Mitsubishi Electric | PURY-P240 | Outdoor Unit: 20-TON PURY-P240TSKMU-A (-BS)

Outdoor Unit:
Job Name:
20-TON PURY-P240TSKMU-A (-BS)
(Consists of Two PURY-P120TKMU-A (-BS), and One CMY-R100XLCBK Twinning Kit)
Schedule Reference:
Date:
UNIT OPTION
OUTDOOR VRF HEAT PUMP WITH HEAT RECOVERY
SYSTEM FEATURES
□□ Standard Model……..…...…….....……….....PURY-P240TSKMU-A
□□ Sea Coast (BS) Model………....……….PURY-P240TSKMU-A-BS
• INVERTER-driven compressor
• Air-source, simultaneous cooling and heating
• Long line lengths - for details see Engineering Manual
• Connects to CITY MULTI indoor units
• Controlled via CITY MULTI Controls Network
Specifications
Unit Type
Nominal Cooling Capacity
(208/230V)
Nominal Heating Capacity
(208/230V)
Operating Temperature Range *1
External Dimensions (H x W x D)
Net Weight
External Finish
Electrical Power Requirements
Minimum Circuit Ampacity (MCA)
Maximum Fuse Size
Piping Diameter
From Twinning Kit to Indoor Units
(Brazed) (In. / mm)
Max. Total Refrigerant Line Length
Max. Refrigerant Line Length
(Between ODU & IDU)
Max. Control Wiring Length
Indoor Unit
Sound Pressure Level
Fan
Type x Quantity
Airflow Rate
External Static Pressure
Compressor Operating Range
OPTIONAL PARTS
□□ Twinning Kit (required)............................................…CMY-R100XLCBK
□□ Joint Kit.............................…for details see Pipe Accesories Submittal
□□ BC Controller.................…..............for details see BC Controller Submittals
□□ Low Ambient Kit ...............…..for details see Low Ambient Kit Submittal
□□ Snow/Hail Guards Kit......…for details see Snow/Hail Guards Kit Submittal
□□ Base Pan Heater Kit.............for details see Base Pan Heater Kit Submittal
System
PURY-P240TSKMU-A (-BS)
Module 1
PURY-P120TKMU-A (-BS)
Module 2
PURY-P120TKMU-A (-BS)
Btu/h
240,000
120,000
120,000
Btu/h
270,000
135,000
135,000
Cooling (Outdoor) *2
Heating (Outdoor)
In.
mm
Lbs. / kg
Refer to Module Data
Refer to Module Data
Voltage, Phase, Hertz
A
A
1,430 (648)
Refer to Module Data
Refer to Module Data**
Refer to Module Data**
Refer to Module Data**
Liquid (High Pressure)
Gas (Low Pressure)
Ft.
1-1/8 (28.58) Brazed
1-3/8 (34.93) Brazed
2,625
Ft.
Ft.
Total Capacity
Model / Quantity
dB(A)
CFM
In. WG (Pa)
541
Refer to Module Data
Refer to Module Data
7% to 100%
Refer to Module Data
Refrigerant
Refer to Module Data
High Pressure
AHRI Ratings
(Ducted/Non-Ducted)
Inverter Circuit
(Comp. / Fan)
Fan Motor
EER
IEER
COP
Refer to System Data
Refer to System Data
1,650
50~150% of ODUs
P06~P96/2~50 (Max. No.
Connectable Branches: 48)
63
Compressor Type x Quantity
Protection Devices
23~115° F (-5~46° C) DB
-4~60° F (-20~15.5° C) WB
64-31/32 x 68-29/32 x 29-5/32
64-31/32 x 68-29/32 x 29-5/32
1,650 x 1,750 x 740
1,650 x 1,750 x 740
715 (324)
715 (324)
Pre-coated galvanized steel sheet
208 / 230V, 3-Phase, 60Hz
45 / 42
45 / 42
50
50
Refer to Module Data
10.9 / 10.9
17.8 / 18.5
3.38 / 3.42
Refer to System Data
Refer to System Data
Refer to System Data
Propeller fan x 2
Propeller fan x 2
11,300
11,300
Selectable; 0, 0.12 or 0.24”WG; factory set to 0”W.G.
Refer to System Data
Inverter-driven Scroll
Inverter-driven Scroll
Hermetic x 1
Hermetic x 1
R410A x 26 lbs + 1 oz
R410A x 26 lbs + 1 oz
(11.8 kg)
(11.8 kg)
High pressure sensor, High
High pressure sensor, High
pressure switch at 4.15 MPa
pressure switch at 4.15 MPa
(601 psi)
(601 psi)
Over-current protection
Over-current protection
Thermal switch
Thermal switch
Refer to System Data
Simultaneous Rating
SCHE *3
16.46 / 18.60
Refer to System Data
(Ducted/Non-Ducted)
Blue Fin Anti-corrosion Protection: Cellulose- and polyurethane-resin coating treatment applied to condenser coil that protects it from air contaminants
Standard: ≥1μm thick; Salt Spray Test Method - no unusual rust development to 480 hours.
Sea Coast (BS): ≥1μm thick; Salt Spray Test Method - no unusual rust development to 960 hours.
NOTES:
*1. Harsh weather environments may demand performance enhancing equipment.
Ask your Mitsubishi Electric representative for more details about your region.
*2. For details on extended cooling operation range down to -10° F DB, see Low Ambient Kit Submittal.
Specifications are subject to change without notice.
© 2014 Mitsubishi Electric US, Inc.
*3. Simultaneous Cooling and Heating Efficiency
** Each individual module requires a separate electrical connection.
Refer to electrical data for each individual module.
Specifications are subject to change without notice.
© 2014 Mitsubishi Electric US, Inc.
Left view
a
b
Intake
air
d
Twinning Kit
~Outdoor unit
c
f
Component
P120
P120
unit model
High pressure c ø19.05(3/4) e ø19.05(3/4) c
Low pressure d
- (Note 5) f ø28.58(1-1/8) d
P240
Front view
30(1-3/16)
Unit model
Twinning pipe(Low pressure)
<optional parts>
Outdoor unit 1
1750(68-29/32)
PURY-P240TSKMU-A(-BS) PURY-P264TSKMU-A(-BS) PURY-P288TSKMU-A(-BS)
PURY-P120TKMU-A(-BS) PURY-P144TKMU-A(-BS) PURY-P144TKMU-A(-BS)
PURY-P120TKMU-A(-BS) PURY-P120TKMU-A(-BS) PURY-P144TKMU-A(-BS)
CMY-R100XLCBK
ø28.58(1-1/8)
ø34.93(1-3/8)
1650(64-31/32)
Note 1.Connect the pipes as shown in the figure above. Refer to the table above for the pipe size.
2.Twinning pipe (High pressure) should not be tilted more than 15 degrees from the horizontal plane.
Be sure to see the Installation Manual for details of Twinning pipe installation.
3.The pipe section before the Twinning pipe (section "a" in the figure) must have at least 500mm(19-11/16) of straight section
(*including the straight pipe that is supplied with the Twinning pipe).
4.Only use the Twinning pipe by Mitsubishi (optional parts).
5.Connect the outdoor unit 1 with the Twinning pipe (Low pressure) (section "d" in the figure).
Component unit name
Package unit name
Outdoor unit 1
Outdoor unit 2
Outdoor Twinning Kit(optional parts)
High pressure
BC controller~Twinning pipe Low pressure
Twinning pipe connection size
Intake
air
Discharge air
740(29-5/32)
P264
P120
P288
P144
Intake
air
ø22.2(7/8) e ø22.2(7/8)
- (Note 5) f ø28.58(1-1/8)
P144
a
To BC controller
Twinning pipe(High pressure)
<optional parts>
b
To BC controller
ø22.2(7/8) e ø19.05(3/4) c
- (Note 5) f ø28.58(1-1/8) d
P144
e
Outdoor unit 2
1750(68-29/32)
Outdoor Unit: PURY-P240TSKMU-A
PURY-P240,264,288TSKMU-A(-BS)
(-BS) – DIMENSIONS
Unit : mm(in.)
57
(2-1/4)
Left side view
20
20
(13/16) (13/16)
586(23-3/32)
Discharge air
57
(2-1/4)
262
Service panel
Intake
air
Control box
19.5
(25/32)
Refrigerant service valve
<Low pressure>
Refrigerant service valve
<High pressure>
2X7-ø4.6(3/16) Hole
(Make hole at the plastic fan guard
for snow hood attachment)
<Snow hood attachment hole>
(10-11/32)
Intake
air
54(2-5/32)
(2-25/32)
70
600 (23-5/8)
(8-9/16) 217
(5-23/32) 145
2
4
7
5
3
Front view
1
75(2-31/32)
58(2-5/16)
140(5-17/32)
8
Top view
795(31-5/16)
(Mounting pitch)
Refrigerant service valve
<Low pressure>
Bottom view
795(31-5/16)
(Mounting pitch)
Refrigerant service valve
<High pressure>
6
561(22-3/32)
590(23-1/4)
516(20-11/32)
49(1-15/16)
831(32-23/32)
1750(68-29/32)
150(5-29/32)
83
(3-9/32)
831(32-23/32)
526(20-23/32)
541(21-5/16)
562(22-5/32)
80
(3-5/32)
196 (7-23/32)
146 (5-3/4)
121 (4-25/32)
77
(3-1/16)
89
(3-17/32)
2X3-14(9/16)X20(13/16) Oval hole
80
(3-5/32)
ø25.4
(1)
ø25.4
(1)
ø28.58 Brazed
(1-1/8) *1
ø28.58 Brazed
(1-1/8) *1
ø19.05 Brazed
(3/4) *2
ø22.2 Brazed
(7/8) *2
ø28.58
(1-1/8)
ø28.58
(1-1/8)
Low
pressure
Service valve
High
pressure
Low
pressure
High
pressure
Refrigerant pipe
8
7
6
5
4
3
2
1
NO.
Front through hole
Specifications
140 × 77 Knockout hole
(5-17/32)(3-1/16)
Front through hole
(Uses when twinning ø45 Knockout hole
kit (optional parts)
(1-25/32)
is mounted.)
150 × 94 Knockout hole
Bottom through hole
(5-29/32)(3-23/32)
ø62.7
or ø34.5 Knockout hole
Front through hole
(2-15/32) (1-3/8)
ø43.7
or
ø22.2 Knockout hole
Front through hole
(7/8)
(1-3/4)
For wires
Bottom through hole ø65 Knockout hole
(2-9/16)
Bottom through hole ø52 Knockout hole
(2-1/16)
ø34 Knockout hole
For transmission cables Front through hole
(1-11/32)
For pipes
Usage
*1 Expand the on-site piping and connect to the refrigerant service valve piping.ࠉ
*2 Use the pipe joint(field supply) and connect to the refrigerant service valve piping.ࠉ
PURY-P144TKMU
PURY-P120TKMU
Model
Diameter
Note 1.Please refer to the engineering manual for information
regarding necessary spacing around the unit and
foundation work. Outdoor unit must be mounted
at least 12" off the ground or 12" above the highest
average snow depth, whichever is greater.
2.At brazing of pipes,wrap the refrigerant service valve
with wet cloth and keep the temperature of
refrigerant service valve under 120°C(248°F).
Connecting pipe specifications
2X2-80(3-5/32)X35(1-13/32) Oval hole
<Sling hole>
Fan box
Service
panel
Intake
air
19.5
(25/32)
740(29-5/32)
(Mounting pitch)
(740)(29-5/32)
29.5
(1-3/16)
681 (26-13/16)
145
(5-23/32)
84
(3-5/16)
94
(3-23/32)
303
(11-15/16)
1650(64-31/32)
Specifications are subject to change without notice.
© 2014 Mitsubishi Electric US, Inc.
1347(53-1/16)
Model:
29.5
(1-3/16)
PURY-P120,144TKMU-A(-BS)
PURY-P120TKMU-A (-BS) – DIMENSIONS
Unit : mm(in.)
Twinning Kit:
CMY-R100XLCBK
CMY-R100XLCBK
unit : inch
Low-pressure pipe twinning kit
1-9/32”
2-15/32”
6-15/16”
OD 1-1/4”
ID 1-5/32”
1”
4-9/32”
1-1/32”
16-13/16”
1-13/32”
5-3/8”
OD 1-5/32”
<Elbow pipe(Accessory)>
ID 1-1/4”
<Deformed pipe(Accessory)>
OD 1-5/32”
ID 1-13/32”
OD 1-1/4”
ID 7/8”
2-3/32”
ID 1-1/4”
2-15/32”
6-5/16”
2-3/32”
OD 1-1/4”
ID 1-5/32”
ID 1-5/32”
1-31/32”
ID 1-5/32”
OD 7/8”
ID 1-5/32”
2-15/32”
2-23/32”
1-31/32”
High-pressure twinning pipe
<Deformed pipe (Accessory)>
1-31/32”
ID 3/4”
ID 1-5/32”
OD 3/4”
ID 7/8”
OD 7/8”
ID 3/4”
(3Pcs.)
<Pipe for routing through the front (Accessory)>
ID 1”
8-7/16”
ID 1”
ID 3/4”
21/32”
OD 3/4”
2-15/32”
2-15/32”
ID 3/4”
4-17/32”
7-17/32”
2-5/16”
3-5/32”
<Pipe for routing through the bottom (Accessory)>
Notes:
1340 Satellite Boulevard
Suwanee, GA 30024
Toll Free: 800-433-4822
www.mehvac.com
FORM# PURY-P240TSKMU-A (-BS) - 201407
Specifications are subject to change without notice.
© 2014 Mitsubishi Electric US, Inc.
Download PDF

advertising