STC 55 HM doors and frames.

STC 55 HM doors and frames.
SECURITY METAL PRODUCTS STC 55
INSTALLATION INSTRUCTIONS
IMPORTANT
READ BEFORE PROCEEDING
PROPER INSTALLATION OF THE DOOR, FRAME, THRESHOLD, AND SEALS ARE CRUCIAL TO ENSURE PROPER
OPERATION AND ACHIEVE THE SPECIFIED STC RATING. FRAMES SHOULD BE MORTAR FILLED AND SET
PLUMB AND SQUARE. USING A MORTAR WITHOUT AGGREGATE OR ROCK WILL MAKE DRILLING INTO THE
FRAME EASIER. PROPER CLEARANCES BETWEEN DOOR AND HINGE JAMB ARE 3/8”AND 3/16” AT HEAD AND
LOCK JAMB. THE PERIMETER SEALS SHOULD BE INSTALLED PRIOR TO INSTALLING HARDWARE THAT
MOUNTS TO THE SOFFIT.
NOTE: FINISH COAT OF PAINT MUST BE COMPLETELY CURED BEFORE INSTALLING ANY SEALS.
Masonry Wire Anchor
1. INSTALL MASONRY FRAME BY ANCHORING TO FLOOR
WITH FOOT CLIPS (FIGURE 2).
1" (25)
GROUT
2. FILL FRAME FULL WITH MORTAR WHILE BUILDING WALL
(FIGURE 3).
FIGURE 1
3. CAULK BETWEEN FRAME AND WALL (FIGURE 3).
GROUT
SETTING
SPREADERS
WIRE SLIP-IN
ANCHOR
FLOOR
CAULK BETWEEN FRAME AND WALL
FIGURE 3
FIGURE 2
Welded Pipe Spacer Existing Opening Anchor
1. GROUT IN THE THROAT OF THE FRAME TO FULL
DEPTH (BY OTHERS).
2. SLIDE FRAME INTO PLACE AND SECURE ANCHORS.
GROUT
3. FILL ANY VOIDS BETWEEN FRAME AND WALL WITH
12 LB. DENSITY FIBERGLASS INSULATION (BY OTHERS).
FIGURE 1
4. CAULK BETWEEN FRAME AND WALL (FIGURE 2).
FIBERGLASS INSULATION
GROUT
FIGURE 2
CAULK GAP BETWEEN FRAME AND WALL
Seal Set 7 Installation Diagram (2 -1/2” Door)
Seal Set 7 Installation Diagram (2 -1/2” Door)
Was this manual useful for you? yes no