- No category
advertisement
®
VERSAFILLER
Model PWSBF
Installation Instructions
The VersaFiller is an extension of the Aqua Pointe product line that mounts directly above Versacooler I and II products. No additional electrical
connections are required.
If installed onto a refrigerated cooler, then chilled water can be dispensed through the Versa Filler. Otherwise, room temperature water will be dispensed.
The VersaFiller is shipped partially assembled.
When completed, the finished assembly will look like this:
OR
Section 1: Getting Started
What’s Included:
(Top cap)
VersaFiller Sports
Bottle Filler- (with wrapper, alcove and top cap installed onto the frame)
Drip tray
Gasket
Anti splash grate
Quick connect tee fitting
38” of ¼ OD plastic tubing with 19” of sponge tubing insulation
Installation instructions
Tools required:
3/8 drill bit that will drill through SS top
Electric drill
Small tubing cutter for copper tube
T15 torx driver with pin in head vandal tip
T20 torx driver with pin in head vandal tip
1/4 “ nut driver
# 2 Phillips screw driver
Anti Splash grate screws (2)
Snap bushing
Section 2: Rough In Drawing
Oasis PWSBF: Versacooler
®
II Models PAC, P8AC with VersaFiller
Section 2: Rough In Drawing
Oasis PWSBF: Versacooler
®
II Split Level Models with VersaFiller
* On split level models, the VersaFiller must be mounted on the low unit in order to meet ADA guidelines.
Section 3: Installation
A: Drilling hole in the top for water line connection.
1.
Disconnect power by UNPLUGGING unit. It might be necessary to remove the front panel to get access to the power.
2.
Turn OFF water supply to the unit. It might be necessary to remove the front panel to access the water stop valve.
3.
Place hole template onto cooler top so it is aligned with the left side of unit and wall. SEE NEXT PAGE FOR TEMPLATE
4.
Mark hole location
5.
Remove top from unit.
Mark hole location.
Template
Remove top from cooler by removing six #15 torx head screws on sides of top.
6.
Using a 3/8 drill bit, drill a hole through top.
7.
Install snap bushing into hole to protect tubing from being cut.
Drill
Install bushing
ALIGN THIS EDGE WITH LEFT EDGE OF COOLER TOP
3-
1/4” from side
2-
1/8” from back
Mark this center point on the top. Remove the top from the cooler. Then drill a 3/8 hole through the top at the marked center point.
USE THIS TEMPLATE TO MARK THE
HOLE LOCATION ON COOLER TOP
Section 3: Installation
B: Connecting the water line
If the cooling tank is nonpressurized, then go to the “Pressurizing the cooling tank” addendum section. Otherwise, proceed to step 1 below.
Non-pressurized units are single units made since December of 2009.
Refer to the schematic below to identify the system that you have.
Water valve/ regulator
Water valve/ regulator
Supply
Water
Supply
Water
NON-
PRESSURIZED
COOLING TANK
PRESSURIZED
COOLING
TANK
1.
With the cooler top removed, find the tube going from the cooling tank outlet to the valve. The TEE fitting (supplied) will need to connect between the cooling tank and valve.
Outlet Tube (insulated plastic)
Outlet Tube (insulated copper)
Valve
P8AC family
Valve
P8AM family
Section 3: Installation:
For the P8AC Version: Versacooler II
2.
Disconnect tubing from the elbow on the valve.
3.
Using the 30” piece of tubing provided, cut 6” and install it on the end of the
TEE. Install the remaining tubing onto the branch of the TEE. Connect the other end of the
TEE to the tank outlet tubing (tube that was disconnected from the elbow).
TEE
4.
Route the TEE and tubing under the waste drain and connect the 6” length to the water valve elbow.
24” tubing
6” tubing
Go to Step 5 “Final steps for both product families:”
Water valve elbow
Section 3: Installation:
For the P8AM Version: Versacooler I
Remove tar tape
2.
Remove tar tape from the insulation on the outlet tube.
3.
Pull back insulation and cut the copper tube with a tubing cutter. Cut where there is at least 1 inch of
straight tubing on each side of the cut.
4.
Install TEE fitting by connecting the copper tubing to each end. Then install the 30” piece of plastic tubing to the TEE branch.
30” plastic tubing
(supplied)
Section 3: Installation:
Final steps for both product families:
5. Feed tubing up through the top and attach the top to the cooler.
TIP: For the P8AM, it is easier to connect the outlet tube to the bubbler if the front nose is removed.
C: Mounting the frame to the wall
1. Place rubber gasket on top of the cooler so it is centered left/right and against the wall.
Section 3: Installation
2. Set the wall frame onto the gasket. Center it left/right and push it against the wall and mark hole locations for wall fasteners. The gasket will set the frame at the proper height.
Use mounting slots that will provide the proper securing location.
Make sure to pull the plastic tubing up through the hole in the frame.
3. Secure frame to the wall with fasteners (not provided). Pull plastic tubing up through the hole in the frame.
4. Slide sponge tubing insulation over water line. Connect the tubing to the INLET elbow on the back of the VersaFiller assembly.
Connect tube to elbow on the valve
Plastic tubing
Sponge tubing insulation
Rear view of VersaFiller
Section 3: Installation
5. Set the VersaFiller cabinet into place. MAKE SURE the cabinet fits into the groove in the rubber gasket on both sides and front of the wrapper.
VersaFiller cabinet
Groove in the gasket
6. Attach VersaFiller assembly and top cap to the frame using the six
(6) vandal resistant torx screws.
Torx screws
Section 3: Installation
7. Install the drip tray and anti-splash grate into the alcove area and secure with the two (2) stainless steel T20 torx head screws.
Anti-splash grate screws (provided)
Anti-splash grate
Drip tray
8. Turn ON water supply and check for leaks. Press the activation button and release any trapped air from the system. Plug in the power cord and replace the front panel IF it was removed earlier.
Press
INSTALLATION COMPLETE
Addendum Section: Pressurizing Cooling Tank
The water should already be turned OFF and the power disconnected.
Unit as it appears with top removed
STEP 1
Unplug un-insulated water line from water valve inlet
(JG elbow located left side of water valve facing the front of the cooler). Set tubing aside (careful to not contaminate water contact end).
STEP 2
Unplug tubing from JG elbow leading to cooling tank inlet.
STEP 3
Plug un-insulated tubing that was removed in step 1 into
JG elbow leading to the cooling tank from step 2.
STEP 4
Unplug tubing that is connected to the water valve outlet (JG elbow located on the right side of valve facing the cooler).
STEP 5
Connect tubing from step 4 to JG elbow on the left side of the valve.
Step 6
Unplug JG tubing from the cooling tank outlet. Do not set it down.
Step 7
Using tubing removed in step 6, plug into JG elbow on the right side of the valve. (be sure to rout the tubing under existing tubing installed in step 4 as shown)
Step 8
Using tubing that is connected to the JG elbow left side of valve (done in step
4), and plug the other end to the JG fitting at the top of the cooling tank.
Return to Section 3 B
“Connecting the water line”
24
26
33
25
12
19
20
22
30
21
29
16
13
14
17
15
3
18
23
2
1
28
27
32
9
8
4
22
22
25
11
10
5
EXPLODED PARTS
BREAKDOWN
31
7
22
*Items highlighted in GRAY are available as service parts
1 036190-002
2 036691-001
3 036686-001
4 026675-016
5 036688-001
6 036695-001
7 036697-001
8 036194-002
9 034649-001
10 036689-001
11 036191-002
12 035990-001
13 029967-002
14 A020957
15 036690-001
16 030176-002
ALCOVE, PWSBF
WRAPPER, PWSBF STN2
CAP, PWSBF
SCREW, FLAT HEAD TAPPING
TRAY, DRIP PWSBF
TRAY, GRILLE DRIP
DRIP TRAY BOTTOM CAP
BUTTON, PWSBF
SPRING, MSBF
GASKET, PWSBF
DRAIN, MSBF, SHORT
HOLDER, CARTRIDGE STEM CON
CARTRIDGE
NUT, RETAINING PLASTIC
BRACKET, VALVE PWSBF
PLUG, HOLE
17 028706-036
18 026670-007
19 028481-101
20 036479-001
WASHER/SPACER/GASKET-NON META
SCREW, HEX HD MACHINE
FTG, PP UNION ELBOW WHT
FILL TUBE ASSY
21 036209-001
22 026642-003
23 031206-005
24 030152-046
25 035262-001
BRACKET, FILL TUBE SUPPORT
SCREW, HEX HD TAPPING
INSERT, NAMEPLATE AQUAPOINTE
TUBE, PE CUT LENGTH WHI
SCREW, BUTTON HD TAPPING
26 036687-001
27 027189-007
28 029199-103
29 030152-031
FRAME, PWSBF
BUSHING, SNAP
FTG, PP UNION TEE WHITE
TUBE, PE CUT LENGTH WHI
30 017681-008
31 036701-001
INSULATION, SPONGE TUBING
DRIP TRAY ASSEMBLY-SERVICE
32 036702-001 BUTTON ASSEMBLY, PWSBF-SERVICE
33 036231-001-SP VALVE ASSEMBLY, PWSBF DISPENSE-SERVICE
P/N 030099-412 Date: 8/2010 Rev A
Oasis International
222 East Campus View Blvd.
Columbus, OH 43235
614-861-1350 www.oasiscoolers.com
© 2010 Oasis International. Oasis, Aqua Pointe, Versacooler and VersaFiller are registered trademarks of LVD Acquisition.
6
advertisement
* Your assessment is very important for improving the workof artificial intelligence, which forms the content of this project