TBLZ-1-64 connection kit installation,
GOLD
1. General
The TBLZ-1-64 connection kit is used for connecting up
to 10 MIRU Control units or 1 chiller/heat pump to one
GOLD unit. The connection kit consists of one cable
adapter and one bus cable.
Bus contacts.
Wiring
terminals
2. Installation
Mount the cable adapter on the DIN rail inside the electric
equipment cubicle of the GOLD air handling unit.
3. Electrical connections
Connect the bus cable (supplied) between an optional bus
contact, marked Internal EIA485, on the control unit of
the GOLD unit and an optional bus contact on the cable
adapter.
Cable adapter
GOLD Control unit
Cable adapter
3.1 MIRU Control
Connect the cable between the MIRU Control unit(s) and
the cable adapter as shown in the illustration. The cable is
not included in the supply. A twisted-pair, shielded cable is
recommended.
Wiring terminal,
cable adapter
Wiring terminal,
MIRU Control
1
3
8 9 10
A B GND
EXT.BUS(BMS)
2
4
3.2 BlueBox chiller/heat pump
See the Function Guide for the BlueBox.
Swegon reserves the right to alter specifications.
www.swegon.se
1
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertisement