Compaq Cabinet H9A11 Installation & Owners Manual

Add to my manuals
32 Pages

advertisement

Compaq Cabinet H9A11 Installation  & Owners Manual | Manualzz
H9A11 Cabinet
Installation/Owner's Guide
Part Number: EK-H9A11-IN. B01
June 1999
Compaq Computer Corporation
Houston, Texas
June 1999
COMPAQ COMPUTER CORPORATION SHALL NOT BE LIABLE FOR TECHNICAL OR EDITORIAL
ERRORS OR OMISSIONS CONTAINED HEREIN, NOR FOR INCIDENTAL OR CONSEQUENTIAL
DAMAGES RESULTING FROM THE FURNISHING, PERFORMANCE, OR USE OF THIS MATERIAL. THIS
INFORMATION IS PROVIDED “AS IS” AND COMPAQ COMPUTER CORPORATION DISCLAIMS ANY
WARRANTIES, EXPRESS, IMPLIED OR STATUTORY AND EXPRESSLY DISCLAIMS THE IMPLIED
WARRANTIES OF MERCHANTABILITY, FITNESS FOR PARTICULAR PURPOSE, GOOD TITLE AND
AGAINST INFRINGEMENT.
This publication contains information protected by copyright. No part of this publication may be photocopied or
reproduced in any form without prior written consent from Compaq Computer Corporation.
 1999 Compaq Computer Corporation.
All rights reserved.
The software described in this guide is furnished under a license agreement or nondisclosure agreement. The
software may be used or copied only in accordance with the terms of the agreement.
Compaq and the Compaq logo are registered in United States Patent and Trademark Office.
Other product names mentioned herein may be trademarks and/or registered trademarks of their respective
companies.
Table of Contents
Preface
Overview .................................................................................................................................... v
Intended Audience ...................................................................................................................... v
How to Use This Guide ............................................................................................................... v
Organization .............................................................................................................................. vi
Conventions ...............................................................................................................................vi
Safety Symbol............................................................................................................................ vi
Reader's Comments...................................................................................................................vii
1 Introduction
1.1 Description........................................................................................................................ 1–1
1.2 Specifications .................................................................................................................... 1–3
2 Installation
2.1 Introduction....................................................................................................................... 2–1
2.2 Tools Required.................................................................................................................. 2–1
2.3 Site Planning ..................................................................................................................... 2–1
2.4 Unpacking......................................................................................................................... 2–3
2.5 Installation Procedures....................................................................................................... 2–9
2.5.1 Removing and Replacing the Rear Lift-Off Door.................................................... 2–10
2.5.2 Removing and Replacing the Front Filler Panels..................................................... 2–12
2.5.3 Pulling Out and Adjusting the Stabilizer Bar .......................................................... 2–14
2.5.4 Removing and Replacing the Power Distribution Unit ............................................ 2–16
A Field Replaceable Units (FRUs)
iii
Figures
Figure 1-1 H9A11 Cabinet ...................................................................................................... 1–2
Figure 2-1 Unpacking the Cabinet ........................................................................................... 2–4
Figure 2-2 Installing the Ramps............................................................................................... 2–6
Figure 2-3 Deskidding the Cabinet .......................................................................................... 2–8
Figure 2-4 Removing and Replacing the Rear Lift-Off Door .................................................. 2–11
Figure 2-5 Removing and Replacing the Front Filler Panels................................................... 2–13
Figure 2-6 Pulling Out and Adjusting the Stabilizer Bar......................................................... 2–15
Figure 2-7 Removing and Replacing the Power Distribution Unit .......................................... 2–17
Tables
Table A-1 Field Replaceable Units (FRUs)..............................................................................A–1
iv
Preface
Overview
This guide provides the information necessary to install the H9A11 Cabinet. This guide does
not provide information concerning systems that can be installed in the cabinet. For
information concerning systems installed in the cabinet, refer to the respective
documentation shipped with the system.
Intended Audience
The instructions in this guide are for Compaq Customer Service representatives and
customer maintenance personnel who are familiar with computer hardware and operating
systems. Personnel should be experienced and trained in installing computer and related
equipment.
How to Use This Guide
Read all of this guide before installing the H9A11 Cabinet. As mentioned earlier, for
information concerning systems installed in the cabinet, refer to the respective
documentation shipped with the system.
Before installation, review the warranty. The terms of the warranty agreement with Compaq
may require that a qualified Compaq Customer Service representative install the system.
Contact your local Compaq representative if you have any questions.
v
Organization
This guide is organized as follows:
Chapter 1, Introduction -- Provides an overview of the H9A11 Cabinet features and
specifications.
Chapter 2, Installation -- Provides site preparation, unpacking, and installation
information.
Appendix A, Field Replaceable Units (FRUs) -- Provides a list of the field replaceable
units (FRUs) for the H9A11 Cabinet.
Conventions
The following conventions are used in this guide:
Convention
Meaning
Note
A note calls the reader's attention to important information.
Caution
Cautions provide information to prevent damage to equipment or
software. Read these carefully.
WARNING
A warning contains information essential to the safety of personnel.
Safety Symbol
The following symbol appears on the power distribution unit. Please review its definition
below:
This Dangerous Voltage warning symbol indicates a risk of electric
shock and indicates hazards from dangerous voltage.
vi
Reader's Comments
Compaq welcomes your comments on this or any other manual. You can send your
comments to Compaq in the following ways:
•
Internet electronic mail: [email protected]
•
Mail:
Compaq Computer Corporation
Information Design
PKO3-2/21J
129 Parker Street
Maynard, MA 01754-2199
For additional information, call 1-800-282-6672.
vii
This is some white text.
1
Introduction
1.1 Description
The H9A11 Cabinet (Figure 1-1) is a low-cost, computer-equipment enclosure system that
meets the Electronic Industries Association (EIA) standard 310C and the International
Electrotechnical Commission (IEC) 297 standards and can accommodate fixed or slidemounted chassis that fit into a standard 48.26-cm (19-in.) rack.
The cabinet has the following factory installed features:
•
Equipment mounting rails with the EIA universal rail-hole pattern
•
Front trim kit that provides a finished look to the front opening of the cabinet
•
Vented rear lift-off door
•
Nonvented top cover
•
Four nonlocking casters that facilitate the placement of the cabinet. The front two
casters swivel. The rear two casters are fixed.
•
Adjustable leveling feet that are used to stabilize and secure the cabinet at the
installation site.
•
Stabilizer bar that is used to provide cabinet stability when installing or sliding
equipment out of the cabinet.
•
A single-phase H7600-AA (120 Vac), H7600-AB (240 Vac), or H7600-DB (240 Vac)
power distribution units (PDU) --- Each H7600-AA/AB power distribution unit
provides ten (10) ac power outlets and each H7600-DB power distribution unit provides
twelve (12) ac power outlets.
H9A11 Cabinet Installation/Owner’s Guide 1–1
Introduction
Figure 1-1 H9A11 Cabinet
scale=.12
scale=.9
Not for
external
loads
J1
LJ-04803
1–2 H9A11 Cabinet Installation/Owner’s Guide
Introduction
1.2 Specifications
Specifications for the H9A11 Cabinet are as follows:
Physical
Height, overall
110.0 cm (43.31 in.)
Width, overall
60.0 cm (23.60 in.)
Depth, overall
86.0 cm (33.86 in.)
Maximum vertical rackmounting space
93.35 cm (36.75 in.)
Maximum vertical rackmounting space (with
power distribution unit installed)\
88.9 cm (35.00 in.)
Horizontal rack width
Standard 48.26-cm (19-in.)
Weight
- Cabinet with power distribution unit
80.74 kg (178 lb)
- Cabinet with power distribution unit plus
packing material
103.42 kg (228 lb)
- Fully configured (filled) cabinet
Up to 420.94 kg (928 lb)
- Fully configured (filled) cabinet plus packing
material
Up to 443.62 kg (978 lb)
Casters, swivel, nonlocking:
Diameter:
Maximum capacity:
7.62 cm (3 in.)
225 kg (500 lb)
Casters, fixed, nonlocking:
Diameter:
Maximum capacity:
7.62 cm (3 in.)
225 kg (500 lb)
Enclosure finish
Painted
Electrical
AC input voltage for H7600-AA PDU
100 to 120 Vac, single-phase, 3-wire
AC input voltage for H7600-AB PDU
220 to 240 Vac, single-phase, 3-wire
AC input voltage for H7600-DB PDU
200 to 240 Vac, single-phase, 3-wire
AC load
24 A per H7600-AA PDU
16 A per H7600-AB/DB PDU
Input line frequency range
47 to 63 Hz
Input power at full load
2.88 kVA per H7600-AA PDU
3.84 kVA per H7600-AB/DB PDU
1–3 H9A11 Cabinet Installation/Owner’s Guide
Introduction
Power cord (attached)
1–4 H9A11 Cabinet Installation/Owner’s Guide
H7600-AA - 120 Vac with L5-30P
connector
H7600-AB - 240 Vac with L6-20P
connector
H7600-DB - 240 Vac with IEC 309
connector
2
Installation
2.1 Introduction
This chapter provides the following information:
•
Tools Required (Section 2.2)
•
Site Planning (Section 2.3)
•
Unpacking (Section 2.4)
•
Installation Procedures (Section 2.5)
2.2 Tools Required
The tools needed to install the H9A11 Cabinet are:
•
Utility knife
•
Phillips screwdriver
•
5/8-inch box wrench or adjustable wrench
2.3 Site Planning
The cabinet requires a space of 60.0 cm (23.60 in.) by 86.0 cm (33.86 in.). In addition, the
cabinet requires a clearance of 91.44 cm (36.00 in.) at both the front and rear of the cabinet
for service. This may be greater depending on the distance that a system may be slid out of
the cabinet.
H9A11 Cabinet Installation/Owner's Guide 2–1
Installation
_______________________ WARNING __________________________
High Leakage Current --- An insulated earthing conductor that is identical in
size, insulation material, and thickness to the earthed and unearthed branchcircuit supply conductors (except that it is green with or without one or more
yellow stripes) is to be installed as part of the branch circuit that supplies the
unit or system. The earthing conductor described is to be connected to earth
at the service equipment or, if supplied by a separately derived system, at the
supply transformer or motor-generator set.
The attachment-plug receptacles in the vicinity of the unit or system are all
to be of an earthing type, and the earthing conductors serving these
receptacles are to be connected to earth at the service equipment.
___________________________________________________________
_______________________ WARNING __________________________
Use sufficient personnel when unloading the cabinet from the pallet or
moving the cabinet to a new location. The cabinet weighs 80.74 kg (178 lb)
empty, and can weigh up to 420.94 kg (928 lb) fully configured.
___________________________________________________________
For site preparation details concerning the system devices installed or the systems to be
installed in the cabinet, refer to the documentation for those systems.
2–2 H9A11 Cabinet Installation/Owner's Guide
Installation
2.4 Unpacking
The cabinet is shipped on a wooden pallet. Proceed as follows to unpack the cabinet:
1.
2.
3.
Position the pallet with the cabinet in an area that provides sufficient workspace for
unpacking. Ensure that there is sufficient clearance in front of the pallet (marked with a
large F) to roll the cabinet down the ramps.
Refer to Figure 2-1. Cut and remove the plastic wrapping ™ that secures the corner
posts š and the carton › to the cabinet. The carton contains the two ramps.
Remove the corner posts š and the carton › from the pallet œ.
_________________________ Caution ___________________________
In the next step, take care not to damage the cabinet finish when removing the
shrinkwrap.
____________________________________________________________
4.
5.
Remove the plastic bag  covering the cabinet.
Check the cabinet and the associated equipment for any external damage. Report any
damage to Compaq Customer Service or a Compaq sales office and to the responsible
freight carrier.
__________________________ Note _____________________________
Keep all packing material and receipts in case a damage claim is filed.
____________________________________________________________
H9A11 Cabinet Installation/Owner's Guide 2–3
Installation
Figure 2-1 Unpacking the Cabinet
Not for
external
loads
1
J1
F
2
2
Not for
external
loads
scale=.12
3
J1
F
4
2
5
2–4 H9A11 Cabinet Installation/Owner's Guide
LJ-04804
Installation
6.
Refer to Figure 2-2. Remove the four shipping bolts ž and brackets Ÿ that secure the
four cabinet leveler feet to the pallet œ.
__________________________ Note _____________________________
The ramps attach to the front of the pallet. Therefore, the cabinet will have to be
rolled frontwards down the ramps.
____________________________________________________________
7.
Remove the ramps ¡ from the shipping carton and set the ramps in the holes ¢
provided at the front of the pallet œ. Ensure that the arrows  on the ramps match the
pallet arrows  as shown in Figure 2-2.
_________________________ Caution ___________________________
In the next step, the leveler feet must be fully retracted to prevent contact with the
ramp or the floor when the cabinet is unloaded from the pallet.
____________________________________________________________
8.
Adjust the four cabinet leveler feet and the leveler foot on the stabilizer bar ‘ to the
maximum upward position.
H9A11 Cabinet Installation/Owner's Guide 2–5
Installation
Figure 2-2 Installing the Ramps
7
6
8
scale=.12
Not for
external
loads
3
J1
10
4
1
9
2
LJ-04805
2–6 H9A11 Cabinet Installation/Owner's Guide
Installation
________________________WARNING __________________________
In the following step, use sufficient personnel to move the cabinet off the
pallet. The cabinet weighs 80.74 kg (178 lb) empty, and can weigh up to
420.94 kg (928 lb) fully configured.
If equipment is installed in the cabinet, the cabinet may become top heavy
and could accelerate rapidly down the ramps if not restrained. Be prepared
to guide and control the motion of the cabinet.
____________________________________________________________
9.
Refer to Figure 2-3 and roll the cabinet down the ramps using sufficient personnel for
safety.
10. Wheel the cabinet to the desired location.
11. Adjust the leveler feet downward so that the cabinet is level and the load is removed
from the casters.
_________________________ Caution ___________________________
Ensure that the leveler feet extend enough to carry the load of the cabinet so that
the casters spin freely. If not, damage to the casters will result over an extended
period of time.
____________________________________________________________
H9A11 Cabinet Installation/Owner's Guide 2–7
Installation
Figure 2-3 Deskidding the Cabinet
Not for
external
loads
scale=.12
J1
LJ-04806
2–8 H9A11 Cabinet Installation/Owner's Guide
Installation
2.5 Installation Procedures
During the installation of the cabinet, one or more of the following procedures may be
needed:
•
Removing and Replacing the Rear Lift-Off Door (Section 2.5.1)
•
Removing and Replacing the Front Filler Panels (Section 2.5.2)
•
Pulling Out and Adjusting the Stabilizer Bar (Section 2.5.3)
•
Removing and Replacing the Power Distribution Unit (Section 2.5.4)
H9A11 Cabinet Installation/Owner's Guide 2–9
Installation
2.5.1 Removing and Replacing the Rear Lift-Off Door
The rear lift-off door provides access into the rear of the cabinet. To remove the rear lift-off
door, refer to Figure 2-4 and proceed as follows:
Removal
1.
Remove the two Phillips-head screws ™ that secure the rear lift-off door to the two
brackets œ at the top rear of the cabinet.
2.
Grasp both sides of the rear lift-off door about midway up the door. Then lift the door
up until the securing tabs š on the rear lift-off door come out of the tab catches › on
the cabinet.
3.
Lift the door off and away from the cabinet.
4.
Place the rear lift-off door aside and out of the way.
Replacement
To replace the rear lift-off door, reverse the removal procedure, steps 1 through 4.
2–10 H9A11 Cabinet Installation/Owner's Guide
Installation
Figure 2-4 Removing and Replacing the Rear Lift-Off Door
1
4
MAIN
POWE
R
2
3
LJ-04807
H9A11 Cabinet Installation/Owner's Guide 2–11
Installation
2.5.2 Removing and Replacing the Front Filler Pa nels
To remove a front filler panel, refer to Figure 2-5 and proceed as follows:
Removal
Grasp the front filler panel ™ on both sides and then pull straight back away from the
cabinet.
Replacement
To replace a front filler panel ™, align the sockets š on the front filler panel (refer to the
exploded view) with the appropriate ball studs › on the rails œ and push the panel into
place.
2–12 H9A11 Cabinet Installation/Owner's Guide
Installation
Figure 2-5 Removing and Replacing the Front Filler Panels
scale=.12
scale=.9
4
1
2
Not for
external
loads
J1
3
4
3
2
1
LJ-04808
H9A11 Cabinet Installation/Owner's Guide 2–13
Installation
2.5.3 Pulling Out and Adjusting the Stabilizer Bar
The stabilizer bar ™ pulls straight out from the bottom front of the cabinet š as shown in
Figure 2-6. When the stabilizer bar is fully extended, adjust the foot › at the end of the
stabilizer bar until it touches the floor.
_______________________ WARNING __________________________
The stabilizer bar must be fully extended before any system is extended out
of the cabinet on its slides.
___________________________________________________________
The H9A11 Cabinet can hold various system configurations. The amount of force required
to tip or make the cabinet unstable differs with each configuration.
2–14 H9A11 Cabinet Installation/Owner's Guide
Installation
Figure 2-6 Pulling Out and Adjusting the Stabilizer Bar
Not for
external
loads
Scale=.12
then .72
J1
2
1
3
LJ-04809
H9A11 Cabinet Installation/Owner's Guide 2–15
Installation
2.5.4 Removing and Replacing the Power Distribu tion Unit
_______________________ WARNING __________________________
There can be one or more PDUs per cabinet. Ensure that all systems installed
in the cabinet are turned off as described in the system documentation before
performing the following procedure.
___________________________________________________________
To remove a power distribution unit, refer to Figure 2-7 and proceed as follows:
Removal
1.
If the cabinet contains an operating system, turn off the system as described in the
system documentation.
2.
Remove the two Phillips-head screws that secure the rear lift-off door to the two
brackets at the top rear of the cabinet, and lift the door off of the cabinet (refer to
Section 2.5.1).
3.
Set the Main Power switch ™ on all power distribution units to the off (O) position.
4.
Disconnect the power distribution units from the ac power source.
5.
Remove the bottom front filler panel (refer to Section 2.5.2). This provides access to the
ac outlets on the power distribution units.
6.
Note and record the power cord connections to the outlets š at the rear of the failed
power distribution unit. Then unplug the power cords from that power distribution unit.
7.
At the rear of the cabinet, remove the four (4) 10-32 truss-head screws › that secure the
power distribution unit  to the rear rails (via the four (4) 10-32 clip nuts œ.
8.
Pull out the power distribution unit  and remove it from the cabinet.
Replacement
To replace a power distribution unit, reverse the removal procedure, steps 2 through 8, then
follow the power-on procedure in the system documentation.
2–16 H9A11 Cabinet Installation/Owner's Guide
Installation
Figure 2-7 Removing and Replacing the Power Distribution Unit
2
1
Not for
external
loads
J1
J2
J3
M AI N
PO W ER
J4
Ne s’appliqu pas
a l’alimentation
externe.
J5
4
4
MAI N
POW ER
5
3
3
LJ-04810
H9A11 Cabinet Installation/Owner's Guide 2–17
This is some white text.
A
Field Replaceable Units (FRUs)
Table A-1 lists the field replaceable units (FRUs) for the H9A11 cabinet.
Table A-1 Field Replaceable Units (FRUs)
Description
Part Number
Power distribution unit, 100 to 120 Vac
H7600-AA
Power distribution unit, 200 to 240 Vac
H7600-AB
Power distribution unit, 200 to 240 Vac
H7600-DB
H9A11 Cabinet Installation/Owner's Guide A–1
Help

advertisement

Was this manual useful for you? Yes No
Thank you for your participation!

* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project

Related manuals

Download PDF

advertisement