Good Water Warehouse GOLDLINE-50 Installation & Service Manual

Good Water Warehouse GOLDLINE-50 Installation & Service Manual

Good Water Warehouse GOLDLINE-50 is a reverse osmosis drinking water system designed for easy installation and maintenance. It conforms to NSF/ANSI Standards 58 for performance claims as verified and sustained by test data. The system is designed to reduce various contaminants, including TDS, barium, cadmium, chromium, lead, radium, selenium, fluoride, nitrite, nitrate, copper, and cysts. It has a production rate of 11.19 gpd and a recovery rate of 23.87%. The system includes a storage tank with a capacity of 2.

advertisement

Assistant Bot

Need help? Our chatbot has already read the manual and is ready to assist you. Feel free to ask any questions about the device, but providing details will make the conversation more productive.

Manual
Good Water Warehouse GOLDLINE-50 Installation & Service Manual | Manualzz

Good Water Warehouse Inc.

1700 E Walnut Ave

Fullerton CA 92831

(714) 441-2893

(714) 441-0525 FAX

Reverse Osmosis System

Installation & Service Guide

Model # GOLDLINE-50

System Conforms to NSF/ANSI Standard 58 for Performance Class

System Tested and Certified by NSF International against NSF/ANSI Standard 58 for the reduction of the claims specified on the Performance Data Sheet (page 3)

System Tested and Certified by NSF International and WQA against NSF/ANSI Standard 58 for the reduction of the claims specified on the Performance Data Sheet (Page 3)

(1)

GoldLine Manual Introduction

The Goldline RO System conforms to NSF/ANSI Standards 58 for performance claims as verified and sustained by test data. All pre and post filtration demands were removed prior to contaminant reduction performance testing by the Water Quality Association laboratory.

The Goldline reverse osmosis drinking water system is designed for easy installation and maintenance. You will insure a successful installation as well as reliable operation by carefully reading this manual and following the operational guidelines. Please note that routine maintenance is essential to the longevity and performance of the system. Filters should be changed every six months

(see below) depending on the quality of the feed water supply. The Goldline RO installation should comply with all state and

local laws and regulations. Manufacturer recommends a TDS test every six months. This system is acceptable for treatment of influent concentrations of no more that 27 mg/L nitrate and 3 mg/L nitrite in combination measured as N and is certified for nitrate/ nitrite reduction only for water supplies with a pressure of 40 psig or greater. This reverse osmosis system contains a replaceable component critical to the efficiency of the system. Replacement of the reverse osmosis component should be with one of identical specifications, as defined by the manufacturer, to assure the same efficiency and contaminant reduction performance.

Necessary Installation Tools

• Variable speed drill

• Relton Drill

• 1" hole saw

• Teflon tape

• Small knife

• Phillips screw driver

Recommended Filter & Membrane

Replacement Schedule

Filter/Membrane Part # Frequency

Sediment 93023 6 months

Carbon Block Prefilter 32-250-125-975 6 months

Carbon Postfilter

* RO Membrane

CL10ROT40-B

1204694

6 months

2-5 years

Conditions for Operation of TFC - Thin Film Composite Membrane

Used in the Goldline-50

Source Water Supply - TFC

Community / Private Bacteriologically Safe

System Pressure min/max 30 / 100 psi

Temperature 4º / 38ºC (40º / 100º F) pH Range 3.0 to 11.0

Maximum supply TDS level 1800 mg/L

Turbidity < 1.0 net turbidity (NTU)

1

Efficiency rating means the percentage of the influent water to the system that is available to the user as reverse osmosis treated water under operating conditions that approximate typical daily usage

Chemical Parameters - TFC

Hardness (CaC o

3

) < 170 mg/L (< 10 gpg)

Iron (Fe) < 0.1 mg/L

Manganese (Mn) < 0.05 mg/L

Hydrogen Sulfide (H

2

S) 0.00 mg/L

Production Rate

1

Efficiency Rate 8.67%

2

Recovery Rate 23.87 %

Daily Production Rate 11.19 gpd

Test parameters: 25º± 1ºC, 50 psi and pH of 7.5

2

Recovery rating means the percentage of the influent water to the membrane portion of the system that is available to the user as reverse osmosis treated water when the system is operated without a storage tank or when the storage tank is bypassed.

Caution: Do not use with water that is microbiologically unsafe or of unknown quality without adequate disinfection before or after the system. Systems certified for cyst reduction may be used on disinfected water that may contain filterable cysts

(2)

Good Water Warehouse Inc.

Good Water Warehouse Reverse Osmosis System NSF 58

Part Number: GOLDLINE-50

Systems Tested and Certified to NSF/ANSI 58

General installation / Operation / Maintenance Requirements

GWW Inc.

1700 E Walnut Ave

Fullerton CA 92831

(714) 441-2893

(714) 441-0525 FAX

1. Do not use with water that is microbiologically unsafe or of unknown quality without adequate disinfection before or after the system.

Systems certified for cyst reduction may be used on disinfected water that may contain filterable cysts.

2. No iron present in feed water to R.O. System

4. Hardness of more than 7 grains may shorten membrane life

5. Manufacturer recommends a TDS test every six months

6. Efficiency rating means the percentage of the influent water to the system that is available to the user as reverse osmosis treated water

under operating conditions that approximate typical daily usage.

7. Recovery rating means the percentage of the influent water to the membrane portion of the system that is available to the user as reverse

osmosis treated water when the system is operated without a storage tank or when the storage tank is by passed.

8. This system is acceptable for treatment of influent concentrations of no more that 27 mg/L nitrate and 3 mg/L nitrite in combination

measured as N and is certified for nitrate/nitrite reduction only for water supplies with a pressure of 40 psi or greater.

9. The Goldine-50 installation should comply with all state and local laws and regulations.

10. This Reverse Osmosis System contains a replaceable treatment component critical for effective reduction of total dissolved solids. The

product water shall be tested periodically to verify that the system is performing satisfactorily.

11. See owners manual for manufacturer's limited warranty, installation, operation and maintenance requirements.

12. This system has been tested and shown to operate at its calculated recovery rating, or efficiency rating, or both under standard test

conditions. Test parameters: 25º± 1ºC, 50 psi and pH of 7.5.

13. Chlorine in the influent water may affect the RO membrane polymers.

This system has been tested according to NSF/ANSI 58 for reduction of substances listed below. The concentration of the indicated substances in water entering the system was reduced to a concentration less than or equal to the permissible limit for water leaving the system, as specified in NSF/ANSI 58.

Testing was performed under standard laboratory conditions, actual performance may vary.

Contaminant

* Barium

Ave.

Influent

(mg/L)

9.4

Ave.

Effluent

(mg/L)

0.58

Ave. %

Reduction

93.8

US EPA MCL or

Min% reduction

(mg/L)

2.0

0.03

* Barium is used as a surrogate for Radium testing

0.0004

98.7

0.005

Cadmium

Chromium

(Hexavalent)

Chromium

(Trivalent)

Copper

Fluoride

Lead

Radium

226/228

Selenium

Turbidity

TDS

CYST

0.29

0.32

3.0

8.6

0.15

25 pCi/L

0.099

11 NTU

738

13,000 #/mL

0.026

0.017

0.033

0.4

0.002

5 pCi/L

0.004

0.1 NTU

45

4 #/mL

91.2

94.8

98.9

95.6

98.7

N/A

96.0

99.0

93.8

99.9

0.1

0.1

1.3

1.5

0.010

5 pCi/L

0.05

0.5 NTU

187

99.95%

Nitrite

Nitrate

2.9

27

0.60

5.9

79.2

78.2

1.0

10.0

A performance indicator will monitor the performance of the RO membrane, a critical component for the reduction of the above contaminants

Daily Production Rate

Recovery rate

Pressure Drop at Rated Flow

System Weight

Efficiency Rating

Min. / Max. Pressure

Min. / Max. Temperature

Production Storage Capacity

11.19 gpd

23.87 %

5 psi

30 lbs

8.67 %

30/100 psi

4º/38ºc (40º/100º F)

2.4 gallons

Test parameters: 25º± 1ºC, 50 psi and pH of 7.5

Recommended Replacement of Membrane and Filters

R.O. Membrane

Sediment Prefilter

Carbon Block Prefilter 32-250-125-975

Carbon Block Prefilter

Post Carbon Filter

1204694

1227867-V

32-250-125-975

CL10ROT40-B

2 to 5 years

6 months

6 months

6 months

6 months

WQA certified for the reduction of:

TDS, Barium, Cadmium, Hexavalent and Trivalent Chromium, Lead,

Radium 226/228, Selenium, Fluoride, Nitrite, Nitrate, Copper, CYST

Refer to owners manual for additional maintenance and warranty information

(3)

Starting Your Installation

Preparation

Check the following list of components to ensure that all parts are packed with your system.

Quantity

1 Each

Item

Storage Tank

RO System

Faucet a c c c

Fittings and Tubing

Easy Fit fittings are used throughout the system with the exception of the supply feed and drain connector. To insure an optimal seal, tubing should be cut with the end square.

An angled cut or distortion of the tubing will not provide an efficient seal and may cause leaks.

To install a tube, push it through the collet until it seats firmly. To remove a tube, push in the collet and pull out the tube.

Determine the location for the installation of the RO system. Avoid locations where the system might come in contact with hot water pipes or other hazards. Determine the location for the faucet. Check to see that drilling the faucet hole will not damage pipes or wires running underneath the sink. Determine the location for the storage tank. A maximum distance from tank to faucet of 15 feet is possible. The system will produce a faster flow at the faucet with the shortest tubing run from tank to faucet.

Check to see that no damage has occurred during shipment, all connectors are secure, and there are no leaks once the system is hooked up. Close inspection of the system should be performed during the first week of operation.

Shutting Off the Water

Locate the water shut-off valve for the cold water feed line you choose to use for the supply. Accidentally hooking up the system to the hot supply line will permanently damage the membrane (See Conditions for operation). To assure you are using the cold water line, turn on both the hot and cold faucet. After the water is warm to the touch, feel the pipes under the sink. It will be easy to identify the hot and cold pipes.

Close the cold water valve. Turn on the cold water faucet only to assure that the line is completely shut off and the line is drained. If no shut off valve is located under the sink, turn off the main supply at the entry to the house.

Fittings & Tubing Diagram

Compression fittings are used on the supply feed and drain connector. To insure a optimal seal, tubing should be cut with the end square. An angled cut or distortion of the tubing will not provide an efficient seal and may cause leaks.

Compression Fittings Diagram

(4)

Installation

Supply Feed Installation

(A) Flex Line: Loosen nut and separate cold water riser tube from faucet shank. Gently bend riser tube so that slip joint fits onto faucet shank. Replace the existing cone washer with new washer provided in installation kit onto cold water riser tube. Reinstall riser tube onto slip joint adapter and tighten.

(B) Solid Copper Riser Tube: Same procedure as flex tubing except you must cut a piece of the riser tube about

3/4” to 1” so the slip joint adapter can fit between faucet and riser tube (Teflon tape must be used on slip joint adapter to prevent leaks).

Using the opening in the drain outlet saddle as a guide, drill a 1/4” hole in the drain pipe. Clean debris from the saddle and threads.

Mounting the Tank Ball Valve

(1) Wrap the threads on the top of the water storage tank

3 times with plumbers (Teflon) tape only. Make sure it is tight, but not over tight. (2) Connect the tank ball valve assembly to the top of the water storage tank. (3) Connect the tube from the RO membrane to the water storage tank.

Note: Do not tamper with the air valve on the storage tank. It has been preset and screwed on with blue cap by the manufacturers.

Flex Line Solid Copper Line

Supply Feed (Insert)

Drain Clamp Installation

Select a location for the drain hole based on the design of the plumbing. Position the drain outlet saddle on the drain pipe. Allow adequate space for drilling. Tighten the bolts evenly on both sides. Avoid overtightening.

Ball Valve Diagram

RO Membrane Installation

Disconnect the easy fitting as shown in the diagram below.

Remove the membrane housing head by turning counter clockwise.

RO Membrane

(5)

Installation - Product Water Faucet

Drilling the Faucet Hole

The product water faucet may be installed on any flat surface at least 2” in diameter. Check the underside of the location for interference.

Porcelain/Enamel Sinks

A 1” variable speed drill is recommended for this procedure.

A spring loaded Relton style drill set is strongly recommended to prevent chipping. The plastic sleeve supplied on the pilot drill is to be positioned on the drill bit against the drill chuck. This prevents the chuck from contacting the porcelain after the pilot hole has been completed. Avoid high motor RPM during the initial cutting of the porcelain as this can cause chipping.

Stainless Steel Sink

Make a small indent to mark the desired drilling location using a center punch. Drill a pilot hole with a 1/8” metal drill bit. Enlarge the hole using a 1” metal drill bit.

Air Gap Faucet Installation

Once the hole has been drilled place the chrome washer under the faucet body. Next, insert the rubber gasket under the chrome washer and locate the RO faucet in the hole.

Install the lock washer and nut and then tighten firmly while aligning the faucet in the desired direction. Finally, connect the Easy Fit 3/8” fittings (in the installation kit) on the faucet shank using teflon tape.

Drilling with the recommended Relton cut ter

Using a carbide tipped drill bit, drill a pilot hole completely through the porcelain and the material underneath. Place the spring loaded porcelain saw into the drill chuck. Make sure the pilot guide is inserted tightly. Insert the pilot guide into the pilot hole. Push down gently on the drill motor to apply light pressure to the porcelain surface. Start the drill motor turning as slowly as possible. After the initial cut has started, motor speed may be gradually increased. The cut may require three to four minutes to complete. Going faster could result in excessive chipping. This saw is used to cut the porcelain only. Be sure a complete ring has been cut through the porcelain to the metal underneath.

Place the finish hole saw into the drill chuck. Make sure the pilot guide is inserted tightly. Insert the pilot guide into the pilot hole. Begin cut using a slow speed and light pressure until the metal has been penetrated.

(6)

Optional Ice Maker Hook-Up

If your refrigerator is less than 25 feet to your R.O. unit,

1/4” polypropylene plastic tubing is recommended. If your refrigerator is greater than 25 feet from your R.O. unit,

3/8” tubing is recommended. Do not use copper tubing

as an objectionable ice cube taste can result.

To begin, install a tee in the blue tubing between the final filter and the faucet. Next, it is recommended to install a ball valve in the line to the ice maker. This will allow storage tank pressure to increase sufficiently for the ice maker solenoid to operate properly. Leave the ball valve in the closed position until the tank is full after start up procedure is completed, open ball valve.

Installation Diagram & Tubing Guidelines

Goldline Installation Diagram

Long Reach

Drinking Faucet

1/4” Orange tubing from Air Gap to Drain

TDS Monitor (optional)

Cold water feed supply

Drain Connector

Storage Tank

3/8” White tubing to tank

Stage 5: Carbon

Postfilter

Stage 4: TFC

Membrane

3/8” Blue tubing to faucet

1/4” Orange tubing from flow restrictor to

Airgap faucet

1/4” Black tubing from feed

TUBING

1/4" Black

3/8" Blue

3/8" White

1/4" Orange

3/8" Black

Stage 3: Carbon

Block

Stage 2: Carbon Block

Stage 1: Sediment

Prefilter

Color Coded Tubing

DIRECTIONS

Feed water supply line to inlet on sediment filter elbow labeled feed

Carbon post filter elbow labeled faucet to center threaded shank of faucet to faucet connector

Carbon post filter tee labeled tank to ball valve on storage tank

Flow restrictor labeled drain to airgap faucet. 1/4" barbed connector

Airgap faucet 3/8" barbed connector to waste water drain connector

Do Not Use the First Two Reservoirs of Water

Allow the reservoir to fill for 12 hours. Dispense this water to drain. This process removes the factory installed sanitizing solution from the entire system and sends it to the drain. Repeat this process one more time. Allow the tank to fill for 12 hours and dispense this water to the drain.

(7)

21

WHITE

Good Water Warehouse Inc.

1700 E. Walnut Ave.

Fullerton, CA, 92831

Phone: 714-441-2893 Fax: 714-441-0525

Goldline-50

1/4" WHITE

WHITE

10

25

14

24

ORANGE

BLACK

26

TDS Monitor

(optional)

ORANGE

Please Call Your Local Water Professional or Good Water Warehouse For Parts Replacement

2. 1/4" Male Connector

4. Filter Housing 'O-Ring

15. 1/4" Male Connector

18. Stem Adaptor PI051222S

20. Ball Valve

TKE-3200W

1204694

(8)

Activation, Care, & Troubleshooting

Activating the System For the First Time

Make sure all water supply/drain lines are secure and free from leakage. Slowly turn the saddle valve counterclockwise until fully open. Check stem seal for leakage. If necessary tighten stem nut lightly. Turn storage tank valve one quarter turn counterclockwise to open the valve (the handle should be in line with the tubing as it enters the connection). Open the product water faucet and let the water flow until all the air has been expelled from the system. This will take about an hour. Close the product water faucet. In 30 minutes, check the connections for leaks and correct if necessary.

Replacement Filter Procedures

Before starting the filter replacement shut off cold water supply, drain the storage tank by turning on the RO faucet, and shut off the storage tank ball valve. Once you have completed the preparation, first begin by twisting the housings counter clockwise with a filter wrench and remove the old filters. Then wash out the inside of the housing with mild soap and a few drops of household bleach and rinse out thoroughly. Finally, lube the O-ring on the filter housing, insert the new filters, and screw on the housing in a clockwise direction.

System Sanitization

It is recommended to sanitize your system once per year when you are changing the filters. Start by shutting off the cold water supply and draining the storage tank by turning on the RO faucet. Once this is completed remove the filters and membrane and put 1/2 teaspoon of household bleach in the sediment filter housing. Then run water through the system until water begins pouring out the RO faucet. Close the faucet, allow the bleach to remain in the system for three minutes, and then slowly drain the water from the system for five minutes. Finally, reinstall the filters and membrane.

Troubleshooting

Problem Reason

Water has an offensive odor / taste Carbon post filter is depleted

Water has an offensive odor / taste Filters are depleted

Not enough product H

2

O Pressure Storage tank air pressure is low

Not enough water Low water pressure

Not enough water Water supply is blocked

Not enough water

Not enough water

No drain water

No water

Under sink is wet

Storage tank is depleted

Clogged pre-filter cartridge

Clogged flow restrictor

Water supply is turned off

Leak from valve, faucet or fitting

Solution

Drain storage tank & replace post filter

Replace filters & sanitize system

Empty storage tank and set pressure to 8 psi (55kPa)

If line pressure is below 30 psi install a booster pump

Clear restriction, rotate valve on feed water

Consider an increase in tank or membrane capacity

Replace prefilter, drain tank and sanitize system

Replace flow restrictor, check TDS monitor

Turn water on

Dry everything with towels to isolate leak, identify and fix.

(9)

GoldLine Limited Warranty

The Goldline reverse osmosis system is warranted to be free from defects in materials and workmanship under normal use within the operating parameters listed below. For a period of three years from the date of purchase Good Water Warehouse will repair or replace any part of the reverse osmosis system with the exception of the filters and membrane.

Conditions of Warranty

The above warranty does not apply to any part of the Goldline reverse osmosis system that is damaged because of neglect, misuse, alteration, accident, misapplication, physical damage, fouling, and/or scaling of the membrane by minerals, bacterial attack, sediment or damage caused by fire, freezing, hot water, or an act of God.

Good Water Warehouse assumes no warranty liability in connection with this reverse osmosis system other than as specified herein. Good Water Warehouse shall not be liable for consequential damages of any kind or nature due to the use of Goldline-50 product.

Good Water Warehouse Inc. will provide warranty service under the following conditions:

1) Contact your local dealer who will obtain return authorization instructions.

2) Ship the unit or part freight prepaid for warranty evaluation or service. Unit must be returned in the original carton or packaged to prevent possible damage. Systems or parts covered under the warranty shall be repaired (or, at our option replaced) and returned without charge.

Conditions for Operation of TFC - Thin Film Composite Membrane

Used in the Goldline-50

Source Water Supply - TFC

Community / Private Bacteriologically Safe

System Pressure min/max 30 / 100 psi

Temperature 4º / 38ºC (40º / 100º F) pH Range 3.0 to 11.0

Maximum supply TDS level 1800 mg/L

Turbidity < 1.0 net turbidity (NTU)

Chemical Parameters - TFC

Hardness (CaC o

3

) < 170 mg/L (< 10 gpg

Iron (Fe) < 0.1 mg/L

Manganese (Mn) < 0.05 mg/L

Hydrogen Sulfide (H

2

S) 0.00 mg/L

Production Rate

Daily Production Rate 11.19 gallons per day

Printed in USA

(10)

GoldLine Manual

8/2009

advertisement

Related manuals

Download PDF

advertisement