SLX 230 V Instructions

Add to my manuals
8 Pages

advertisement

SLX 230 V Instructions | Manualzz

Installation/Operating Instructions

230V AC Scissor Lift SLX Video Projector Lift by Draper

Electrical Connections

These Installation/Operating Instructions are available in the official language of the country where you purchase the product. Please contact your distributor to request a copy.

Vous pourriez demander les instructions d’installation et d’opération traduises dans la langue officielle du pays ou vous achetez le produit. Veuillez demander à votre distributeur.

Die Gebrauchsanweisung für Installation und Konstruktion sind in der offiziellen Sprache des

Landes, indem Sie das Produkt gekauft haben, vorhanden. Fragen Sie die jeweilige Verkaufs-

Abteilung.

Unit operates on 230V AC, 50 Hz. current.

5.4 amps current draw (2 amps for lift, 3.5 amps for outlet).

Opening the electrical box exposes terminals for field connections.

Unit is shipped with internal wiring complete.

Caution:

ImPOrTAnT SAfeTy InSTrUCTIOnS

Read all instructions completely before proceeding.

Wire to connect unit to power supply should be furnished by installer.

Connections should be made in accordance with wiring diagram, and wiring should comply with national and local electrical codes.

WARNING/AVERTISSEMENT DANGER: To reduce risk of shock:

An appropriate disconnect device shall be provided as part of the building installation. All operating switches should be “off” before power is connected.

1 Always disconnect power from lift before cleaning.

WArnInG–To reduce risk of burns, fires, electric shock or injuries to persons:

2 Disconnect power from lift before putting on or taking off parts.

3 Use this lift only for its intended use as described in these instructions.

Do not use attachments not recommended by the manufacturer.

4 Never operate this lift if it has a damaged cord or plug. If it is not working

properly, call your dealer or the manufacturer for assistance/repair.

5

Keep cords away from heated surfaces.

6

Never operate lift with air opening blocked. Keep the air openings free of lint,

hair, and the like.

7 Never drop or insert any object into any opening.

8 Do not use outdoors.

9 Route cords and cables as shown in the instructions.

10

WARNING: Risk of Electric Shock—

connect this product to a properly grounded electrical supply.

Caution: Make sure electrical supply has been disconnected before attempting to connect Scissor Lift to electricity.

Scissor Lift should be operated and checked prior to installing projector and/or optional ceiling closure.

Low Voltage Control Switch shown on Page 2 comes with 22.8m of non-plenum rated cable and should be plugged in to Control Panel on top frame of lift for control of the "Up" and "Show" positions.

Momentary Key Switch shown on Page 2 comes with 22.8m of cable and should be plugged in to Control Panel on top frame of lift for control of the

"Service" position.

ImPOrTAnT InSTALLATIOn/OPerATInG InSTrUCTIOnS

WARNING: To prevent injury, this apparatus must be securely attached to the building structure in accordance with the instructions.

Planning

1 Based on screen location and projector specifications, determine proper

position for projector installation.

11 Test lift prior to installation.

Please Note: Packaging must be removed from lift before testing.

12 Follow instructions carefully. Installation contrary to instructions invalidates warranty.

13 Do not obstruct operation of Scissor Lift SLX with fingers or any object.

Serious injury or damage could result.

14 Lift is intended for use with product weighing not more than 150 kg.

15 Scissor Lift SLX is designed to accommodate ceiling suspended equipment. equipment should not be allowed to rest on optional ceiling closure

during operation (refer to section titled “Installing Projector”).

16 Entire bottom of unit must be unobstructed to permit proper operation.

Sufficient clearance must be allowed below projector or optional ceiling closure:

305 cm for Model SLX10, 427 cm for Model SLX14, etc.

17 Unit must be installed level (use a carpenter’s level).

18 Unit operates on 230V AC 50 Hz. current. 5.4 amps current draw (2 amps for

lift, 3.5 amps for outlet).

19

Verify the show position when testing lift. Make required changes by referring

to adjustment instructions on page 4 of this document.

20 The maintenance/service factory limit setting must not be adjusted to a lower position

than the preset factory limit setting. In addition, Draper does not recommend setting

show position at the maintenance/service position—for example, if you wish to have

244 cm show position, order a lift with at least a 305 cm maintenance position.

21 When the Scissor Lift SLX is to be installed in “other space used for environ-

mental air” the optional environmental air space housing must be installed per

instructions to isolate the lift from the “other space used for environmental air.”

22 When Scissor Lift SLX is nOT installed in environmental air space housing

and optional ceiling closure, the ALTERNATE wiring for up limit switch may

be used (see Alternate Wiring schematic on page 5).

2 Confirm that there is adequate space for installation and operation.

Minimum clearance above ceiling level varies according to Scissor Lift model,

plus height of projector, optional mounting bracket, optional ceiling closure,

and optional Environmental Air Space Housing.

3 Arrange to provide service access to the unit.

4 Maximum lifting capacity is 159 kg.

As Soon As Scissor Lift Arrives

1 Open carton and inspect for damage.

2 Locate the following parts:

A. The unit itself

B. Controls

C. Optional equipment:

I. Environmental Air Space Housing,

II. Universal Projector Mount,

III. Closure Panel or Ceiling Finish Kit

(all ship in separate cartons).

3 Test lift prior to installation.

Please Note: Packaging must be removed from lift before testing.

CAUTION: Before servicing unit, disconnect hardwired control and any remote control.

Note: Unit has been thoroughly inspected and tested at factory and found to be operating properly prior to shipment.

Caution:

Caution: Beware of pinch points

Copyright © 2015 Draper Inc. Form ScissorLiftSLX-230V_Inst15 Printed in U.S.A.

Beware of pinch points

If you encounter any difficulties installing or servicing your Scissor Lift SLX, call your dealer or Draper, Inc. in Spiceland, Indiana, 765-987-7999, or fax 765-987-7142.

230V AC Scissor Lift SLX by Draper

Hanging Unit

Please note: If using Environmental Air Space Housing option, go to Environmental Air Space Housing instructions on page 8.

The Scissor Lift may be installed in a variety of ways; recessed above the ceiling, or suspended below the ceiling. The lift should be supported by four 12.7 mm threaded mounting rods or bolts with locking nuts. If ceiling recessed, the entire unit (including the projector) should set approximately 38 mm above the finished ceiling in its “stored” position. The threaded rods should pass through the corner mounting flanges and be secured by nuts above and below. The unit should then be guy wired or blocked to prevent swinging.

All installations should observe the following guidelines:

1 If installing above a hard ceiling, optional Draper Access Panels are available to

allow access to the unit.

2 Installer must ensure that all fasteners and supports are of adequate strength to

securely support Scissor Lift and projector.

3 Fastening methods must be suitable for mounting surface, and securely

anchored so that vibration or abusive pulling on unit will not weaken installation.

4 Unit should be level, with weight shared more or less equally by all four

threaded mounting rods.

5

Bottom of unit must be unobstructed after installation. Sufficient clearance must

be allowed below projector or optional ceiling closure.

6 Unit must be secured independent from suspended ceiling and do not use unit

to support adjacent ceiling, light fixtures, etc.

7 Unit to be installed so when lowered to its lowest point, it is a minimum of

2.44 m above the floor.

8 Do not complete the ceiling below unit until electrical connections have been

completed and unit has been operated successfully.

9 We recommend that safety cables be attached to the Scissor Lift SLX for

added security (a sound installation practice with overhead equipment).

10

When the Scissor Lift SLX is to be installed in “other space used for

environmental air” the optional environmental Air Space Housing must be

installed per instructions to isolate the lift from the “other space used for

environmental air.”

Caution:

page 2 of 8

Operation

Before operating or testing the unit, make sure the packaging has been removed from the unit. This can be accomplished by removing the eight screws

(four per side) holding the packing frame to the lift. Once the packaging is all removed, operate the lift in the "Up" direction, so the lift's control encoder will recognize it's "home" location. Until you do this, the Down function will not work.

When unit is first operated, be cautious! If unit fails to operate properly, press

“off” and recheck electrical connections before proceeding. Cycle unit down and up several times to confirm satisfactory operation. You must also do this if the

Scissor Lift ever loses or is disconnected from the power.

Caution: Do not pull on or touch safety belt when unit is in motion. If belt locks, the cables will unspool.

Caution: Obstructing bottom pan may cause cables to unspool.

Standard Single Station Low Voltage Control

(See Fig. 1)—One three-button switch with “Up”,

“Down”, and “Off” buttons. Lift starts up or down when appropriate button is pressed, and may be stopped by pressing “Off” button. Factory set limit 4½" switches stop lift automatically when projector is in

“show” position. One momentary key switch lowers lift from “Show” to “Service” position.

Lift LV Switch

7 /

SP-KSM

8

Service

D C U

Front Figure 1 Side Back

Optional Multiple Station Control

Optional, moves lift from “Stored” to “Show” position only. Each switching station has a three-button switch with “Up”, “Down”, and “Off” buttons. Lift starts up or down when appropriate button is pressed, and may be stopped by pressing “Off” button.

Factory set limit switches stop lift automatically when projector is in “Show” position.

Optional Key Operated Switch—

If ordered, the standard Lift LV Switch can be replaced with a second single station, momentary key-operated three position (up/off/down) switch. Multiple Station Control required for this option. Moves lift from “stored” to “show” position only.

Caution: Beware of pinch points

Optional Infrared or Radio Frequency Remote Control—

If ordered, a three-button transmitter is provided, with “up”, “down”, and “stop” buttons. Unit starts up or down when appropriate button is pressed, and may be stopped by pressing “off” button. Factory set limit switches stop unit automatically when projector is in “show” position. Only controls "show" and "stored" positions.

Beware of pinch points

Please Note: Scissor Lift SLX must be installed in accordance with the requirements of the Local Building Codes, the Canadian Electrical Code (CEC),

CAN/CSA C22.1 and the National Electric Code (NEC), NFPA 70, as required. An appropriate disconnect device shall be provided as part of the building installation.

Optional RS232 Control—

For Serial communication an R2D7 Serial Communications Interface is optionally available.

Low Voltage Trigger—

Input provided for Low Voltage Trigger from projector (see diagram on page 4).

Adjusting for Level or Center of Gravity (See Fig. 2 Below)

Preferred Method—Adjusting Projector Pan

Attachment points for Lifting Cables

The Projector Pan can be moved forward or back.

1

Make sure Bottom Pan is supported.

2

Remove the Lifting Cable Bar.

3

Remove screws holding Projector Pan on Bottom Pan.

4

Move Bottom Pan forward or back.

5

Replace screws.

6

Replace Lifting Cable Bar.

Lifting

Cable Bar

Projector Pan

Secondary Method—Adjusting Lifting Cable Bar

(if above does not work)

Run the unit to its "Service" position and make sure pan is level.

Try and set so that pan is not more than 19 mm out of level.

However, the pan does not have to be perfectly level, as long as the positioning is consistent and repeatable in "Show" and "Closed" positions.

¼"-20 x ¾" hex head cap screws for attaching

Projector Pan to Bottom Pan

1 Make sure Bottom Pan is supported.

2 Remove screws holding Lifting Cable Bar to the Bottom Pan.

3 Move Lifting Cable Bar forward or back.

4 Replace screws.

5 Check level again. If still not level, repeat.

www.draperinc.com

Figure 2

(765) 987-7999

3 /

8

"-18 x 1" hex head cap screws for attaching

Lifting Cable Bar to Bottom Pan

Bottom

Pan

230V AC Scissor Lift SLX by Draper

page 3 of 8

Installing Projector

Generally, the video projector should be suspended from the Projector Pan according to projector manufacturer’s instructions and recommended standard ceiling mounting hardware. Projector should be bolted to Projector Pan as in a normal ceiling mounting. Equipment should not be allowed to rest on optional ceiling closure during operation.

The Scissor Lift SLX has a grounded 230V AC, 50 Hz outlet for projector power supply.

Control cables should be laced through our Cable Management System on

rear scissor mechanism only. Route the cables and attach with plastic wire ties similar to factory installed power cable. Make sure to use flexible cables. Plenum rated cables are typically too stiff and should not be used. Installer is responsible for ensuring cables do not stretch, kink, or interfere with the scissor mechanism as the unit raises and lowers. This will ensure that cords do not become tangled and damaged during Scissor Lift SL operation.

Unit and projection system should be operated, checked and adjusted as necessary at this time.

NOTE: Immediately upon completion of the surrounding ceiling, units should be operated to confirm that optional ceiling closure panel stops just short of touching ceiling in closed position.

Warning: Keep fingers and other objects away from automatic ceiling closure and scissor mechanisms when unit is operating.

Serious injury or damage could result.

2½"

(64mm)

Installing Projector Using Universal Projector Mount

(maximum Capacity 11.7 kg)

See Installation Instructions included with Universal Pojector Mount.

5½"

(140mm)

Figure 3

7"

(178mm)

12" (305mm)

10" (254mm)

12" (305mm)

7"

(178mm)

Attaching Universal Projector Mount to Projector Pan

If you ordered the unit with optional Universal Projector Mount pre-installed, disregard these instructions.

If you did not order the mount pre-installed, you will need to install a new

Projector Pan, which includes the Universal Projector Mount's rectangular plate.

1 Lower unit until the Bottom Pan is resting on a tabletop or other stable and

sturdy surface.

2 Remove Lifting Cable Bar from Bottom Pan (see Fig. 2).

3 Remove bolts holding Projector Pan to Bottom Pan (see Fig. 2).

4 Remove Projector Pan and set aside.

5 Place new Projector Pan with Universal Mount into place.

6 Re-attach Projector Pan to Bottom Pan.

7 Re-attach Lifting Cable Bar to Bottom Pan.

3

15

/

16

" (100mm)

3

15

2½"

/

16

" (100mm)

12" (305mm)

12"

(304mm)

7"

(178mm)

2

1

/

5½"

(140mm)

2

1

/

16

"

(52mm)

10" (254mm)

Figure 4

16

"

(52mm)

12" (305mm) www.draperinc.com

12"

(304mm)

(765) 987-7999

7"

(178mm)

230V AC Scissor Lift SLX by Draper

page 4 of 8

Installing Optional Ceiling Closure

If your Scissor Lift SLX is equipped with optional ceiling closure, it can be used as is, or in conjunction with a square of existing ceiling tile (see Fig. 5).

1 If installing with ceiling tile, you may need to cut tile so that its overall dimensions

are the same as (or slightly less than) the closure panel. Place tile into trim frame.

Lay closure panel on top (back side) of ceiling tile, and tighten screws to hold in place.

Lipless Closure Option is available by removing the Trim Ring from the

Closure Panel. A substrate material (ceiling tile, gypsum board, etc.) can be

attached directly to the Closure Panel using adhesive, double-sided tape or

NOTE: Make sure the added weight of the substrate does not

exceed the stated weight capacity of the lift. Substrate should be installed

so that it is centered within the finished opening in the ceiling, with a gap of no

less that 5mm around all edges. Lipless Closure dimensions shown with

drawing below.

*

2 Attach provided angle brackets to side of Bottom Panel of Scissor Lift SLX.

in

3 Attach threaded rods to angle bracket.

4 Run unit “up” until bottom pan stops at highest position. Mark position on

rods even with ceiling level and cut to length (remove from pan if convenient).

5 Run unit “down” until bottom pan stops at “show” position.

6 Attach closure to lower end of rods by slipping into four corner slots and

secure with nuts above and below slots.

Caution: Make sure nuts are completely tightened.

7 Run unit “up” again to highest position. Measure distance by which panel fails to

reach required “closed” height for surrounding ceiling.

8 Run unit “down” then re-adjust mounting of threaded rods in traveling grid to raise

panel required distance.

9 Test unit operation to confirm that panel will stop in closed position just before

touching ceiling.

PLEASE NOTE:

Immediately upon completion of the surrounding ceiling, unit should be operated to confirm that optional ceiling closure panel by Draper or by others stops 1 /

8

" short of touching ceiling in closed position. If closure panel

touches, the motor may continue operating after the lift is closed.

If it continues to cycle once the lift is closed, a motor failure may occur.

For Additional Safety:

1

2

Be sure the nuts that attach the threaded

rods to the closure panel are tight.

Wrap a plastic wire tie around the mounting

tab and the threaded rod at all four corners

of the closure panel (see drawing).

Please Note: Do NOT use a paper-covered or similar wire tie— use only plastic wire ties for maximum safety.

5

7

Figure 5

Item Qty Part number

1 1

2

3

7

4

1

2

C028.546

C044.181.07SA

C002.845.07SA

2

/

8 9

3

1

Frame, SLX Closure Trim

8

Bracket, SLX Closure

4 4 C077.035.49 Rod

5

6

8

8

C013.050

C020.082

7 16 C018.027

Description

Panel, SLX Assembled Closure

7 /

8

" L Threaded , Zinc

Washer .375 I.D. x .875" O.D.

x .064" TK GRD 2 Zinc Flat

8 4 C020.322 Screw,

9 4 C018.045

Nut,

5

Screw, 10-16 X ½" 6 Lobe

Truss Head AB E-White

/

16

"-18 x ¾" Long Grade 5 HH Zinc

6

Installing Optional Ceiling Trim Kit

The Scissor Lift SLX is available with a Ceiling Trim Kit, which consists of the lower section of the Environmental Air Space Housing and the optional closure panel (see Fig. 6).

1 Install Scissor Lift SLX as previously described in these instructions.

2 Install bottom section of Environmental Air Space Housing and Trim Ring in

opening. This can be accomplished by suspending with wire, or by mounting

directly to the ceiling joists (if space permits).

3 Install projector and attach optional ceiling closure to Scissor Lift SLX,

according to the instructions included in this document.

Scissor Lift SLX Inspection and Maintenance

Draper recommends inspecting the Scissor Lift SLX at least annually or every 300 cycles—whichever comes first.

A recommended maintenance schedule includes:

Cables:

Check for fraying.

Lower section of

Environmental Air

Space Housing

Figure 6

Drive Chain Gears:

Check for rust, breaks, secure attachment.

Fasteners along scissor arm assemblies:

Make sure they are not loose. If any are loose, hand tighten the nuts.

Please Note:

There is no need to tighten nut in the top scissor which slides back and forth in the side slot in the lift. Tightening this fasteners assembly will cause the unit to lock up and lead to damage to the unit.

-Closure:

Make sure threaded rod remains seated firmly in the closure panel

corners, and that nuts remain tight. If they are loose, tighten them.

Trim Ring

Ceiling tile

(by others) www.draperinc.com

(765) 987-7999

230V AC Scissor Lift SLX by Draper

Connecting Controls to Data Cable Splitter Board

Controls plug into the Data Cable Splitter Board, which is located on the Top Frame on the front side of the lift, using RJ14 connectors.

For IR or RF Remote Control, use data cable with RJ14 connectors on both ends.

For serial control of "Show" position, use data cable with RJ14 connectors on both ends and an R2D7 Serial Control Interface.

Plug into the "RP/RQ" input.

Any control, including automated dry contact systems, being connected to the wall switch input MUST send a momentary signal.

Function Indicator

page 5 of 8

Figure 7

Pin

1 2 3 4 5 6

Y G R B

Pin

1 2 3 4 5 6

Y G R B

Low Voltage Trigger

(6-24 VDC)

(Polarity Independent)

RP/RQ Bus Ports for remote controls such as

IR Eye, RF Receiver, LED

Wall Switch and RS232

Pin

1 2 3 4 5 6

Y G R B

SP-KSM

Key Switch-Service Position

Red - Down

Black - Com

Black - Com

Blue - Up

Green

Black

Yellow

DCU

Green

Black

Yellow

Pin

1 2 3 4 5 6

Y G R B

Pin

1 2 3 4 5 6

Y G R B

Please Note:

Data cable connections must be made using

electrically straight 4-conductor modular cable (RJ14). If making your own cables, this means colors do not cross over: blue leads to blue, green to green, etc. (see diagram below).

Pin

6 5 4 3 2 1

B R G Y

Optional

R2D7, RS232

Controller

To RS232 Port:

Yellow = Rx (Data from control system)

Green = Tx (Data to control system)

Red = Unused

Black = Gnd (Signal Ground)

METHOD #1

CLEARING THE SHOW POSITION AT CURRENT SHOW POSITION:

1 Move lift to the show position.

2 While lift is at the show position press and hold the Key Up toggle

switch and release once the Lift begins moving upward.

3 The show position is now cleared and ready for a new show position

to be set.

METHOD #2

CLEARING THE SHOW POSITION AT THE MAINTENANCE POSITION:

1 Move lift to the maintenance position.

2 While lift is at the maintenance position press and hold the Key Down

toggle switch and release once the Lift begins moving upward.

3 The show position is now cleared and ready for a new show position

to be set.

PLEASE NOTE: At this point the Key Switch will not operate until the new “Show Position” has been set. Also the 3-Button Wall Switch changes into a maintain, push and hold type button, for continuous movement. This allows for easy setting of new “Show Position”)

PROCEDURE FOR SETTING SHOW POSITION:

1

Now that the show position has been cleared, use wall switch up and down

buttons to get lift into desired show position.

2

While lift is at desired show position, press and hold the Key Down toggle

switch until lift begins to move upward. Lift will begin a calibration cycle

where it will move upward for two seconds, stop then move down for one

second and then the Lift will return to the desired show position.

www.draperinc.com

Optional Delay Feature

1 When the Optional Delay Feature is installed the Delay Switch must be in

the "Delay On" position for normal operation.

KEEP DELAY IN OFF POSITION

CURRENT SENSOR IS NO WHEN

T USED

The Optional Current Sensor

Connected To The Lift.

2 If the Optional Delay Feature is installed and the "Show Position" requires

adjusting, then the "Delay Switch" must be switched to Off while adjusting

the show position.

CAUTION: Be sure all switches are in Off position before adjusting limit switch. Always be prepared to shut lift off manually when new adjustment is being tested. Please refer to wiring diagram.

PLEASE NOTE: If the Scissor Lift loses power, the DOWn

function will not work until you operate the lift in the UP direction using the wall switch. This allows the lift's control encoder to recognize it's "home" location.

(765) 987-7999

230V AC Scissor Lift SLX by Draper

page 6 of 8

Adjusting Limit Switches

PLEASE NOTE:

Changing the fully open or fully closed position will reset the electronic controls and cause the lift to operate improperly.

Please call Draper before attempting these adjustments.

Adjusting fULLy DOWn position

Limit switches for the Scissor Lift SL are preset at the factory.

The DOWn limit switch is set for the fully down (maintenance) position for the size lift you have ordered. The limit switch assembly is located inside the lift and behind the Lifting Cable Drum.

Figure 8

The Down limit switche shown in the drawing are for setting the "Fully

Down" position. This can be adjusted manually by loosening or tightening the screw to increase or reduce the travel.

DOWN

DOWN

Limit

Switch

ROTATE

TO

ADJUST

Wiring Schematic

Caution: The maintenance/service factory limit setting must not be adjusted to a lower position than the preset factory limit setting. In addition, Draper does not recommend setting show position at the maintenance/service position.

ALTERNATE ‘UP’ LIMIT SWITCH WIRING

RD

Up

Limit

Switch

NC OR

NC

BK BK

BK

Jumper* nOTe: This CAnnOT be used when lift is installed in environmental Air Space Housing and Optional Ceiling Closure

RP/RQ Bus Ports for remote controls such as IR Eye, RF Receiver,

LED Wall Switch and

RS232.

RD

WH

BK

WH

RD

BN

RD

WH

BK

YL

YL/GN

RD

WH

2 Cond. Cable

Down Limit

Switch

BN

NC RD

RD

BK

Up Limit

Switch

NC

NC

OR

BK

Delay Switch

(ON position)

OR

RD

Run Cap

60 MFD

BK

RD

BK

Motor

Down

Up

YL/GN

BL

BK

BK

230V AC, 50 Hz Outlet

WH

WH

BK

BK

BK

WH

OR

RD

BK

BK

WH

OR

RD

WH

Attached to lower pan

N

BK

GN

50 Hz Suppl

AC

AC

COM

N.O.

N.C.

OR

BK

WH

RD

Optional Delay Assembly

Dashed wiring by electrician

Low Voltage Trigger (6-24 VDC)

Low voltage wiring by others

*Black (BK) Jumper wire is located in the plastic sleeve with these instructions.

RD

WH

BK

Encoder www.draperinc.com

(765) 987-7999

230V AC Scissor Lift SLX by Draper

Scissor Lift SLX Dimensions

973.14

mm

919.16

mm

Table A

Closed extended

model Height

SLX10 36cm

Height

232cm

SLX14 42cm

SLX17 47cm

SLX21 53cm

SLX24 60cm

SLX28 65cm

432cm

538cm

648cm

754cm

866cm

page 7 of 8

903.29mm

957.26mm

Top View

See

Table

A

127mm

3.175

mm

889mm

920.75mm

992mm

1066.8mm

Front View

41.275

mm

Lipless Closure Dimensions

994mm x 994mm

900.1mm

941.39mm

1066.8mm

Side View

527mm

1060mm

1054mm

1231.9mm-

571.5mm

482.6

mm

front/Back View

www.draperinc.com

(765) 987-7999

Side View

230 V AC Scissor Lift SLX by Draper

Installing Optional Environmental Air Space Housing

The Environmental Air Space Housing is shipped in pieces, and must be assembled by the installer. The height of the Environmental Air Space Housing is set by punching out the knockouts at the desired locations then using screws to connect in side panels. It is recommended that an access panel be installed in the ceiling to allow future access. The optional Environmental Air

Space Housing must be installed per instructions to isolate the lift from the

“other space used for environmental air.”

page

8

of 8

1 Attach Environmental Air Space Housing top frame to top of Scissor Lift

SLX with bolts provided.

2 Install top panel to Environmental Air Space Housing frame.

3 Attach assembly to overhead structure. Allow clearance between Environ-

mental Air Space Housing top and structure for ease of future access.

4 Install side and end panels, and trim frame.

Please Note: The factory wiring of 'UP' Limit Switch MUST ALWAYS

be used when SLX is installed in Environmental Air Space Housing

and Optional Ceiling Closure.

See installation instructions included with Environmental Air Space Housing.

11

11

7

11

11

11

11

1

11

3

3

5

8

11

5

4

3

FRONT/BACK

Knockouts

SIDE

9

3

6

4

Do not use electrical knockouts on bottom sections

10

9

2

Item Qty Part number

1 1 C028.544.02SA

2

3

4

5

6

1

4

4

2

2

C028.545.07SA

C044.178SA

C044.180SA

C044.179SA

C044.177SA

Description

Frame, SLX Plenum

Frame, SLX Trim Ring

Panel, SLX Plenum Side

Panel, SLX Plenum End

Panel, SLX Middle End

Panel, SLX Plenum Middle Side

7 1 C095.123SA

8 28

9 40

10 12

11 24

C020.325

C018.051

Cover, SLX Plenum

Screw, 8-32 x 3 /

8

" Type 1 HWH

Nut #8-32 Zinc Hex KEPS

C013.070 Washer, .188 I.D. x .5 O.D. x .07" TK Nylon Flat

C020.112 Screw, 8-32 x 3 /

8

" Type F HWH

Caution: Be careful when handling Environmental Air Space

Housing Panels. The panels could have sharp edges.

www.draperinc.com

(765) 987-7999

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement