1. Product description
3 . Safety Instructions
The PSB heating system type 27-1680 ** 20 **** with the PSB (type
07-5801 *** A) self-limiting parallel heating tape, assembled with a
connection and remote end termination or joining system with
PLEXO P. The PSB heating system type 27-1680 ** 30 **** with the
PSB (type 07-5801 ****) self-limiting parallel heating tape and
assembled with a connection and remote end termination or joining
system with PLEXO P and cold connection technology (installation kit
05-0091-0130 and/or 05-0091-0136), is set up as a stationary
resistance heating system for pipelines or tanks in hazardous areas.
It is used in Zones 1, 2 or 21 in accordance with the certified explosion
group II and temperature classes T5, T6.
The supply conductors and the protective braiding on the heating
tape are connected to the PLEXO P in conformance to the installation
instructions (in compliance with the relevant standards EN 60079-0
and EN 60079-7).
The relevant installation and operating regulations must be observed
for electrical systems in hazardous areas (e.g. Directive 1999/92/
EC, Directive 94/9EC, EN 60079-14, EN 61241-14 and the
DIN VDE 0100 series).
The requirements under EN 60519-1 and EN 60519-2 on safety in
electroheat installations must be complied with.
Thermal Safety Class 0 under EN 60519-2 Section 13 is met by the
heating tape’s design characteristics.
The Cu braid with a resistance of < 18.2 Ω/Km is suitable as a
protective conductor.
To protect against indirect contact, conductive parts from other firms
must be included in the (protective conductor) safety measures. For
each electric circuit it is necessary to have a residual-current circuitbreaker and a means of isolating all outer wires from the current
supply.
The operator of an electrical system in a hazardous environment has
to keep the equipment in an orderly condition, operate it correctly,
monitor it and do the required maintenance and repairs.
(EN 60079-14, EN 60079-17, EN 60079-19 and EN 61241-14).
2 . Technical data
Rated voltage
110 to 120 V or 208 to 254 V
Rated current
max. 20 A
Referenced rated capacity
max. 33 W/m at 10°C
the IP56 protection class will be upheld.
To connect the PLEXO P-CN, P-CW and P-CA to the voltage supply,
it is necessary to use a supply cable, approved cable gland and
approved junction box that suit the applications. The cable gland
must be mounted onto the enclosure in a way that ensures that the
IP65 protection class will be preserved. The protection rating
conforms to EN 60529.
Once the heating system with accessories has been mounted, the
insulation resistance between the heating conductor and the metallic
braid must be verified.
The testing voltage should be at least 500VDC and the insulation
resistance at least 20 MΩ/km EN 60079-30-2 Section 8.3.4)
When used in TT and TN systems a residual current device according
to IEC 60079-30-1, clause 4.3 point d) shall be installed. When used
in IT systems an insulation monitoring device according to IEC
60079-30-1, clause 4.3 point e) shall be used.
Caution! When mounting the PLEXO P with cold-applied
connection technology, observe the operating instructions for the
27-1680-**10/**** heating system.
The specifications in the EC Type Examination Certificate and in the
installation instructions must be observed. The data in Installation
Instruction for the heating tape must be observed also.
Do not connect the heating tape’s two supply wires – short circuit!
Maximum length of heating circuit (according to the dimensioning of the capacity circuit breaker, characteristic C)
Rated voltage AC 120 V
16 A
Certification
KEMA 08 ATEX 0111
IECEx KEM 09.0084
Conformity to standards:
EN 60079-0: 2006, EN 60079-7: 2007, EN 61241-0: 2006,
EN 61241-1: 2004, EN 60079-30-1: 2007
IEC 60079-0:2004, IEC 60079-7:2006, IEC 61241-0:2004,
IEC 61241-1:2004, IEC 60079-30-1:2007
Minimum bending radius
25 mm
Max. permissible process temperature
(applies to heating tape with remote end termination)
+65°C when the heating tape is switched on
+85°C when the heating tape is switched off
Ambient temperature range
-55°C to +65°C
Min. cut-in temperature
-40 °C
EN 2/12
Type
°C
W/m
+10
PSB 10
07-5801-.10.
PSB 13
07-5801-.13.
PSB 15
07-5801-.15.
21-1680-7D0003/A-05/11-BEH-D294619
Ex protection type
II 2G Ex e II T5, T6
II 2D Ex tD A21 IP65 T 95 °C, T 80 °C
The relevant installation and operating regulations must be observed
when setting up or operating explosion-protected systems (e.g.
EN60079-14, EN 60079-30-2 and the DIN VDE 0100 series).
The heating tape must be installed on the workpiece in accordance
with the project engineering specifications. Only qualified specialists
may do any of the work on the machine. Before any work is done on
the machine, it must have come to a complete stop, be disconnected
and precautions must be taken to ensure that it cannot be switched
on again.
Before and during installation: keep the ends and connection
components of the heating system dry. The metallic braiding in this
heating system must be connected to a suitable earthing terminal.
!! The minimum bending radius must be observed.
The heating tape is attached to the workpiece by means of temperatureresistant adhesive tape with a max. spacing of 200 mm!! Use only
plasticiser-free adhesive tapes (no PVC adhesive tapes)!
After every dismantling, replace the sealings for the heating tape and
supply cable if there are any visible signs of permanent deformation.
To ensure efficient heat transmission, the heating tape must have
even contact over the entire length of the surface. If necessary, the
distances between fastenings must be reduced. The tape is laid on
the pipelines either parallel to the axis of the pipe or in spiral form
(in accordance with the project engineering instructions).
On plastic pipes, which conduct heat less efficiently than metal pipes
do, aluminium foil or aluminium adhesive tape is put under or over
the heating tape. This substantially improves the distribution of heat,
prevents a local accumulation of heat and at the same time it partly
compensates for the lower heat dissipation and associated reduction
in the capacity of the heating tape.The PLEXO BP must be mounted
onto an Ex e or Ex tD approved enclosure in a way that ensures that
6 . Operation, maintenance and fault clearance
The heating systems must be used only in accordance with their
intended purpose and within the operating data specified by BARTEC.
The operator of an electrical system in a hazardous environment must
keep it in good condition, operate it properly, monitor it and do
maintenance and repairs. (EN 60079-14, 61241-14).
Caution! When mounting the PLEXO P with cold-applied
connection technology, obser ve the technical data for the
27-1680-**10/**** heating system.
Only an electrician may do the maintenance work and fault clearance.
Before restarting operation, check compliance with the applicable
laws and directives. Before maintenance or troubleshooting, make
sure that the specified safety regulations are adhered to.
Warning! DO NOT OPEN WHEN ENERGIZED
PLEXO B-P:
Warning! POTENTIAL ELECTROSTATIC CHARGING HAZARD SEE INSTRUCTIONS
Clean the protective tube with a damp cloth only!
7 . Accessories, spare parts see BARTEC catalogue.
5.b) Commissioning
The equipment may only be operated if it is clean and free of any
4. Assembly of heating circuits
5.a) Assembly
Explosion protection
damage. Electrical systems must be examined by an electrician before
commissioning and afterwards at certain intervals of time.
PSB 26
07-5801-.26.
PSB 33
07-5801-.33.
-15
Rated voltage AC 240 V
16 A
20 A
m
m
m
m
95
95
205
205
186
69
90
139
-30
58
75
120
150
+10
78
86
169
179
-15
10
20 A
55
72
111
149
-30
47
59
94
124
+10
67
80
145
16
45
60
93
125
-30
39
49
77
106
+10
43
58
88
117
-15
-15
13
15
30
38
58
75
-30
26
31
45
64
+10
33
45
70
90
25
32
49
64
21
26
43
52
-15
-30
26
33
EN 3/12
Reservation
Technical data subject to change without notice. Changes, errors and misprints may not be used as a basis for any claim for damages.
PSB PLEXO P
Operating instructions
8 . Type label heating system
Practical example:
The type label is to be filled in manually on the basis of the table and
points 1-6. The blanks in the heating system’s type number must be
filled on the basis of the components used. A water-proof and lightfast
marker must be used (e.g.: Staedtler Lumocolor permanent special
marker or BARTEC no.: 02-7140-0001).
The serial no.: and the TAG no. can be filled in by the person setting
up the heating-circuit.
A practical example of a filled-in type label is given further on.
The type label must be stuck onto the lid of the junction box. The
surface must be cleaned first before the glue is applied. Care must
be taken that the sticker is put on carefully. It may not jut out over
the correct area and it may not have any air bubbles.
The following components were used:
PSB 120 V 26 W; PLEXO P and BARTEC polyester junction box.
It was filled in according to the grey-shaded line in the table.
Declaration of Conformity
1
2
3
4
5
6
Table
Supply
voltage
4
T-class
1
T-class
2
120 V
T5
T95 °C
07-5801-113 *
120 V
T5
T95 °C
07-5801-115 *
120 V
T5
T95 °C
07-5801-126 *
120 V
T5
T95 °C
07-5801-133 *
120 V
T5
T95 °C
07-5801-210 *
254 V
T6
T80 °C
07-5801-213 *
254 V
T6
T80 °C
07-5801-215 *
254 V
T6
T80 °C
07-5801-226 *
254 V
T5
T95 °C
07-5801-233 *
254 V
T5
T95 °C
impressed voltage
07-5801-110 *
3
Protection device:
16 A, 20 A
5
Frequency:
50 oder 60 Hz
6
Construction week/year: 43/2009 (for example)
EN 4/12
21-1680-7D0003/A-05/11-BEH-D294619
Typ heat trace Supply
voltage
EN 5/12
Reservation
Technical data subject to change without notice. Changes, errors and misprints may not be used as a basis for any claim for damages.
PSB PLEXO P
Installation instructions
Individual parts
P-CW
B-P
P-S
1
■
■
■
■
■
2
■
■
■
3
■
■
■
■
■ x2
14
4
■
■
■
■
■
13
5
15
16 cm
P-CN
■
P-1S
P-2S
PLEXO assembly on pipe
min. 50 mm
■
Fastening area
min. 50 mm
■
Hex key
Included in the
installation kit
■
Fastening area
min. 50 mm
■
6
■
■
7
■
■
■
8
■
9
■
9
10
■
8
11
12
Examples of installation
Tools required for assembly
PLEXO
P-CA
11
■
Heating tape and supply cables
7
10
PSB self-limiting parallel heating tape
Protective sheath
Metal jacketing
Insulating sleeve
Supply conductor
12
■
13
■
Supply cable to be used
6
for CN sleeve diameter 6 to 10 mm,
CW sleeve diameter 8 to 12 mm
Conductor
■
Core
Sheath
5
14
15
■
16
■
■
■
■
■
■
■
■
■
19
■
■
■
■
■
■
■
20
■
■
■
0
EN 6/12
■
21-1680-7D0003/A-05/11-BEH-D294619
3
18
1
17
2
4
See certification for minimum requirements.
Supply cable to be used
for CA sleeve diameter 12 to 16 mm
Conductor Cores Core sleeve
Reinforcement
Sheath
See certification for minimum requirements.
EN 7/12
Reservation
Technical data subject to change without notice. Changes, errors and misprints may not be used as a basis for any claim for damages.
PSB PLEXO P
Installation instructions
Assembly supply cable side
Heating tape side 1
P-CA, P-CN, P-CW, B-P, P-S
Heating tape side 2
P-S, P-2S
Supply cable side
P-CN, P-CW
Armoured supply cable side
P-CA
Cut off the heating tape with a straight cut.
Push sleeve 1 and clamping sleeve 3 over the heating tape.
Cut off the heating tape with a straight cut.
Push sleeve 2 and clamping sleeve 3 over the heating tape.
Push sleeve 2 and clamping sleeve 7 onto supply cable.
Remove 52 mm of the sheath from the supply cable. Remove
28 mm of the armouring. Strip 6 mm of the core insulation.
24
28 +2
1
Remove 35 mm of the protective sheath from the heating tape.
35
13
14
15
16 cm
Assembly at heating tape side
Push back the metal jacketing. Expose 24 mm of the supply
conductor.
The black heating element must be removed completely!
Cut out a triangle between the strands (5 mm)
1
Remove 20 mm of the sheath off the supply cable.
Strip 8mm of the core insulation.
Move the slide switch on socket 5 to „OFF“.
Feed the supply conductor into the socket and move the slide
switch to the „ON“ position.
Supply conductors must be visible in the inspection hole!
20
8
!
Twist and align conductors
24
9
10
11
12
2
1
3
8
5
Bend the supply conductors slightly, twist and align them so
that they are parallel again.
6
7
4
Move slide switch on plug 4 to „OFF“
Inspection hole
2
Move the slide switch on socket 6 to „OFF“
Feed the three conductors into the socket simultaneously and
move the slide switches into the „ON“ position.
Attention: the protective earthing conductor must be connected
to the terminal point marked green. Supply conductors must be
visible in the inspection hole!
Push clamping sleeve 3 onto socket 5 until the locking pin
snaps into the borehole.
3
Inspection hole
5
!
4
5
6
2
Feed the supply conductors into the plug and move
the slide switch to the „ON“ position.
Supply conductors must be visible in the inspection hole!
0
1
Push the clamping sleeve 3 onto plug 4 until the locking pin
snaps into the borehole.
EN 8/12
21-1680-7D0003/A-05/11-BEH-D294619
4
Push clamping sleeve 7 onto socket 6. The clamping sleeve
must lie flush! Tighten the strain relief screw until the supply
cable is clamped securely.
Inspection hole
3
2
3
5
6+2
1
Make sure the clamping rings are tapered!
Push the outside clamping ring 9 over the reinforcement.
Push the inside locking 8 under the reinforcement until it is
flush with the reinforcement. Push the outside clamping ring
as far as possible over the inside clamping ring and push the
reinforcement forwards.
2
3
4
Push sleeve 2 and clamping sleeve 10 onto the supply cable.
Align the conductors.
Move the slide switch on socket 11 to „OFF“
Feed the three conductors into the socket simultaneously and
move the slide switch to the „ON“ position.
Attention: the protective earthing conductor must be
connected to the terminal point marked green. Supply
conductors must be visible in the inspection hole!
Inspection hole
5
Push the clamping sleeve 10 onto socket 11. Tighten the
strain relief screw until the supply cable is clamped securely.
6
EN 9/12
Reservation
Technical data subject to change without notice. Changes, errors and misprints may not be used as a basis for any claim for damages.
Installation instructions
Assembly heating tape end
Final assembly
P-1S
Heating tape joining and connection
P-CA, P-CN, P-CW
Cut off the heating tape with a straight cut.
Push sleeve 2 and clamping sleeve 13 over the heating tape.
Join the plug and socket together. The pin and hole must be
aligned one over the other. Green covers are opposite each
other.
1
Remove 15 mm of the protective sheath from the heating tape.
15
13
14
15
16 cm
PSB PLEXO P
12
11
10
9
1
2
Join the plug to the socket in the direct enclosure entry 15.
Pin and hole must be aligned one on top of the other.
Heating tape end
P-2S
Push the sleeve over clamping sleeve and socket. Screw on the
end sleeve. Use hex key 18 to tighten the grub screw in the
ridge on the sleeve.
2
Bring sleeve 1 and the direct enclosure entry 15 together
and screw them together. Use hex key 18 to tighten the grub
screw in the ridge on the sleeve.
Position clamping sleeve 13 40mm from the end of the heating
tape. Tighten the strain relief screw until it clamps the heating
tape securely.
7
8
1
Remove the metal jacketing with a diagonal cutter or knife.
Cut out a triangle between the strands (5 mm)
3
Screw in the direct enclosure entry 15 into the junction box.
Use the hexagon nut 17 for locking purposes inside the
enclosure.
Clamp the black cores on L and N and clamp the green/yellow
cores on PE.
Bring the sleeves together and screw them one to the other. Use
hex key 18 to tighten the grub screw in the ridge on the sleeve.
2
5
Mounting direct enclosure entry side B-P
40
5
6
4
Twist end sleeve 12 onto sleeve 2. Use hex key 18 to tighten
the grub screw in the ridge on the sleeve.
6
0
1
2
3
5
EN 10/12
Cable gland
Screw cable gland 20 into the enclosure.
21-1680-7D0003/A-05/11-BEH-D294619
4
Push end sleeve 12 onto the end of the heating tape up to
clamping sleeve 13.
3
Cable ties
Fasten the cable ties 19 with the imprint
„WARNING - disconnect from voltage before opening“
after the final assembly on the PLEXO.
Preferably over the ridge.
Push the protective pipe 16 onto direct enclosure entry 15. A
borehole in the protective tube must be brought into alignment
over one of the two grub screws on the direct enclosure entry.
Use hex key 18 to unscrew the grub screw until the protective
tube is locked in place.
The grub screw may not jut out over the tube diameter
4
EN 11/12
Reservation
Technical data subject to change without notice. Changes, errors and misprints may not be used as a basis for any claim for damages.
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertising