Bard QW 2S1, QW 3S1, QW 4S1, QW 5S1 geothermal heat pump Installation instructions

Below you will find brief information for geothermal heat pump QW QW2S1, geothermal heat pump QW QW3S1. This unit is designed for use with or without duct work. For use without duct work, Plenum Box QPB** is recommended. The unit is equipped with a variable speed indoor blower motor which increases in speed with an increase in duct static pressure.

PDF Download
Document
Bard QW QW2S1, QW QW3S1 Installation Instructions | Manualzz

Advertisement

Advertisement

Advertisement

Key features

  • Staged capacity
  • Variable speed blower motor
  • Optional ducted or ductless configuration
  • Earth loop or ground water operation
  • Compressor control module
  • High and low pressure switch monitoring
  • Optional CFM settings
  • Mist eliminator

Frequently asked questions

The "R" terminal is the 24 VAC hot terminal and is supplied through Pin #10 of Plug P2. The "C" terminal is the 24 VAC common/grounded terminal and feeds through Pin #11 of Plug P2. The "G" terminal is the indoor blower input signal and feeds through Pin #6 of Plug P2. The "Y1" terminal is the compressor starting signal and feeds through Pin #7 of Plug P2. The "W2" terminal is the electric heat signal and feeds through Pin #9 of Plug P2. The "W1/E" terminal is the emergency heat signal and feeds through Pin #3 of Plug P2. The "L" terminal is used as an input terminal when a CS2000 infrared occupancy device is used. It feeds through Pin #12 of Plug P2. The "D" terminal is used only of dehumidification models and feeds through Pin #1 of Plug P2. The "Y2" terminal is the compressor staging solenoid signal and feeds through Pin #4 of Plug P2. The "O" terminal is the reversing valve signal and feeds through Pin #8 of Plug P2. The "A" terminal is the ventilation demand signal and outputs a signal for ventilation during occupied programming conditions, and feeds through Pin #5 of Plug P2.

The minimum installation height for ducted applications is 8 ft. 9 in. This provides enough clearance to install the duct work. The minimum installation height of the unit with a Free Blow Plenum is 8 ft. 9 in. This provides enough clearance for the plenum to be removed.

The potentiometer is used to select delay on break time from 30 seconds to 5 minutes. Delay on Make (DOM) timing on power up and after power interruptions is equal to 2 minutes plus 10% of Delay on Break (DOB) setting. See Delay on Make Timing chart on page 24. During routine operation of the unit with no power interruptions the compressor will operate on demand with no delay.