ALL56152 Panhard Bar Mount

ALL56152 Panhard Bar Mount
Panhard Mount
ALL56152
INSTALLATION INSTRUCTIONS
1. IMPORTANT! Before welding adjuster to chassis, use a 3/8" drive ratchet extension to turn adjusting screw and position slider as
far away from welding heat as possible. This will protect the Teflon bushings from melting. Unit has 3" of screw adjustment.
2. To prevent damage of slider components, never exceed 30 foot-pounds of torque on adjuster screw.
3. To prevent binding of slider, never clamp adjustable panhard mount beyond retaining rings.
4. Keep light tension on nylon set screw to prevent screw from moving on its own.
Weld
OPTION 1
If upper tubing is directly over lower frame rail,
holesaw through and weld to 1-3/4" tubing.
Side View
Weld
13-1/4"
21"
OPTION 2
If upper tubing is offset to lower frame rail,
position mount beside upper tubing and
gusset top and bottom with 1/8" plate.
2-1/4"
Front Mount
(unit accepts any 1-3/4" panhard clevis not included)
Allstar Performance 8300 Lane Dr., Watervliet, MI 49098
Phone: (269) 463-8000 Fax: (800) 772-2618 www.allstarperformance.com
Form 1075
Page 1 of 1
Rev. 051110
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement