LB-100 thru LB-240 Double Stack User Manual Installation Instructions


Add to my manuals
31 Pages

advertisement

LB-100 thru LB-240 Double Stack User Manual Installation Instructions | Manualzz

User Manual

& Installation Instruction

LB-100 thru LB-240 Double Stack

IMPORTANT – READ ALL INSTRUCTIONS BEFORE OPERATING

All steam boilers are built in accordance with ASME miniature boiler code.

NOTE: It is the responsibility of the installer to conform to any state or local codes. If further inspection, following modification by installer, is required under state or local codes, that is the responsibility of the local installer.

www.electrosteam.com

rev. 07022009

WARNING

- The following labels have been placed on this boiler for YOUR SAFETY. Failure

to observe these instructions could lead to PROPERTY DAMAGE, SEVERE INJURY, or

even DEATH

CAU T ION

CA U T I N

THROW OFF MAIN

POWER SWITCH

BEFORE WORKING ON

ELECTRICAL CABINET

DANGER

HIGH VOLTAGE

AUTHORIZED

PERSONNEL

ONLY

PELIGRO

ALTO VOLTAJE

SOLAMENTE

PERSONAL

AUTORIZADO

A MANUAL WAS SHIPPED WITH THIS

BOILER. IT IS IMPORTANT THAT YOU

READ, UNDERSTAND, AND OPERATE

THIS STEAM GENERATOR IN ACCOR-

DANCE WITH THE OPERATING

INSTRUCTIONS CONTAINED IN THE

MANUAL. IF FOR ANY REASON YOU

DO NOT HAVE A MANUAL, CALL

ELECRTO-STEAM AT 800-634-8177

REPLACE GLASS

EVERY SIX MONTHS

CAUTION

USE ELECTRICAL

SUPPLY CONDUCTORS RATED

FOR A MINIMUM OF 90°C

RETIGHTEN SIGHT GLASS

BEFORE USE

TERMINALS ARE SUITABLE

FOR COPPER WIRE ONLY

U.L. 834 PAR. 4416

AMBIENT TEMPERATURE

AROUND UNIT NOT TO

EXCEED 105° F

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

TABLE OF CONTENTS

1.)

INSTALLATION INSTRUCTIONS

....................................................................

4

2.)

OPERATION & SEQUENCE OF EVENTS

.....................................................

5

3.)

CLEANING & MAINTENANCE

....................................................................

6-14

3.1) MANUAL “BLOW DOWN” .....................................................................................

6

3.2) CLEANING WATER LEVEL PROBES ...............................................................

7-7

3.3) CLEANING OR REPLACING HEATERS ...............................................................

7

3.4) REPLACING GLASS GAUGE AND RUBBER WASHERS ...............................

8-9

3.4.1) BRASS SIGHT GLASS (STANDARD)

...................................................................

8

3.4.1) BRASS SIGHT GLASS (SEISMIC)

........................................................................

9

3.5) CHAMBER CLEANING & CHEMICAL TREATMENT ...............................

10-11

3.6) PRESSURE CONTROL DATA SHEET .................................................................

12

3.7) SETTING THE PRESSURE CONTROLS .......................................................

13-14

4.)

CALCULATIONS & DATA SHEETS

........................................................

15-17

4.1) HEATER POWER & VOLTAGE RATINGS .........................................................

15

4.2) AMPERAGE CALCULATIONS ......................................................................

15-16

4.3) ACTUAL POWER RATING CALCULATIONS ...................................................

16

4.4) STEAM CAPACITY CALCULATIONS ................................................................

17

5.)

DRAWINGS & WIRING SCHEMATICS

.................................................

18-28

5.1) PARTS LEGENDS ............................................................................................

18-19

5.1.1) DOUBLE STACK LB (100-240KW) (LOW PRESSURE) (0-15PSI)

.......................... 18

5.1.2) DOUBLE STACK LB (100-240KW) (HIGH PRESSURE) (0-30, 0-100PSI)

................

19

5.2) INSTALLATION DATA SHEETS .........................................................................

20

5.3) CONTROL WIRING SCHEMATICS ..............................................................

21-22

5.3.1) LB (LOW PRESSURE) (MAFD) (0-15PSI)

........................................................... 21

5.3.2) LB (HIGH PRESSURE) (MAFD) (0-30, 0-100PSI)

.................................................

22

5.4) HEATER WIRING SCHEMATICS .................................................................

23-28

5.4.1) LB (100-120KW) (THREE PHASE) (208-240V)

....................................................

23

5.4.2) LB (150-180KW) (THREE PHASE) (208-240V), (240KW) (380-400V)

.....................

24

5.4.3) LB (100-120KW) (THREE PHASE) (380-425V)

....................................................

25

5.4.4) LB (150-180KW) (THREE PHASE) (380-425V)

....................................................

26

5.4.5) LB (100-120KW) (THREE PHASE) (440-600V)

....................................................

27

5.4.6) LB (150-240KW) (THREE PHASE) (440-600V)

....................................................

28

6.)

TERMS & CONDITIONS

......................................................................................

29

3 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

1.) INSTALLATION INSTRUCTIONS

LITTLE BOILER “LB-SERIES”

The Electro-Steam Generator design consists essentially of a high pressure chamber filled with water that is heated by one or more submerged resistance type electric heating elements. Automatic controls are provided to maintain the pre-set operating pressure and water level. Safety features include: automatic low-water cutoff (manual low-water reset optional), dual pressure controls, safety valve, and visible water level gauge. All of our generators are built in accordance with A.S.M.E. Miniature Boiler

Code and are individually inspected and stamped by an Authorized National Board Insurance Inspector.

IMPORTANT – READ ALL INSTRUCTIONS BEFORE OPERATING

Important – Set unit perfectly level, and as close as possible to the steam vessel or appliance it will operate. For generator measurements, refer to Installation Data Drawing attached. For interpretation of numbered items, refer to Parts Legend Drawing attached.

NOTE: Ambient temperature around this unit must not exceed 104°F or 40°C.

CONNECTIONS:

Periodically check all plumbing and electrical connections for tightness; this should also be done before initial start-up.

ELECTRICAL:

This generator must be connected to FOUR disconnect switches (one per Louvered

Electrical Cabinet #1) by a licensed electrician in accordance with N.E.C. and your local codes with the proper size wire, protected by fuses or circuit breakers –

Voltage, KW, and Phase requirement are marked on the nameplate.

WATER SUPPLY:

Connect city water line to Y-Strainer (#6).

Purity: NOT to exceed 26,000 OHMS per CM

Temperature Range: 32°F – 140°F or 0°C – 60°C.

Pressure Range: 20PSI – 150PSI.

*CAUTION:

The Pump (#8) requires clean tap water. If the water is not free of foreign matter, a 5 micron cartridge filter should be installed in the water supply line.

STEAM OUTLET:

Connect Steam Outlet Flange (#22) to piece of equipment, vessel, room, or area to be operated by Electro Steam Generator(s).

SAFETY VALVE, DRAIN, & STEAM TRAP:

Separately route the Safety Valve (#18), Drain (#23), and Steam Trap (#24) to a high temperature drain *NO PVC. Discharging pipe of the Safety Valve (#18) should never be smaller than the valve outlet and should be rigidly supported, placing no weight on the safety valve itself.

4 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

2.) OPERATION & SEQUENCE OF EVENTS

IMPORTANT – READ INSTALLATION INSTRUCTIONS BEFORE OPERATING

1. Turn on water supply from the source to the Generator.

2. OPEN all valves on the Generator except for the Manual Drain (#19).

3. Place main disconnect switch in ON position.

4. Place ON/OFF Switch (#2) in ON position.

The Water Solenoid (#7) [and Pump (#8), if high pressure] will engage and the chamber will begin to fill with water. As the water level rises, it will make contact with the (G OR

D) and (A) probes, indicating the heaters are safely submerged. At this time the contactors will engage, supplying power to the heaters, causing steam pressure to accumulate.

The chamber will continue to fill with water until 3 seconds after the water makes contact with the (C) probe, causing the Water Solenoid (#7) [and Pump (#8), if high pressure] to turn off.

If the contactors still have not engaged at this time, you may need to press the Safety Reset

(#13) on the “Safety” Pressure Control (#12). If your generator is equipped with a

Manual Low-Water Reset (MLWR) (#3), it must be pressed at this time to engage the contactors. If your generator is equipped with a Motorized Auto-Flush & Drain (MAFD)

(#20), you must wait until it closes before the contactors will engage. (approximately 3 minutes)

Steam pressure will continue to rise until is reaches its set operating pressure. This may take up to 25 minutes. At this time, the “Control” Pressure Control (#12) will cause the contactor(s) to disengage. The pressure will drop approximately 2-8 PSI until the

Control” Pressure Control (#12) causes the contactor(s) to reengage, causing the pressure to rise again. The contactor(s) will continue to cycle on and off during operation.

5. The Generator is now fully operational and will produce steam until it is turned off.

As steam is exhausted, the water level will drop until 3 seconds after it breaks contact with the (C) probe. At this time, the Water Solenoid (#7) [and Pump (#8), if high pressure] will engage and the chamber will again fill with water. The chamber will continue filling until 3 seconds after the water makes contact with the (C) probe. The

Water Solenoid (#7) [and Pump (#8), if high pressure] will continue to cycle on and off during operation.

6. To shut off the Generator, place ON/OFF Switch (#2) in OFF position. Pressure will drop naturally as the chamber cools, or the Generator may be drained manually through Manual

Drain (#19). (See Manual Blow Down 3.1)

WARNING

HOT WATER and STEAM under HIGH PRESSURE can lift drain pipes right off the ground and cause SERIOUS INJURY. Make sure drain pipe is SECURE and

CANNOT move. The drain must be directed into a HIGH TEMPERATURE drain (NO

PVC) or outside.

5 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

3.) CLEANING & MAINTENANCE

The following cleaning procedures are HIGHLY RECOMMENDED in order to keep your Steam Generator in the best operating condition at all times.

3.1)

MANUAL “BLOW DOWN”

A Manual “Blow Down” is an easy way to GREATLY extend the life of your Steam

Generator. Using a Motorized Auto-Flush & Drain (MAFD) of course helps, but is not a

“Cure all”. The following is the LEAST amount of times recommended to blow down your generator:

NORMAL WATER AREAS – Should be done TWICE A MONTH.

BAD WATER AREAS – Should be done ONCE A WEEK.

NOTE: The best time to Blow Down your generator is after it has been running for some time, while it is still hot.

1. Place Toggle Switch (#2) in OFF position.

2. Allow pressure to drop between 10 and 20 PSI.

3. Open Manual Drain (#19) slowly, allowing HOT WATER and STEAM to blow out into the drain, cleaning out the generator.

NOTE: Blow Down your generator at any pressure you feel comfortable with. 10 to 20

PSI is only a recommendation. You may go higher or lower, but higher is always better.

WARNING

HOT WATER and STEAM under HIGH PRESSURE can lift drain pipes right off the ground and cause SERIOUS INJURY. Make sure drain pipe is

SECURELY STRAPPED and CANNOT move. The drain must be directed into a

HIGH TEMPERATURE drain (NO PVC).

3.2)

CLEANING WATER LEVEL PROBES

Water Level Probes are the heart of your generator. Almost all steam generator malfunctions are caused by dirty water level probes. CLEANING your PROBES is by far the MOST IMPORTANT maintenance step to keep your generator running properly.

The following is the LEAST amount of times recommended to clean your probes:

NORMAL WATER AREAS – Should be done TWICE A YEAR.

BAD WATER AREAS – Should be done 3-4 TIMES A YEAR.

NOTE: The best time to clean your probes is before you turn your generator on, while it is still cool.

1. Place main disconnect switches and the Toggle Switch (#2) in the OFF position.

2. Make sure generator is cool and the Pressure Gauge (#15) reads 0 PSI.

3. Locate the Water Level Probes (#5) on top of the generator and pull the rubber boots off the probes plugs, exposing the wire connections.

4. Use 5/16” Socket to remove wires from probes.

5. Use 13/16” Spark Plug Socket to remove probes from chamber.

6 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

3.2) CLEANING WATER LEVEL PROBES (Continued)

6. Clean probes to remove rust and scaling.

NOTE: To clean probes you may use wire wheel, wire brush, steal wool, or Scotch-

Brite. (Wire wheel works the best) You may also want to try some sort of chemical like CLR remover or LIME-A-WAY.

7. Reinstall probes assuring each probe’s length is assigned to its proper letter.

8. Reconnect wires to probes assuring each color is also assigned to its proper letter.

NOTE: DO NOT make wires too tight. Just tighten enough to make contact. Over tightening can cause probe plugs to pull apart over time.

9. Push rubber boots back over the probe plugs.

Water Level Probe Specifications:

Letter Assignment on Chamber A B C D/G

Water Level Probe Length 5 ¼” 5 ½” 3 ¾” 5 ½”

Wire Color Assignment RED Not Used BLACK GREEN

Assignment on Dual Function Board LLCO Not Used H G

NOTE: The (B) Probe is not used. It is a spare probe that can be cut and used to replace any one of the other probes.

WARNING

– There MUST be NO PRESSURE in the chamber when removing probes.

If you must change probes while chamber is HOT, make sure the steam out and drain valves are open to assure chamber will remain depressurized. DO NOT touch probes with your bare hands while HOT, and be cautious of escaping steam from probe holes while probes are removed.

3.3)

CLEANING OR REPLACING HEATERS

Heaters are located inside the Control Panel (#1) below the insulation barrier, bolted into the chamber. If (3.5) Chamber Chemical/Acid Treatments are not regularly done, heaters must be taken out at least ONCE A YEAR, cleaned with wire brush and reinstalled using a new gasket. If you are replacing or cleaning your heater elements:

1. Place main disconnect switches and the Toggle Switch (#2) in the OFF position.

2. Make sure generator is cool and the Pressure Gauge (#15) reads 0 PSI.

3. Remove heater wires from heater(s), using a 3/8” Socket.

4. Unbolt and remove heater(s) using a 1 1/16” Socket.

NOTE: Heater(s) may be difficult to get out; you may need to use some sort of pry bar to get them loose.

5. Clean heater(s) with wire brush. If replacing, dispose of old heater(s).

6. Reinstall heater(s) with new gasket(s).

7. Attach heater wires assuring proper wiring. *Refer to Heater Wiring Schematics attached*

NOTE: If you are replacing a heater because of a heater failure, you must also clean the probes and clean out the chamber, or you may have another heater failure within 48 hours.

7 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

3.4) REPLACING GLASS GAUGE & RUBBER WASHERS OR

GLASS PACKINGS

The Sight Glass (#10) gives the operator the ability to easily monitor the actual water level inside the chamber. If the Sight Glass (#10) gets clogged or is no longer functional, it can be very difficult to troubleshoot a problem.

3.4.1) BRASS SIGHT GLASS (STANDARD)

GLASS GAUGE and RUBBER WASHERS

MUST be replaced EVERY SIX MONTHS

INSTALLATION:

Only properly trained personnel should install and maintain water gauge glass and connections.

Remember to wear safety gloves and glasses during installation. Before installing, make sure all parts are free of chips and debris.

1. Uninstall GUARD RODS, GLASS GAUGE, and

RUBBER WASHERS. (you may need to rotate one of the

GAUGE FITTINGS to remove GLASS GAUGE)

2. Slip a new RUBBER WASHER on the new GLASS

GAUGE about an inch from the bottom.

3. Now slip the following items through the top of GLASS

GAUGE in the following order:

FRICTION WASHER

GLASS PACKING NUT (facing down)

GLASS PACKING NUT (facing up)

FRICTION WASHER

RUBBER WASHER (inch down from top)

4. Gently insert GLASS GAUGE into GAUGE FITTINGS.

You may need to rotate GAUGE FITTINGS until vertically aligned, after GLASS GAUGE is in.

5. Carefully raise GLASS GAUGE about 1/16” from bottom and slide lower RUBBER WASHER down until it makes contact with the BOTTOM GAUGE FITTING. (DO

NOT allow GLASS GAUGE to remain in contact with any metal)

6. Carefully slide upper RUBBER WASHER up as far as possible.

7. Hand tighten both GLASS PACKING NUTS, then tighten

1/2 turn more by wrench. Tighten only enough to prevent leakage. DO NOT OVER TIGHTEN! If any leakage should occur, tighten slightly, a quarter turn at a time, checking for leakage after each turn.

8. Reinstall GUARD RODS.

8 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

3.4) REPLACING GLASS GAUGE & RUBBER WASHERS OR

GLASS PACKINGS (Continued)

The Sight Glass (#10) gives the operator the ability to easily monitor the actual water level inside the chamber. If the Sight Glass (#10) gets clogged or is no longer functional, it can be very difficult to troubleshoot a problem.

3.4.2) BRASS SIGHT GLASS (SEISMIC)

GLASS GAUGE and GLASS PACKINGS

MUST be replaced EVERY SIX MONTHS

The Seismic Sight Glass is equipped with BALL

CHECKS in each GAUGE FITTING

INSTALLATION:

Only properly trained personnel should install and maintain water gauge glass and connections.

Remember to wear safety gloves and glasses during installation. Before installing, make sure all parts are free of chips and debris.

1. Uninstall GUARD RODS, GLASS GAUGE, and GLASS

PACKINGS. (you may need to rotate one of the GAUGE

FITTINGS to remove GLASS GAUGE)

2. Slip a new GLASS PACKINGS on the new GLASS

GAUGE about an inch from the bottom.

3. Now slip the following items through the top of GLASS

GAUGE in the following order:

PACKING GLAND (facing down)

GLASS PACKING NUT (facing down)

GLASS PACKING NUT (facing up)

PACKING GLAND (facing up)

GLASS PACKINGS (inch down from top)

PACKING WASHER

4. Gently insert GLASS GAUGE into GAUGE FITTINGS.

You may need to rotate GAUGE FITTINGS until vertically aligned, after GLASS GAUGE is in.

5. Carefully raise GLASS GAUGE about 1/16” from bottom and slide lower GLASS PACKINGS down until it makes contact with the BOTTOM GAUGE FITTING. (DO

NOT allow GLASS GAUGE to remain in contact with any metal)

6. Carefully slide upper GLASS PACKINGS up as far as possible.

7. Hand tighten both GLASS PACKING NUTS, then tighten

1/2 turn more by wrench. Tighten only enough to prevent leakage. DO NOT OVER TIGHTEN! If any leakage should occur, tighten slightly, a quarter turn at a time, checking for leakage after each turn.

8. Reinstall GUARD RODS.

9 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

3.5) CHAMBER CHEMICAL/ACID TREATMENT

All Electric Steam Generator should be cleaned regularly. The following is the least amount of times recommended to clean out your chamber:

NORMAL WATER AREAS – Should be done ONCE A YEAR.

BAD WATER AREAS – Should be done TWICE A YEAR.

Chamber Treatment Instructions:

1. Make sure MAFD (#20) in the closed position.

2. Place the main disconnect switches and the Toggle Switch

(#2) in the OFF position

3. Dial the TIME ADJUSTMENT on the MAFD

TIMER/RELAY, located in the in the Louvered Electrical

Cabinet #1,

all the way down to 15 seconds.

4. Disconnect the orange wire from the normally open (NO) terminal on the MAFD TIMER/RELAY.

5. Close the Louvered Electrical Cabinet #1 door and turn on the generator, allowing pressure to climb to 10 to 20 PSI on Pressure Gauge (#15), and then shut off.

6. “Blow Down” Open Manual Drain (#19) slowly, allowing HOT WATER and

STEAM to blow out into the drain.

NOTE: You may Blow Down your generator at any pressure you feel comfortable with. 10

to 20 PSI is only a recommendation. You may go higher or lower, but higher is always better.

WARNING

HOT WATER and STEAM under HIGH PRESSURE can lift drain pipes right off the ground and cause SERIOUS INJURY. Make sure drain pipe is SECURE and CANNOT move. The drain must be directed into a HIGH TEMPERATURE drain

(NO PVC).

7. Remove Safety Valve (#18).

WARNING

– There MUST be NO PRESSURE in the chamber when removing the Safety

Valve, make sure the steam out and drain are open to assure chamber will remain depressurized. Be cautious of escaping steam from chamber while Safety Valve is removed.

8. Close Manual Drain (#19) and Steam Out (#16); turn generator on until Sight Glass

(#10) shows that it is 1/2 full, and then shut off.

9. Insert funnel into coupling, where Safety Valve (#18) used to be.

10 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

3.5) CHAMBER CHEMICAL/ACID TREATMENT (Continued)

10. Pour a 1 Gallon of hydrochloric acid (inhibited) solution (NON-FOOD

APPLICATIONS) into funnel very slowly, being careful of fumes and venting while pouring.

NOTE: Solution can be obtained from any industrial chemical dealer.

FOR FOOD APPLICATIONS: Use FDA approved chemicals.

11. Remove funnel, reinstall Safety Valve (#18), and verify Steam Out (#16) is closed; let solution set in generator for 1 HOUR.

12. Turn on generator, allowing pressure to climb to 5 PSI on Pressure Gauge (#15), and then shut off.

13. Allow the pressure to drop to 0 PSI on Pressure Gauge (#15) naturally. DO NOT open

Steam Out (#16) or Manual Drain (#19) until pressure is down.

14. Remove Safety Valve (#18).

15. Reinsert funnel, and fill generator completely to the top with clean water; let stand for an additional 1/2 HOUR.

NOTE: Turning on the generator will not completely fill it to the top. Filling must be done manually through the safety valve coupling.

16. Open Manual Drain (#19) to drain generator.

17. Close Manual Drain (#19); refill generator completely to the top with clean water and open Manual Drain (#19) to flush out generator completely.

18. Reinstall Safety Valve (#18) and close Manual Drain (#19).

19. Turn on generator, allowing pressure to climb to 10 to 20 PSI on Pressure Gauge (#15), and then shut off.

20. “Blow Down” Open Manual Drain (#19) slowly, allowing HOT WATER and

STEAM to blow out into the drain.

NOTE: You may Blow Down your generator at any pressure you feel comfortable with. 10 to 20 PSI is only a recommendation. You may go higher or lower, but higher is always better.

WARNING

HOT WATER and STEAM under HIGH PRESSURE can lift drain pipes right off the ground and cause SERIOUS INJURY. Make sure drain pipe is SECURE and CANNOT move. The drain must be directed into a HIGH TEMPERATURE drain

(NO PVC).

21. Reconnect the orange wire to the normally open (NO) terminal on the MAFD

TIMER/RELAY.

22. Dial TIME ADJUSTMENT on MAFD TIMER/RELAY up to the desired flush time

(Most commonly 3 minutes)

23. Your generator is now ready for normal use and operation.

11 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

3.6) PRESSURE CONTROL DATA SHEET

DEFINITIONS:

“CONROL” PRESSURE CONTROL – This pressure control should be the only one controlling the operating pressure of the generator.

“SAFETY” PRESSURE CONTROL – This pressure control is only used if the “Control” fails. It is always set higher than the “Control”; if the operating pressure is passed, The

“Safety” will turn the heaters off.

SAFETY RESET – This reset is tripped when the “Safety” turns the heaters off. It must be manually pushed to turn the heaters back on. This lets the user know there was a problem.

If it is tripped, the “Control” most likely failed.

PRESSURE ADJUSTING DIAL – These dials adjust the set pressure at which each pressure control will turn the heaters off.

DIFFERENTIAL ADJUSTING DIAL – This dial is only on the “Control”. When the

“Control” turns the heaters off, the amount of pressure that is dropped before it turns the heaters back on (the differential) can be adjusted by this dial. This dial should never have to be adjusted, unless desired.

PRESSURE GAUGE – This tells the user what pressure is in the chamber. The pressure controls are set to this gauge.

5 PSI PRESSURE CONTROL – This pressure control prevents the MAFD from opening when there is more than 5 pounds off pressure in the generator.

12 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

3.7) SETTING THE PRESSURE CONTROLS

WARNING

– The pressure controls must be set while all circuits are live. TO AVOID

NOTES:

ELECTRICAL SHOCK, DO NOT TOUCH the wires or the terminals in which they connect while setting the pressure controls.

- Setting the pressure controls greatly relies on your ability to tell whether the contactors are turning the heaters on or off. You should be able to hear the contactors, located inside the

Louvered Electrical Cabinets #1, click on and off. Familiarize yourself with this sound.

- The order in which the pressure controls must be set is the “Safety” and then the “Control”.

- In order to set the “Safety” you must keep the “Control” at a higher pressure setting than the

“Safety”

- Once the “Safety” is set, then you can lower the

“Control” to its correct setting.

- To INCREASE the pressure setting, when looking down on pressure control, using your two index fingers, turn the PRESSURE

ADJUSTMENT DIAL CLOCKWISE, causing the BLACK INDICATOR LINE to move

DOWN the scale.

- To DECREASE the pressure setting, turn the dial

COUNTER CLOCKWISE, causing the indicator line to move UP the scale.

SETTING INSTRUCTIONS:

1. Open the pressure control covers, as shown on previous page.

2. Adjust the PRESSURE ADJUSTMENT DIAL on the

CONTROL” so that the BLACK INDICATOR LINE is somewhere between ½ and ¾ of the way down from the top.

3. Adjust the PRESSURE ADJUSTMENT DIAL on the

SAFETY” so that the BLACK INDICATOR LINE is somewhere between ¼ and ½ of the way down from the top.

4. Close the Steam Out (#16) and turn on generator. When the contactors click on, the pressure will rise. If contactor(s) do not click on right away, you may need to press SAFETY RESET.

Continue to watch the Pressure Gauge (#15) until you hear the contactors click off. This may take up to 20 minutes.

WARNING

DO NOT allow the pressure to exceed the rating on the

Safety Valve (#18). If contactors do not turn off before the pressure limit is exceeded, manually shut off generator, open the Steam Out (#16), and DECREASE the pressure setting on the “SAFETY” pressure control. Repeat step #4.

13 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

3.7) SETTING THE PRESSURE CONTROLS (Continued)

5. At this point the contactors should be clicked off and you should be able to click them on and then off again by pressing the SAFETY RESET. This is a way to test if the

SAFETY” is still controlling the pressure, and not the “CONTROL”. While setting the

SAFETY” and the contactors are off, if the SAFETY RESET does not cause the contactor(s) to click on and off again, INCREASE the setting on the “CONTROL

WARNING

DO NOT allow the pressure to

Pressure Control Settings

exceed the rating on the Safety Valve (#18). If contactors do not turn off before the pressure limit is exceeded, manually shut off generator, High Pressure

“Control” “Safety”

80 PSI 85 PSI

open the Steam Out (#16), and DECREASE

(0-100 PSI)

the pressure setting on the “SAFETY” pressure control. If you cannot get the “SAFETY” to control the pressure, it may need to be replaced.

High Pressure

(0-30 PSI)

Low Pressure

25 PSI 27 PSI

6. Open the Steam Out (#16) to exhaust some

(0-15 PSI)

11 PSI 13.5 PSI

pressure. Continue pressing the SAFETY RESET until the contactors click on and remain on. The pressure should eventually begin to rise. If it doesn’t, throttle the Steam

Out (#16) somewhere between closed and open until it does.

7. Pay attention to what the pressure reads when the contactors click off. If the pressure stopped BELOW the “SAFETY PRESSURE SETTING”, then INCREASE the pressure setting on the “SAFETY”. If the pressure stopped ABOVE, then DECREASE the pressure setting.

8. Continue to watch the pressure go up and down, while adjusting the “SAFETY” and pressing the SAFETY RESET, until the pressure stops at the proper “SAFETY

PRESSURE SETTING”.

9. At this point the “SAFETY” should be set to the proper “SAFETY PRESSURE

SETTING”, and the “CONTROL” should be set somewhere above the “SAFETY”.

10. Let the pressure drop below the “OPERATING PRESSURE SETTING” and then press the SAFETY RESET, so that the contactors click on. DECREASE the pressure setting on the “CONTROL” until the contactors click off.

11. Repeat Step 10 until you no longer need to press the SAFETY RESET for the contactors to click on.

12. Continue to watch the pressure go up and down, while adjusting the “CONTROL”, until the pressure stops at the proper “OPERATING PRESSURE SETTING”.

13. The Pressure Controls are now set.

NOTE: If at anytime the SAFETY RESET needs to be pressed after the pressure controls are set, either one of the controls are bad, the “SAFETY” is set too low, or the “CONTROL” is set too high.

14 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

4.) CALCULATIONS AND DATA SHEETS

4.1) HEATER POWER & VOLTAGE RATINGS

LB 100 thru 240 Model units use 4 or 6 heaters to meet the required (KW) POWER from the customer’s specified INPUT VOLTAGE. Each heater comes in 3 different (KW) POWER RATINGS and 4 different

VOLTAGE RATINGS

HEATER VOLTAGE RATINGS per INPUT VOLTAGE (VOLTS)

Input Voltage 208 220 230 240 380 400 415 425 440 460 480 550 575 600

LB 100-180

208 230 230 230 208 230 230 230 480 480 480 600 600 600

LB 240

NA NA NA NA 380 380 NA NA 480 480 480 600 600 600

NOTE: 380-425V heaters are not usually rated for 380-

425V. They are usually 208-240V heaters that have been re-stamped 380-425V and jumpered in series.

POWER RATINGS per MODEL

MODEL UNIT QUAN. KW

AVAILABLE HEATER RATINGS

LB-100

4 25

KW

25

208

VOLTAGES

230 480 600

LB-120

LB-150

4

6

30

25

30

40

208 230

380

480

480

600

600

LB-180

LB-240

6

6

30

40

4.2) AMPERAGE CALCULATIONS

The INPUT VOLTAGE, PHASE, TOTAL POWER RATING, and HEATER

VOLTAGE RATING are used to calculate the amperage.

THREE PHASE AMPERAGE FORMULAS

208-240V & 440-600V 380-425V (using 208-240V heaters)

DEFINITIONS:

I = Amperage V

I

= Input Voltage

P

T

= Total Power Rating V

H

= Heater Voltage Rating

15 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

4.2) AMPERAGE CALCULATIONS (Continued)

THREE PHASE AMPERAGE CALCULATIONS (AMPS)

Input Voltage 208 220 230 240 380 400 415 425 440 460 480 550 575 600

LB-100

278 240 251 262 169 146 151 155 110 115 120 88 92 96

LB-120

333 288 301 314 203 175 181 186 132 138 144 106 111 115

LB-150

416 360 377 393 254 218 226 232 165 173 180 132 138 144

LB-180

500 432 452 471 304 262 272 278 198 207 217 159 166 173

LB-240

NA NA NA NA 365 384 NA NA 265 277 289 212 221 231

4.3) ACTUAL POWER RATING CALCULATIONS

Because the HEATER VOLTAGE RATINGS only come in 4 different voltages, and there are so many different voltages in the field, the TOTAL POWER RATING is only completely accurate if the VOLTAGE IN is exactly equal to the HEATER VOLTAGE RATING. This means, in most cases, the TOTAL POWER RATING is not completely accurate. The AMERAGE and INPUT

VOLTAGE can be used to calculate the ACTUAL POWER RATING.

THREE PHASE ACTUAL

POWER RATINGS FORMULA

DEFINITIONS:

P

A

= Actual Power Rating

I = Amperage

V

I

= Input Voltage

ACTUAL POWER RATING CALCULATIONS (KW)

Input Voltage 208 220 230 240 380 400 415 425 440 460 480 550 575 600

LB-100

100 91.5 100 109 111 101 109 114 84 91.8 100 84 91.8 100

LB-120

LB-150

120 110 120 131 134 121 130 137 101 110

150 137 150 163 167 151 163 171 126 138

120 101

150 126

110 120

138 150

LB-180

180 165 180 196 200 182 195 205 151 165 180 151 165 180

LB-240

NA NA NA NA 240 266 NA NA 202 220 240 202 220 240

16 of 29

S.S. DOUBLE STACK LB-100 thru LB-240 w/ MERCOID - User Manual Electro-Steam Generator Corp.

4.4) STEAM CAPACITY CALCULATIONS

Steam Capacity Calculations are based on the impossible feed water temperature of 212°F.

WARNING

– Anything above 140°F will cause damage to water solenoid and pump.

NET STEAM CAPACITY CALCULATIONS

MODEL

UNIT

Feed Water

@ 212°F

Feed Water

@ 140°F

90% of 212°F

Feed Water

@ 100°F

80% of 212°F

Feed Water

@ 60°F

75% of 212°F

LB-100

345.0 LB/hr

156.5 Kg/hr

310.5 LB/hr

140.8 Kg/hr

LB-120

414.0 LB/hr

187.8 Kg/hr

372.6 LB/hr

169.0 Kg/hr

LB-150

518.0 LB/hr

235.0 Kg/hr

466.2 LB/hr

211.5 Kg/hr

LB-180

621.0 LB/hr

281.7 Kg/hr

558.9 LB/hr

253.5 Kg/hr

276.0 LB/hr

125.2 Kg/hr

331.2 LB/hr

150.2 Kg/hr

414.4 LB/hr

188.0 Kg/hr

496.8 LB/hr

225.3 Kg/hr

258.8 LB/hr

117.4 Kg/hr

310.5 LB/hr

140.8 Kg/hr

388.5 LB/hr

176.2 Kg/hr

465.8 LB/hr

211.3 Kg/hr

LB-240

828.0 LB/hr

375.6 Kg/hr

745.2 LB/hr

338.0 Kg/hr

662.4 LB/hr

300.5 Kg/hr

621.0 LB/hr

281.7 Kg/hr

17 of 29

18 of 29

19 of 29

20 of 29

G

H

LLCO

L

G

NO

NC

21 of 29

G

H

LLCO

L

G

NO

NC

22 of 29

23 of 29

24 of 29

25 of 29

26 of 29

27 of 29

28 of 29

ELECTRO-­‐STEAM  GENERATOR  CORPORATION      TERMS  AND  CONDITIONS  OF  SALE  

EXCLUSIVE  AND  ENTIRE:  The  following  Standard  Terms  and  Conditions  are  intended  by  the  parties  to   govern  all  the  purchases  of  equipment,  parts  or  service  from  Seller,  and  together  with  the  specifications   provided  or  embodied  herewith,  represent  the  entire  understanding  of  the  parties  without  exception.    

All  other  terms  and  conditions  are  specifically  rejected,  and  by  proceeding  with  the  transaction  in  any   manner,  both  Seller  and  Buyer  agree  that  these  Standard  Terms  and  Conditions  shall  control.  The  price   charged  by  Seller  is  based  on  these  Standard  Terms  and  Conditions.  

DOMESTIC  TERMS  

TERMS:  Net  30  days.  A  "late  payment"  in  the  form  of  interest  at  the  rate  of  2%  per  month  or  a  service   charge  of  like  amount  will  be  levied  on  all  late  payments  (the  type  of  charge  being  consistent  with  the   applicable  local  law).  Invoices  will  be  submitted  when  the  equipment,  part,  service  is  supplied.  Attention   to  these  terms  will  eliminate  delays  in  starting  up  any  equipment  or  providing  further  service  or  parts.  

NOTE:  Terms  pending  credit  approval.  

INTERNATIONAL  TERMS  

TERMS:  Advanced  payment  (wire  transfer,  credit  card,  or  cash  in  advance)  or  confirmed  letter  of  credit.  

TAXES:      No  taxes  of  any  kind  are  included.  All  prices  herein  and/or  contracts  shall  be  subject  to  increase   without  notice  by  the  amount  of  present  or  future  sales  or  excise  tax  levied  or  charged,  either  by  

Federal,  State  or  any  other  assessing  agency.    

CHANGES:  Changes  made  after  fabrication  has  begun  shall  be  submitted  in  writing,  signed  by  Buyer.  

Buyer  agrees  to  pay  the  cost  of  any  changes.  The  specifications  and  prices  are  subject  to  change  without   notice.  

CLAIMS:  Title  passes  to  the  Buyer  upon  delivery  to  the  carrier,  unless  otherwise  indicated.  Safe  delivery   is  the  responsibility  of  the  carrier.  Damaged  merchandise,  if  accepted,  should  be  noted  on  the  delivery   receipt  and  on  the  freight  bill  before  acceptance  of  shipment.  Make  claim  promptly.  

LOCAL  CODES:  All  steam  boilers  are  built  in  accordance  with  ASME  miniature  boiler  codes.  NOTE:  It  is   the  responsibility  of  the  installer  to  conform  to  any  state  or  local  codes.  If  further  inspection  following   modifications  by  the  installer  is  required  under  state  and  local  codes  it  is  the  responsibility  of  the  local   installer.  

SEVERABLE  AND  INDEPENDENT  PROVISION:      WITHOUT  LIMITING  THE  FOREGOING,  IT  IS  EXPRESSLY  

UNDERSTOOD  AND  AGREED  THAT  EACH  AND  EVERY  PROVISION  OF  THIS  AGREEMENT  THAT  PROVIDES  

FOR  A  LIMITATION  OF  LIABILITY,  DISCLAIMER  OF  WARRANTIES,  OR  EXCLUSION  OF  DAMAGES  IS  

INTENDED  BY  THE  PARTIES  TO  BE  SEVERABLE  AND  INDEPENDENT  OF  ANY  OTHER  PROVISION  AND  TO  BE  

ENFORCED  AS  SUCH,  FURTHER,  IT  IS  EXPRESSLY  UNDERSTOOD  AND  AGREED  THAT  IN  THE  EVENT  ANY  

REMEDY  HEREUNDER  IS  DETERMINED  TO  HAVE  FAILED  ITS  ESSENTIAL  PURPOSE,  ALL  OTHER  

LIMITATIONS  OF  LIABILITY  AND  EXCLUSION  OF  DAMAGES  SET  FORTH  HEREIN  SHALL  REMAIN  IN  FULL  

FORCE  AND  EFFECT.  ALL  SUCH  PROVISIONS  SHALL  SURVIVE  THE  TERMINATION  OF  THIS  AGREEMENT.  

NO  ACTION,  REGARDLESS  OF  FORM,  ARISING  OUT  OF  THE  TRANSACTIONS  OF  THIS  AGREEMENT  MAY  BE  

BROUGHT  BY  BUYERMORE  THAN  ONE  YEAR  AFTER  THE  CAUSE  OF  ACTION  HAS  ACCRUED.  

WARRANTY:        Seller  warrants  that  the  equipment,  service,  software,  repair  or  parts  supplied  shall   conform  to  the  description.  In  the  event  that  any  part  or  parts,  excepting  expendable  items  such  as,  but   not  limited  to,  coil  liners,  thermocouples,  refractories  and  other  similar  consumable  items,  that  fail  due   to  defects  in  material  or  workmanship    within  the  first  twelve  (12)  months  of  startup  of  equipment  or   eighteen  (18)  months  after  shipment,  whichever  occurs  first,  or  in  the  case  of  service,  repairs,  or  parts,  

within  twelve  (12)  months  of  supplying  such  service,  repair  or  part,  Seller  shall  at  its  option,  repair  or   replace  EXW  (Ex  works),  such  defective  part  or  parts.  If  the  equipment,  service,  repair  or  part  included   software,  Seller  warrants,  for  a  period  of  twelve  (12)  months  of  startup  or  eighteen  (18)  months  after   shipment,  whichever  occurs  first,  that  the  software  supplied  or  serviced  will  meet  its  published   functional  specifications.  Should  software  fail  to  meet  the  specifications,  or  be  otherwise  defective,  

Seller  shall  promptly  correct  errors  or  non-­‐conformities.  If  correction  is  not  possible,  Seller  shall  replace   defective  software,  or,  at  Seller=s  option,  refund  the  purchase  price  paid  for  such  software.  The   warranty  obligations  of  Seller  with  respect  to  equipment  not  manufactured  by  Seller  shall  conform  to   and  be  limited  to  the  warranty  actually  extended  to  Seller  by  its  suppliers.  Notice  of  a  claim  for  alleged   defective  equipment  must  be  given  within  fifteen  (15)  days  after  Buyer  learns  of  the  defect.    The   defective  part  or  parts  shall  be  returned  to  Seller,  freight  prepaid,  unless  otherwise  directed  by  Seller.  

This  warranty  shall  be  exclusive  and  in  lieu  of  any  other  warranties  and  Seller  makes  no  warranty  of   merchantability  or  warranties  of  any  other  kind  express  or  implied,  including  any  implied  warranty  of   fitness  for  a  particular  purpose  which  extend  beyond  the  warranty  as  set  forth  above.  Seller=s  liability   for  any  and  all  losses  and  damages  to  Buyer  resulting  from  defective  parts  of  equipment  shall  in  no   event  exceed  the  cost  of  repair  or  replacement,  EXW  of  defective  parts  or  equipment.  IN  NO  EVENT  

SHALL  SELLER  BE  LIABLE  FOR  INCIDENTAL,  SPECIAL  OR  CONSEQUENTIAL  DAMAGES  OF  ANY  KIND  OR  

NATURE  WHATSOEVER.  

PATENT  INDEMNITY:          Seller  agrees  to  indemnify  Buyer  against  any  proven  claim  and  assessed  liability   for  infringement  of  any  United  States  patent  arising  from  the  manufacture  or  sale  of  any  apparatus   furnished  by  Seller  to  Purchaser.      THE  FOREGOING  STATES  SELLER'S  ENTIRE  LIABILITY  FOR  CLAIMS  OR  

PATENT  INFRINGEMENT.    Seller  shall  have  no  liability  whatsoever  if  the  claim  of  infringement  arises  out   of  Seller's  compliance  with  Purchaser's  specifications.    Seller  shall  have  no  liability  whatsoever  if  a  claim   of  infringement  is  based  upon  the  Purchaser's  use  of  the  equipment  as  part  of  a  patented  combination   where  the  other  elements  of  the  combination  are  not  supplied  by  Seller,  or  in  the  practice  of  a  patented   process.  Where  the  specifications,  process,  design  are  supplied  by  Purchaser,  then  Buyer  agrees  to   indemnify  Seller  in  like  manner.  

PROPRIETARY  RIGHTS:  Unless  otherwise  stated  herein  all  design,  manufacturing  processes,   manufacturing  information,  vendor  sources,  know-­‐how,  equipment,  tooling  or  other  hardware,   software,  or  information  (collectively  referred  to  as  "resources")  acquired  or  utilized  by  the  Seller  to   produce  the  finished  goods,  and  any  intellectual  property  rights,  including  but  not  limited  to  patents,   copyrights  and  trade  secrets  related  in  any  way  to  the  resources,  are  and  shall  hereinafter  remain  the   exclusive  property  of  the  Seller,  regardless  of  whether  such  resources  are  created  solely  by  the  Seller,  or   by  Buyer's  collaboration  with  the  Seller,  for  example,  where  Seller  utilizes  Buyer's  specifications  to   create  resources,  and  the  Buyer  shall  acquire  or  receive  no  rights  or  title  therein  or  thereto  as  a  result  of   this  purchase  whether  or  not  the  order  provides  for  Seller's  delivery  of  technical  data,  drawings  or  other   information  to  the  Buyer  in  addition  to  the  finished  goods.  Unless  Seller's  prior  written  consent  is  given,   in  no  event  shall  the  Buyer  permit  such  data,  drawings  or  information  to  be:  (1)  disclosed  to  any  third   party  other  than  the  Buyer's  customer;  (2)  used  by  the  Buyer  or  the  Buyer's  customer  for  manufacture   of  like  or  similar  goods;  (3)  used  for  purposes  of  duplicating  or  reverse-­‐engineering  Seller's  proprietary   designs  or  processes;  or  (4)  used  by  a  party  other  than  the  Buyer  or  the  Buyer's  customer  for  any   purpose.  

LIMITATION  OF  LIABILITY:    SELLER'S  TOTAL  AGGREGATE  LIABILITY  (ARISING  OUT  OF  OR  IN  CONNECTION  

WITH  BUT  NOT  LIMITED  TO  ANY  BREACH  OF  CONTRACT,  NEGLIGENCE,  TORT,  LIQUIDATED  DAMAGES,  

SPECIFIC  PERFORMANCE,  TERMINATION,  CANCELLATION  INCLUDING  THE  REPAYING  OF  THE  CONTRACT  

PRICE  OR  PARTS  THEREOF,  FUNDAMENTAL  BREACH,  BREACH  OF  WARRANTIES,  MISREPRESENTATION,  

NONPERFORMANCE,  NONPAYMENT,  OR  ANY  OTHER)  WHETHER  BASED  IN  CONTRACT,  IN  TORT,  IN  

EQUITY,  ON  STATUE,  AT  LAW  OR  ON  ANY  OTHER  THEORY  OF  LAW,  SHALL  NOT  EXCEED  THE  PAID  

CONTRACT  PRICE.  THE  BUYERACKNOWLEDGES  THAT  THE  REMEDIES  PROVIDED  IN  THIS  CONTRACT  ARE  

EXCLUSIVE  AND  IN  LIEU  OF  ALL  OTHER  REMEDIES  AVAILABLE  TO  THE  BUYERAT  LAW,  IN  CONTRACT,  IN  

TORT,  IN  STATUTE  OR  IN  EQUITY  OR  IN  ANY  OTHER  THEORY  OF  LAWS.  

INSURANCE:          Buyer  represents  that  they  have  a  program  of  Insurance  which  adequately  protects  their   interest,  and  that  of  their  employees  and  agents,  including  damage  to  plant,  property  and  equipment,   personal  injury  of  any  kind,  directly  or  indirectly  related  in  any  way  to  the  equipment,  service,  repair  or   parts  supplied  by  Seller.    Accordingly,  Buyer  waives  any  claim  against  Seller  for  the  foregoing,  and  on   behalf  of  its  Insurance  Company,  any  right  of  subrogation  in  connection  therewith.  

U.S.  EXPORT  CONTROLS:    All  items  furnished  by  Seller  to  Buyer  in  connection  herewith  shall  at  all  times   be  subject  to  the  export  control  laws  and  regulations  of  the  U.S.  including,  but  not  limited  to,  10  CFR  

Part  810  and  U.S.  Export  Administration  Regulations.  Buyer  agrees  and  give  assurance  that  no  items,   equipment,  materials,  service,  technical  data,  technology,  software  or  other  technical  information  or   assistance  furnished  by  Seller,  or  any  good  or  product  resulting  therefrom,  shall  be  exported  or  re-­‐ exported  by  Buyer  or  its  authorized  transferees,  if  any,  directly  or  indirectly,    unless  in  accordance  with   applicable  U.S.  export  laws  and  regulations.  The  aforesaid  obligations  shall  survive  any  satisfaction,   expiration,  termination  or  discharge  of  any  other  contract  obligations.  

FREIGHT  TERMS:  F.O.B.  Factory.    Unloading  and  transportation  to  job  site  are  at  the  Buyers  expense.  

INSTALLATION:  No  installation  or  job  supervision  charges  are  included.  

RETURN  OF  MATERIAL:  No  goods  will  be  accepted  for  return  without  a  return  authorization  number   from  the  factory.  A  25%  restocking  fee  is  charged  on  returns,  freight  prepaid.  

FORCE  MAJEURE:      If  the  performance  of  any  part  of  this  contract  by  Seller  is  rendered  commercially   impracticable  by  reason  of  any  strike,  fire,  flood,  accident,  or  any  other  contingency,  the  non-­‐occurrence   of  which  was  a  basic  assumption  of  this  contract  including  war,  embargo,  government  regulation,  or  any   unforeseen  shutdown  of  major  supply  sources  or  other  like  causes  beyond  the  control  of  Seller  such  as   cannot  be  circumvented  by  reasonable  diligence  and  without  unusual  expense,  Seller  shall  be  excused   from  such  performance  in  whole  or  in  part  to  the  extent  that  it  is  prevented  and  for  as  long  a  period  of   time  as  these  conditions  render  Seller's  performance  commercially  impractical.  

LAW:          This  Agreement  shall  be  governed  by  the  internal  laws  of  the  State  of  New  Jersey,  USA,  and  any   claims  arising  hereunder  shall  be  prosecuted  in  the  US  District  Court  having  jurisdiction  of  causes  arising   in  the  District  in  which  Seller  is  located.  CISG  (the  Convention  for  the  International  Sale  of  Goods)  is   expressly  rejected.  