This site preparation guide provides information about site requirements and system specifications for Xuri Cell Expansion System W25. This site preparation guide describes the following areas: site preparation, system specifications, component specifications, and client computer specifications.

This site preparation guide provides information about site requirements and system specifications for Xuri Cell Expansion System W25. This site preparation guide describes the following areas: site preparation, system specifications, component specifications, and client computer specifications.
Xuri™ Cell Expansion System W25
Site Preparation Guide
Page intentionally left blank
Table of Contents
Table of Contents
1
Introduction ..........................................................................................................
5
2
Site preparation ...................................................................................................
6
2.1
2.2
Delivery and storage ...........................................................................................................................
Site requirements ..................................................................................................................................
7
9
Specifications ........................................................................................................
12
3.1
3.2
3.3
13
14
16
3
System specifications .........................................................................................................................
Component specifications ................................................................................................................
Client computer specifications .......................................................................................................
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
3
Page intentionally left blank
1 Introduction
1
Introduction
This site preparation guide provides information about site requirements and system
specifications for Xuri Cell Expansion System W25.
This site preparation guide describes the following areas:
•
Site preparation
•
System specifications
•
Component specifications
•
Client computer specifications
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
5
2 Site preparation
2
Site preparation
In this section
This section describes the site planning and the preparations necessary before installation
of Xuri Cell Expansion System W25. The purpose is to provide planners and technical
staff with the data needed to prepare the laboratory for the installation.
This section contains the following subsections:
Section
6
See page
2.1 Delivery and storage
7
2.2 Site requirements
9
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
2 Site preparation
2.1 Delivery and storage
2.1
Delivery and storage
When you receive the delivery
boxes
•
Record on the packing slip if there is any apparent damage on the delivery boxes.
Inform your GE Healthcare representative of any such damage.
•
Move the delivery boxes to a protected location indoors.
Delivery boxes
The system units are shipped in delivery boxes with the following dimensions and weight.
Contents
Dimensions (mm)
Weight (kg)
Xuri Cell Expansion
System W25,
rocker
685 x 540 x 390 (including pallet)
32
Xuri Cell Expansion
System W25 CBCU
370 x 405 x 160
7
Xuri Cell Expansion
System W25 Pump
370 x 345 x 160
5
Tray 10
655 x 545 x 170
7
Tray 20
880 x 685 x 150
11
Tray 50
940 x 815 x 150
13
Lid 10
585 x 540 x 275
4
Lid 20
850 x 590 x 285
6
Lid 50
910 x 720 x 305
7
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
7
2 Site preparation
2.1 Delivery and storage
Storage requirements
The delivery boxes should be stored in a protected location indoors. The following storage
requirements must be fulfilled for the unopened boxes.
8
Parameter
Allowed range
Ambient temperature, storage
-25°C to 50°C
Humidity
5% to 95% humidity, non-condensing
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
2 Site preparation
2.2 Site requirements
2.2
Site requirements
Laboratory bench
•
The bench is recommended to be at least 80 cm deep and 180 cm wide.
•
The bench must be clean, level, flat and stable, and able to withstand vibration from
the rocking.
•
Do not place any other vibrating equipment on the same bench, since vibrations
might affect the weight reading.
•
The bench must be able to support the total weight of the system, including the filled
Cellbag™ bioreactor. See Equipment weight, on page 14. If other optional instruments
are installed, their weights must also be included.
•
Do not place soft material, paper sheets or similar under the system, as this may
block the ventilation inlet.
Illustration of system setup
The illustration below shows the recommended setup of the bioreactor system on the
laboratory bench.
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
9
2 Site preparation
2.2 Site requirements
Power requirements
The table below specifies the power requirements.
Parameter
Requirement
Supply voltage
100-120/200-240 V ~ ±10%
Frequency
50-60 Hz
Transient level
Overvoltage category II
Maximum power consumption
of the system
1500 VA
Type of sockets
EU or US plugs. Grounded main sockets, fused or
protected by equivalent circuit breaker.
Location of sockets
Maximum 2 m from the instrument (due to length
of mains cable). Extension cables can be used if
necessary.
