazardous voltage.
Will cause death or serious injury.
Do not open-circuit the secondary of an energized current transformer. Always short-circuit the secondary of any current transformer before performing maintenance on current transformer wiring.
Current transformers for metering are generally mounted on the stationary primary disconnect studs in the circuit breaker compartment and are readily accessible for inspection and replacement.
Current transformers for electronic trip device use are called
“tripping transformers.” They are mounted in the circuit breaker except when a ground fault trip element or neutral metering element is furnished for a four wire application. In this case, a fourth tripping transformer is mounted in the cable compartment on the neutral bus or in the link between the neutral bus and the ground bus. This will be shown on the one line diagram.
Ground connections
A common ground bus is incorporated in all sections for properly grounding the switchgear after installation. Provisions for connecting this ground bus to the station ground must be made by purchaser in a reliable manner. Ground per requirements of NEC.
Cleaning
DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep out.
Qualified personnel only.
Disconnect and lock off all power before working on this equipment.
When switchgear installation is complete and all electrical connections have been made, but prior to energizing, or installing circuit breakers, all equipment must be thoroughly cleaned using a vacuum cleaner to make certain they are free of construction dust, chips or other debris. Do not use pressurized air (ie., an air hose) to blow dirt and debris out of the switchgear as this can cause foreign items to lodge in areas from which removal will be difficult. Do not use solvents without reading “Cleaning of Insulation” in the
“Maintenance” section.
Type WL Switchgear Instruction and Installation Guide 21
Inspection and tests
DANGER
Connected positions)
Keep out.
Qualified personnel only.
Disconnect and lock off all power before working on this equipment.
Inspection and testing
Before the equipment is energized, it must be thoroughly inspected and tested. Correct any deviations before energization.
Inspection
Check the following points:
1. Power connections and secondary control connections properly made and checked for shorts and undesired grounds.
2. Electrical disconnecting contacts, machined parts, shutters, etc., checked for lubrication and operation.
3. Blocking supports and other temporary ties removed from breakers, instruments, relays, etc.
4. Proper fuses correctly placed.
5. After external connections have been made, check that temporary wiring jumpers (used on the secondaries of current transformers tied to external devices, as shown on wiring diagrams) have been removed.
6. Ground connections properly made.
7. All equipment which has been removed during assembly has been replaced.
8. Trip devices and/or relays coordinated with other protective devices on the system. Refer to protective device instructions before making any adjustments. Consult the local utility before making any connections to the power supply system.
9. Storage battery fully charged and battery charger operating correctly (For DC control source only).
10. Interlocks performing properly.
11. Circuit breakers checked and prepared per instruction manuals.
12. All filters in vent area are clean and free of shipping or construction material.
13. All tools removed from equipment, and equipment clean.
Testing
1. A megger test is made on the high voltage circuit to be sure that all connections made in the field are free of undesired grounds. A megger test is also advisable on the control circuit.
2. A dielectric test, if possible, should be made on the high voltage (power) circuit for one minute at the appropriate test voltage. (Voltage transformers, control power transformers, surge arresters, and surge capacitors must be disconnected during this test).
Rated voltage of circuit
480 or 600 volts
208 or 240 volts
Secondary and control circuits
Test voltage
75% of 2200 = 1650 VAC
75% of 1500 = 1125 VAC
75% of 1500 = 1125 VAC
Note: Certain control devices, such as motors and motor circuits, should be tested at 675V AC. Electronic devices should be tested at the voltages specified in the instruction manual for the electronic device.
In accordance with ANSI C37.20.1, Field Dielectric Tests are also recommended when new units are added to an existing installation, or after major field modifications. The equipment should be put in good condition prior to the field test. It is not expected that equipment shall be subjected to these tests after it has been stored for long periods of time or has accumulated a large amount of dust, moisture, or other contaminants without being first restored to good condition.
CAUTION
Excessive test voltages may result in damage to equipment.
Do not perform dielectric tests at test voltages exceeding the ratings of the tested equipment.
3. With circuit breaker in the TEST position make the following tests on each unit:
A. Trip and close the circuit breaker manually, and electrically if breaker is electrically operated.
B. Use a trip test set or other suitable source of current to trip the circuit breaker through the trip device.
C. If protective relays are provided, trip electrically operated circuit breaker by passing sufficient current for voltage,
(if applicable) through the coils of protective relays.
D. Trip and close electrically operated circuit breakers from any remote control locations.
E. Operate auxiliary device (e.g., MOC or TOC switches) to confirm correct operation.
F. Test the phase sequence of polyphase high voltage circuits, particularly those used for motor starting.
G. Perform other tests and checks in accordance with the circuit breaker and trip device instruction manuals.
H. Test for correct phasing across the bus tie circuit.
4. Current transformer circuits are tested for continuity. As shown in Figure 23, with the switchgear installed but not energized, disconnect the “grounded” lead at the current transformer secondary terminal block connection, and pass a measurable amount of current not to exceed five amperes through the lead to ground. Pass sufficient current to observe operation of relays and instruments.
Manipulate the instrument switches and observe the phasing. Repeat with each transformer. Do this for metering and relaying current transformers only – not breaker tripping transformer.
22 Type WL Switchgear Instruction and Installation Guide
Inspection and tests
Figure 23. Current transformer testing
Placing equipment into service
To place equipment in service for the first time, proceed as follows:
1. Check that all circuit breakers are open and all contact circuits energized.
2. Connect incoming power source to equipment.
3. Check all instruments, relays, meters, etc., during this time.
4. Connect as small a load as possible and observe instruments.
Note: Allow several minutes before connecting additional load.
5. Gradually connect more load to the equipment while observing instruments until the full load is connected.
6. Check for overheating of primary and secondary circuits and satisfactory operation of all instruments during the first week of operation.
Type WL Switchgear Instruction and Installation Guide 23
Maintenance
Introduction and maintenance intervals
Periodic inspections and maintenance are essential to obtain safe and reliable operation of the switchgear. When Type
WL switchgear is operated under “Usual Service Conditions,” maintenance and lubrication is recommended at five-year intervals. “Usual” and “Unusual” service conditions for Low
Voltage Metal-enclosed Switchgear are defined in ANSI
C37.20.1. Generally, “usual service conditions” are defined as an environment in which the equipment is not exposed to excessive dust, acid fumes, damaging chemicals, salt air, rapid or frequent changes in temperature, vibration, high humidity, and extremes of temperature.
The definition of “usual service conditions” is subject to a variety of interpretations. Because of this, you are best served by adjusting maintenance and lubrication intervals based on your experience with the equipment in the actual service environment.
Regardless of the length of the maintenance and lubrication interval, Siemens recommends that circuit breakers should be inspected and exercised annually.
DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep out.
Qualified personnel only.
Disconnect and lock off all power before working on this equipment.
For the safety of maintenance personnel as well as others who might be exposed to hazards associated with maintenance activities, the safety related work practices of NFPA 70E, parts
II and III should always be followed when working on electrical equipment. Maintenance personnel should be trained in the safety practices, procedures and requirements that pertain to their respective job assignments. This manual should be reviewed and retained in a location readily accessible for reference during maintenance of this equipment.
The user must establish a periodic maintenance program to ensure trouble-free and safe operation. The frequency of inspection, periodic cleaning and preventative maintenance schedule will depend upon the operation conditions. NFPA
Publication 70B, “Electrical Equipment Maintenance” may be used as a guide to establish such a program. A preventative maintenance program is not intended to cover reconditioning or major repair, but should be designed to reveal, if possible, the need for such actions in time to prevent malfunctions during operation.
Recommended hand tools
The switchgear uses standard SAE fasteners, although some devices (particularly instruments), may have metric fasteners.
Recommended maintenance and lubrication
Periodic maintenance and lubrication should include all the tasks shown in Table 1.
WARNING
Failure to properly maintain the equipment can result in death, serious injury or product failure, and can prevent successful functioning of connected apparatus.
The instructions contained herein should be carefully reviewed, understood, and followed.
The maintenance tasks in Table 1 must be performed regularly.
Table 1. Maintenance tasks
1. Before any maintenance work is performed within primary compartments, make certain that the equipment is completely de-energized, tested, grounded, tagged and properly identified and released for work in an authorized manner.
2. Before starting work on the switchgear, the following should be completed on any equipment that will affect the area of the work:
A. Disable remote control and automatic transfer schemes.
B. De-energize all direct and backfeed power and control sources, test and ground.
C. Disconnect all voltage and control power transformers.
D. Open all disconnects.
3. Include the following items in your inspection procedure:
A. Check general condition of switchgear installation
B. Inspect switchgear interior for accumulation of dust, dirt or any foreign matter, and clean as needed.
C. Clean air filters by washing in any mild household detergent.
D. Examine indicating lamps and replace as required.
E. Check terminal block contacts for loose connections.
F. Check instrument and control switches and inspect their contacts.
G. Check for proper condition of instrument transformers.
Replace burned out fuses, if any. Check primary and secondary connections.
H. Remove dust from all insulators and insulation.
I. Inspect bus bars and connections for proper condition. If bus bars are overheating, check for poor or loose connections or for overload.
J. Check wiring for loose connections.
K. Examine automatic shutters (if any) for proper operation.
L. Check MOC and TOC switches (if provided) and their operating mechanisms for proper operation, and check their contacts.
M. Examine all safety interlocks for correct function.
N. Perform maintenance of circuit breakers outlined in circuit breaker instruction manual.
O. Check space heaters and thermostat (if equipped) for proper operation.
P. Maintain other equipment per the relevant instruction manual requirements.
Q. Lubricate mechanisms, contacts, and other moving components.
R. Replace, reassemble, re-insulate, return all items to proper operating conditions and remove grounds prior to energization.
24 Type WL Switchgear Instruction and Installation Guide
Maintenance
The list of tasks in Table 1 does not represent an exhaustive survey of maintenance steps necessary to ensure safe operation of the equipment. Particular applications may require further procedures. Should further information be desired or should particular problems arise which are not covered sufficiently for the Purchaser’s purposes, the matter should be referred to the local Siemens sales office.
The use of unauthorized parts in the repair of the equipment, or tampering by unqualified personnel will result in dangerous conditions which can cause death, serious injury or equipment damage. Follow all safety instructions contained herein.
Lubrication
Lubrication is most essential in maintaining the performance of switchgear and should not be treated indifferently. It will aid in protecting the switchgear from corrosion and wear, and will help assure that all operating mechanisms work freely.
Lubrication intervals should be adjusted to suit the operating conditions. Lubrication is required at more frequent intervals under severe operating conditions of when exposed to contaminated atmosphere.
Siemens electrical contact lubricant, part no. 11-B-9824, is not only an excellent contact lubricant, but also a fine general purpose grease for mechanical parts. This grease has very good thermal stability to cover the wide range of conditions to which switchgear may be exposed, and aids in protecting silver-plated contact surfaces from tarnish. The following areas or parts must be lubricated:
1. Wiping electrical contacts
2. Mechanical devices
3. Circuit breakers
Siemens WL circuit breakers are shipped with a special lubricant applied, as required, at the factory. This lubricant, Part No.
11-B-9824, should not be mixed with other lubricants, as they may interact and lose essential properties.
Wiping Electrical contacts
The silver-plated contact surfaces of primary disconnects and secondary disconnects, when properly lubricated, will greatly outwear contacts without grease, and will be protected from severe tarnishing. After wiping off old grease, apply a thin film of electrical contact lubricant 11-B-9824 periodically.
Important: If optional shutters are included with the equipment, refer to the applicable section in the WL
Breaker Operator's Manual and study the operation of the shutter before attempting to open the shutter. The shutter must be open in order to allow lubrication of the primary disconnects in the switchgear.
Avoid getting contact lubricant on insulating materials.
DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep out.
Qualified personnel only.
Disconnect and lock off all power before working on this equipment.
Electrical contact lubricant should be applied to:
1. Primary disconnects
2. Secondary disconnects
In extremely corrosive atmospheres, it is recommended that a heavier coating be applied (0.03-0.06 inches thick). With this heavier coat, grease will migrate more readily to areas wiped clean by contact finger movement.
Mechanical devices
After wiping off old grease, moving parts should be lubricated with Siemens electrical contact lubricant Part No.11-B-9824.
The following parts or assemblies should receive a light coating of lubricant.
1. Hinges
2. Traveling crane (hoist) – apply a heavy coat of lubricant to the gears
Circuit breakers
Circuit breakers should be lubricated as described in the instruction manual for the circuit breakers.
Type WL Switchgear Instruction and Installation Guide 25
Maintenance ance
Cleaning insulation
Most of the plastics and synthetics used in insulation systems are attacked by solvents containing aromatics or halogenated hydrocarbons. The use of these may cause crazing and deformation of the material reducing the dielectric strength.
ISOPROPYL ALCOHOL IS THE ONLY RECOMMENDED
SOLVENT CLEANER.
DANGER
Hazardous voltage.
Will cause death or serious injury.
Keep out.
Qualified personnel only.
Disconnect and lock off all power before working on this equipment.
Corrosive atmosphere
This switchgear is designed to give top performance when installed in normal indoor or outdoor locations. Where abnormal conditions, such as corrosive atmospheres, are encountered, special precautions must be taken to minimize their effect. Exposed metallic surfaces, bus bars, disconnect switches, primary and secondary disconnecting contacts, wire ends, instrument terminals, etc., must all be protected.
At each maintenance inspection, all of the old grease should be wiped off of the contacts and new lubricant applied to all sliding surfaces. Apply the material in a layer .03-.06” (1-2mm) thick. Use only Siemens Electrical Contact Lubricant, Part No.
11-B-9824. Other exposed components can be protected with a coat of glyptol or other corrosion-resistant coating.
When old grease becomes dirty, wipe the part clean and apply new grease immediately.
Relays and instruments
To insure satisfactory operation of relays and instruments, do not leave device covers off longer than necessary. When a cover has been broken, cover the device temporarily and replace broken glass or plastic as soon as possible.
Equipment surfaces
Inspect the painted surfaces and touch up scratches as necessary. Touchup paint is available from Siemens.
26 Type WL Switchgear Instruction and Installation Guide
Notes
Notes
Notes
Siemens Industry, Inc.
Building Technologies Division
5400 Triangle Parkway
Norcross, GA 30092
1-800-964-4114 [email protected]
www.usa.siemens.com/switchgear
Subject to change without prior notice.
Order No: LVIM-02000-0510
All rights reserved.
Printed in USA
©2010 Siemens Industry, Inc.
The information provided in this brochure contains merely general descriptions or characteristics of performance which in case of actual use do not always apply as described or which may change as a result of further development of the products. An obligation to provide the respective characteristics shall only exist if expressly agreed in the terms of contract.
All product designations may be trademarks or product names of Siemens AG or supplier companies whose use by third parties for their own purposes could violate the rights of the owners.
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project
Related manuals
advertisement