User manual | McQuay WMC 035T Centrifugal Chiller Installation Maintenance Manual

User manual | McQuay WMC 035T Centrifugal Chiller Installation Maintenance Manual

Add to My manuals
40 Pages

Below you will find brief information for Centrifugal Chiller WMC-035T. The McQuay Model WMC Centrifugal Water Chiller is a complete, self-contained, automatically controlled, fluid-chilling unit featuring dual, oil-free, magnetic bearing compressors. Each unit is completely assembled and factory tested before shipment. The chillers use refrigerant R-134a that operates at a positive pressure over the entire operation range, so no purge system is required. The controls are pre-wired, adjusted and tested. Only normal field connections such as water piping, relief valve piping, electric power and control interlocks are required, thereby simplifying installation and increasing reliability. Necessary equipment protection and operating controls are included.

advertisement

McQuay WMC-035T Centrifugal Chiller Installation Maintenance Manual | Manualzz

Installation Maintenance Manual

IMM WMC-1

Group: Chiller

Part Number: 331374601

Effective: June 2005

Supersedes: IMM WMC

Dual Compressor Centrifugal Chillers with Magnetic Bearings

Model WMC-035T, Cooling Only

50/60 Hertz

R-134a

2

Table of Contents

Introduction........................................... 3

General Description........................................3

Nomenclature .................................................3

Installation............................................. 4

Receiving and Handling .................................4

Location and Mounting...................................5

Water Piping ...................................................5

Field Insulation ...............................................7

Physical Data and Weights..............................8

Dimensions .....................................................9

Pressure Drop Curves ...................................12

Relief Valves.................................................13

Electrical.......................................................14

Power Wiring................................................14

Electrical Data ..............................................15

Use with On-Site Generators ........................16

System Pumps...............................................17

Field Wiring Diagram...................................19

Multiple Chiller Setup ..................................22

Prestart System Checklist .............................24

Operation............................................. 25

Operator Responsibilities ............................. 25

Compressor Operation ................................. 25

Operating Limits: ......................................... 25

MicroTech II

™ Control................................27

Building Automation Systems............ 27

Capacity Control System.............................. 29

Surge and Stall ............................................. 30

Condenser Water Temperature ..................... 30

Normal Unit Startup/Shutdown .................... 32

Annual Unit Startup/Shutdown..................... 33

Maintenance ........................................ 34

Pressure/Temperature Chart ......................... 34

Routine Maintenance.................................... 35

Repair of System .......................................... 36

Maintenance Schedule........................ 38

Service Programs ................................ 39

Operator Schools ................................ 39

Warranty Statement ........................... 39

Unit controllers are LONMARK certified with an optional LONWORKS communications module.

Manufactured in an ISO Certified Facility

¤2005 McQuay International

Information and illustrations cover the McQuay International products at the time of publication and we reserve the right to make changes in design and construction at anytime without notice.

®™ The following are trademarks or registered trademarks of their respective companies: BACnet from ASHRAE; Modbus from Gould, Inc;

L

ON

M

ARK and

L

ON

W

ORKS from Echelon Corporation; and MicroTech II from McQuay International; Victaulic from Victaulic Company;

Centrifugal Chillers IMM WMC-1

Introduction

General Description

The McQuay Model WMC Centrifugal Water Chiller is a complete, self-contained, automatically controlled, fluid-chilling unit featuring dual, oil-free, magnetic bearing compressors. Each unit is completely assembled and factory tested before shipment.

The WMC chillers are equipped with two compressors operating in parallel with a single evaporator and single condenser.

The chillers use refrigerant R-134a that operates at a positive pressure over the entire operation range, so no purge system is required.

The controls are pre-wired, adjusted and tested. Only normal field connections such as water piping, relief valve piping, electric power and control interlocks are required, thereby simplifying installation and increasing reliability. Necessary equipment protection and operating controls are included.

All McQuay centrifugal chillers are factory-tested prior to shipment and must be commissioned by a factory-trained McQuay service technician. Failure to follow this startup procedure can affect the equipment warranty.

The standard limited warranty on this equipment covers parts that prove defective in material or workmanship. Specific details of this warranty can be found in the warranty statement furnished with the equipment.

Cooling towers used with McQuay centrifugal chillers are normally selected for condenser water inlet water temperatures between 75°F and 90°F (24°C and 32°C). Lower entering water temperatures are desirable from the standpoint of energy reduction, but a minimum does exist. For recommendations on optimum entering water temperature and cooling tower fan control, consult the

“Condenser Water” section on page 30.

Nomenclature

W M C 035 T

W = Water-cooled

M = Magnetic Bearings

Centrifugal Compressor

Twin Compressors

Impeller Diameter

3.5 inches

IMM WMC-1 Centrifugal Chillers 3

Installation

Receiving and Handling

The unit should be inspected immediately after receipt for possible damage.

All McQuay centrifugal water chillers are shipped FOB factory and all claims for handling and shipping damage are the responsibility of the consignee.

On units with factory-installed insulation, the insulation is removed from the vessel lifting hole

(also used for transportation tie-downs) locations and are shipped loose. They should be glued in place after the unit is finally placed. Neoprene vibration pads are also shipped loose. Check that these items have been delivered with the unit. They are usually placed in a control panel.

If so equipped, leave the shipping skid in place until the unit is in its final position. This will aid in handling the equipment.

Extreme care must be used when rigging the unit to prevent damage to the control panels and refrigerant piping. See the certified dimension drawings included in the job submittal for the center of gravity of the unit. If the drawings are not available, consult the local McQuay sales office for assistance.

The unit can be lifted by fastening the rigging hooks to the four corners of the unit where the rigging eyes are located (see Figure 1). Spreader bars must be used between the rigging lines to prevent damage to the control panels, piping and electrical panels.

Figure 1, WMC Major Component Locations

Combined

Discharge Check and Shutoff Valve

Control Panel

Operator Interface

Touch Screen, OITS

Compressor #1

Suction Shutoff Valve

Compressor #2

Rigging Holes

Each Corner

Evaporator Relief Valve

Outlet

Evaporator

Outlet

Inlet

Condenser

Condenser

Relief Valves

Optional Single-Point

Power Block or

Disconnect Switch

Circuit #2

Power Panel

Circuit #1

Power Panel

Electronic Expansion Valve

4 Centrifugal Chillers IMM WMC-1

Location and Mounting

Clearance

The unit must be mounted on a level concrete or steel base and must be located to provide service clearance at one end of the unit for possible removal of evaporator and/or condenser tubes. Evaporator and condenser tubes are rolled into the tube sheets to permit replacement if necessary. The length of the vessel should be allowed at one end. Doors or removable wall sections can be utilized for tube clearance.

Clearance at all other points, including the top, is 3 feet (1 meter). The U.S. National Electric Code

(NEC) can require more clearance in and around electrical components (4-feet in front of electrical panels) and must be checked.

Vibration Pads

The shipped-loose neoprene vibration pads should be located under the corners of the unit (unless the job specifications state otherwise). They are installed to be flush with the sides and outside edge of the feet.

Mounting

Make sure that the floor or structural support is adequate to support the full operating weight of the complete unit.

It is not necessary to bolt the unit to the mounting slab or framework; but should this be desirable, 1 1/8"

(28.5 mm) mounting holes are provided in the unit support at the four corners.

Note: Units are shipped with refrigerant valves closed to isolate the refrigerant in the unit condenser. Valves must remain closed until start-up by the McQuay technician.

Nameplates

There are several identification nameplates on the chiller:

The unit nameplate is located on the Unit Control Panel. It has a Model No. XXXX and Serial No.

XXXX. Both are unique to the unit and will identify it. These numbers should be used to identify the unit for service, parts, or warranty questions. This plate also has the unit refrigerant charge.

Vessel nameplates are located on the evaporator and condenser. Along with other information, they have a National Board Number (NB) and a serial number, either of which identify the vessel (but not the entire unit).

Water Piping

Evaporator and Condenser Water Piping

All evaporators and condensers come standard with groove-type nozzles for Victaulic couplings (also suitable for welding), or optional flange connections. The installing contractor must provide matching mechanical connections of the size and type required.

CAUTION

Freeze Notice: Neither the evaporator nor the condenser is self-draining; both must be blown out to help avoid damage from freezing.

The piping should include thermometers at the inlet and outlet connections and air vents at the high points.

The water heads can be interchanged (end for end) so that the water connections can be made at either end of the unit. If this is done, new head gaskets must be used and control sensors relocated.

In cases where the water pump noise can be objectionable, vibration isolation sections are recommended at both the inlet and outlet of the pump. In most cases, it will not be necessary to provide vibration eliminator sections in the condenser inlet and outlet water lines. But they can be required where noise and vibration are critical.

IMM WMC-1 Centrifugal Chillers 5

6

Important Notes on Welding

If welding is to be performed on the mechanical or flange connections:

1. Remove the solid-state temperature sensor, thermostat bulbs and optional nozzle mounted flow switches (if so equipped) from the wells to prevent damage to those components.

2. Properly ground the unit or severe damage to the MicroTech II unit controller can occur.

Welding should never be performed on a vessel shell or tube sheet, as this will revoke the ASME certification.

Water pressure gauge connection taps and gauges must be provided in the field piping at the inlet and outlet connections of both vessels for measuring the water pressure drop. The pressure drops and flow rates for the various evaporators and condensers are job specific and the original job documentation can be consulted for this information. Refer to the nameplate on the vessel shell for identification.