Environment requirements
The bioreactor system is intended for indoor use only. The following requirements must
be fulfilled:
•
The room must have forced ventilation, adapted for usage of CO2, O2 and N2.
•
The system units should not be exposed to direct sunlight.
Allowed ranges for environmental parameters are specified in the table below.
Parameter
Allowed range
Ambient temperature, operating
15°C to 32°C
Relative humidity, operating
Maximum relative humidity 80%
Altitude
Maximum 2000 m
Atmospheric pressure
800 mbar to 1060 mbar
Pollution degree
2
Note:
10
For satisfactory temperature control, the ambient temperature must be at
least 5°C lower than the desired culture growth temperature.
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
2 Site preparation
2.2 Site requirements
Noise level
•
The noise level of the operating bioreactor system is below 65 dBA.
•
Audio warning signals have a higher noise level than the operating system.
Heat output
The heat output data is listed in the table below.
Component
Heat output
Bioreactor system, including the rocker
unit, CBCU and pump.
Maximum 1500 W
Gas supply
The table below lists the gas supplies that may be required.
Gas
Pressure (bar)
Compressed
air/N2, CO2 and O2.
1.2 (1.0 to 1.5)
Gas flow
The table below lists the gas flow required.
Gas
Flow (l/min)
Normal use
Flow (l/min)
Fast fill
Compressed air/N2
1.3
3.5
CO2
0.2
0.5
O2
0.7
1.7
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
11
3 Specifications
3
Specifications
In this section
This section describes the system specifications, component specifications and computer
specifications of Xuri Cell Expansion System W25.
This section contains the following subsections:
Section
12
See page
3.1 System specifications
13
3.2 Component specifications
14
3.3 Client computer specifications
16
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
3 Specifications
3.1 System specifications
3.1
System specifications
The table below lists the system specifications of Xuri Cell Expansion System W25.
Parameter
Data
System configuration
Benchtop system, external computer
Control system
UNICORN™ 6.3.2 or higher version
Rocker embedded PC operating system
Windows® embedded standard 7
Connection between PC and instrument
Ethernet
Power supply
100-120/200-240 V ~, 50-60 Hz
Power consumption
Maximum 1500 VA
Enclosure protective class
IP 21
External air supply
1.0 bar to 1.5 bar
Normal use: 1.3 l/min
Fast fill: 3.5 l/min
External CO2 supply
1.0 bar to 1.5 bar
Normal use: 0.2 l/min
Fast fill: 0.5 l/min
External O2 supply
1.0 bar to 1.5 bar
Normal use: 0.7 l/min
Fast fill: 1.7 l/min
Operating ambient temperature range
15°C to 32°C
Operating humidity range
20% to 80% RH (non-condensing)
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
13
3 Specifications
3.2 Component specifications
3.2
Component specifications
Equipment dimensions
The table below lists the outer dimensions of the bioreactor system units.
System unit
Dimensions, W x D x H (mm)
Rocker
404 x 560 x 205
CBCU
276 x 360 x 117
Pump
275 x 280 x 115
Tray 10
475 x 430 x 60
Tray 20
740 x 480 x 70
Tray 50
800 x 610 x 70
Lid 10
475 x 430 x 230
Lid 20
740 x 480 x 245
Lid 50
800 x 610 x 260
Equipment weight
The table below lists the weights of the bioreactor system units.
14
System unit
Weight (kg)
Rocker
24.0
CBCU
4.8
Pump
3.8
Tray 10
4.5
Tray 20
7.3
Tray 50
9.5
Lid 10
1.7
Lid 20
3.3
Lid 50
3.9
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
3 Specifications
3.2 Component specifications
Detailed specifications
For detailed system specifications regarding the Rocker, Xuri Cell Expansion System W25
CBCU and Xuri Cell Expansion System W25 Pump, refer to the data file (code no.
29-0618-52) available on www.gelifesciences.com/xuri.
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
15
3 Specifications
3.3 Client computer specifications
3.3
Client computer specifications
The table below describes the recommended client computer specifications for a UNICORN system operating with the bioreactor system.
The operating systems recommended for installation are Windows XP Professional x86 with SP3 installed
and Windows 7 Professional x86 and x64 with SP1 installed. In the table below these are listed only as
Windows XP and Windows 7.
UNICORN
Client
Database Server
Workstation installation
E-License Server
Common Components
Min.
free
disc
space
6 GB
6 GB
12 GB
500 MB
500 MB
Min.
available
RAM
3 GB
3 GB
3 GB
2 GB
2 GB
Disc format
NTFS
NTFS
NTFS
NTFS
NTFS
OS
Windows
XP
Windows XP
Windows
XP
Windows XP
Windows XP
Windows 7
Windows 7
Windows 7
Windows Server
2003/2003 R2
Windows Server
2003/2003 R2
Windows Server
2008/2008 R2
Windows Server
2008/2008 R2
Windows 7
Windows 7
Windows Server®
2003/2003 R2
Windows Server
2008/2008 R2
OS language
English
(U.S.) Code
1033
English (U.S.) Code
1033
English
(U.S.) Code
1033
English (U.S.) Code
1033
English (U.S.) Code
1033
Architecture
Intel™ Dual
Core (or
better)
Intel Dual Core (or
better)
Intel Dual
Core (or better)
Intel Dual Core (or
better)
Intel Dual Core (or
better)
Windows XP
Windows XP
Windows
XP
Windows 7
Windows
XP
Windows 7
Windows 7
Windows Server
2003 x86, x64/R2
x86, x64
Windows Server
2003 x86, x64/R2
x86, x64
Windows Server
2008 x64/R2 x64
Windows Server
2008 x64/R2 x64
Windows 7
Windows XP
Windows Server
2003 x86, x64/R2
x86, x64
Windows Server
2008 x64/R2 x64
16
Windows 7
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
3 Specifications
3.3 Client computer specifications
Note:
•
UNICORN is tested using an English operating system version. Using other
language versions of the operating system may cause errors.
•
A screen resolution of 1280x1024 or higher is recommended. Parts of the
UNICORN user interface may not be displayed properly using a lower resolution.
•
Changing the default font and font size in Windows may cause problems
in the UNICORN user interface.
•
The Windows basic color scheme is recommended. (UNICORN must be
closed when the color scheme is changed.)
•
Using the Windows 7 Aero color scheme is not recommended.
•
Windows power save features should be turned off to avoid conflicts with
system operations.
•
UNICORN is not compatible with the Windows 7 feature High DPI Awareness, which allows the graphic user interface to be scaled. The interface
scale must remain at 100% to avoid issues with clipping and misaligning
of parts of the UNICORN user interface. Normally, the scale is set at 100%
by default.
Xuri Cell Expansion System W25 Site Preparation Guide 29-0878-21 AA
17
Page intentionally left blank
For local office contact information, visit
www.gelifesciences.com/contact
GE, imagination at work and GE monogram are trademarks of General Electric
Company.
GE Healthcare Bio-Sciences AB
Björkgatan 30
751 84 Uppsala
Sweden
Intel is a trademark of Intel Corporation.
www.gelifesciences.com/xuri
Cellbag, Xuri, and UNICORN are trademarks of GE Healthcare companies.
Windows and Windows Server are registered trademarks of Microsoft Corporation.
© 2014 General Electric Company – All rights reserved.
First published Feb. 2014
All goods and services are sold subject to the terms and conditions of sale of
the company within GE Healthcare which supplies them. A copy of these terms
and conditions is available on request. Contact your local GE Healthcare representative for the most current information.
GE Healthcare Europe GmbH
Munzinger Strasse 5, D-79111 Freiburg, Germany
GE Healthcare UK Limited
Amersham Place, Little Chalfont, Buckinghamshire, HP7 9NA, UK
GE Healthcare Bio-Sciences Corp.
800 Centennial Avenue, P.O. Box 1327, Piscataway, NJ 08855-1327, USA
GE Healthcare Japan Corporation
Sanken Bldg. 3-25-1, Hyakunincho Shinjuku-ku, Tokyo 169-0073, Japan
imagination at work
29-0878-21 AA 02/2014
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertising