Advertisement
Advertisement
MetData1 Weather Station with UT30 Tower
Revision: 4/98
C o p y r i g h t ( c ) 1 9 9 3 - 1 9 9 8
C a m p b e l l S c i e n t i f i c , I n c .
Warranty and Assistance
The
METDATA1 AND THE UT30 TOWER are warranted by CAMPBELL
SCIENTIFIC, INC. to be free from defects in materials and workmanship under normal use and service for twelve (12) months from date of shipment unless specified otherwise. Batteries have no warranty. CAMPBELL
SCIENTIFIC, INC.'s obligation under this warranty is limited to repairing or replacing (at CAMPBELL SCIENTIFIC, INC.'s option) defective products.
The customer shall assume all costs of removing, reinstalling, and shipping defective products to CAMPBELL SCIENTIFIC, INC. CAMPBELL
SCIENTIFIC, INC. will return such products by surface carrier prepaid. This warranty shall not apply to any CAMPBELL SCIENTIFIC, INC. products which have been subjected to modification, misuse, neglect, accidents of nature, or shipping damage. This warranty is in lieu of all other warranties, expressed or implied, including warranties of merchantability or fitness for a particular purpose. CAMPBELL SCIENTIFIC, INC. is not liable for special, indirect, incidental, or consequential damages.
Products may not be returned without prior authorization. The following contact information is for US and International customers residing in countries served by Campbell Scientific, Inc. directly. Affiliate companies handle repairs for customers within their territories. Please visit www.campbellsci.com to determine which Campbell Scientific company serves your country. To obtain a Returned Materials Authorization (RMA), contact CAMPBELL SCIENTIFIC, INC., phone (435) 753-2342. After an applications engineer determines the nature of the problem, an RMA number will be issued. Please write this number clearly on the outside of the shipping container. CAMPBELL SCIENTIFIC's shipping address is:
CAMPBELL SCIENTIFIC, INC.
RMA#_____
815 West 1800 North
Logan, Utah 84321-1784
CAMPBELL SCIENTIFIC, INC. does not accept collect calls.
TABLE OF CONTENTS
PDF viewers note: These page numbers refer to the printed version of this document. Use the Adobe Acrobat® bookmarks tab for links to specific sections.
PAGE
1. PREPARATION AND SITING
............................................................................................ 1-1
1.1 Installation Tasks ................................................................................................................... 1-1
1.4 Determining True North for Wind Vane Orientation............................................................... 1-5
2. TOWER/TRIPOD
................................................................................... 2-1
4.2
4.3
4.4
4.5
4.6
4.7
4.9
4.10
4.11
4.12
4.13
2.2 Sensor Mounting Brackets
3. INSTRUMENTATION
........................................................................... 3-1
3.1 Enclosure, Datalogger, and Power Supply
3.3
3.4
Communication and Data Storage Peripherals
Sealing and Desiccating the Enclosure
4. SENSOR
.................................................................................................. 4-1
014A Met One Wind Speed Sensor....................................................................................... 4-1
024A Met One Wind Direction Sensor................................................................................... 4-2
05103 and 05305 RM Young Wind Monitors......................................................................... 4-2
03001 RM Young Wind Sentry Wind Set............................................................................... 4-3
03101 RM Young Wind Sentry Anemometer ........................................................................ 4-3
LI200S Li-Cor Silicon Pyranometer/LI190SB Quantum Sensor ............................................ 4-4
107B Soil Temperature Probe ............................................................................................... 4-5
CS500 Vaisala Temperature and RH Probe ......................................................................... 4-5
HMP35C Vaisala Temperature and RH Probe...................................................................... 4-6
CS105 Vaisala Barometric Pressure Sensor......................................................................... 4-6
TE525 Texas Electronics Tipping Bucket Rain Gage............................................................ 4-7
4.16
4.17
4.18
4.19
CS615-L Water Content Reflectometer ................................................................................. 4-8
237 Leaf Wetness Sensor ..................................................................................................... 4-9
257 Soil Moisture Sensor....................................................................................................... 4-9
Wind Direction Sensor Orientation ...................................................................................... 4-10
5. SOFTWARE
............................................................................................ 5-1
6. MAINTENANCE AND TROUBLESHOOTING
.............................................................. 6-1
6.1 Maintenance .......................................................................................................................... 6-1
6.2 Troubleshooting ..................................................................................................................... 6-2
I
TABLE OF CONTENTS
3.3-1
3.3-2
2.1-1
2.1-2
LIST OF TABLES
Station ID Numbers and Corresponding Switch Settings** ................................................. 3-10
Station ID Numbers and Corresponding Switch Settings .................................................... 3-12
LIST OF FIGURES
UT30 Tower-Based Weather Station..................................................................................... 2-1
Top View of Base and Guy Anchor Layout............................................................................ 2-1
2.1-5 RFM18 Flat Roof Mounting Base .......................................................................................... 2-3
2.1-8
2.1-9
Guy Wire Attached to Tower.................................................................................................. 2-4
Guy Wire/Turnbuckle Attached to UTEYE Anchor ................................................................ 2-5
2.2-3
2.2-4
3.1-1
3.1-2
3.1-4
3.1-5
3.1-6
3.1-7
3.2-1
UT12VA Gill Radiation Shield and UT018 Crossarm ............................................................ 2-7
UTLI Leveling Fixture/Crossarm Mount and UT018 .............................................................. 2-7
MetData1 Enclosure on CM6 or CM10 Tripod ...................................................................... 3-2
MetData1 Enclosure on UT10 or UT30 Tower ...................................................................... 3-2
BPALK 12 in MetData1 Enclosure ......................................................................................... 3-3
PS12LA in MetData1 Enclosure ............................................................................................ 3-3
MSX10 Solar Panel on CM6 or CM10 Tripod........................................................................ 3-4
MSX10 Solar Panel on UT10 or UT30 Tower........................................................................ 3-4
Illustration of MetData1
External bottom panel showing sensor, communication, power, and ground connections... 3-5
3.3-4 SRM-5A and SC932 at Datalogger........................................................................................ 3-8
3.3-5 SRM-5A Wiring ...................................................................................................................... 3-9
3.3-6
3.3-7
RF95 RF Modem and RF100/RF200 Transceiver............................................................... 3-10
RF232 Base Station Installation........................................................................................... 3-11
3.3-8
3.3-9
MD9 Multidrop Interface in MetData1 .................................................................................. 3-12
MD9 Multidrop Interface at the Computer and at the MetData1.......................................... 3-13
4.1-1
4.2-1
4.3-1
4.4-1
4.5-2
4.6-1
4.7-1
Met One 034A Wind Speed and Direction Sensor ................................................................ 4-1
Met One 014A Wind Speed Sensor....................................................................................... 4-1
Met One 024A Wind Direction Sensor................................................................................... 4-2
05103 RM Young Wind Monitor............................................................................................. 4-2
03001 Mounted to 019ALU Crossarm ................................................................................... 4-3
03101 RM Young Wind Sentry Anemometer......................................................................... 4-3
LI200S/LI190SB and LI2003S Leveling Fixture..................................................................... 4-4
4.11-1 HMP35C Vaisala Temperature and RH Probe ...................................................................... 4-6
4.12-1 CS105 Vaisala Barometric Pressure Sensor in a Custom Weather Station Enclosure ........ 4-6
4.12-2 CS105MD Vaisala Barometric Pressure Sensor in a MetData1 Enclosure .......................... 4-6
4.13-1 TE525 Texas Electronics Rain Gage..................................................................................... 4-7
4.14-1 CS700-L Rain Gage and CM100 Mounting Bracket.............................................................. 4-7
II
TABLE OF CONTENTS
4.16-1 CS615 Water Content Reflectometer with CS615G Probe Insertion Guide ......................... 4-8
4.17-1 237 Leaf Wetness Sensor ..................................................................................................... 4-9
4.18-1 257 Soil Moisture Sensor....................................................................................................... 4-9
4.19-1 Magnetic Declination for the Contiguous United States ...................................................... 4-10
4.19-2 Declination Angles East of True North Are Subtracted From 0 to Get True North.............. 4-11
4.19-3 Declination Angles West of True North Are Added to 0 to Get True North ......................... 4-11
III
TABLE OF CONTENTS
This is a blank page.
IV
SECTION 1. PREPARATION AND SITING
These guidelines apply to several different Campbell Scientific weather stations.
1.1 INSTALLATION TASKS
1.1.1 INDOORS
•
Immediately upon receipt of your shipment…
⇒
Open shipping cartons.
⇒
Check contents against invoice.
Contact CSI immediately about any shortages.
•
Several days prior to the planned installation date…
⇒
Collect tools and site information
(Section 1)
⇒
Assemble datalogger, communications device, and power supply in enclosure
(Section 3)
⇒
Install datalogger support software on
PC (Section 5)
⇒
Establish communications between the datalogger and the PC (Section 5)
⇒
Program datalogger, test sensors, and retrieve data (Section 5)
⇒
Trial run the tower / tripod installation, assembling as much as possible
(Section 2)
⇒
Repackage equipment for transport to the field site
1.1.2 OUTDOORS
•
Locate suitable site (Section 1)
•
Prepare tower or tripod base (Section 2)
•
Tripod and UT10 (3 meter tower) tower stations:
⇒
Raise tripod or tower (Section 2)
⇒
Install instrumentation enclosure
(Section 3)
⇒
Install sensors (Section 4)
•
UT30 (10 meter tower) tower stations:
⇒
Install 3 to 10 meter level sensors
(Section 4)
⇒
Raise tower (Section 2)
⇒
Install instrumentation enclosure
(Section 3)
⇒
Install 0 to 3 meter level sensors
(Section 4)
•
ET101 / ET106 ET Stations:
⇒
Place instrumentation enclosure low on the ET Tower (Section 3)
⇒
Install sensor option (Section 4)
⇒
Slide enclosure to top of tower and secure with correct orientation (Section 3)
1.2 TOOLS REQUIRED
Tools required to install and maintain a weather station are listed below.
1.2.1 TOOLS FOR TOWER INSTALLATION
All Towers
Shovel
Rake
Open end wrenches: 3/8", 7/16", ½",
(2) 9/16"
Magnetic compass
6' Step ladder
CM6/CM10
Tape measure (12')
Level (12" to 24")
Small sledge hammer
Teflon tape or pipe dope
Allen hex wrench (5/64)
1-1
SECTION 1. PREPARATION AND SITING
UT10
Tape measure (12' to 20')
Level (24" to 36")
Pick or digging bar
Claw Hammer
Materials for concrete form:
Hand saw
(4) 12" wood stakes
(1) 2"x 4"x 8' piece of lumber
(8) 8p double-head nails
(8) 16p double-head nails
Concrete trowels
(2) 1 to 1.5" thick x 24" boards
Concrete (0.4 cubic yards)
ET Tower to support base above forms (optional)
Tape measure (12’ to 20’)
Claw hammer
Level (24” to 36”)
Hand saw
Materials for concrete form:
(4) 1" x 2" x 12" stakes
(2) 2" x 4" x 96" lumber
(12) 8p double-head nails
(8) 16p double-head nails
20 ft form wire
½ Yard concrete
Concrete trowel, edger
Electrical Fish tape or 20 feet of small diameter rope
Wheelbarrow
UT30
Tape measure (12' and 20')
Nut driver (3/8")
Level (36" to 48")
Small sledge hammer
Pliers
Tie wire
Climbing harness
Hard hat
Haul rope (50')
Non-stretch line (20')
Wire rope cutters
Materials for B18 Base and UTEYE Anchors:
(4) Wood stakes 12"
Pick or digging bar
Concrete form materials (2"x 4" lumber, stakes, saw, hammer, nails, etc.)
Concrete trowel and edger
Materials for UTDUK Duckbill Anchors
Sledgehammer
Highlift jack
Chain (to attach jack to anchor loops)
Materials for RFM18 Base:
(3) anchors appropriate for mounting surface
(3) bolts and washers to secure base to anchors
1.2.2 TOOLS FOR INSTRUMENTATION AND
MAINTENANCE
All Towers
Lock and key for enclosure
Magnetic declination angle (Section 4)
Magnetic compass
Straight bit screwdrivers (small, medium, large)
Phillips-head screwdrivers (small, medium)
Small diagonal side-cuts
Needle-nose pliers
Wire strippers
Pocket knife
Calculator
Volt / Ohm Meter
Electrical Tape
Step ladder (6')
Datalogger prompt sheet (Section 6)
Station manuals
Station log and pen
Open end wrenches: 3/8", 7/16", ½", (2)
9/16"
Socket wrench and 7/16" deep well socket
Adjustable wrench
Pliers
Conduit and associated tools (as required)
Felt-tipped marking pen
Claw hammer
Pipe wrench (12")
CM6/CM10
Tape measure (12')
Level (12" to 24")
Teflon tape or pipe dope
UT10
Tape measure (12' to 20')
3/8" nut driver
Level (24" to 36")
Teflon tape or pipe dope
(12) ¼" washers (for the 015 Crossarm stand only)
Allen wrench set
1-2
SECTION 1. PREPARATION AND SITING
UT30
Tape measure (12' to 20')
3/8" nut driver
Level (36" to 48")
Pliers
Climbing harness
Hard hats
50' haul rope
Crescent wrench
Channel-lock pliers
¼" washers (spacers for U-bolts)
5/64" Allen hex wrench
1.2.3 SUPPLIES FOR POWER AND
COMMUNICATIONS OPTIONS
AC Power
Wire, conduit, and junction boxes as needed
Phone Modem
Hayes compatible calling modem for PC
Phone line to weather station or junction box
Short-Haul Modem
4 Conductor communications cable from PC to weather station or junction box
6' copper ground rod and clamp for PC surge protection (optional)
1.3 SITING AND EXPOSURE
CAUTION: If any part of the weather station comes in contact with power lines, you could be killed. Contact local utilities for the location of buried utility lines before digging or driving ground rods.
Selecting an appropriate site for the weather station is critical in order to obtain accurate meteorological data. In general, the site should be representative of the general area of interest, and away from the influence of obstructions such as buildings and trees.
The weather station should not be located where sprinkler irrigation water will strike sensors or instrument enclosure.
Some general guidelines for site selection are listed below, which were condensed from EPA
(1988)
1
, WMO (1983)
2
, and AASC (1985)
3 publications.
1.3.1 WIND SPEED AND DIRECTION
Wind sensors should be located over open level terrain, and at a distance of at least ten times
(EPA) the height of any nearby building, tree or other obstruction, as illustrated in Figure 1.3-1.
Standard measurement heights:
3.0 m ± 0.1 m recommended (AASC)
2.0 m ± 0.1 m, 10.0 m ± 0.5 m optional (AASC)
10.0 m (WMO and EPA)
1.3.2 TEMPERATURE AND RELATIVE
HUMIDITY
Sensors should be located over an open level area at least 9 m (EPA) in diameter. The surface should be covered by short grass, or where grass does not grow, the natural earth surface. Sensors should be located at a distance of at least four times the height of any nearby obstruction and at least 30 m (EPA) from large paved areas. Sensors should be protected from thermal radiation, and adequately ventilated.
Situations to avoid include:
• large industrial heat sources
• rooftops
• steep slopes
• sheltered hollows
• high vegetation
• shaded areas
• swamps
• areas where snow drifts occur
• low places holding standing water after rains
Standard measurement heights:
1.5 m ± 1.0 m (AASC)
1.25 - 2.0 m (WMO)
2.0 m temperature (EPA)
2.0 m and 10.0 m for temperature difference
(EPA)
1.3.3 PRECIPITATION
A rain gage should be sited on level ground that is covered with short grass or gravel. In open areas, the distance to obstructions should be two to four times (EPA, AASC) the height of the obstruction.
The height of the opening should be as low as possible, but should be high enough to avoid splashing from the ground. Wind shields, such as those used by the National Weather Service, are recommended for open areas.
1-3
SECTION 1. PREPARATION AND SITING
Collectors should be heated, if necessary, to properly measure frozen precipitation. The gage must be mounted above the average level of snow accumulation in areas that experience significant snowfall.
Standard measurement heights:
1.0 m ± 1.0 cm (AASC)
30.0 cm minimum (WMO, EPA)
1.3.4 SOLAR RADIATION
Pyranometers should be located to avoid shadows on the sensor at any time. Mounting it on the southern most (northern hemisphere) portion of the weather station will minimize the chance of shading from other weather station structures. Reflective surfaces and sources of artificial radiation should be avoided. The height at which the sensor is mounted is not critical.
1.3.5 SOIL TEMPERATURE
The measurement site for soil temperature should be at least 1 m
2 and typical of the surface of interest. The ground surface should be level with respect to the immediate area (10 m radius).
Standard measurement depths:
10.0 cm ± 1.0 cm (AASC)
5.0 cm, 10.0 cm, 50.0 cm, 100.0 cm (WMO)
H
10H
10T
FIGURE 1.3-1. Effect of Structure on Wind Flow
1-4
SECTION 1. PREPARATION AND SITING
1.4 DETERMINING TRUE NORTH FOR
WIND VANE ORIENTATION
Magnetic declination, or other methods to find True
North, should be determined prior to installing the weather station. True North is usually found by reading a magnetic compass and applying the correction for magnetic declination*; where magnetic declination is the number of degrees between True North and Magnetic North. Magnetic declination for a specific site can be obtained from a
USFA map, local airport, or through an internet service called NSSDC CGM (Section 1.4.1). A general map showing magnetic declination for the contiguous United States is shown in Figure 1.4-1.
Declination angles east of True North are considered negative, and are subtracted from 0 degrees to get True North as shown Figure 1.4-2.
Declination angles west of True North are considered positive, and are added to 0 degrees to get
True North as shown in Figure 1.4-3. For example, the declination for Logan, Utah is 14.5
°
East. True North is 360
°
- 14.5
°
, or 345.5
°
as read on a compass.
* Other methods employ observations using the North Star or the sun, and are discussed in the Quality Assurance
Handbook for Air Pollution Measurement
Systems, Volume IV - Meteorological
Measurements
4
.
22 E
20 E
18 E
Subtract declination from 360
16 E
14 E
12 E
10 E
8 E
°
Add declination to 0
°
20 W
18 W
16 W
6 E
4 E
2 E
0
6 W
4 W
2 W
14 W
12 W
10 W
8 W
FIGURE 1.4-1. Magnetic Declination for the Contiguous United States
1-5
SECTION 1. PREPARATION AND SITING
1.4.1 NSSDC CGM SERVICE
The NSSDC CGM (Corrected Geomagnetic)
Service provides an easy way of determining magnetic declination of a specific site. Since magnetic declination fluctuates with time, it should be determined each time the wind vane orientation is adjusted. It can be accessed on the world wide web at http://nssdc.gsfc.nasa.gov/space/cgm/cgm.html
If you know the latitude and longitude of your site, fill out Form 1as shown below for an accurate magnetic declination. If you do not know the latitude and longitude of your site, fill out Form 2 for estimate of magnetic declination.
Note that longitude is expressed in 0 to 360 degrees east of the Greenwich prime meridian, and that north latitudes are positive.
Query Form 1: Latitude/Longitude
Latitude/Longitude below specified in:
Geographic
Year (from 1945 to 2000): 1998
Altitude above Earth's surface (km) [from 0.
to 40000.]: 0
Latitude (degrees) [from -90.00 to 90.00]:
42.03
Longitude (degrees) [from 0.00 to 360.00]:
248.15
Query Form 2: Image Map
Year (from 1945 to 2000): 1998
Altitude above Earth's surface (km)
[0. - 40000.]: 0
Click on map to specify location and submit:
(select area on map provided)
A table containing similar information to the following will be returned after submitting Forms
1 or 2.
Geographic
Lat.
Long.
42.03
248.15
Alt.
(km)
0.
Lat.
CGM
Long.
49.80
311.06
IGRF Magnetic Field
H(nT) D(deg) Z(nt)
20608.
14.417
50505.
Lat.
Dipole
Long.
49.68
312.14
1-6
Magnetic declination is bold in this example to show its location in the table. A positive declination is east, while a negative declination is west. The declination in this example is
14.417 degrees. As shown in Figure 1.4-1, the declination for Logan, UT is east, so True North for this site is 360 - 14.417, or 345.5 degrees.
SECTION 1. PREPARATION AND SITING
References
1
EPA, (1987). On-Site Meteorological Program
Guidance for Regulatory Modeling Applications,
EPA-450/4-87-013. Office of Air Quality
Planning and Standards, Research Triangle
Park, North Carolina 27711.
2 WMO, (1983). Guide to Meteorological
Instruments and Methods of Observation.
World Meteorological Organization No. 8, 5th edition, Geneva, Switzerland.
3
The State Climatologist, (1985) Publication of the American Association of State
Climatologists: Height and Exposure Standards for Sensors on Automated Weather Stations, v. 9, No. 4 October, 1985.
4 EPA, (1989). Quality Assurance Handbook for
Air Pollution Measurement Systems, EPA Office of Research and Development, Research
Triangle Park, North Carolina 27711.
FIGURE 1.4-2. Declination Angles East of
True North Are Subtracted From 0 to Get
True North
FIGURE 1.4-3. Declination Angles West of True
North Are Added to 0 to Get
True North
1-7
SECTION 2. UT30 TOWER INSTALLATION
2.1 UT30 TOWER INSTALLATION
The UT30 10 meter tower provides a support structure for mounting the weather station components. Figure 2.1-1 shows a typical
UT30 equipped with instrumentation enclosure, meteorological sensors, and solar panel.
2.1.1 TOWER INSTALLATION SAFETY
CONCERNS
WARNING: Tower installation near power lines is dangerous. The minimum safe recommended distance from overhead power lines is 2 times the height of the tower and mast combined.
When installing the tower, remember:
•
DO NOT use a metal ladder
•
DO NOT work on a wet or windy day
•
DO dress properly
− shoes with rubber soles and heels, rubber gloves, and long sleeves.
2.1.2 BASE AND GUY ANCHOR LAYOUT
1. A guyed UT30 tower requires an area approximately 17 feet in diameter. Brush and tall weeds should be removed, otherwise the natural vegetation and ground surface should be disturbed as little as possible.
2. Drive a stake where the base of the tower will be located. Attach a line to the stake and scribe a circle with a 17 foot radius.
Drive a stake on the scribed line opposite the direction the tower will hinge for the first guy anchor location (Figure 2.1-2).
On level ground, lay out the remaining two anchor locations by measuring 29.5 feet from the first anchor to the scribed line on either side of the base stake (Figure 2.1-2).
On unlevel ground, use a compass at the base stake to lay out the remaining two anchor locations 120 degrees from the first.
Vary the distance between the tower and each anchor so that the angle between the tower and the guy wire will be approximately
30 degrees.
2.1.3 TOWER BASE INSTALLATION
There are two base options: the B18 base is poured in concrete; the RFM18 roof mount base is anchored to a flat surface.
2.1.3.1 B18 Base installation
1. Dig a hole 36" square and 48" deep where the tower base will be located (Figure 2.1-3).
2. Optional
construct a concrete form out of
2" x 4" lumber 36" square (inside dimensions). Center the form over the hole and drive two stakes along the outside edge of each side. Level the form by driving nails through the stakes and into the form while holding the form level.
3. Attach the bottom section of the tower to the B18 base using one bolt per leg, making sure that the hinge direction is common for all legs.
4. Center the bottom tower section with the base attached in the hole. Orient the tower/base for the proper hinge direction.
Make sure that the top of the legs will be at least 1/2" above the finished height of the concrete (Figure 2.1-4).
5. Fill the hole with concrete. Getting the bottom tower section plumb is very important. As concrete is poured into the hole, periodically check the tower for plumb using a carpenter's level and make adjustments as necessary. Allow three to four days for the concrete to cure.
REGCOMENDED
SENSORS
FIGURE 2.1-1. UT30 Tower-Based
Weather Station
2-1
SECTION 2. TOWER INSTALLATION
17 ' RADIUS
29.5 ' 29.5 '
120
TILT DIRECTION
(NORTH)
CENTER POINT
ANCHOR LOCATIONS
(3) PLCS
2-2
48"
FIGURE 2.1-2. Top View of Base and Guy Anchor Layout
SIDE VIEW
TOP VIEW
B18 Base
(3) places
36"
CEMENT
Foundation
North
36"
FIGURE 2.1-3. Foundation for B18 Base
SECTION 2. TOWER INSTALLATION
2.1.3.2 RFM18 Base Installation
1. Position the RFM18 on the surface where it will be installed. Make sure the hinge direction is correct and mark the locations of the three mounting holes. Install an appropriate anchor
(user-supplied) for each hole.
Attach the bottom section of the tower to the RFM18 base using one bolt per leg
(Figure 2.1-5). Position the base over the anchor holes. Secure the base to the anchors with appropriate hardware (usersupplied). Check the tower for plumb and shim the RFM18 if necessary before fully tightening the bolts.
2.1.4 GUY ANCHOR INSTALLATION
There are two types of anchors for the tower guy wires: the UTEYE eye bolts are poured in concrete; the UTDUK duckbill anchors are driven into the soil.
2.1.4.1 UTEYE Eyebolt Guy Anchor
1. Dig a hole 24" square by 24" deep at each anchor location (Section 2.1.2).
2. Optional
construct a concrete form out of
2" x 4" lumber 24" square (inside dimensions) for each hole. Center the forms over the holes and level them using a carpenter's level and stakes.
3. Fill the holes with concrete and install the eyebolts as shown in Figure 2.1-6.
2.1.4.2 UTDUK Duckbill Guy Anchor
1. Locate the three anchor locations (Section
2.1.2). It is important that the anchors be driven at the same angle as the guy wires
(Figure 2.1-7). Insert the steel drive bar into the anchor body and drive the anchor into the ground using a fence post driver or sledgehammer until only the top half of the loop remains above the ground.
2. Attach a high-lift jack to the loop and jack the anchor up about 6 inches to rotate the anchor into the load-lock position.
WARNING: Failure to install and lock the anchor at the correct angle will result in the anchor cable cutting through the soil until the angles equalize, causing slack in the guy wires.
B18
(3) places
FIGURE 2.1-4. B18 Concrete Mounting Base
24 "
UT3B#B
(tripods)
Mounting Hole
(3) places
(tripods)
Mounting Base
SIDE VIEW
Tower
→
24 "
60
RFM18
Foundation
FIGURE 2.1-6. UTEYE Eyebolt Guy Anchor
2-3
SECTION 2. TOWER INSTALLATION
2.1.5 UT30 10 M TOWER ASSEMBLY
1. Having previously installed the base and bottom tower section (Section 2.1.4), remove the bolt from the rear tower leg, and loosen the bolt in the side legs so the bottom tower section is free to hinge. Tilt the tower section to the ground and assemble the remaining sections and mast using the hardware provided with the tower.
2. Install the guy wires to the top of the tower
(Figure 2.1-8). Cut the 120' piece of guy wire into three pieces; lengths will vary with slope.
Attach the guy wires to the tower using two Ubolts for each guy wire.
3. Mounting brackets and sensors that attach to upper tower sections are most easily attached while the tower is lying on the ground.
4. "Walk" the tower to its upright position and install the remaining bolts in the tower base.
5. Attach the guy wires to the anchors (Figure
2.1-9). Unscrew the jaw and eye bolts until 1 inch of thread extends through the turnbuckle body. Attach the jaw end of the turnbuckles to the anchors. While holding the tower plumb, attach the guy wires to the eye end of the turnbuckles using a thimble and two U-bolts for each guy wire. Tighten the turnbuckles until the guy wires are snug and the tower is plumb. Do not overtighten the turnbuckles.
Duckbill Anchor
U-bolts
(2) places
Drive Bar
60 o
Tower
FIGURE 2.1-7. UTDUK Duckbill Guy Anchor
→
2.1.6 UTGND TOWER GROUNDING KIT
1. Drive the ground rod close to the tower
(Figure 2.2-1) using a fence post driver or sledgehammer. Drive the rod at an angle if an impenetrable hardpan layer exists. In hard clay soils, a gallon milk jug of water can be used to "prime" the soil and hole to make driving the rod easier.
2. Loosen the bolt that attaches the clamp to the ground rod. Insert one end of the 4
AWG wire between the rod and the clamp and tighten the bolt (Figure 2.1-10).
3. Attach the tower grounding clamp to a tower leg (Figure 2.1-11). Route the 4
AWG wire attached to the ground rod up the tower leg to the grounding clamp.
Loosen the set screw and insert the 4 AWG wire and the 24 AWG enclosure ground wire into the hole behind the set screw and tighten the set screw. Route the green wire to where the enclosure will be installed.
FIGURE 2.1-8. Guy Wire Attached to Tower
2-4
Turnbuckle
U-bolt
(2) places
Thimble
SECTION 2. TOWER INSTALLATION
Wire to
Enclosure
Clamp
Wire to
Ground Rod
FIGURE 2.1-9. Guy Wire/Turnbuckle
Attached to UTEYE Anchor
Clamp
FIGURE 2.1-11. Tower Grounding Clamp
Ground Rod
FIGURE 2.1-10. Ground Rod and Clamp
2-5
SECTION 2. TOWER INSTALLATION
2.2 SENSOR MOUNTING BRACKETS
Sensor mounting brackets provide a means of mounting the sensors to the tower. General orientation of the mounting brackets is shown in
Figure 2.2-1.
2.2.1 019ALU CROSSARM SENSOR MOUNT
1. Loosen the two bolts that secure the mast to the top tower section. Extend the mast
16" (swaged end up) above the top of the tower and tighten the bolts.
2. Attach the 019ALU crossarm to the mast as shown in Figure 2.2-2. Position the middle
NU-RAIL at the base of the swaged mast section. Orient the 019ALU in a north/south direction, with the 3/4" NU-RAIL facing south (northern hemisphere) and tighten the set screws.
3. Install the lightning rod to the mast as shown in Figure 2.2-2. Loosen the two screws on the lightning rod mounting bracket. Position the mounting bracket 2" down from the top of the mast and tighten both screws evenly. Make sure the lightning rod set screw is tight.
2.2.2 GILL RADIATION SHIELDS
1. Attach the Gill Radiation Shield (UT12VA,
UT12P, or UT6P) to the UT018 crossarm with the bolt and nut provided (Figure 2.2-3).
2. Attach the UT018 to the tower leg facing the prevailing wind direction (Figure 2.2-3). The top of the crossarm mounting bracket should be 74" from the bottom of the tower. Tighten the four nuts on the compression bracket to secure the crossarm.
2.2.3 UTLI LEVELING FIXTURE AND
CROSSARM MOUNT
1. Attach the UTLI leveling fixture to the UT018 crossarm with the nut and bolt provided
(Figure 2.2-4).
2. Attach the UT018 to a tower leg so that the crossarm faces south (northern hemisphere).
The top of the crossarm mounting bracket should be 98 inches from the bottom of the tower. Tighten the four nuts on the compression bracket to secure the crossarm.
1" NU-RAIL
Enclosure
UT018 Crossarm
Lightning Rod
Ground Rod
UT30
RFM18
019ALU Crossarm
3/4" NU-RAIL
NORTH
FIGURE 2.2-1. Top View of Tower
Lightning Rod
019ALU
FIGURE 2.2-2. 019ALU Crossarm and
Lightning Rod
2-6
2.2.4 025 PYRANOMETER CROSSARM STAND
1. Attach the LI2003S Leveling Fixture to the
025 Pyranometer Crossarm Stand using the three screws provided (see Figure 2.2-5).
2. Position the 025 mounting plate 5" above the 3/4" x 3/4" NU-RAIL and tighten the set screws.
NOTE: The 025 mounts to the 3/4" x 3/4"
NU-RAIL (PN 1017) on the 019ALU
Crossarm, which may not be available depending on the wind sensor configuration.
UTLI-B1
SECTION 2. TOWER INSTALLATION
UT018
UTLI
FIGURE 2.2-4. UTLI Leveling
Fixture/Crossarm Mount and UT018
UT12VA
FIGURE 2.2-3. UT12VA Gill Radiation Shield and UT018 Crossarm
025
019ALU
FIGURE 2.2-5. 025 Pyranometer
Crossarm Stand
2-7
SECTION 3. METDATA1 INSTRUMENTATION INSTALLATION
3.1 ENCLOSURE, DATALOGGER,
POWER SUPPLY
All instrumentation (datalogger, power supply, sensor interface board, communications or data retrieval peripherals) are mounted in the
MetData1 enclosure. Bulkhead connectors are provided on the enclosure bottom for connecting external sensors and devices as illustrated in Figure 3.2-1.
Step 1) Mount MetData1 enclosure on the station platform as shown in Figures 3.1-1 or
3.1-2.
1.
Position the enclosure on the north side of the mast or tower (northern hemisphere). Orient the enclosure so that the latch is on the right side (as you are facing the enclosure) and the connector panel is on bottom. Tighten
U-bolts until enclosure is snug. Do not over tighten since doing so may damage the station platform.
2.
Route the 13 AWG wire from the brass grounding clamp on the tripod or tower to the enclosure grounding lug. Insert the end of the wire into the grounding lug and tighten the set screw.
Step 2) Open enclosure by springing the latch on the right side.
Step 3) Install the battery pack option as described in sections 3.1.1 or 3.1.2. Installation of an MSX10 solar panel is described in section
3.1.3.
Step 3) Place a packet of desiccant in the desiccant holder located inside the enclosure lid. Close the enclosure and secure the latch.
A lock may be used on the latch for extra security.
3.1.1 BPALK 12 VOLT POWER SUPPLY
The BPALK houses 8 “D” cell batteries. To install the battery pack, loosen the thumb screw and remove cover. Insert the battery pack and plug the battery lead into the connector labeled internal (Figure 3.1-4).
3.1.2 PS12LA 12V POWER SUPPLY WITH
RECHARGEABLE BATTERY
The PS12LA houses a sealed monoblock rechargeable battery. To install the battery, loosen the two thumb screws and remove the cover (Figure 3.1-5).
1.
With the PS12 power switch "OFF", insert the battery and plug the battery lead into the connector labeled "INT". (Figure 3.1-3)
2.
An unregulated solar panel (Section 3.1.3) or charging wall plug transformer should be connected to the MetData1 at all times when the PS12LA is the power supply option. Power connection port is shown in Figure 3.2-1.
3.
Turn power switch to "ON", and replace the cover.
3.1.3 MSX10 SOLAR PANEL
MetData1 Solar panels purchased from CSI are shipped with a power connector attached.
1.
Mount the MSX10 solar panel to the tower so that it faces south (northern hemisphere) as shown in Figure 3.1-6 or 3.1-7. Position the MSX10 as high off the ground as practical, ensuring that it cannot interfere with air flow or sunlight around the sensors.
2.
The solar panel should be oriented to receive maximum insolation over the course of the year. Suggested tilt angles
(referenced to the horizontal plane) are listed below.
Site Latitude Tilt Angle
0 to 10 degrees
11 to 20
21 to 45
46 to 65
>65
10 degrees
Latitude + 5 degrees
Latitude + 10 degrees
Latitude + 15 degrees
80 degrees
3.
After determining the tilt angle, loosen the two bolts that attach the mounting bracket to the panel. Adjust the angle, then tighten the bolts. Secure the lead wire to the mast using wire ties.
4.
Connect the solar panel to the MetData1 enclosure at the connection port labeled
"AC/SOLAR" as shown in Figure 3.2-1.
3-1
SECTION 3. INSTRUMENTATION INSTALLATION
METDATA
STATION
COLLEC
TION
LOGAN, UTAH - USA
DATA
METEOR
OLOGICAL
METDATA
M
ETEOR
LOGAN, UTAH - USA
DATA
OL
OGICAL
COLLEC
TION
STATION
FIGURE 3.1-1. MetData1 Enclosure on CM6 or CM10 Tripod
FIGURE 3.1-2. MetData1 Enclosure on UT10 or UT30 Tower
3-2
Internal Battery
Connector
Power Switch
SECTION 3. INSTRUMENTATION INSTALLATION
INT
EXT
CHG
CHG
CHG
+12
+12
FIGURE 3.1-3. PS12LA/CH12R Wiring and Switch Panel
Logan, Utah
INTERNAL BATTERY
TEMPARARY BATTER
BPALK
12V ALKALINE BATTERY PACK
MADE IN USA
INTERNAL BATTERY
BPALK
TEMPORARY BATTERY
12V ALKALINE BATTERY PACK
Logan, Utah
MADE IN USA
D
Alkaline Pannasonic
D
Alkaline
Pannasonic
D
Alkaline Pannasonic
D
Alkaline
Pannasonic
INT
EXT
CHG
CHG
CHG
CHG
PS12 POWER SUPPLY
WITH 12V CHARGING REGULATOR
Logan, Utah
MADE IN USA
WARNING:
PERMANENT DAMAGE TO RECHARGEABLE
CELLS MAY RESULT IF DISCARGED
BELOW 10.5 VOLTS
FUNCTION
INT
EXT
CHG
CHG
CHG
+12
+12
PS12 BATTERY
EXTERNAL BATTERY - DO NOT USE WITH
INTERNAL RECHARGEABLE BATTERY
POWER TO +12 TERMINALS
INPUT FROM CHARGER OR SOLAR PANEL
16-26 VDC OR AC RMS: POSITIVE TO
12V PERIPHERALS
*
CHARGING INSTRUCTION (AT 2000 )
PS12 POWER SUPPLY
WITH 12V CHARGING REGULATOR
WARNING:
PERMANENT DAMAGE TO RECHARGEABLE
CELLS MAY RESULT IF DISCHARGED
BELOW 10.5 VOLTS
FUNCTION
INT
EXT
CHG
PS12 BATTERY
EXTERNAL BATTERY - DO NOT USE WITH
INTERNAL RECHARGEABLE BATTERY
CHARGE VOLTAGE PRESENT
CHG
CHG
+12
+12
INPUT FROM CHARGER OR SOLAR PANEL
16-26 VDC OR AC RMS: POSITIVE TO
EITHER TERMINAL, NEGATIVE TO OTHER
POWER TO DATALOGGER OR
12V PERIPHERALS
MADE IN USA
FIGURE 3.1-4. BPALK in MetData1
Enclosure
FIGURE 3.1-5. PS12LA in MetData1
Enclosure
3-3
SECTION 3. INSTRUMENTATION INSTALLATION
U-bolt
MSX10
Mounting
Bracket
3.2 SENSOR CONNECTION
External MetData1 sensors connect to one of seven bulkhead connectors on the bottom of the MetData1 enclosure, as shown in Figure
3.2-1. Telephone and short haul modem wires connect to connector #8. All power connections occur at the AC/solar connector. Coaxial bulkhead connectors are installed in the “popout”. The ground chuck should be connected to earth ground.
The CS105MD mounts in the enclosure as shown in Figure 3.12-2. Connect to internal wiring panel of MetData1 as shown below:
Green ---------- 6H
White ---------- 6L
Black ---------- GND
Red ---------- 12V Switch
FIGURE 3.1-6. MSX10 Solar Panel on CM6 or CM10 Tripod
MSX10
Mounting
Bracket
U-bolt
FIGURE 3.1-7. MSX10 Solar Panel on UT10 or UT30 Tower
3-4
SECTION 3. INSTRUMENTATION INSTALLATION
Connector #2
034A-LC
05103-LC
05305-LC
CS800*
03001-LC
Connector #1*
HMP45C-LC
CS500-LC
HMP35C-LC
Connector #4
CS615-LC
108-LC
107-LC
237-LC
Rad Modem Connector
Connector #6
SR50-LC
253-LC
Connector #8
Telephone and
Met Rad-L
Met Phone-L
Met Voice-L
Campbell Scientific
Serial I/O Connection
“Pop Out”
Coaxial
Connections
AC/Solar
MSX10-C
AC Wall Charger
Connector #3*
LI190SB-LC
Connector #5
CS700-LC
Connector #7
237-LC
107-LC
108-LC
LI200S-LC
LI200X-LC
TE525-LC
TE525WS-LC
TE525MM-LC
*Configure MetData1 jumpers as shown in Figure 3.2-2.
To Earth Ground
FIGURE 3.2-1. Illustration of MetData1
External bottom panel showing sensor, communication, power, and ground connections.
HMP35C
CS500
HMP45C
CS800
LI190SB
LI200S
LI200X
#1
#1
#1
#4
#3
#2
#2
#3
#2, #3
Closed
Open
Open
Right
Closed
Open
Closed
Open
Open
#1
#4
#2 #3
Default CS800
FIGURE 3.2-2. MetData1 Jumper Configuration
3-5
SECTION 3. INSTRUMENTATION INSTALLATION
3.3 COMMUNICATION AND DATA
STORAGE PERIPHERALS FOR
METDATA1
One or more peripherals (i.e., storage modules, modems, relay drivers, etc.) can be mounted to the MetData1 enclosure backplate.
3.3.1 SM192/SM716 STORAGE MODULE
Storage modules extend the amount of memory that is available for storing data, provide on-site backup for data and programs, and provide a means of transporting data from remote sites.
Mount the SM192 mounting bracket to the enclosure backplate as shown in Figure 3.3-1 using the four nylon inserts and screws provided.
Connect the storage module to the MetData1’s
I/O port with the SC12 cable. Place the storage module in the bracket and fasten the Velcro straps.
SC12 Cable
SM192
Mounting
Bracket
SM192 or SM716
Storage Module
FIGURE 3.3-1. SM192/SM716 Storage
Module
3.3.2 MET PHONE COM200/VS1/COM300
PHONE MODEMS
The Met Phone Kit contains:
(1) Phone Modem
(1) SC12 Cable
(1) RJ-11 Patch Cord (12”)
(4) Nylon Backplate Inserts
(4) Screws
(1) Direct Bury Splice Kit
(1) Telephone Leader with Connector (20’)
Phone Modems enable communication between the MetData1 and a PC (with Hayes compatible Phone Modem) over a dedicated phone line (Figure 3.3-2). An external phone connection cable is provided. Connect the external cable connector end into MetData1 connector #8. Connect the other end to the telephone line in the telephone service box.
Install the Met Phone Kit as shown in Figure
3.2-2.
1.
Mount the phone modem to the enclosure backplate with the nylon inserts and screws.
The telephone company generally provides surge protection. Surge protection is also built into the MetData1 RJ11C jack.
2.
Connect the modem 9-pin port to the
MetData1 9-pin port with the SC12 cable.
3.
Connect the modem RJ-11 port to the
MetData1 RJ-11 port with the RJ-11 patch cord.
4.
Connect modem ground to MetData1 ground.
5.
Connect the telephone leader cable to connector #8 on the external bottom panel of the MetData1 (see Figure 3.2-1).
6.
Connect the tip and ring lines of the telephone leader to the commercial phone system, either at a service box or using the direct bury splice kit provided.
3-6
SECTION 3. INSTRUMENTATION INSTALLATION
SC12 Cable
2.
Install the modem and cellular transceiver with the nylon inserts and screws provided.
3.
Connect the modem 9-pin port to the
MetData1 internal 9-pin port with the SC12 cable.
4.
Connect the modem RJ-11 port to the
MetData1 RJ-11 port with the RJ-11 patch cord.
5.
Connect the antenna to the external side of the coaxial bulkhead connector.
6.
Connect the 12V line and ground lines from the COM100 to the PS12 power supply.
Modem
Ground
Cable
Ground Cable
RJ-11 Patch
Cord
Modem
CAMPBELL
SCIENTIFIC
VS1 VOICE SYNTHESIZER
INC.
Complies with Part 68, FCC rules. FCC Registration No. B9QUSA-75378-MM-T
Ringer Equivalence 0.6B. Required Connector USOC RJ11C. Canadian Load No.5
This equipment complies with the requirements in Part 15 of FCC Rules for Class A computing device. Operation of this equipment in a residential area may cause unacceptable interference to radio and TV reception requiring the operator to take whatever steps are necessary to correct the interference.
S/N
1001
MADE IN USA
FIGURE 3.3-2. Telephone Modem
Installation
3.3.3 METCELL COM100 CELLULAR
TRANSCEIVER
The MetCell COM100 requires the use of the
CR10KD or SC32A for initial programming of the MetData1.
/O
CAUTION: Do not connect transceiver power until antenna is connected.
Cellular service and programming of your transceiver must be coordinated with your local cellular provider. A cellular transceiver enables communication between the datalogger and a
PC (with a Hayes compatible phone modem) over cellular phone service.
Install the MetCell cell phone kit as shown in
Figure 3.3-3.
1.
As shown in Figure 3.2-1, a “pop-out” plug is provided adjacent to the AC/Solar connector for installing the coaxial bulkhead connector.
Remove the “pop-out” plug by pushing it out from inside the enclosure with a screw driver. Wear gloves while doing this to protect your hands when the plug gives way.
Install the coaxial bulkhead connector.
Antenna Cable to Coaxial
Bulkhead
Connector
FIGURE 3.3-3. Phone Installation
SC12
Cable
3.3.4 METRAD SRM-5A RAD MODEM AND
SC932C INTERFACE
Rad Modems enable communication between a datalogger and computer over two twisted pairs of wires. The maximum distance between modems is determined by baud rate and wire gauge. At 9600 baud the approximate range is
4.0 miles.
3-7
SECTION 3. INSTRUMENTATION INSTALLATION
The MetRad kit includes:
(2) Rad modems
(2) Nylon Inserts
(2) Screws
(1) Rad Modem 4-Wire Patch Cable
(1) SC932C 9-Pin Interface
(1) Ground Wire
(1) Surge Protector Kit
(2) Burial Splice Kits
(1) Mounting Bracket
(1) PC 4-Wire Leader
(1) Met-Rad 4-Wire Leader with Connector
(1) Length of User-Supplied Wire
(Supplier: Anixter, P/N F-02P22BPN,
708-677-2600)
3.3.4.1 MetRad at MetData1
Install the MetRad as shown in Figure 3.3-4.
1.
Plug the SRM-5A into the SC932C.
Position the notched tabs in the mounting bracket over the two screws in the SRM-5A
(refer to Figure 3.3-4). Thread the SRM-5A screws through the bracket and into
SC932C.
2.
Mount the SRM-5A/SC932C mounting bracket into the MetData1 using the 2 nylon inserts and screws.
3.
Connect the SC932C 9-pin port to the
MetData1 internal 9-pin port with the SC12 cable.
4.
Connect the SRM-5A to the MetData1 with the short 4 wire patch cord provided. Match wire labels to MetData wiring panel labels
(+XMT to +XMT, etc.).
5.
Connect the 20 foot 4 wire leader to connector #8 on the bottom external
MetData1 panel. See Figure 3.2-1 for connector #8 location. Splice this cable to the user supplied cable using the burial splice kits.
3.3.4.2 MetRad at the PC
1.
Mount the Surge Protector to a flat surface
(close to the PC). Ground the center terminal to an earth (or building) ground using the 12 AWG ground wire.
2.
Connect the 4-wire leader cable to the
SRM-5A as shown in Figure 3.3-4. Fasten the cable to the strain relief tab with a cable tie. Connect the SRM-5A to the PC's serial port using an SC25PS cable for 25-pin serial ports, or a PN7026 cable for a 9-pin serial port.
3.
Route the user-supplied cable from the remote SRM-5A, and the cable from the
SRM-5A attached to the computer to the surge protector box. Connect the cables to the surge protector terminals as shown in
Figure 3.3-5.
SC12 Cable
SRM-5A
SC932C
FIGURE 3.3-4. SRM-5A and SC932C in MetData1
3-8
SECTION 3. INSTRUMENTATION INSTALLATION
- RCV (black)
+ RCV (red)
- XMT (white)
+ XMT (green)
+ RCV (red)
- RCV (black)
+ XMT (green)
- XMT (white)
METDATA 1 WIRING PANEL
To # 8
External Connector
PC
SRM-6A
+ XMT (green)
- XMT (white)
+ RCV (red)
- RCV (black)
Surge
Protector
3
4
1
2
User
Supplied
Cable
1
Splices
+ RCV
RED
2
- RCV
BLACK
3
4
+ XMT
GREEN
- XMT
WHITE
Earth Ground
FIGURE 3.3-5. SRM-5A Wiring
3.3.5 RF95 RF MODEM AND RF100/RF200
TRANSCEIVER
CAUTION: Do not connect transceiver power until antenna is connected.
Radiotelemetry (RF) enables communications between one or more MetData1s/dataloggers and a PC over an FCC-assigned radio frequency in the VHF or UHF band. The maximum distance between any two communicating stations is approximately 20 miles and must be line-of-sight. Longer distances and rough terrain may require intermediate repeater station(s). Refer to the
Radiotelemetry Network Applications manual for
RF repeater stations and RF Networks accessed remotely by phone.
3.3.5.1 RF95 Modem and RF100/RF200
Transceiver at the MetData1
1.
Remove the four screws that attach the lid to the RF95 modem. Remove the RF95 case lid. Remove the center screw from the circuit board. Remove the circuit board.
2.
Mount the bottom half of the RF95 case into the MetData1, orienting it as shown in
Figure 3.3-5. Replace the circuit board and center screw.
3.
Set the dip switches on the circuit board to the appropriate Station ID (Table 3.3-1).
Each RF95 must have a unique station ID; address 1 is usually used for the base station, address 2 for first remote station, address 3 for the next remote station, etc.
Switch 9 should be in the "OPEN" position.
Do not tighten the four lid screws at this time.
4.
Replace the lid. Place the radio mounting bracket and radio on the RF95 and tighten the four lid screws.
5.
Locate the short coaxial cable with the bulkhead connector on the end. Install the
3-9
SECTION 3. INSTRUMENTATION INSTALLATION bulkhead connector into the “punch-out” hole, located as shown in Figure 3.3-5.
Install the bulkhead connector so that the cable is inside the MetData1. Connect the other end of the cable to the radio’s BNC connector.
6.
Mount the antenna to the mast according to the manufacturer's instructions. Connect the antenna cable to the antenna and route the cable. Connect the antenna cable to the outside end of the coaxial bulkhead connector as shown in Figure 3.3-5. Wrap the connection with the self-vulcanizing rubber provided.
TABLE 3.3-1. Station ID Numbers and
Corresponding Switch Settings**
Station
ID
0
10
11
12
*255
7
8
5
6
9
3
4
1
2
Switch Settings
1234 56789
0000 0000X
1000
0100
1100
0010
1010
0110
1110
0001
1001
0101
1101
0011
1111
0000X
0000X
0000X
1111X
0000X
0000X
0000X
0000X
0000X
0000X
0000X
0000X
0000X
* Station ID 255 is reserved for phone-to-RF base stations.
** See Appendix A in the Radiotelemetry
Network Applications Manual for a table of switch settings.
Cable to
Antenna
SC12 Cable
Radio
Transceiver
Coaxial Bulkhead Connector (wrap with supplied self-vulcanizing rubber)
FIGURE 3.3-5. RF95 RF Modem and
RF100/RF200 Transceiver
3.3.5.2 RF232 RF Base Station
1.
Install the base station antenna according to the manufacturer's instructions. Connect the antenna cable to the antenna and route the cable to the RF232.
2.
With the power cord disconnected, remove the four screws that attach the RF232 lid. Remove the lid, and install the RF200 transceiver as shown in Figure 3.3-6. Connect the red wire to the "12 V" terminal, and the black wire to the
" " terminal inside the RF232. Connect the multi-colored ribbon cable to the RF modem; make sure that the keyway is properly aligned.
3.
Connect the antenna cable to the antenna connector on the RF200. Reassemble the
RF232 lid using the screws previously removed.
3-10
SECTION 3. INSTRUMENTATION INSTALLATION
4.
With the power switch "OFF", connect the power cord to 110V AC. Connect the serial port to the computer's serial port using an SC25PS cable for a 25-pin serial port, or a PN7026 cable for a 9-pin serial port. Toggle the power switch to "ON" to operate the RF232.
INTERNATIONAL
I P POWER
IHB12-1.7
OUTPUT:
12DC AT
1.7 AMPS
!
EXTERNAL FUSE RECOUNTER
EXIT
AC INPUT 57 - 63 Hz
FOR USE AT 100 120
JUMPER
APPLY AC
1&2
1&2
1&4
1&3
1&3
1&5
230-240
2&3
1&4
2&3
1&5
MAX (CURENT)
FUSE RATING
.5A
.25A
MADE IN THE
USA
Power
Switch
Port
Radio
Antenna Cable
Serial
12V and G
Terminals
FIGURE 3.3-6. RF232 Base Station
Installation
3.3.6 MD9 MULTIDROP INTERFACE
The MD9 Multidrop Interface enables communication with one or more
MetData1s/dataloggers and the computer over a single 75 ohm coaxial cable. An MD9 network can be connected directly to a PC, or can be connected to a telephone modem (refer to the
MD9 Manual) and accessed remotely.
Total coax length may be up to three miles.
Since each MD9 attenuates the signal 0.2 db, the maximum length depends on the number of
MD9s in the network (refer to the MD9 manual).
Coaxial cable and BNC connectors may be ordered from CSI, or purchased locally (Belden
Type 9100 RG59/U or equivalent). Call Belden
Wire and Cable at (317) 983-5200 for the name of a local distributor.
Installation requirements depend on the type of cable that is used, and how it is installed (direct burial, conduit, etc.). In general, follow state and local electrical codes.
3.3.6.1 MD9 Multidrop Interface at the
MetData1
1.
Remove the four screws that attach the lid to the MD9. Remove the lid. Remove the center screw from the circuit board.
Carefully remove the circuit board.
2.
Mount the lower half of the case into the
MetData1 using the inserts and screws provided. Replace the circuit board and center screw.
3.
Set the dip switches on the circuit board to the appropriate Station ID (Table 3.3-2). Each
MD9 must have a unique ID; address 1 is usually used for the MD9 at the computer, address 2 for the next MD9, address 3 for the next MD9, etc. The default baud rate is 9600, which can be changed with the jumpers next to the dip switches (Table 3.3-2).
4.
Replace the lid.
5.
A “pop-out” plug is provided adjacent to the
AC/Solar connector for mounting the coaxial bulkhead connector into the enclosure as shown in Figure 3.3-5.
Remove the “pop-out” plug by pushing it out from inside the enclosure with a screw driver. Wear gloves while doing this to protect your hands when the plug gives way. Install the coaxial bulkhead connector.
Attach the short coaxial cable to the MD9’s coax connectors to the inside end of the bulkhead connector. Attach the main coaxial cable to the outside end of the bulkhead connector. Wrap the outside connection with the provided selfvulcanizing rubber.
6.
Route the coaxial cable(s) to the MD9.
Connect the cable(s) to the MD9 using the
BNC "T" provided. The first and last MD9s of the network must be terminated with 75 ohm Coax Terminators (Model MD9CT) to prevent signal reflection.
3.3.6.2 MD9 Multidrop Interface at the
Computer
Connect the MD9 and the SC532 9 Pin
Peripheral to RS232 Interface to the computer as shown in Figure 3.3-8.
1.
Connect the SC532 to the computer's serial port using an SC25PS cable for a 25-pin serial port, or a PN7026 cable for a 9-pin serial port. Connect the MD9 to the SC532 with an SC12 cable.
2.
Route the coaxial cable to the MD9; connect the cable and an MD9CT to the
MD9 using the BNC "T" provided.
3-11
SECTION 3. INSTRUMENTATION INSTALLATION
SC12 Cable
CAMPBELL
SCIENTIFIC
INC.
MD9
MULTIDROP INTERFACE
MADE IN USA
TABLE 3.3-2 Station ID Numbers and
Corresponding Switch Settings
MD9
Position of Installed
Coaxial Bulkhead
Connector
Ground Wire
Must be
Installed
Coaxial Cable to
Bulkhead Connector
FIGURE 3.3-7. MD9 Multidrop Interface in MetData1
9600 Baud
A-B Short
C-D Short
Station
5
6
3
4
7
ID
0
1
2
10
11
8
9
12
*255
1200 Baud
A-B Open
C-D Short
Switch Settings
1234
0000
1000
0100
1100
0010
1010
0110
1110
0001
1001
0101
1101
0011
1111
300 Baud
A-B Short
C-D Open
5678
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
0000
1111
NOTE: Addresses 1-254 are valid for an
MD9 connected to a datalogger or computer.
Address 255 is used only when the MD9 is connected to a telephone modem.
3-12
COMPUTER
SECTION 3. INSTRUMENTATION INSTALLATION
SC532
SC12
MD9
MD9CT
COAX
CABLE
MD9
SC12
CSI
DATALOGGER
METDATA1
FIGURE 3.3-9. MD9 Multidrop Interface at the Computer and at the MetData1
3.4 SEALING AND DESICCATING THE
ENCLOSURE
The MetData1 enclosure is supplied with desiccant packs. The desiccant maintains a low humidity in the enclosure to minimize the chance of condensation on the instrumentation. The desiccant must be changed periodically. Place one or two desiccant packs into desiccant holder just before leaving the installation site. Be sure to close the lid. A desiccant change is indicated when the internal MetData1 humidity sensor measures 30% or higher. Keep unused desiccant tightly sealed in an airtight container.
1
2
3
4
5
6
7
8
SERIAL I/O
AC/SOLAR SERIAL #:
Desiccant
Holder
FIGURE 3.4-1. Inside MetData1 Lid
3-13
SECTION 4. SENSOR INSTALLATION
Sensor leads should be routed down the North side of the mast to the enclosure and secured with cable ties.
4.1 034A MET ONE WINDSET
Mount the 034A to the 019ALU crossarm as shown in Figure 4.1-1.
1. Place the 034A stem and bushing into the
3/4" x 1” NU-RAIL fitting.
2. With the shoulder screw in place, orient the counter weight to point due south. See
Section 4.19 for final calibration.
3. Tighten the NU-RAIL set screws and remove the shoulder screw.
4.2 014A MET ONE WIND SPEED
SENSOR
Mount the 014A sensor to the 019ALU crossarm as shown in Figure 4.2-1.
1. Insert the base of the sensor through the
3/4" NU-RAIL. Position the sensor 1" below the NU-RAIL and tighten the set screws.
2. Connect the sensor lead to the sensor. A small amount of lithium grease applied to the threads of the connector will prevent problems due to corrosion.
Shoulder
Screw
034A
Alignment
Screw
N
NU-RAIL
FIGURE 4.1-1. Met One 034A Wind Speed and Direction Sensor
REGCOMENDED
Feed SENSORS
Serial 27115
Portland Or USA
014A
019ALU
FIGURE 4.2-1. Met One 014A Wind
Speed Sensor
4-1
SECTION 4. SENSOR INSTALLATION
4.3 024A MET ONE WIND DIRECTION
SENSOR
Mount the 024A sensor to the 019ALU crossarm as shown in Figure 4.3-1.
1. Remove the hex-head screw located 3" from the base of the sensor. Insert the base of the sensor through the aluminum bushing provided with the sensor. Align the hole in the bushing with the hole in the sensor and replace the screw.
2. Insert the base of the sensor through the 1"
NU-RAIL until the bushing screw rests on the NU-RAIL. Orient the sensor so the counter weight points south and tighten the set screws (see Section 4.19 for final calibration). Remove the shoulder screw to allow the vane to rotate.
3. Connect the sensor lead to the sensor. A small amount of lithium grease applied to the threads of the connector will prevent problems due to corrosion.
4.4 05103 AND 05305 RM YOUNG WIND
MONITORS
Mount the 05103 (or 05305) to the 019ALU crossarm as shown in Figure 4.4-1.
1. Position the top of the mounting post 5" above the 1" NU-RAIL and tighten the set screws.
2. Slide the orientation ring and the 05103 onto the mounting post. Rotate the sensor base so that the square wiring box points south. Engage the key in the orientation ring with the keyway on the sensor and tighten the band clamps (see Section 4.19
for final calibration).
3. Remove the plastic nut on the propeller shaft. Slide the propeller onto the shaft
(face the side with the lettering out) and replace the nut.
YOUNG
Shoulder Screw
024
Aluminum Bushing
REGCOMENDED
Feed SENSORS
Serial 27115
Portland Or USA
REGCOMENDED
Feed SENSORS
Serial 27115 27115
Portland Or USA
NU-RAIL
YOUNG
05103
Wiring Box
Mounting Post
019ALU
FIGURE 4.4-1. 05103 RM Young Wind
Monitor
FIGURE 4.3-1. Met One 024A Wind
Direction Sensor
4-2
SECTION 4. SENSOR INSTALLATION
4.5 03001 RM YOUNG WIND SENTRY
WIND SET
The 03001 can be mounted directly to the mast, or to the 019ALU Crossarm.
4.5.1 03001 MOUNTED TO THE MAST
Mount the 03001 to the mast as shown in
Figure 4.5-1.
1. Slide the crossarm mounting bracket onto the mast. Orient the crossarm so the vane end points north, and tighten the band clamp (see Section 4.19 for final calibration).
2. Attach the cup assembly to the anemometer shaft using the allen wrench provided.
4.5.2 03001 MOUNTED TO 019ALU CROSSARM
Mount the 03001 to the 019ALU crossarm as shown in Figure 4.5-2.
1. Position the top of the mounting post 5" above the 3/4" NU-RAIL and tighten the set screws.
2. Slide the crossarm mounting bracket onto the mounting post. Orient the crossarm so the vane end points north, and tighten the band clamp (see Section 4.19 for final calibration).
3. Attach the cup assembly to the anemometer shaft using the allen wrench provided.
03001
Mounting Post
NU-RAIL
FIGURE 4.5-2. 03001 Mounted to
019ALU Crossarm
4.6 03101 RM YOUNG WIND SENTRY
ANEMOMETER
Mount the 03101 to the 019ALU crossarm as shown in Figure 4.6-1.
1. Screw the mounting post into the mounting bracket on the sensor.
2. Position the top of the mounting post 5" above the 3/4" NU-RAIL and tighten the set screws.
3. Attach the cup assembly to the anemometer shaft using the allen wrench provided.
03101
03001
Mounting Post
FIGURE 4.5-1. 03001 Mounted to the Mast
019ALU
FIGURE 4.6-1. 03101 RM Young Wind
Sentry Anemometer
4-3
SECTION 4. SENSOR INSTALLATION
4.7 LICOR SILICON RADIATION
SENSORS (LI200X, LI200S, LI190SB)
Mount the Radiation Sensor to the LI2003S Base and Leveling Fixture as shown in Figure 4.7-1.
4.8 107/108 TEMPERATURE PROBE
Mount the 107 temperature probe inside the
41301 (UT6P) 6-Plate Gill Radiation Shield as shown in Figure 4.8-1.
1. Position the base of the sensor in the mounting flange on the LI2003S, and tighten the set screw with the allen wrench provided. Adjust the three leveling screws flush with the bottom of the LI2003S.
2. Mount the LI2003S to the 025 or 015
(Section 2.2) using the three mounting screws provided. Do not tighten the screws at this time.
1. Loosen the two mounting clamp screws on the base of the 41301 (UT6P). Insert the
107 probe through the mounting clamp until the white heat shrink is even with the bottom of the clamp.
2. Tighten the two screws evenly until the clamp is snug against the sensor lead.
3. Level the LI2003S using the bubble level and leveling screws and tighten the mounting screws. Remove the red protective cap prior to use.
015 or 025
41301
Bullseye level
(3) Leveling
Screws
(3) Mounting
Screws
Mounting Clamp
107
Sensor
Mounting Base
UT6P
UT018
FIGURE 4.7-1. LI200X/LI200S/LI190SB and
LI2003S Leveling Fixture
107
Mounting Clamp
FIGURE 4.8-1. 107 Temperature Probe
4-4
SECTION 4. SENSOR INSTALLATION
4.9 107/108 SOIL TEMPERATURE
PROBE
1. Select an undisturbed area of ground on the side of the tower that will receive the least amount of traffic. Route the sensor lead from the datalogger to the selected area.
2. Dig a narrow trench next to the sensor lead, ending the trench at least 6" short of the probe tip. Lay the sensor lead into the trench.
3. Use a screwdriver to poke a horizontal hole into the undisturbed soil at the end of the trench at the appropriate measurement depth. Insert the probe tip into the hole and carefully backfill the trench.
4. If bare soil is required, a soil sterilant such as Paramitol
can be applied to the area where the probe is buried. Soil erosion can be a problem when the probe is under bare soil. To prevent erosion from occurring, bury a 36” square frame constructed from
2” x 4" lumber around the probe, with the top of the frame even with the soil surface.
4.10 CS500 VAISALA TEMPERATURE
AND RH PROBE
Mount the CS500 probe inside the 41301
(UT6P) 6-Plate Gill Radiation shield as shown in
Figure 4.10-1.
1. Loosen the two mounting clamp screws on the base of the radiation shield. Insert the
CS500 sensor through the clamp until the base of the sensor is even with the bottom of the clamp.
Tighten the two screws evenly until the clamp is snug against the sensor base.
41031
Mounting
Clamp
CS500
Base
UTGP
UT018
CS500
Base
CS500
Mounting
Clamp
FIGURE 4.10-1. CS500 Temperature and
RH Probe
4-5
SECTION 4. SENSOR INSTALLATION
4.11 HMP45C/HMP35C VAISALA
TEMPERATURE AND RH PROBE
Mount the probe inside the 41002 or UT12VA
12-Plate Gill Radiation shield as shown in
Figure
4.11-1.
1. Loosen the split plastic nut on the base of the shield. Insert the probe and tighten the nut.
4.12 CS105 VAISALA BAROMETRIC
PRESSURE SENSOR
Mount the CS105 sensor to the enclosure backplate as shown in Figure 4.12-1 or Figure
4.12-2.
1. Mount the CS105 to the mounting plate using the two screws and grommets provided.
CHG
+12
+12
16-26 VDC OR AC RMS: POSITIVE TO
EITHER TERMINAL, NEGATIVE TO OTHER
POWER TO DATALOGGER OR
12V PERIPHERALS
MADE IN USA
G 12V
Logan, Utah
SE
DIFF
7 8
G G H
4
L
9 10
AG H
5
L
11 12
AG H
6
L AG E3 AG G G 5V 5V G
SW 12V CTRL
SW 12V
G
G 12V
POWER
IN
CS I/O
CR10X WIRING PANEL
MADE IN USA
EARTH
GROUND
SE
DIFF
1 2
G G H
1
L
3
AG H
2
L
4 5
AG H
3
L
6
AG E1 AG E2 G
SDM
P1 G P2 G C8 C7 C6 C5 C4 C3 C2 C1 G 12V 12V
WIRING
PANEL NO.
41002
PRESSURE TRANSMITTER
MODEL PTB100A
SERIAL NO
RANGE
OUTPUT
SUPPLY
P4450003
800-1060 hPa
0-5 VDC
10-30 VDC
VAISALA
MADE IN FINLAND
Split Nut
HMP45C
FIGURE 4.12-1. CS105 Vaisala Barometric
Pressure Sensor in a
Standard Weather Station Enclosure
UT018
UT12VA
PRESSURE TRANSMITTER
MODEL
SERIAL NO
RANGE
OUTPUT
SUPPLY
PTB100A
P4450003
800-1060 hPa
0-5 VDC
10-30 VDC
VAISALA
MADE IN FINLAND
HMP45C
FIGURE 4.11-1. HMP35C Vaisala
Temperature and RH Probe
FIGURE 4.12-2. CS105MD Vaisala
Barometric Pressure Sensor in a
MetData1 Enclosure
4-6
SECTION 4. SENSOR INSTALLATION
4.13 TEXAS ELECTRONICS TIPPING
BUCKET RAIN GAGES (TE525,
TE525WS, TE525MM)
1. Mount the rain gage to a vertical pipe as shown in Figure 4.13-1. Mounting the gage directly to the tripod or tower is not recommended.
2. Dig a 6" diameter hole 24" deep.
3. Center a 1 1/4" to 2" IPS pipe in the hole and fill the hole with concrete. Use a level to plumb the pipe as the hole is filled.
4. After the concrete has cured, attach the rain gage to the top of the pipe with the hose clamps provided. Route the sensor lead to the tripod in plastic or metal conduit.
4.14 CS700-L RAIN GAGE
The CS700-L should be mounted in a relatively level spot that is representative of the surrounding area. The lip of the funnel should be horizontal and at least 30 inches above the ground. The ground surface around the rain gage should be natural vegetation or gravel.
The gage should not be installed over concrete or pavement.
1. Mount the CS700 to either the CM100
(Figure 4.14-1) or a user supplied bracket.
Remove the CS700-L funnel from the base by removing the three screws and lifting upward. Adjust the three nuts on the
CM100 bracket to level the rain gage. On user supplied brackets, shims or washers can be used to level the rain gage. A bubble level is mounted on the CS700-L base to facilitate leveling.
2. Remove the rubber shipping band and cardboard packing securing the tipping bucket assembly. Tip the bucket several times to insure the tipping mechanism is moving freely.
3. Replace the housing assembly and tighten the three screws to secure the housing to the base.
TE525
CS700
Hose Clamp
(2) Places
FIGURE 4.13-1. TE525 Texas Electronics
Rain Gage
CM100
FIGURE 4.14-1. CS700-L Rain Gage and
CM100 Mounting Bracket
4-7
SECTION 4. SENSOR INSTALLATION
4.15 SR50 SONIC RANGING SENSOR
The SR50s mounting stem enables various installation options. A 3/4" x 1" NU-RAIL (CSI part number 1049) enables the SR50 to mount to a horizontal 3/4" pipe. The mounting stem also has 1" pipe thread to accommodate other threaded installation options. The UT018 crossarm and part number 6880 bracket can be used to mount the SR50 to 3/4" - 1.25" diameter vertical pipe.
The SR50 should be mounted perpendicular to the target surface, without obstructions. See
Figure 4.15-1.
PN 1049
UT018
PN 6880
SR50
4.16 CS615 WATER CONTENT
REFLECTOMETER
Probe rods can be inserted vertically or horizontally into the soil surface, as shown in
Figure 4.16-1, or buried at any orientation to the surface. A probe inserted vertically into a soil surface will give an indication of the water content in the upper 30 cm of soil. Horizontal installation will detect the passing of wetting fronts. Insertion at a 30 degree angle with the surface will measure water content in the upper
15 cm of soil.
Probes must be inserted such that no air voids are created around the rods, and that the rods remain as parallel as possible. Use the
CS615G probe insertion guide to minimize errors due to improper insertion.
The standard calibration for the CS615 probe, as programmed in Short Cut, is valid for loamy soils with low organic content. In other types of soils, reporting the output in units of period will make it possible to apply your own calibration during post processing of data.
FIGURE 4.15-1. SR50 Sonic Ranging Sensor
1
2
FIGURE 4.16-1. CS615 Water Content
Reflectometer with
CS615G Probe Insertion Guide
4-8
SECTION 4. SENSOR INSTALLATION
4.17 237 LEAF WETNESS SENSOR
Mounting and orientation considerations are left to the user to determine. Consult the 237 manual for preparation and other information.
Normally, the sensor is mounted away from the meteorological tower in or near a plant canopy.
4.18 257 SOIL MOISTURE SENSOR
1. Soak the sensor end of the 257 in irrigation water for 12 to 14 hours. Allow the sensor to dry for 1 to 2 days after soaking and repeat the soak/dry cycle twice to improve sensor response. Always install a wet sensor.
2. Install the sensor into soil representative of the field conditions you wish to monitor.
Avoid high or low spots. Placement south of the weather station mast (northern hemisphere) will avoid the effects of the mast shade. Installation in the root zone is best if measurements are used for irrigation purposes.
3. The 257 should be removed from the soil prior to harvest or cultivation operations to avoid damaging the sensor or sensor cable.
Remove when soil is moist.
FIGURE 4.17-1. 237 Leaf Wetness Sensor
JARO
JARO
FIGURE 4.18-1. 257 Soil Moisture Sensor
4-9
SECTION 4. SENSOR INSTALLATION
4.19 ENCLOSURE HUMIDITY SENSOR
Install the PN 10162, HM2000 Humidity Sensor in the enclosure to monitor enclosure humidity.
The MetData1 and ET101/106 are shipped with this sensor pre-installed.
FIGURE 4.19-1. Enclosure Humidity Sensor
4.20 WIND DIRECTION SENSOR
ORIENTATION
4.20.1 DETERMINING TRUE NORTH AND
SENSOR ORIENTATION
Orientation of the wind direction sensor is done after the datalogger has been programmed, and the location of True North has been determined. True
North is usually found by reading a magnetic compass and applying the correction for magnetic declination*; where magnetic declination is the number of degrees between True North and
Magnetic North. Magnetic declination for a specific site can be obtained from a USFA map, local airport, or through a computer service offered by the USFS called GEOMAG (Section 4.20.2). A general map showing magnetic declination for the contiguous United States is shown in Figure 4.20-1.
Declination angles east of True North are considered negative, and are subtracted from 0 degrees to get True North as shown Figure 4.20-2.
Declination angles west of True North are considered positive, and are added to 0 degrees to get
True North as shown in Figure 4.20-3. For example, the declination for Logan, Utah is 16
°
East. True North is 360
°
- 16
°
, or 344
°
as read on a compass.
Orientation is most easily done with two people, one to aim and adjust the sensor, while the other observes the wind direction displayed by the datalogger.
1.
Establish a reference point on the horizon for
True North.
2.
Sighting down the instrument center line, aim the nose cone, or counterweight at True North.
Display the input location for wind direction using the *6 Mode of the datalogger, or, the
Monitor Mode of GraphTerm with an on-line
PC.
3.
Loosen the band clamps or set screws that secure the base of the sensor to the mast or crossarm. While holding the vane position, slowly rotate the sensor base until the datalogger indicates 0 degrees. Tighten the band clamps or set screws loosened previously.
4. Engage the orientation ring indexing pin in the notch at the instrument base (05103 and 05305 sensors only), and tighten the band clamp on the orientation ring.
* Other methods employ observations using the North Star or the sun, and are discussed in the Quality Assurance
Handbook for Air Pollution Measurement
Systems, Volume IV - Meteorological
Measurements
4 .
4-10
SECTION 4. SENSOR INSTALLATION
22 E
20 E
18 E
Subtract declination from 360
16 E
14 E
12 E
10 E
8 E
°
Add declination to 0
°
20 W
18 W
16 W
6 E
4 E
2 E
0
6 W
4 W
2 W
14 W
12 W
10 W
8 W
FIGURE 4.20-1. Magnetic Declination for the Contiguous United States
4.20.2 PROMPTS FROM GEOMAG
GEOMAG is accessed by calling 1-800-358-
2663 with a computer and telephone modem, and communications program such as
GraphTerm (PC208 Software). GEOMAG prompts the caller for site latitude, longitude, and elevation, which it uses to determine the magnetic declination and annual change. The following Menu and prompts are from
GEOMAG:
Latitude
Longitude
Elevation
Units (m/km/ft)
: 42/2 N
: 111/51/2 W
: 4454
: ft
Example of report generated by GEOMAG:
Model: USCON90
Date : 7/27/93
D deg min
15 59.6
Latitude: 42/2 N
Longitude: 111/51/2 W
Elevation: 4454.0 ft
MAIN MENU
Type
Q for Quick Epicenter Determinations (QED)
L for Earthquake Lists (EQLIST)
M for Geomagnetic Field Values (GEOMAG)
X to log out
Enter program option: M
Would you like information on how to run
GEOMAG (Y/N)? N
Options:
1 = Field Values (D, I, H, X, Z, F)
2 = Magnetic Pole Positions
3 = Dipole Axis and Magnitude
4 = Magnetic Center [1] : 1
Annual change:
0 -6.1
The declination in the example above is listed as 15 degrees and 59.6 minutes. Expressed in degrees, this would be 15.99 degrees. As shown in Figure 4.20-1, the declination for Utah is east, so True North for this site is 360 - 15.99, or 344 degrees. The annual change is -6.1
minutes.
Display values twice
Name of field model
Date
[N]: press return
[USCON90]: press return
[current date]: press return
4-11
SECTION 4. SENSOR INSTALLATION
FIGURE 4.20-2. Declination Angles East of
True North Are Subtracted From 0 to Get
True North
FIGURE 4.20-3. Declination Angles West of
True North Are Added to 0 to Get
True North
4-12
SECTION 5. METDATA1 SOFTWARE INSTALLATION
Software required for the METDATA1 consists of the datalogger program and a datalogger support software suite for Windows or MS-DOS.
5.1 DATALOGGER PROGRAM
The datalogger program operates the
MetData1. It programs the MetData1 to measure sensors, process the measurements, and store data in the datalogger’s memory. The datalogger program is created using Short Cut for MS-DOS. It is compatible with Windows
DOS emulator. A separate manual covers the use of Short Cut in detail.
5.2 DATALOGGER SUPPORT SUITE
A datalogger support software suite, either
PC208W or PC208, enables interfacing with the
MetData1 through Windows or MS-DOS.
Follow the installation procedure outlined in the front of the software manual. PC208(W) is used to download programs to the MetData1. It is also used to monitor data in real time and retrieve data stored in the MetData1.
File | Open | Station then RealTime | Call then Tools | Clock Set / Check will activate the station file and confirm communications by checking the datalogger clock.
6) Download the program created in Step 2.
With PC208W Connect | Send will download the MetData1 program. With
PC208 Tools | Send Datalogger Prog will download the MetData1 program.
7) After the appropriate length of time, retrieve data from the datalogger to an ASCII file.
With PC208W Connect | Collect will retrieve data. With PC208 DataCollection |
Call Now (CurrentStn) will retrieve data.
8) Weather reports can be generated. PAR files created by Short Cut can be used to create simple reports. With PC208W
Report | File | Open will select a PAR file.
With PC208, File | Reports | Edit Param
File will select a PAR file.
5.3 QUICK START REVIEW
Follow these steps to program the MetData1 and install the datalogger support software suite.
1) Install PC208W or PC208, and Short Cut, into your Windows or DOS computer.
2) Start Short Cut by entering “MetData1” at a
DOS prompt. Create the MetData1 program by following the four steps outlined. Use CR10X as the datalogger choice in Short Cuts Step 1.
3) Start PC208 by typing “PC208E” at the DOS prompt OR start PC208W from Windows.
4) Create a station file with PC208 (File |
New | Station) OR create a station on the
PC208W device map (Setup |
Add Device).
5) Establish communications with the
MetData1. With PC208W Connect |
Connect will activate the communication and confirm communications by reporting the datalogger clock time. With PC208
5-1
SECTION 6. MAINTENANCE AND TROUBLESHOOTING
These guidelines apply to several different Campbell Scientific weather stations.
6.1 MAINTENANCE
Proper maintenance of weather station components is essential to obtain accurate data. Equipment must be in good operating condition, which requires a program of regular inspection and maintenance. Routine and simple maintenance can be accomplished by the person in charge of the weather station.
More difficult maintenance such as sensor calibration, sensor performance testing (i.e., bearing torque), and sensor component replacement, generally requires a skilled technician, or that the instrument be sent to
Campbell Scientific or the manufacturer.
A station log should be maintained for each weather station that includes serial numbers, dates that the site was visited, and maintenance that was performed.
6.1.1 INSTRUMENTATION MAINTENANCE
The instrumentation requires a minimum of routine maintenance. A few preventative maintenance steps will optimize battery life and decrease the chances of datalogger failure.
solar panel at all times. The charge indicating diode should be "ON" when voltage to the charging circuitry is present. Be aware of battery voltage that consistently decreases over time, which indicates a failure in the charging circuitry.
6.1.3 DESICCANT
Enclosure humidity is monitored in the ET
Enclosure and MetData1 systems by an RH chip incorporated into the connector board.
Change the desiccant packs when the enclosure RH exceeds 35%. The RH chip should be changed every 3 to 5 years.
In standard weather stations, a humidity indicator card is provided with the enclosure. A small RH sensor (10162) can be purchased separately to record the RH inside the enclosure. Change the desiccant when either the card or the sensor read about 35% RH.
Desiccant may be ordered through Campbell
Scientific (DSC 20/4).
Desiccant packs inside of the dataloggers do not require replacement under normal conditions.
6.1.2 BATTERIES
Instruction 10 can be used to measure battery voltage. By recording battery voltage the user can determine how long a fresh set of batteries will last (see the Installation Section of the datalogger Operator's Manual for cold temperature effects on alkaline batteries).
Short Cut and ETPro automatically program the weather station to measure battery voltage.
When alkaline batteries are used, the battery voltage should not be allowed to drop below 9.6
VDC before replacement. Where CR10 or 21X dataloggers are used in the instrumentation, an external battery must be used to maintain power to the datalogger when changing batteries, otherwise the clock, program, and data will be lost (refer to the Installation Section of the datalogger's Operator's Manual for details).
When not in use, remove the eight cells to eliminate potential corrosion of the contact points, and store in a cool dry place.
Rechargeable power supplies should be connected to an AC transformer or unregulated
6.1.4 SENSOR MAINTENANCE
Sensor maintenance should be performed at regular intervals, depending on the desired accuracy and the conditions of use. A suggested maintenance schedule is outlined below.
1 week
•
Check the pyranometer for level and contamination. Gently clean, if needed.
•
Visually inspect the wind sensors and radiation shield.
1 month
•
Check the rain gage funnel for debris and level.
•
Do a visual/audio inspection of the anemometer at low wind speeds.
•
Check the filter of the temperature/humidity sensor for contamination.
6-1
SECTION 6. MAINTENANCE AND TROUBLESHOOTING
General Maintenance
•
An occasional cleaning of the glass on the solar panel will improve its efficiency.
•
Check sensor leads and cables for cracking, deterioration, proper routing, and strain relief.
•
Check the tripod or tower for structural damage, proper alignment, and for level/plumb.
6 months
• Clean the temperature/humidity sensor.
•
Clean the Gill Radiation Shield.
1 year
•
Replace anemometer bearings.
•
Calibrate the rain gage.
•
Calibrate the HMP45C/HMP35C probe.
•
Check calibration of CS500 RH Probe; replace RH chip if necessary.
•
Check internal RH chip (MetData1 and
ET101/106 only). Replace if >5% off.
2 years
•
Calibrate the solar radiation sensors (some users suggest yearly).
•
Calibrate the temperature sensor.
•
Replace the wind vane potentiometer and bearings.
4 - 5 years
•
Replace sensor cables as required.
6.2 TROUBLESHOOTING
6.2.1 NO RESPONSE USING THE KEYPAD
Check keypad response after each of the following steps.
A.
Make sure the battery has been installed, and the power switch, if any, is "ON"
(Section 7).
B.
Use a voltmeter to measure the voltage on the 12 V and G terminals; the voltage must be between 9.6 and 16 VDC.
C. Disconnect any sensor or peripheral wires connected to the 5 V and 12 V terminals.
D. Disconnect any communications or storage peripherals from the datalogger.
E.
Reset the datalogger by turning the power switch to "OFF", then to "ON" or disconnecting and reconnecting the battery.
F.
If still no response, call Campbell Scientific.
6.2.2 NO RESPONSE FROM DATALOGGER
THROUGH SC32A OR MODEM PERIPHERAL
At the datalogger:
A.
Make sure the battery has been installed, and the power switch, if any, is "ON" (Section 7).
B.
Use a voltmeter to measure the voltage on the 12 V and G terminals; the voltage must be between 9.6 and 16 V DC.
C. Make sure the datalogger is connected to the modem, and the modem is properly configured and cabled (Section 9).
At the computer:
D. Make sure the Station File is configured correctly (PC208 Manual).
E.
Check the cable(s) between the serial port and the modem. If cables have not been purchased through Campbell Scientific, check for the following configuration using an ohm meter:
25-pin serial port: computer end
2
3
7
20 modem end
2
3
7
20
9-pin serial port: computer end modem end
2
3
4
5
3
2
20
7
F.
Make sure the modem is properly configured and cabled (Section 9).
G. If still no response, call Campbell Scientific.
6-2
SECTION 6. MAINTENANCE AND TROUBLESHOOTING
6.2.3 -99999 DISPLAYED IN AN INPUT
LOCATION
A.
Make sure the battery voltage is between
9.6 and 16 VDC.
B.
With the MetData1 or ET106, verify that the sensor is connected to the proper bulkhead connector. With custom weather stations, verify the sensor is wired to the analog channel specified in the measurement instruction or Short Cut .FSL file (singleended channels are not labeled on the older silver-colored wiring panels and are numbered sequentially starting at 1H; i.e. 1L is single-ended channel 2).
C. Make sure the Range parameter in the measurement instruction covers the full scale voltage output by the sensor.
6.2.4 UNREASONABLE RESULTS DISPLAYED
IN AN INPUT LOCATION
A.
Inspect the sensor for damage and/or contamination.
B.
Make sure the sensor is properly wired to the datalogger.
C. Check the multiplier and offset parameters in the measurement instruction.
6.2.5 6999 OR 99999 STORED IN FINAL
STORAGE (OR STORAGE MODULE)
A. Final Storage format limitations exceeded
(any number larger than 6999 in low resolution, or 99999 in high resolution format is stored as the maximum number).
Change the datalogger program.
6-3
This is a blank page.
Campbell Scientific Companies
Campbell Scientific, Inc. (CSI)
815 West 1800 North
Logan, Utah 84321
UNITED STATES www.campbellsci.com
Campbell Scientific Africa Pty. Ltd. (CSAf)
PO Box 2450
Somerset West 7129
SOUTH AFRICA www.csafrica.co.za
Campbell Scientific Australia Pty. Ltd. (CSA)
PO Box 444
Thuringowa Central
QLD 4812 AUSTRALIA www.campbellsci.com.au
Campbell Scientific do Brazil Ltda. (CSB)
Rua Luisa Crapsi Orsi, 15 Butantã
CEP: 005543-000 São Paulo SP BRAZIL www.campbellsci.com.br
Campbell Scientific Canada Corp. (CSC)
11564 - 149th Street NW
Edmonton, Alberta T5M 1W7
CANADA www.campbellsci.ca
Campbell Scientific Ltd. (CSL)
Campbell Park
80 Hathern Road
Shepshed, Loughborough LE12 9GX
UNITED KINGDOM www.campbellsci.co.uk
Campbell Scientific Ltd. (France)
Miniparc du Verger - Bat. H
1, rue de Terre Neuve - Les Ulis
91967 COURTABOEUF CEDEX
FRANCE www.campbellsci.fr
Campbell Scientific Spain, S. L.
Psg. Font 14, local 8
08013 Barcelona
SPAIN www.campbellsci.es
Please visit www.campbellsci.com to obtain contact information for your local US or International representative.
Advertisement