Connections

Be sure that water inlet and outlet connections match certified drawings and stenciled nozzle markings. The condenser is connected with the coolest water entering at the bottom connection to maximize subcooling. The evaporator outlet is on the side of the unit with the two power panels, regardless of which end the connections are on. See Figure 1.

CAUTION

When common piping is used for both building heating and cooling modes, care must be taken to provide that water flowing through the evaporator cannot exceed 110°F which can cause the relief valve to discharge refrigerant or damage controls.

Piping must be supported to eliminate weight and strain on the fittings and connections. Chilled water piping must be adequately insulated. A cleanable 20-mesh water strainer must be installed in both water inlet lines. Sufficient shutoff valves must be installed to permit draining the water from the evaporator or condenser without draining the complete system.

Figure 2, Unit-Mounted Flow Switch

Flow Switch

Chiller units must be provided with flow switches for the evaporator and condenser. McQuay furnishes factory-installed and wired, thermal-type flow switches as standard equipment on WMC chillers.

They prevent the unit from starting without sufficient water flow through the vessels. They also serve to shut down the unit in the event that water flow is interrupted to guard against evaporator freeze-up or excessive discharge pressure.

Additionally, for a higher margin of protection, normally open auxiliary contacts in the pump starters can be wired in series with the flow switches as shown in the Field Wiring Diagram.

Cooling Towers

The condenser water flow rate must be checked to be sure that it conforms to the system design.

A tower bypass valve is required to control the minimum condenser entering temperature. Unless the system and chiller unit are specifically designed for them, condenser bypass or variable condenser flow is not recommended, since low condenser flow rates can cause unstable operation and excessive tube fouling.

Centrifugal Chillers IMM WMC-1

Figure 3, Bypass, Mild Weather Operation

Bypass, Cold Weather Operation

IMM WMC-1

Low Condenser Water Temperature Operation

When ambient wet bulb temperature are lower than design, the entering condenser water temperature can be allowed to fall to improve chiller performance. This is especially true of an advanced design such as the McQuay WMC that features variable compressor speed.

It is an engineering fact that as the compressor discharge pressure is reduced the amount of power to pump a given amount of gas also is reduced. The reduction can result in significant energy savings.

However, as with most centrifugal chiller applications, a tower bypass valve must be installed.

Figure 16 illustrates two temperature actuated tower bypass arrangements. The “Cold Weather” scheme provides better startup under cold ambient air temperature conditions. The check valve may be required to prevent entraining air at the pump inlet.

Minimum Condenser Water Temperature

The McQuay WMC centrifugal chiller will start and run with 55

°F (12.8°C) entering condenser water temperature.

It is highly recommended that the condenser water pumps cycle on and off with the unit to reduce the possibility of refrigerant migration to the condenser. See on page 19 for wiring details.

CAUTION

Tower water treatment is essential for continued efficient and reliable unit operation.

If not available in-house, competent water treatment specialists should be contracted.

Field Insulation

If the optional factory-installation of thermal insulation is not ordered, insulation should be field installed to reduce heat loss and prevent condensation from forming. Insulation should cover the evaporator barrel, tube sheet, and water heads, plus the suction line to the compressor flange and the compressor end bell opposite the suction connection.

The optional factory-installed insulation of cold surfaces includes the evaporator and nonconnection water head, suction piping, compressor inlet, and motor housing.

Insulation is UL recognized (File # E55475). It is 3/4" thick ABS/PVC flexible foam with a skin.

The K factor is 0.28 at 75°F. Sheet insulation is fitted and cemented in place forming a vapor barrier, then painted with a resilient epoxy finish that resists cracking.

The insulation complies to, or has been tested in accordance, with the following:

ASTM-C-177 ASTM-C-534 Type 2

ASTM-D-1056-91-2C1 ASTM E 84

UL 94-5V

MEA 186-86-M Vol. N

Centrifugal Chillers 7

8

Physical Data and Weights

Evaporator

Refrigerant-side design pressure is 200 psi (1380 kPa). Water-side is 150 psi (1034 kPa).

In the event insulation is to be field-installed, none of the cold surfaces identified above will be factory insulated. Approximate total square footage of insulation surface required for individual packaged chillers is tabulated by evaporator code and can be found below.

Table 1, Evaporator Physical Data

Evaporator

Code

E2209

E2212

Maximum

Refrigerant Charge lb. (kg)

590 (268)

790 (358)

Evaporator

Water

Capacity, gal (L)

38 (145)

45 (170)

Insulation

Area sq. ft. (m

2

66 (6.1)

90 (8.3)

)

Vessel

Weight lb. (kg)

2387 (1083)

2877 (1305)

Number of Relief

Valves

1

1

Notes:

1. Refrigerant charge is for the entire unit and is approximate since the actual charge will depend on other variables.

Actual charge will be shown on the unit nameplate.

2. Water capacity is based on standard tube configuration and standard dished heads.

Condenser

With positive pressure systems, the pressure variance with temperature is always predictable, and the vessel design and pressure relief protection are based upon pure refrigerant characteristics.

R-134a requires ASME vessel design, inspection and testing and uses spring-loaded pressure relief valves. When an over pressure condition occurs, spring-loaded relief valves purge only that refrigerant required to reduce system pressure to their set pressure, and then close.

Refrigerant-side design pressure is 200 psi (1380 kPa). Water-side design is 150 psi (1034 kPa).

Table 2, Condenser Physical Data

Condenser

Code

C2009

Maximum

Pumpdown

Capacity lb. (kg)

728 (330)

Water Capacity

gal. (L)

47 (147)

Vessel Weight lb. (kg)

Number of

Relief Valves

2130 (965) 2

C2012 971 (440) 62 (236) 2528 (1147) 2

Notes:

1. Condenser pumpdown capacity based on 90% full at 90

°F.

2. Water capacity based on standard configuration and standard heads and can be less with lower tube counts.

3. See Relief Valves section for additional information.

Pumpdown

To facilitate compressor service, all McQuay centrifugal chillers are designed to permit pumpdown and isolation of the entire refrigerant charge in the unit’s condenser. Model WMC chillers are equipped with suction and discharge shutoff valves and the refrigerant charge can also be pumped down into the evaporator.

Centrifugal Chillers IMM WMC-1

Dimensions

Figure 4, Dimension Drawing WMC 2 Pass Evaporator, 2 Pass Condenser

6.9

(175.3)

12.6

(320.0)

19.2 (487.7)

13.2 (335.3)

Inlet

18.2

(462.3)

Outlet

0 1.13

QTY. 8

3.7 (93.9)

“A”

31.2

(792.5)

39.3

(998.2)

26.5

(673.1)

“B”

1.0” FPT

Relief Valves

8.0”

QTY. 2

78.0

(1981.2)

Evaporator

Out

In

6.0”

QTY. 2

42.7

(1084.6)

20.4

(518.2)

9.1 (231.1)

1.4 (35.5)

5.2 (132.1)

Condenser

4.0

(101.6)

26.5

(673.1)

35.0

(889.0)

8.0 (203.2)

“C” 5.2 (132.1)

8.0 (203.2)

330654401 R01 Production Unit

NOTES:

1. The dimension drawing above is for standard production units. Certain early production units will have a different control panel arrangement and a greater height dimension.

2. Left-hand connections shown. Right-hand connections are available for either vessel.

WMC Unit

9 Foot Shells

12 Foot Shells

Dimensions Inches (mm)

A B C

31.2 (792.4)

43.7 (1109.9)

134.7 (3421.4)

169.6 (4307.8)

100.1 (2542.5)

134.9 (3426.5)

IMM WMC-1 Centrifugal Chillers 9

10

Figure 5, Dimension Drawing WMC 3 Pass Evaporator, 2 Pass Condenser

12.6

(320.0)

6.9

(175.3)

13.2 (335.3) 13.2 (335.3)

Inlet

Outlet

18.2

(462.3)

0 1.13

QTY. 8

3.7 (93.9)

“A”

31.2

(792.5)

39.3

(998.2)

26.5

(673.1)

“B”

1.0” FPT

Relief Valves

5.0”

QTY. 2

78.0

(1981.2)

Evaporator

Out

6.0”

QTY. 2

42.7

(1084.6)

In

20.4

(518.2)

9.1 (231.1)

1.4 (35.5)

5.2 (132.1)

Condenser

4.0

(101.6)

26.5

(673.1)

35.0

(889.0)

8.0 (203.2)

“C” 5.2 (132.1)

8.0 (203.2)

330654401_3-Pass Evap Production Unit

NOTES:

1. The dimension drawing above is for standard production units. Certain early production units will have a different control panel arrangement and a greater height dimension.

2. Left-hand connections shown. Right-hand connections are available for either vessel.

3. For right-hand evaporator, the inlet and outlet are reversed. That is, the inlet is on the right end and looking at the head, the connection is on the left side.

WMC Unit

9 Foot Shells

12 Foot Shells

Dimensions Inches (mm)

A B C

31.2 (792.4)

43.7 (1109.9)

134.2 (3408.7)

169.1 (4295.1)

100.1 (2542.5)

134.9 (3426.5)

Centrifugal Chillers IMM WMC-1

Figure 6, Mounting/Lifting Weights

Corner 3 Corner 4

Corner 1

“A

Control Panel

“B”

Circuit #1

Circuit #2

Electric Panels

Corner 2

Unit Size Corner 1

Mounting Weight, lbs (kg)

Corner 2 Corner 3 Corner 4 Total

9 Ft Shells 1562 (709) 1516 (688) 1459 (662) 2350 (1067) 7887 (3581)

12 Ft Shells 2712 (1231) 2122 (963) 2161 (981) 1691 (768) 8686 (3943)

Mounting Location inch (mm)

See

Figure 4

See

Figure 4

See

Figure 4

See

Figure 4

Unit Size Corner 1

Shipping Weight, lbs (kg)

Corner 2 Corner 3 Corner 4 Total

Lifting Location inch (mm)

“A” “B”

9 Ft Shells 1396 (634) 2249 (1021) 1305 (592) 2102 (954) 7052 (3202) 4.0 (102) 112.0 (2845)

12 Ft Shells 2450 (1112) 1918 (871) 1965 (892) 1528 (694) 7851 (3564) 4.0 (102) 147.0 (3734)

NOTE:

1. The block shown above is the mounting footprint, not the entire unit footprint.

2. Lifting holes in the top of the tube sheets are 2.5 inch diameter. Mounting holes in the feet are

1.125 inch diameter.

IMM WMC-1 Centrifugal Chillers 11

12

Pressure Drop Curves

Figure 7, Evaporator Pressure Drops

WMC Evap - Water Side Pressure Drop

90

60

50

40

30

80

70

20

10

0

0 200 400 600 800 1000

EGPM - gpm

1200

E2212-B 1 pass

E2212-B 2 pass

E2209-B 1 pass

E2209-B 2 pass

E2212-C 1 pass

E2212-C 2 pass

E2212-C 3 pass

E2209-C 1 pass

E2209-C 2 pass

E2209-C 3 pass

E2212-D 1 pass

E2212-D 2 pass

E2212-D 3 pass

E2209-D 1 pass

E2209-D 2 pass

E2209-D 3 pass

1400 1600 1800

Figure 8, Condenser Pressure Drops

WMC Cond - Water Side Pressure Drop

60.0

50.0

40.0

C2012-B 1 pass

C2012-B 2 pass

C2009-B 1 pass

C2009-B 2 pass

C2012-C 1 pass

C2012-C 2 pass

C2012-C 3 pass

C2009-C 1 pass

C2009-C 2 pass

C2009-C 3 pass

30.0

20.0

10.0

0.0

0 500 1000

CGPM - gpm

1500 2000 2500

Centrifugal Chillers IMM WMC-1

Relief Valves

As a safety precaution and to meet code requirements, each chiller is equipped with pressure relief valves located on the condenser and evaporator for the purpose of relieving excessive refrigerant pressure (caused by equipment malfunction, fire, etc.) to the atmosphere.

Most codes require that relief valves be vented to the outside of a building, and this is a desirable practice for all installations. Relief piping connections to the relief valves must have flexible connectors.

Note

:

Remove plastic shipping plugs (if installed) from the inside of the valves prior to making pipe connections. Whenever vent piping is installed, the lines must be run in accordance with local code requirements; where local codes do not apply, the latest issue of ANSI/ASHRAE Standard

15 code recommendations must be followed.

Condensers have two relief valves as a set with a threeway valve separating the two valves. One valve remains active at all times and the second valve acts as a standby.

Figure 9, Condenser 3-Way Relief Valve

IMM WMC-1

Refrigerant Vent Piping

Relief valve connection sizes are one-inch FPT and are in the quantity shown in Table 1 and Table

2 on page 8. Twin relief valves mounted on a transfer valve are used on the condenser so that one relief valve can be shut off and removed, leaving the other in operation. Only one of the two is in operation at any time.

Vent piping is sized for only one valve of the set (but connected to both) since only one can be in operation at a time. In no case would a combination of evaporator and condenser sizes require more refrigerant than the pumpdown capacity of the condenser. Condenser pumpdown capacities are based on the current ANSI/ASHRAE Standard 15 that recommend 90% full at 90°F (32

°C). To convert values to the older ARI standard, multiply pumpdown capacity by 0.888.

Sizing Vent Piping (ASHRAE Method)

Relief valve pipe sizing is based on the discharge capacity for the given evaporator or condenser and the length of piping to be run. Discharge capacity for R-134a vessels is calculated using a complicated equation that accounts for equivalent length of pipe, valve capacity, Moody friction

Centrifugal Chillers 13

14 factor, pipe ID, outlet pressure and back pressure. The formula, and tables derived from it, are contained in ASHRAE Standard 15-2001.

The McQuay WMC centrifugal units have a relief valve setting of 200 psi.

Using the ASHRAE formula and basing calculations on the 225 psi design yields a conservative pipe size, which is summarized in Table 3. The table gives the pipe size required per relief valve.

When valves are piped together, the common piping must follow the rules set out in the following paragraph on common piping.

Table 3. Relief Valve Piping Sizes

Equivalent length (ft)

Pipe Size inch (NPT)

2.2

1 1/4

18.5

1 1/2

105.8

2

296.7

2 1/2

973.6 4117.4

3 4

NOTE: A 1-inch pipe is too small to handle these valves. A pipe increaser must always be installed at the valve outlet.

Common Piping

According to ASHRAE Standard 15, the pipe size cannot be less than the relief valve outlet size.

The discharge from more than one relief valve can be run into a common header, the area of which cannot be less than the sum of the areas of the connected pipes. For further details, refer to

ASHRAE Standard 15. The common header can be calculated by the formula:

DCommon

=

§

©¨

D

2

1

+

D

2

2

....

2

¹¸

·

The above information is a guide only. Consult local codes and/or latest version of ASHRAE

Standard 15 for sizing data.

Electrical

Wiring, fuse and wire size must be in accordance with the National Electric Code (NEC).

Important: The voltage to these units must be within

±10% of nameplate voltage, and the voltage unbalance between phases must not exceed 2%. Since a 2% voltage unbalance will cause a current

Figure 10, Electrical Panel, Multi-Point

Connection

unbalance of 6 to 10 times the voltage unbalance per NEMA MG-1, 1998

Power

Entry

Standard, it is most important that the unbalance between phases be kept at a minimum.

Power Wiring

Incoming

Lugs

The standard power wiring connection to WMC chillers is multi-point, i.e. a separate power supply to each circuit’s terminal box. Single-point connection to a terminal box, located under the low voltage control panel, is available

(3) Controller

Transformers

120V-24V

Circuit

Breaker individual circuit breakers for each circuit are retained. The single point connection is to a standard power block or optional single unit disconnect switch.

Transformer

480V-120V

Line

Reactors

Centrifugal Chillers IMM WMC-1

IMM WMC-1

The electrical panel (as shown to the right) contains the circuit breaker/ disconnect (standard on both multi-point connection and single-point connection), a line reactor, and a radio frequency (RF) filter. The circuit breakers provide compressor overload protection.

Proper phase sequence to the unit is not required as far as the unit operation is concerned. Correct motor rotation is established by the chiller control system regardless of the connected phase sequence.

WARNING

Qualified and licensed electricians must perform wiring. Shock hazard exists.

The RLA for use in the following tables is obtained by the selection of a specific unit by McQuay.

When shipped, a unit will bear the specific RLA, stamped on the nameplate, for the selected operating conditions.

Electrical Data

Table 4, Multi-Point Connection, Each Circuit – 1 Compressor per Circuit

Field Wire RLA

(Per Compressor)

52 to 55 Amps

56 to 65 Amps

68 to 77 Amps

78 to 85 Amps

89 to 91 Amps

92 to 103 Amps

72

72

94

94

124

124

60

60

50, 60

50, 60

50, 60

50, 60

104 to 110 Amps 124 50, 60

111 to 113 Amps 124 50, 60

LRA Hz

Minimum Circuit

Ampacity (MCA)

65 to 69

70 to 82

85 to 97

98 to 107

112 to 114

115 to 129

130 to 138

139 to 142

3

3

3

3

3

3

3

3

4 GA

4 GA

3 GA

2 GA

2 GA

1 GA

1/0

1/0

Max Fuse

Size

110 Amps

125 Amps

150 Amps

175 Amps

200 Amps

200 Amps

225 Amps

250 Amps

Table 5, Single Point Connection, Total Unit – 2 Compressors per Unit

Per Compressor

RLA

(Per Compressor)

LRA Hz

Minimum Circuit

Ampacity (MCA)

52 to 53 Amps

54 to 57 Amps

58 to 61 Amps

62 to 65 Amps

72

72

72

72

50

50

50

50

68 to 69 Amps

70 to 76 Amps

77 to 85 Amps

94

94

94

50, 60

50, 60

50, 60

89 to 92 Amps

93 to 102 Amps

124 50, 60

124 50, 60

103 to 107 Amps 124 50, 60

108 to 113 Amps 124 50, 60

117 to 120

122 to 129

131 to 138

140 to 147

153 to 156

158 to 171

174 to 192

201 to 207

210 to 230

232 to 241

243 to 255

Per Unit

Field Wire

3

3

3

3

3

3

3

3

3

3

3

1 GA

1 GA

1/0

1/0

2/0

2/0

3/0

4/0

4/0

250

250

Max Fuse

Size

150 Amps

175 Amps

175 Amps

200 Amps

200 Amps

225 Amps

250 Amps

250 Amps

300 Amps

300 Amps

350 Amps

Centrifugal Chillers 15

16

Table 6, Single Point and Multi-point Connection

RLA

(Per Compressor)

Multi-Point Connection

Type of Connection Disconnect Switch Only

52 to 65 Amps

68 to 85 Amps

89 to 113 Amps

100 Amps

150 Amps

175 Amps

See Note 1

Single Point Connection

Power Block

335 Amps

See Note 2

Disconnect Switch

400 Amps

See Note 2

NOTES 1: Disconnect Switch will also be a Circuit Breaker.

2: Circuit Breaker in each circuit after Power Block or Molded Case Disconnect Switch.

3: A high short circuit current rated (HSCCR) panel rated at 65 kA is an option.

CAUTION

Connections to terminals must be made with copper lugs and copper wire.

Care must be taken when attaching leads to compressor terminals.

Control Wiring

The control circuit on the McQuay centrifugal packaged chiller is designed for 115-volts. Control power is supplied from a factory-wired transformer located in the electrical box.

Use with On-Site Generators

WMC chillers have their total tonnage divided between two compressors that start sequentially and they are operated with variable frequency drives. These features make WMC chillers especially appropriate for use in applications where they may be required to run with on-site electrical generators. This is particularly true when the generators are used for temporary power when the utility power is lost.

Generator Sizing: Gas and diesel generators are sensitive to the compressor’s locked-rotor characteristics when the chillers start up. Use the electrical data supplied with the performance output sheet, obtained from the McQuay sales office, for generator sizing purposes. The chiller data sheet will show the RLA, which is for both compressors. Refer to Table 4or Table 5 on the previous page to determine the LRA, based on the RLA. It is important to size the generator to handle the LRA at start up.

Starting/Stopping Procedure: The stopping of the chiller in the event of a power failure should be uneventful. The chiller will sense a loss of voltage and the compressors will stop, coasting down using power generated from their dynamic braking to maintain the bearing magnetic field. The stop signal will initiate a three-minute stop-to-start timer, effectively preventing compressor restart for three minutes. The timer is adjustable from three to fifteen minutes, but the recommended, and default value, is three minutes. This interval allows the generator sufficient time to get up to speed and stabilize. The chiller will restart automatically when the start-to-start timer expires.

Transfer Back to Grid Power: Proper transfer from stand-by generator power back to grid power is essential to avoid compressor damage.

CAUTION

Stop the chiller before transferring supply power from the generator back to the utility power grid. Transferring power while the chiller is running can cause severe compressor damage.

Centrifugal Chillers IMM WMC-1

The necessary procedure for reconnecting power from the generator back to the utility grid is show below. These procedures are not peculiar to McQuay units only, but should be observed for any chiller manufacturer.

1. Set the generator to always run five minutes longer than the unit start-to-start timer, which could be set from 15 to 60 minutes. The actual setting can be viewed on the operator interface panel on the Setpoint/Timer screen.

2. Configure the transfer switch, provided with the generator, to automatically shut down the chiller before transfer is made. The automatic shut-off function can be accomplished through a

BAS interface or with the “remote on/off” wiring connection shown in Figure 11. A start signal can be given anytime after the stop signal since the three-minute start-to-start timer will be in effect.

Chiller Control Power: For proper operation on standby power, the chiller control power must remain as factory-wired from a unit-mounted transformer. Do not supply chiller control power from an external power source because the chiller may not sense a loss of power and do a normal shutdown sequence.

System Pumps

Operation of the chilled water pump can be to 1) cycle the pump with the compressor, 2) operate continuously, or 3) start automatically by a remote source.

The cooling tower pump must cycle with the machine. The holding coil of the cooling tower pump motor starter must be rated at 115 volts, 60 Hz, with a maximum volt-amperage rating of 100. A control relay is required if the voltage-amperage rating is exceeded. See the Field Wiring Diagram on page 19 or in the cover of control panel for proper connections.

All interlock contacts must be rated for no less than 10 inductive amps. The alarm circuit provided in the control center utilizes 115-volts AC. The alarm used must not draw more than 10 volt amperes.

IMM WMC-1 Centrifugal Chillers 17

Field Wiring Diagram Notes (Page 19)

1. Compressor terminal boxes are factory-mounted and wired. All line-side wiring must be in accordance with the NEC and be made with copper wire and copper lugs only. Power wiring between the terminal box and compressor terminals is factory installed.

2. Minimum wire size for 115 VAC is 12 ga. for a maximum length of 50 feet. If greater than 50 feet refer to McQuay for recommended wire size minimum. Wire size for 24 VAC is 18 ga. All wiring to be installed as NEC Class 1 wiring system. All 24 VAC wiring must be run in separate conduit from 115 VAC wiring. Wiring must be wired in accordance with NEC and connection to be made with copper wire and copper lugs only.

3. A customer furnished 24 or 120 Vac power for alarm relay coil may be connected between UTB1 terminals 84 power and 81 neutral of the control panel. For normally open contacts wire between 82 & 81. For normally closed wire between 83 & 81. The alarm is operator programmable. Maximum rating of the alarm relay coil is 25VA.

4. Remote on/off control of unit can be accomplished by installing a set of dry contacts between terminals 70 and 54.

5. If field supplied pressure differential switches are used, they must be installed across the vessel and not the pump. They must be suitable for 24vac and low current application. Field wiring not required with the standard factory-mounted flow switches.

6. Customer supplied 115 VAC 20 amp power for optional evaporator and condenser water pump control power and tower fans is supplied to unit control terminals (UTB1) 85 power / 86 neutral, PE equipment ground.

7. Optional customer supplied 115 VAC, 25 VA maximum coil rated, chilled water pump relay (ep1 & 2) may be wired as shown. This option will cycle the chilled water pump in response to chiller demand.

8. The condenser water pump must cycle with the unit. A customer supplied 115 VAC 25 VA maximum coil rated, condenser water pump relay (CP1 & 2) is to be wired as shown. Units with free-cooling must have condenser water above 60°F before starting.

9. Optional customer supplied 115 VAC 25 VA maximum coil rated cooling tower fan relays (C1 - C2 standard, C3-C4 optional) may be wired as shown. This option will cycle the cooling tower fans in order to maintain unit head pressure.

10. Auxiliary 24 VAC rated contacts in both the chilled water and condenser water pump starters should be wired as shown.

11. Optional Control Inputs. The following 4-20 ma optional inputs are connected as shown:

• Demand Limit; Terminals 58 and 71 common

• Chilled Water Reset; Terminals 51 and 71 common

• Evaporator Water Flow; Terminals 59 and 71 common

• Condenser Water Flow; Terminals 60 and 71 common

12. Optional Control Power Source. 115 volt control power can be supplied from a separate circuit and fused at 20 amps inductive load. Connection is to terminals 85 and 86 common.

13. 4-20mA external signal for chilled water reset are wired to terminals 71 and 51 on the unit controller; load limit is wired to terminals 71 and 58 on the unit controller.

18 Centrifugal Chillers IMM WMC-1

* COOLING

TOWER

FOURTH

STAGE

STARTER

* COOLING

TOWER

THIRD

STAGE

STARTER

* COOLING

TOWER

SECOND

STAGE

STARTER

* COOLING

TOWER

FIRST

STAGE

STARTER

Field Wiring Diagram

Figure 11, Field Wiring Diagram

H

O

* NOTE 9

GND

POWER

* NOTE 6

NEUTRAL

MICROTECH CONTROL

BOX TERMINALS

(115V) (24V)

UTB1

PE

54

85

86

80

70

55

C4 74

A

86

86

*

MODE SWITCH

* REMOTE

ON/OFF

(NOTE 4)

H

A

O

* NOTE 9

C3

79

73

H

O

* NOTE 9

C2

A

78

77

76

75

(NOTE 5)

SWITCH

DELTA P

(NOTE 5)

SWITCH

DELTA P

FLOW OR

EVAP.

FLOW OR

COND.

H

*

NOTE 9

O

C1

A

CF1

EF1

EF2

CF2

COMMON

*

NOTE 3

POWER

81

82(NO)

83(NC)

84

A

*ALARM RELAY

(NOTE 3)

*COOLING TOWER BYPASS VALUE

0-10 VDC

0-10 VDC

*COOLING TOWER VFD

52

71

71

53

See notes on page 18.

* NOTE 7

EP2

O

H

A

C

NOTE 10

EWI-2

* NOTE 7

EP1

H

O

A

C

NOTE 10

EWI-1

* NOTE 8

CP2

O

H

A C

NOTE 10

CWI-2

*

NOTE 8

CP1

H

O

A

C

NOTE 10

CWI-1

* CHILLED

WATER

PUMP

STARTERS

* CONDENSER

WATER

PUMP

STARTERS

330617801 REV. 00

IMM WMC-1 Centrifugal Chillers 19

20

VFD Line Harmonics

Despite their many benefits, care must be taken when applying VFDs due to the effect of line harmonics on the building electric system. VFDs cause distortion of the AC line because they are nonlinear loads, that is, they don't draw sinusoidal current from the line.

They draw their current from only the peaks of the AC line, thereby flattening the top of the voltage waveform. Some other nonlinear loads are electronic ballasts and uninterruptible power supplies.

Line harmonics and their associated distortion can be critical to ac-drives for three reasons:

1. Current harmonics can cause additional heating to transformers, conductors, and switchgear.

2. Voltage harmonics upset the smooth voltage sinusoidal waveform.

3. High-frequency components of voltage distortion can interfere with signals transmitted on the AC line for some control systems.

The harmonics of concern are the 5 th

, 7 th

, 11 th

, and 13 th

. Even harmonics, harmonics divisible by three, and high magnitude harmonics are usually not a problem.

Current Harmonics

An increase in reactive impedance in front of the VFD helps reduce the harmonic currents.

Reactive impedance can be added in the following ways:

1. Mount the drive far from the source transformer.

2. Add line reactors. They are standard equipment on WMC chillers.

3. Use an isolation transformer.

4. Use a harmonic filter.

Voltage Harmonics

Voltage distortion is caused by the flow of harmonic currents through a source impedance.

A reduction in source impedance to the point of common coupling (PCC) will result in a reduction in voltage harmonics. This can be done in the following ways:

1. Keep the PCC as far from the drives (close to the power source) as possible.

2. Increase the size (decrease the impedance) of the source transformer.

3. Increase the capacity (decrease the impedance) of the busway or cables from the source to the PCC.

4. Make sure that added reactance is "downstream" (closer to the VFD than the source) from the PCC.

Line Reactors

Five-percent line reactors are standard equipment on WMC chillers and located in each compressors power panel. They are employed to improve the power factor by reducing the effects of harmonics.

Harmonic Filter

The harmonic filter is an option for field mounting and wiring outside of the power panel.

It works in conjunction with the line reactor to further minimize harmonic distortion. It is wired between the line reactor and compressor. IEEE 519-1991 Standard defines acceptable limits.

See the WMC certified drawings for harmonic filter dimensions and wiring information.

EMI (Electro Magnetic Interference) and RFI (Radio Frequency Interference) Filter

This filter is a factory-installed option. The terms EMI and RFI are often used interchangeably. EMI is actually any frequency of electrical noise, whereas RFI is a specific subset of electrical noise on the EMI spectrum. There are two types of EMI.

Conducted EMI is unwanted high frequencies that ride on the AC wave form.

Centrifugal Chillers IMM WMC-1

IMM WMC-1

EMI-Radiated EMI is similar to an unwanted radio broadcast being emitted from the power lines. There are many pieces of equipment that can generate EMI, variable frequency drives included. In the case of variable frequency drives, the electrical noise produced is primarily contained in the switching edges of the pulse width modulation (PWM) controller.

As the technology of drives evolves, switching frequencies increase. These increases also increase the effective edge frequencies produced, thereby increasing the amount of electrical noise.

The power line noise emissions associated with variable frequency and variable speed drives can cause disturbances in nearby equipment. Typical disturbances include:

• Dimmer and ballast instability

• Lighting disturbances such as flashing

• Poor radio reception

• Poor television reception

• Instability of control systems

• Flow meter totalizing

• Flow metering fluctuation

• Computer system failures including the loss of data

• Thermostat control problems

• Radar disruption

• Sonar disruption

RFI

Three-phase filters are supplied as an option for factory mounting in the compressor power panels. They use a combination of high frequency inductors and capacitors to reduce noise in the critical 150kHz to 30MHz frequency range. The inductors act as open circuits and the capacitors act as short circuits at high frequencies while allowing the lower power line frequencies to pass untouched. The filters assist with cost effective compliance to Electro

Magnetic Compatibility (EMC) directives, in a compact, efficient, light-weight design. The high common mode and differential mode reduction in the critical 150kHz to 30MHz frequencies assures that potential interference from AC drives is reduced or eliminated.

The filters are current-rated devices. In order to properly size a filter, it is necessary to know the operating voltage, and the input current rating of the drive. No derating or rerating is necessary when applying the filter at voltages that are less than or equal to the maximum voltage listed on the filter.

The IEEE 519-1991 Standard

The Institute of Electrical and Electronics Engineers (IEEE) has developed a standard that defines acceptable limits of system current and voltage distortion. A simple form is available from McQuay that allows McQuay to determine compliance with IEEE 519-1991.

Line reactors, isolation transformers, or phase-shifting transformers can be required on some installations.

Centrifugal Chillers 21

22

Figure 12, Typical WMC Power Wiring

WMC Wiring

GND

L1

AC Input

Voltage

L2

L3

Contactor

Optional

EMI

Filter

(1)

C

Manual

Disconnect

Standard

Line

Reactor

(3)

Optional

Notes:

(1) Single hole, crimp type compression terminal required.

(2) Connect to filter circuit breaker lugs.

(3) Conductors to be sized for 125 minimum circuit ampacity.

Size 1 AWG, 75°C wire recommended.

(2) Hamonic

Filter with

Circuit Breaker

Multiple Chiller Setup

WMC dual compressor units have the four main control components; two compressor controllers, one unit controller, and the operator interface panel with touchscreen (OITS). factory wired to a pLAN local area network so that they can communicate with each other.

Two dual compressor chillers can be interconnected and operated in unison by simple field

RS485 interconnecting wiring and the addition of some MicroTech II control settings.

pLAN Setup

To interconnect multiple chillers, MicroTech II pLAN RS485 wiring must be installed by the installing contractor prior to start-up.

1. With no pLAN connections between chillers, disconnect unit control power and set the

DIP switches as shown in Table 7. They are located on the upper-front of the controllers, above the screen.

2. With all manual switches off, turn on control power to each chiller and set each OITS address (see Note 2 on page 23).

3. Verify correct nodes on each OITS Service Screen.

4. Connect chillers together (pLAN, RS485 wiring) between J6 connections on each unit controller’s isolation board. Wiring should be 22 ga., twisted pair, shielded cable.

5. Verify correct nodes on each OITS Service Screen.

Centrifugal Chillers IMM WMC-1

IMM WMC-1

Table 7, Address DIP Switch Settings for Controllers Using pLAN.

Comp 1

Chiller Comp

Controller

Reserved Reserved

1 2 5 6 7 8

1

Comp 2

Controller

Unit

Controller

Operator

Interface (2)

100000 010000 101000 011000 111000 000100

1

9 10 13 14 15 16

2

100100 010100 101100 011100 111100 000010

2

1

2

17 18 21 22 23 24

100010 010010 101010 011010 111010 000110

25 26 29 30 31 32

100110 010110 101110 011110 111110 000001

NOTES:

1. Up to four compressors can be interconnected.

2. The Operator Interface Touch Screen (OITS) setting is not a DIP switch setting. The OITS address is selected by selecting the ‘service’ set screen. Then, with the Technician level password active, select the ‘pLAN Comm’ button. Buttons A(7), B(15), C(23), D(31) will appear in the middle of the screen, then select the letter for the OITS address for the chiller that it is on. Then close the screen. Note that A is the default setting from the factory.

3. Six Binary Switches: Up is ‘On’, indicated by ‘1’. Down is ‘Off’, indicated by ‘0’

.

MicroTech II Operator Interface Touch Screen (OITS) Settings

Settings for any type of linked multiple compressor operation must be made to the

MicroTech II controller. Settings on a dual compressor unit are made in the factory prior to shipment, but must be verified in the field before startup. Settings for multiple chiller installations are set in the field on the Operator Interface Touch Screen as follows:

Maximum Compressors ON – SETPOINTS - MODES screen, Selection #9 = 2 for a dual, 4 for 2 duals.

Sequence and Staging – SETPOINTS - MODES screen, Selection #10 & #12; #11 & #13.

Sequence sets the sequence in which compressors will start. Setting all to “1” evokes the automatic lead/lag feature and is the preferred setting.

Nominal Capacity – SETPOINTS - MOTOR screen, Selection #14. The setting is the compressor design tons. Compressors on dual units are always of equal capacity.

Operating Sequence

For multiple-chiller, parallel operation, the MicroTech II controllers are tied together by a pLAN network and stage and control compressor loading among the chillers. Each chiller, will stage on or off depending on the sequence number programmed into it. If all are set to

“1”, the automatic lead/lag will be in effect.

When chiller #1 is fully loaded, the leaving chilled water temperature will rise slightly.

When the Delta-T above setpoint reaches the Staging Delta-T, the next chiller scheduled to start will receive a start signal and start its pumps. This procedure is repeated until all chillers are running. The compressors will load-balance themselves.

Centrifugal Chillers 23

Prestart System Checklist

Chilled Water

Piping complete .................................................................................................................

V

Water system filled, vented................................................................................................

V

Pumps installed, (rotation checked), strainers cleaned ......................................................

V

Controls (3-way, face and bypass dampers, bypass valves, etc.) operable.........................

V

Water system operated and flow balanced to meet unit design requirements ....................

V

Condenser Water

Cooling tower flushed, filled and vented ..........................................................................

V

Pumps installed, (rotation checked), strainers cleaned .....................................................

V

Controls (3-way, bypass valves, etc.) operable .................................................................

V

Water system operated and flow-balanced to meet unit requirements ..............................

V

Electrical

Power leads connected to the unit power panel(s) ............................................................

V

All interlock wiring complete between control panel and complies with specifications ...

V

Pump starters and interlock wired ....................................................................................

V

Cooling tower fans and controls wired .............................................................................

V

Wiring complies with National Electrical Code and local codes ......................................

V

Condenser pump starting relay (CWR) installed and wired ..............................................

V

Miscellaneous

Relief valve piping complete ............................................................................................

V

Thermometer wells, thermometers, gauges, control wells, controls, etc., installed ..........

V

Minimum system load of 80% of machine capacity available for testing and adjusting controls .......................................................................................................

V

Control wiring between multiple units, if applicable.........................................................

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

V

Note: This checklist must be completed and sent to the local McQuay service location two weeks prior to start-up.

24 Centrifugal Chillers IMM WMC-1

Operation

Operator Responsibilities

It is important that the operator become familiar with the equipment and the system before attempting to operate the chiller.

During the initial startup of the chiller, the McQuay technician will be available to answer any questions and instruct in the proper operating procedures.

It is recommended that the operator maintain an operating log for each individual chiller unit. In addition, a separate maintenance log should be kept of the periodic maintenance and servicing activities.

Now that you have made an investment in modern, efficient McQuay® equipment, its care and operation should be a high priority. For training information on all McQuay HVAC products, please visit us at www.mcquay.com and click on Training or phone 540-248-0711 and ask for the Training

Department. These sessions are structured to provide basic classroom instruction and include handson operating and troubleshooting exercises.

Compressor Operation

The WMC compressors are two-stage. Suction gas enters the compressor through inlet guide vanes that can be opened and closed to control refrigerant flow as the cooling load changes. The suction gas enters the first stage impeller, is compressed, travels through the vaned radial diffuser to the second stage impeller where compression is completed. The gas travels to the condenser via the discharge volute, which converts any remaining velocity pressure to static pressure.

Motor cooling is accomplished by utilizing the refrigerant effect of high-pressure refrigerant from the condenser expanded to a gas within the compressor. The refrigerant cools heat sinks and the motor.

A five-axis magnetic bearing system supports the motor/compressor shaft, resisting radial and thrust forces. The bearing control system uses shaft position feedback to continually adjust the bearing to keep the shaft in the correct position. In the event of a power failure, the compressor motor acts as a generator and powers the bearing support system during coastdown. There is also a system to gently de-levitate the shaft.

Many controls are mounted directly on the compressor where they monitor and control compressor operation. These compressor controls are interfaced with the conventional MicroTech II controls to provide a complete chiller control system.

Operating Limits:

Maximum standby ambient temperature, 130

°F (55°C)

Minimum operating ambient temperature (standard), 35

°F (2°C)

Leaving chilled water range, 38

°F to 60°F (3°C to 15°C)

Maximum operating evaporator inlet fluid temperature, 66

°F (19°C)

Maximum startup evaporator inlet fluid temperature, 90

°F (32°C)

Maximum non-operating inlet fluid temperature, 100

°F (38°C)

Minimum condenser water entering temperature, 55

°F (12.8°C)

Maximum entering condenser water temperature, 105

°F (40.6°C)

Maximum leaving condenser water temperature, 115

°F (46.1°C)

IMM WMC-1 Centrifugal Chillers 25

System Water Volume

It is important to have adequate water volume in the system to provide an opportunity for the chiller to sense a load change, adjust to the change, and stabilize. As the expected load change becomes more rapid, a greater water volume is needed. The system water volume is the total amount of water in the evaporator, air handling products and associated piping. If the water volume is too low, operational problems can occur including rapid compressor cycling, rapid loading and unloading of compressors, erratic refrigerant flow in the chiller, improper motor cooling, shortened equipment life and other undesirable consequences.

For normal comfort cooling applications, where the cooling load changes relatively slowly, we recommend a minimum system volume of three minutes times the flow rate (gpm). For example, if the design chiller flow rate is 300 gpm, we recommend a minimum system volume of 900 gallons

(300 gpm x 3 minutes).

For process applications where the cooling load can change rapidly, additional system water volume is needed. A process example would be a quenching tank. The load would be very stable until the hot material is immersed in the water tank. Then, the load would increase drastically. For this type of application, system volume may need to be increased.

Since there are many other factors that can influence performance, systems may successfully operate below these suggestions. However, as the water volume decreases below these suggestions, the possibility of problems increases.

Variable Speed Pumping

Variable water flow involves inversely changing the water flow through the evaporator as the load changes. McQuay chillers are designed for this duty provided that the rate of change in water flow is slow and the minimum and maximum flow rates for the vessel, as shown in Figure 7 on page 12 are not exceeded.

The recommended maximum change in water flow is 10 percent of the allowable flow change per minute. Flow is usually not reduced below 50 percent of design flow (provided vessel minimum flow rates are not exceeded).

For example, a 150 ton chiller might have chilled water flow of 360 gpm, reduced to 50 percent, would be 180 gpm. However, the minimum flow rate is 216 gpm, so the flow change would be 360 gpm minus 216 gpm, or 144 gpm. This means that the allowable flow rate change would be 10 percent of 144 or 14.4 gpm per minute.

26 Centrifugal Chillers IMM WMC-1

MicroTech II

Control

Figure 13, MicroTech II Control Panel

The WMC chillers are equipped with the

McQuay MicroTech II control system consisting of:

• Operator interface touchscreen panel

(shown at the left). It contains of a 12-inch

Super VGA color screen.

• Control Panel containing the MicroTech II unit controller, two MicroTech II compressor controllers with connections to the compressor-mounted controls, and various switches and field connection terminals.

Operating instructions for the MicroTech II controller are contained in Operating

Manual OM WMC-2.

Building Automation Systems

All MicroTech II controllers are capable of BAS communications, providing seamless integration and comprehensive monitoring, control, and two-way data exchange with industry standard protocols such as L

ON

M

ARK

®, Modbus® or BACnet®.

Protocol Selectability

Benefits

• Easy to integrate into your building automation system of choice

• Factory-installed and tested communication module

• Comprehensive point list for system integration, equipment monitoring and alarm notification

• Provides efficient equipment operation

• Owner/designer can select the BAS that best meets building requirements

• Comprehensive data exchange

Integration Made Easy

McQuay unit controllers strictly conform to the interoperability guidelines of the

L

ON

M

ARK

® Interoperability Association and the BACnet Manufacturers Association.

They have received:

• L

ON

M

ARK

certification with optional LONWORKS communication module

Protocol Options

• BACnet MS/TP

• BACnet IP

• BACnet Ethernet

• L

ON

W

ORKS

® (FTT-10A)

• Modbus RTU

The BAS communication module can be ordered with a chiller and factory-mounted or can be field-mounted at any time after the chiller unit is installed.

IMM WMC-1 Centrifugal Chillers 27

28

Table 8, Typical Data Point Availability

Typical Data Points

1

(W = Write, R = Read)

Active Setpoint

Actual Capacity

Capacity Limit Output

Capacity Limit Setpoint

Chiller Enable

Chiller Limited

Chiller Local/Remote

Chiller Mode Output

Chiller Mode Setpoint

Chiller On/Off

Chiller Status

R Cond EWT

R Cond Flow Switch Status

R Cond LWT

W Cond Pump Run Hours

R Evap Water Pump Status

R Maximum Send Time

R

R Liquid Line Refrigerant Pressure R

R Liquid Line Refrigerant Temp R

W

W W Cond Refrigerant Pressure R Minimum Send Time

R

Cond Sat. Refrigerant

Temp

R Cond Water Pump Status R Pump Select

R Enabled

W

W

R

W Current Alarm

R

R

Default Values

Evap EWT

Compressor Discharge Temp R Evap Flow Switch Status

R

W

R

R

Compressor Percent RLA

Compressor Run Hours

Compressor Select

Compressor Starts

Compressor Suction Line

Temp

R Evap LWT for Unit

R Evap LWT for Compressor R

W

R

R

Evap Pump Run Hours

Evap Refrigerant Pressure

Evap Sat. Refrigerant

Temp

R

R

R

R

Note: Data points available are dependent upon options selected.

Connection to Chiller

Connection to the chiller for all BAS protocols will be at the unit controller. An interface card, depending on the protocol being used, will have been factory installed in the unit controller if so ordered, or it can be field installed.

Protocols Supported

Table 9, Standard Protocol Data

Controller Other

BACnet

®/IP

Ethernet 10 Base-T 10 Megabits/sec

BACnet MSTP

LonTalk

®

RS485

FTT-10A

ModbusRTU RS-485

Color graphics SBC Reference ED 15057: BACnet PICS

(TBD)

78kbits/sec pCO

2

Unit Controller

Reference ED 15057: BACnet PICS pCO

2

Unit Controller

LONMARK

® Chiller Functional

Profile

(TBD) pCO

2

Unit Controller

NOTE: For additional information on the protocol data available through the BACnet or LonTalk communications modules, reference McQuay ED 15062, MicroTech II Chiller Unit Controller

Protocol Information.

Modbus - When selected, the ident number and baud can also be changed to suit the application.

LONWORKS – When selected, the ident number and baud rate setpoints are not available. Baud rate is locked at 4800.

BACnet – When selected, the ident number and baud rate setpoints are not available. Baud rate is locked at 19200.

The factory installed kits on the MicroTech II

™ controller are as follows:

• BACnet Kit P/N 350147404: BACnet/IP, BACnet MS/TP, or BACnet Ethernet

• LONWORKS Kit P/N 350147401: LonTalk (FTT-10A)

• ModbusRTU

If an interface module was ordered, one of the following BAS interface installation manuals was shipped with the unit. If necessary, contact your local McQuay sales office for a replacement or obtain from www.mcquay.com.

IM 735, L

ON

W

ORKS

® Communication Module Installation

IM 736, BACnet

® Communication Module Installation

IM 743, Modbus

® Communication Module Installation

Centrifugal Chillers IMM WMC-1

Figure 14, Unit Control Panel

SW1, Unit Switch

SW12, Circ #1 Switch

SW22, Circ #2 Switch

Control Circuit Breaker

Unit Terminal Board

UTB1

Unit Controller

Circuit # 1 Controller

Circuit #1 Terminal

Board, TB1

Circuit # 2 Controller

Circuit #2 Terminal

Board, TB2

MOD1, MOD2

IMM WMC-1

Ground

Capacity Control System

The capacity of the chiller is controlled by, 1) staging the compressors on and off, 2) by adjusting the capacity of each compressor by opening or closing the inlet vanes to control the quantity of refrigerant entering the impeller, and 3) varying compressor speed to change capacity.

The speed control and vane control work in conjunction. As load decreases, compressor speed is reduced as low as possible but above the point where stall might begin. If further

Centrifugal Chillers 29

30 capacity reduction is required, the guide vanes will close to whatever position is required to match the compressor capacity to the load.

Surge and Stall

Stall and surge are a characteristic of all centrifugal compressors. These conditions can occur at low load conditions when the operating point moves to the left of the compressor surge line on the performance curve.

In surge, the discharge gas alternately flows backward and forward through the impeller reversing about every two seconds. Increased noise, vibration and heat occur and motor current varies widely. Surge can damage a compressor. The compressors are equipped with safety features that help prevent surge from occurring.

Another instability is stall or incipient surge, which occurs a little to the left, or before, the surge condition. Discharge gas in the diffuser forms rotating stall pockets or cells. The compressor sound level will change and the impeller starts to heat up. Motor current remains steady.

Condenser Water Temperature

When the ambient wet bulb temperature is lower than design, the entering condenser water temperature can be allowed to fall, improving chiller performance.

McQuay chillers will start with entering condenser water temperature as low as 55

°F

(12.8

°C) providing the chilled water temperature is below the condenser water temperature.

Depending on local climatic conditions, using the lowest possible entering condenser water temperature can be more costly in total system power consumed than the expected savings in chiller power would suggest due to the excessive fan power required.

To obtain lower than 55

°F (12.8°C) entering condenser water temperature with a tower selected to produce 85

°F (29.4°C) water temperature at design ambient air temperatures, cooling tower fans must continue to operate at 100% capacity at low wet bulb temperatures.

As chillers are selected for lower kW per ton, the cooling tower fan motor power becomes a higher percentage of the peak load chiller power. The offsets of compressor power and fan power must be examined. On the other hand, the low condenser water temperatures can be easy and economical to achieve in mild climates with low wet bulb temperatures.

Even with tower fan control, some form of water flow control such as tower bypass must be used. The MicroTech II control is capable of controlling tower fans and bypass valve.

Figure 16 and Figure 17 illustrate two temperature actuated tower bypass arrangements.

The “Cold Weather” scheme provides better startup under cold ambient air temperature conditions. The check valve may be required to prevent air at the pump inlet.

Centrifugal Chillers IMM WMC-1

Figure 15, Tower Bypass Valve, Pressure Actuated

Figure 16, Tower Bypass, Mild Weather Operation

IMM WMC-1

Figure 17, Tower Bypass, Cold Weather Operation

Centrifugal Chillers 31

32

Normal Unit Startup/Shutdown

Startup and shutdown, other than seasonal shutdowns, are considered to be normal operation and the following procedures apply (assuming that the equipment room temperature are above freezing). The procedures would be used for a weekend shutdown, for example.

Note that the chiller is part of an entire building heating and cooling system that are usually unique to a particular site. For example, the chilled water loop and chilled water pump can also be used for heating and therefore must be operational year-around. The cooling tower can be used for other equipment besides the chiller and may have to remain functional even though the chiller is not. The following procedures, therefore, must take the peculiarities of the entire system into account.

Shutdown

If the unit is to be secured for several days, and is already off due to lack of load, the UNIT switch in the Unit Control Panel (and the remote Start/Stop switch, if used) should be placed in the OFF position. If the chilled water pump and cooling tower are not required for other purposes, they too can be turned off. If the pumps are controlled by the WMC unit controller, they will shut down after the compressors.

If the chiller is running, the chilled water and condenser water pumps must remain on until the compressors are stopped. This is true regardless of how the unit is turned off, whether by the local switches or through a remote signal. The compressors go through a short shutdown sequence, shutting guide vanes and performing other functions, before it finally stops. The pumps must remain on during this shutdown period.

Once the compressors and pumps have stopped, no further action is required other than opening disconnects, if so desired.

Startup

Any disconnects that were opened must be closed. The chilled water pump and cooling tower should be turned on and flow verified. The chiller can then be started by placing the

UNIT switch (and the remote Start/Stop switch, if used) in the ON position. There is no lube warm-up period required. The compressors go through a starting sequence and may not start immediately. Once started, it is prudent to observe unit operation on the operator interface screen for several minutes to check for normal functioning.

Start/Stop Switching

There are four ways to start/stop the chiller. Three are selected in SETPOINT\ MODE\SP3, the fourth way is through panel-mounted switches:

1. Operator Interface Panel, (LOCAL) Home Screen 1 has AUTO and STOP buttons that are only active when the unit is in "LOCAL CONTROL". This prevents the unit from being accidentally started or stopped when it is under control from a remote switch or BAS. When these buttons are pressed, the unit will cycle through its normal starting or stopping sequence, both compressors will be stopped and normal dual compressor starting procedure will be in effect.

2. Remote SWITCH, Selecting SWITCH in SP3 will put the unit under the control of a remote switch that must be wired into the control. See Field Wiring Diagram, page 19.

3. BAS, BAS input is field-wired into a card that is factory-installed on the unit controller.

Centrifugal Chillers IMM WMC-1

IMM WMC-1

4. Control Panel Switches

Three On/Off switches are located in the upper left corner of the main Control Panel, which is adjacent to the operator interface panel, and have the following function:

• UNIT shuts down the chiller through the normal shutdown cycle of unloading the compressors.

• COMPRESSOR one switch for each compressor on the unit, executes an immediate shutdown without the normal shutdown cycle.

• CIRCUIT BREAKER disconnects optional external power to system pumps and tower fans.

A fourth switch located on the left outside of the Unit Control Panel and labeled

EMERGENCY STOP SWITCH stops the compressor immediately. It is wired in series with the COMPRESSOR On/Off switches.

Annual Unit Startup/Shutdown

Annual Shutdown

Where the chiller can be subject to freezing temperatures, the condenser and chiller must be drained of all water. Dry air blown through the condenser will aid in forcing all water out.

Removal of condenser heads is also recommended. The condenser and evaporator are not self-draining and tubes must be blown out. Water permitted to remain in the piping and vessels can rupture these parts if subjected to freezing temperature.

Forced circulation of antifreeze through the water circuits is one method of avoiding freeze up.

1. Take measures to prevent the shutoff valve in the water supply line from being accidentally turned on.

2. If a cooling tower is used, and if the water pump will be exposed to freezing temperatures, be sure to remove the pump drain plug and leave it out so any water that can accumulate will drain away.

3. Open the compressor disconnect switch. Set the manual COMPRESSOR and UNIT

ON/OFF switches in the Unit Control Panel to the OFF position.

4. Check for corrosion and clean and paint rusted surfaces.

5. Clean and flush water tower for all units operating on a water tower.

6. Remove condenser heads at least once a year to inspect the condenser tubes and clean if required.

Annual Startup

1. Check and tighten all electrical connections.

2. Replace the drain plug in the cooling tower pump if it was removed at shutdown time the previous season.

3. Install fuses in main disconnect switch (if removed).

4. Reconnect water lines and turn on supply water. Flush condenser and check for leaks.

Centrifugal Chillers 33

Maintenance

Danger

Wait 10 minutes after compressor shutdown before opening any compressor access panel. The DC link capacitors store enough energy to cause electrocution.

Pressure/Temperature Chart

HFC-134a Temperature Pressure Chart

°F PSIG °F PSIG °F PSIG °F PSIG

34 Centrifugal Chillers IMM WMC-1

IMM WMC-1

Routine Maintenance

Refrigerant Cycle

Maintenance of the refrigerant cycle includes maintaining a log of the operating conditions, and checking that the unit has the proper refrigerant charge.

At every inspection, the suction, and discharge pressures should be noted and recorded, as well as condenser and chiller water temperatures.

The suction line temperature at the compressor should be taken at least once a month. Subtracting the saturated temperature equivalent of the suction pressure from this will give the suction superheat. Extreme changes in subcooling and/or superheat over a period of time will indicate losses of refrigerant or possible deterioration or malfunction of the expansion valve. The evaporator operates at 0 to 1 degree F (0.5 degree C) of superheat through most of the load range.

The refrigerant used for compressor cooling dumps at the compressor suction, where the suction temperature sensor is located. This results in a warming of the suction gas and superheat readings of 4 to 5 degrees F (2 to 3 degrees C).

The discharge superheat should be between 16 and 18 degrees F (9 to 10 degrees C), and remains fairly constant through most of the load range.

Liquid subcooling is in the range of 8 to 9 degrees F (4.5 to 5.0 degrees C).

The MicroTech II interface panel can display all superheat and subcooling temperatures.

Electrical System

Maintenance of the electrical system involves the general requirement of keeping contacts clean and connections tight and checking on specific items as follows:

1. The compressor current draw should be checked and compared to nameplate RLA value.

Normally, the actual current will be lower, since the nameplate rating represents full load operation. Also check all pump and fan motor amperages, and compare with nameplate ratings.

2. At least once a quarter, all equipment protection controls, except compressor overloads, should be made to operate and their operating points checked. A control can shift its operating point as it ages, and this must be detected so the controls can be adjusted or replaced. Pump interlocks and flow switches should be checked to be sure they interrupt the control circuit when tripped.

Cleaning and Preserving

A common cause of service calls and equipment malfunction is dirt. This can be prevented with normal maintenance. The system components most subject to dirt are:

1. Permanent or cleanable filters in the air handling equipment must be cleaned in accordance with the manufacturer’s instructions; throwaway filters should be replaced. The frequency of this service will vary with each installation.

2. Remove and clean strainers in the chilled water system and condenser water system at every inspection.

Water Treatment

Make sure tower blowdown or bleed-off is operating. Set up and use a good maintenance program to prevent “liming up” of both tower and condenser. It should be recognized that atmospheric air contains many contaminants that increase the need for proper water treatment. The use of untreated water can result in corrosion, erosion, sliming, scaling or algae formation. It is recommended that the service of a reliable water treatment company be used. McQuay

International assumes no responsibility for the results of untreated or improperly treated water.

Centrifugal Chillers 35

36

Repair of System

Pressure Relief Valve Replacement

Current condenser designs use two relief valves separated by a three-way shutoff valve (one set).

This three-way valve allows either relief valve to be shut off, but at no time can both be shut off.

In the event one of the relief valves are leaking in the two valve set, these procedures must be followed:

• If the valve closest to the valve stem is leaking, back seat the three-way valve all the way, closing the port to the leaking pressure relief valve. Remove and replace the faulty relief valve. The three-way shutoff valve must remain either fully back seated or fully forward to normal operation. If the relief valve farthest from the valve stem is leaking, front seat the three-way valve and replace the relief valve as stated above.

• The refrigerant must be pumped down into the condenser before the evaporator relief valve can be removed.

Pumping Down

If it becomes necessary to pump the system down, extreme care must be used to avoid damage to the evaporator from freezing. Always make sure that full water flow is maintained through the chiller and condenser while pumping down. To pump the system down, close all liquid line valves.

With all liquid line valves closed and water flowing, start the compressor. Set the MicroTech II control to the manual load. The vanes must be open while pumping down to avoid a surge or other damaging condition. Pump the unit down until the MicroTech II controller cuts out at approximately 20 psig. It is possible that the unit might experience a mild surge condition prior to cutout. If this should occur, immediately shut off the compressor. Use a portable condensing unit to complete the pump down, condense the refrigerant, and pump it into the condenser or pumpout vessel using approved procedures.

Pressure Testing

No pressure testing is necessary unless some damage was incurred during shipment. Damage can be determined by a visual inspection of the exterior piping, checking that no breakage occurred or fittings loosened. Service gauges should show a positive pressure. If no pressure is evident on the gauges, a leak may have occurred, discharging the entire refrigerant charge. In this case, the unit must be leak tested to determine the location of the leak.

Leak Testing

In the case of loss of the entire refrigerant charge, the unit must be checked for leaks prior to charging the complete system. This can be done by charging enough refrigerant into the system to build the pressure up to approximately 10 psig (69 kPa) and adding sufficient dry nitrogen to bring the pressure up to a maximum of 125 psig (860 kPa). Leak test with an electronic leak detector.

Halide leak detectors do not function with R-134a. Water flow through the vessels must be maintained anytime refrigerant is added or removed from the system.

WARNING

Do not use oxygen or a mixture of a refrigerant and air to build up pressure as an explosion can occur causing serious personal injury.

If any leaks are found in welded or brazed joints, or it is necessary to replace a gasket, relieve the test pressure in the system before proceeding. Brazing is required for copper joints.

After making any necessary repair, the system must be evacuated as described in the following section.

Centrifugal Chillers IMM WMC-1

IMM WMC-1

Evacuation

After it has been determined that there are no refrigerant leaks, the system must be evacuated using a vacuum pump with a capacity that will reduce the vacuum to at least 1000 microns of mercury.

A mercury manometer, or an electronic or other type of micron gauge, must be connected at the farthest point from the vacuum pump. For readings below 1000 microns, an electronic or other micron gauge must be used.

The triple evacuation method is recommended and is particularly helpful if the vacuum pump is unable to obtain the desired 1 millimeter of vacuum. The system is first evacuated to approximately

29 inches of mercury. Dry nitrogen is then added to the system to bring the pressure up to zero pounds.

Then the system is once again evacuated to approximately 29 inches of mercury. This is repeated three times. The first pulldown will remove about 90% of the noncondensables, the second about

90% of that remaining from the first pulldown and, after the third, only 1/10-1% noncondensables will remain.

Charging the System

McQuay water chillers are leak tested at the factory and shipped with the correct charge of refrigerant as indicated on the unit nameplate. In the event the refrigerant charge was lost due to shipping damage, the system should be charged as follows after first repairing the leaks and evacuating the system.

1. Connect the refrigerant drum to the gauge port on the liquid line shutoff valve and purge the charging line between the refrigerant cylinder and the valve. Then open the valve to the midposition.

2. Turn on both the cooling tower water pump and chilled water pump and allow water to circulate through the condenser and the chiller. (It may be necessary to manually close the condenser pump starter.)

3. If the system is under a vacuum, stand the refrigerant drum with the connection up, and open the drum and break the vacuum with refrigerant gas to a saturated pressure above freezing.

4. With a system gas pressure higher than the equivalent of a freezing temperature, invert the charging cylinder and elevate the drum above the condenser. With the drum in this position, valves open, water pumps operating, liquid refrigerant will flow into the condenser.

Approximately 75% of the total requirement estimated for the unit can be charged in this manner.

5. After 75% of the required charge has entered the condenser, reconnect the refrigerant drum and charging line to the service valve on the bottom of the evaporator. Again purge the connecting line, stand the drum with the connection up, and place the service valve in the open position.

IMPORTANT: At this point, the charging procedure should be interrupted and prestart checks made before attempting to complete refrigerant charge. The compressor must not be started at this time. (Preliminary check must first be completed.)

NOTE: It is of utmost importance that all local, national, and international regulations concerning the handling and emission of refrigerants are observed.

Centrifugal Chillers 37

Maintenance Schedule

38

I. Compressor

A. Performance Evaluation (Log & Analysis) *

• Ampere Balance (within 10%)

• Terminal Check (tight connections, porcelain clean)

• Motor Cooling (check temperature)

C. Vane Operation

• Compressor Loads:

Operate Manual Switch

Record Motor Amps

• Compressor Unloads:

Operate manual Switch

Record Motor Amps

• Vanes Will Hold (place manual switch in "hold")

Observe Water Temp and Record Amps

D. Internal Compressor Check

II. Controls

A. Operating Controls

• Check Settings and Operation

• Check Vane Control Setting and Operation

• Verify Motor Load Limit Control

• Verify Load Balance Operation

B. Protective Controls

• Test Operation of:

Alarm Relay

Pump Interlocks

III. Condenser

A. Performance Evaluation

B. Test Water Quality

C. Clean Condenser Tubes

D. Eddy current Test - Tube Wall Thickness

E. Seasonal Protection

IV. Evaporator

A. Performance Evaluation (Log Conditions And Analysis)

B. Test Water Quality

C. Clean Evaporator Tubes (as required)

D. Eddy current Test - Tube Wall thickness (as required)

E. Seasonal Protection

V. Expansion Valve

A. Performance Evaluation (Superheat Control)

VI. Compressor - Chiller Unit

A. Performance Evaluation

B. Leak Test:

• Compressor Fittings and Terminal

• Piping Fittings

• Vessel Relief Valves

C. Vibration Isolation Test

D. General Appearance:

• Paint

• Insulation

VII. Electrical

A. Capacitors, Replace every 5 years from startup, include bus bar. Consult McQuay for parts and instructions.

Key: O = Performed by in-house personnel X = Performed by McQuay Service personnel

O

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

O

O

X

X

O

X

X

X

X

X

X

X

X

X

X

X

Centrifugal Chillers IMM WMC-1

Service Programs

It is important that an air conditioning system receive adequate maintenance if the full equipment life and full system benefits are to be realized.

Maintenance should be an ongoing program from the time the system is initially started. A full inspection should be made after 3 to 4 weeks of normal operation on a new installation, and on a regular basis thereafter.

McQuay offers a variety of maintenance services through the local McQuay service office, its worldwide service organization, and can tailor these services to suit the needs of the building owner.

Most popular among these services is the McQuay Comprehensive Maintenance Contract.

For further information concerning the many services available, contact your local McQuay service office.

Operator Schools

Training courses for Centrifugal Maintenance and Operation are held through the year at the McQuay

Training Center in Staunton, Virginia. The school duration is three and one-half days and includes instruction on basic refrigeration, MicroTech controllers, enhancing chiller efficiency and reliability,

MicroTech troubleshooting, system components, and other related subjects. Further information can be found on www.mcquay.com or call McQuay at 540-248-0711 and ask for the Training

Department.

Warranty Statement

Limited Warranty

Consult your local McQuay Representative for warranty details. Refer to Form 933-43285Y. To find your local McQuay Representative, go to www.mcquay.com.

IMM WMC-1 Centrifugal Chillers 39

This document contains the most current product information as of this printing. For the most up-todate product information, please go to www.mcquay.com.

Post Office Box 2510, Staunton, Virginia

• (800) 432-1342 • www.mcquay.com

IMM WMC-1 (6/05)

advertisement

Key Features

  • Dual compressors
  • Oil-free magnetic bearings
  • R-134a refrigerant
  • Pre-wired and tested controls
  • Factory assembled and tested
  • Variable compressor speed

Frequently Answers and Questions

What are the operating limits of the WMC centrifugal chiller?
The operating limits are listed on page 25 of the manual. They include things like compressor operation, condenser water temperature, and surge and stall conditions.
How do I properly transfer from standby generator power back to utility power?
The chiller must be stopped before transferring power from the generator back to the utility power grid. Transferring power while the chiller is running can cause severe compressor damage.
What is the minimum condenser water temperature for the WMC chiller?
The WMC centrifugal chiller will start and run with 55°F (12.8°C) entering condenser water temperature.