Interval Algebra – an Effective Means of Scheduling Surveillance Radar Networks

Interval Algebra – an Effective Means of Scheduling Surveillance Radar Networks
Interval Algebra – an Effective Means of Scheduling
Surveillance Radar Networks
Richard W. Fockea,b , J. Pieter de Villiersa,c , Michael R. Inggsb
a
Council for Scientific and Industrial Research, Pretoria, South Africa, {rfocke,
jdvilliers1}@csir.co.za
b
University of Cape Town, Cape Town, South Africa, {richard.focke,
michael.inggs}@uct.ac.za
c
University of Pretoria, Pretoria, South Africa, {pieter.devilliers}@up.ac.za
Abstract
Interval Algebra provides an effective means to schedule surveillance radar
networks, as it is a temporal ordering constraint language. Thus it provides
a solution to a part of resource management, which is included in the revised Data Fusion Information Group model of information fusion. In this
paper, the use of Interval Algebra to schedule mechanically steered radars to
make multistatic measurements for selected targets of importance is shown.
Interval Algebra provides a framework for incorporating a richer set of requirements, without requiring modifications to the underlying algorithms.
The performance of Interval Algebra was compared to that of the Greedy
Randomised Adaptive Search Procedure and the applicability of Interval Algebra to nimble scheduling was investigated using Monte-Carlo simulations
of a binary radar system. The comparison was done in terms of actual performance as well as in terms of computation time required. The performance
of the algorithms was quantified by keeping track of the number of targets
that could be measured simultaneously. It was found that nimble scheduling
is important where the targets are moving fast enough to rapidly change the
Preprint submitted to Information Fusion
August 2, 2014
recognised surveillance picture during a scan.
Two novel approaches for implementing Interval Algebra for scheduling
surveillance radars are presented. It was found that adding targets on the fly
and improving performance by incrementally growing the network is more
efficient than pre-creating the full network. The second approach stemmed
from constraint ordering. It was found that for simple constraint sets, the Interval Algebra relationship matrix reduces to a single vector of interval sets.
The simulations revealed that an Interval Algebra algorithm that utilises
both approaches can perform as well as the Greedy Randomised Adaptive
Search Procedure with similar processing time requirements. Finally, it was
found that nimble scheduling is not required for surveillance radar networks
where ballistic and supersonic targets can be ignored. Nevertheless, Interval
Algebra can easily be used to perform nimble scheduling with little modification and may be useful in scheduling the scans of multifunction radars.
Keywords:
Interval Algebra, multistatic radar, scheduling, surveillance, radar
networks, resource management, process refinement
1. Introduction
Multisensor management deals with the task of queueing sensors to make
measurements that best serve the mission that a multisensor data fusion
(MDF) system is intended to complete [1, 2]. In the case of a surveillance
system, this means controlling the sensors so as to gather the most pertinent
information about the sensed area.
Multisensor management is contained entirely in level 4, process refine-
2
ment, of the Joint Directors of Laboratories (JDL) data fusion model [3], as
refining the process of information fusion can best be achieved by controlling the inputs to the process. This is when the only inputs to the information fusion system are the sensor measurements. Recently, the updated
Data Fusion Information Group (DFIG) data fusion model was proposed
[3–5], where resource and mission management replaces process refinement.
Resource management is a subset incorporating aspects such as tuning all
information fusion functionality. Furthermore, it also looks at how to control
information collected by other means, such as military intelligence.
Two preliminary steps can be used to formulate a solution for multisensor
management. The first is to model the sensors, their environment and the
goals they must achieve. The second is the choice of architecture, which
dictates how the multisensor manager will be designed and employed.
Modelling a sensor manager can be achieved using two methods [6]. The
first choice is to make use of a myopic simplification and thus deal with only
a very simple model of the past and the future. The alternative choice is
to employ longer-term planning, which considers more historic information
and generates long-term predictions. Common solutions for the latter choice
include partially observed Markov decision processes (POMDPs) [7, 8] and
multiple-armed bandits (MABs), a simplification of the Markov decision process (MDP) [9, 10]. These are both types of Bayesian networks and, while
they are promising, they often lead to numerically difficult solutions. Thus,
as longer-term planning is desirable, there is still work required to make these
practically feasible in all cases.
There are various architectures used for creating a mulstisensor man-
3
ager. Traditionally, a centralised architecture has been used, where a central
information fusion system feeds a centralised multisensor manager with information so as to control all sensors. Another possibility is a decentralised
architecture, where typically both the information fusion system and multisensor manager are distributed across each discrete sensor or suite of sensors
[2, 11, 12]. These architectures represent the current state of the art, as
distributed problems are difficult to solve. A hybrid of these approaches has
been proposed by various authors [13, 14], which usually consists of two or
more distinct levels. On the lowest level sensor management is distributed
and must keep sensors busy and tune sensor parameters for high-level tasks.
The higher level, sensor coordination, is centralised and ensures that collectively the sensors are optimally achieving the sensor fusion system goals.
Sensor coordination consists of planning and scheduling [2], and can be
sub-divided into three functions [15]. The first function of sensor coordination
must solve the problem of generating tasks for each sensor. The next function
of sensor coordination is to prioritise the generated tasks. Together the first
two functions perform the required planning. The final function of the sensor
coordination is to place the best set of tasks in the timeline of sensing actions
for each sensor. This is known as the scheduling function, which is the focus
of this work.
A sensor coordination algorithm is considered a nimble scheduler when
it is able to rapidly adapt to changes in the surveyed area. This means
that, if there are fast-moving or rapidly accelerating targets, the scheduler
will incorporate the updated target locations in real time. These targets will
not only affect planning but also scheduling within very short time intervals.
4
Thus the scheduler must be able to recalculate the schedule of tasks for the
sensors concurrently with the execution of these tasks by the sensors. The
updated schedule of tasks can leverage the improved situational picture as it
is generated by the information fusion system.
1.1. Current scheduling solutions
Sensor scheduling treats the sensor resources as a timeline extending from
the present towards the future. As such, scheduling is a combinatorial optimisation problem very similar to the knapsack problem. The goal is to fill the
timeline with tasks such that the sensor is never idle. Idle time is wasteful
since this time is better spent catching up on tasks that may later cause a
bottleneck.
A good overview of types of algorithms for sensor scheduling can be found
in the work of Xiong and Svensson [2], Musick and Malhotra [15], as well as
a more recent work by Ding [16]. There are many approaches that can be
followed to schedule individual sensors. However, not all of them are directly
applicable to multisensor scheduling, which is required for an MDF system.
Early in the history of sensor management scheduling was performed by
human operators with only minimal assistance provided by the system that
was being managed [17]. Next, heuristic approaches that captured much of
the domain knowledge of human operators were employed. These approaches
are still very popular today as they require minimal computation time and
are easy to develop [14, 18–20].
As research in the field broadens to encompass additional functions of
sensor coordination, this aspect is sometimes handled intrinsically by task
prioritisation algorithms [9, 21–24]. Examples are split among those using
5
information and decision theory. This has the benefit of not wasting computation especially if the mission of the MDF system changes on a high level.
In this case, instead of handling a timeline of tasks, the sensor manager only
deals with the current task to schedule. On the other hand, if a centralised
fusion centre is used and stops operating or if communication is lost in a
decentralised system, there will be no timeline of tasks to continue with in
the interim. Just doing arbitrary tasks during this time can have detrimental
effects, not only on the optimality of the scheduling solution, but also on the
mission of the MDF system as a whole.
The scheduling problem can be solved through the use of optimisation
algorithms when information-theoretic approaches to task prioritisation are
used [25]. These optimisation algorithms fall into two categories: mathematical programming [19, 26–28] and artificial intelligent search techniques
[29, 30]. Simulation techniques are another possibility, where possible future
timelines are investigated using multiple trials [31–33]. Sometimes random
approaches are followed and these are typically used as an electronic countermeasure [34].
Artificial intelligence techniques have also been proposed in the past and
have predominantly used reasoning/expert systems. Examples include fuzzyset based reasoning [35, 36] and fuzzy decision trees [36] all within the context
of an expert system. In these systems, the scheduling rules are captured by
analysing linguistic rules of thumb provided by human sensor operators.
1.2. Multistatic radars
An interesting application of multisensor management for radars is the
possibility of making multistatic measurements [37, 38], which can be used to
6
increase the probability of detection of small targets in heavy clutter scenarios. Increasingly, there is a trend where small boats are used in piracy and
terrorist activities to attack larger vessels. Coordinating the measurements
of multiple radars could potentially mitigate some of these problems, by ensuring that these targets are detected and tracked. However, most radars
of the affected vessels are not very sophisticated, and thus require a simple
solution to benefit from multistatic measurements.
Multistatic measurements are possible by adequately scheduling each
radar to measure the target simultaneously. Each radar must also be able to
receive the transmitted signals of the other radars, or the signals must combine coherently through constructive interference to increase the energy on
the target. Receiving radars can always make a monostatic measurement by
computing the monopulse angle of the target and the delay experienced by
the signals it transmits. More sophisticated receiving radars can also discern
the Doppler shift induced by the target motion.
For multistatic radars, where a radar can distinguish the signals of the
other radars, this receiving radar can then also make a bistatic measurement.
This is done by pinpointing the position of the target using intersecting
ellipsoids with the receiving and transmitting radars as the ellipsoid foci.
Thus, each radar is able to make more measurements of the target. Each
radar has an increased probability of detection and can make more accurate
measurements of the positional and kinematic attributes of the target.
1.3. Interval Algebra
Interval Algebra (IA) is an artificial intelligence technique that does not
require performing searches. IA falls within the field of constraint satisfaction
7
problems (CSP). Apart from the authors’ conference paper [39], there appear
to be no published papers that investigate the use of IA in information fusion.
At this point, it may be beneficial to refer to Appendix A for the theory
of IA. Briefly, IA reasons about the start and end points of intervals of time.
Hence it is able to ensure that tasks adhere to temporal constraints (with the
potential of adding duration constraints) but is not able to prioritise tasks. It
can also be used to check if the intervals are consistent with each other, given
fixed constraints. As sensor tasks are defined as taking a defined amount of
time and starting at a defined point in time, they can easily be represented as
intervals. Temporal constraints between sensor tasks are also often required
and these can be captured using IA relationships.
Alone IA can also provide a schedule of tasks with a low latency and
within few computation cycles. Thus, IA should be able to efficiently plan
a single dwell for advanced sensor systems. In the case of the surveillance
radar systems discussed here, this would entail planning the tasks for the
radars during the next scan of the sensed area. IA can fill the timeline of
the radars with tasks such that temporal constraints are not violated, but it
cannot make decisions about which tasks are best.
IA can also be used with other algorithms such as information-theoretic
algorithms to provide a holistic sensor management solution. IA could be
used as a pre-processing step which eliminates tasks that violate constraints.
Thereafter, all tasks not excluded by IA could be prioritised and the best
tasks selected using an information-theoretic algorithm such as Shannon’s
entropy.
IA also does not dictate a specific multisensor management architecture.
8
The form of IA used here will naturally work for a centralised architecture or
the central part of a hybrid architecture. It can also be used for the scheduling
of a single sensor and even in a decentralised approach. Nevertheless, it is
also possible to use a decentralised CSP algorithm to solve the constraints
[40].
While IA is being used for scheduling here, it should be noted that IA can
be used to resolve constraints wherever decisions need to be made. Thus, IA
could be used in other parts of an information fusion system such as object
refinement, situation assessment, threat assessment and user refinement.
2. Material and Methods
The results of two different sets of simulations are presented to achieve
the following goals. Firstly, a comparison is drawn between IA and the
Greedy Randomised Adaptive Search Procedure (GRASP). Secondly, an investigation into a nimble scheduler, where targets are highly manoeuvrable,
is presented.
The methodology followed for the comparisons of IA to GRASP is the
same as the experimental set-up of the authors’ previously published work
[39]. For this comparison, the simulations also made use of a target priority
queue so as to prioritise targets as depicted in Figure 1. These simulations
also simplify the information fusion system by only simulating fused tracks.
This was done to keep the simulations tractable such that many simulations
could be executed for the Monte-Carlo analysis.
The nimble scheduler simulations require a more realistic approach. Thus,
unlike in the previous work, the simulation environment makes use of Kalman
9
P (¬s)
P (s)
P (s)
P (s)
P (¬s) · 5 /7
P (¬s) · 5 /7
P (s)+
P (¬s) · 5 /7
Priority N
Priority 1
P (¬s) · 2 /7
Priority N+1
P (¬s) · 2 /7
Priority 7
P (¬s) · 2 /7
Figure 1: Markov chain representing target priority
tracking filters [41]. The tracks of the radars are then fed to a central information fusion system. Here the tracks are associated using the auction
algorithm for data association [42]. An information filter is then used to fuse
the associated tracks [43]. Finally, the covariance of the information filter is
used to prioritise the tracks. When managing real sensors this is a better approach for prioritising targets. However, it may still be desirable to consider
a mechanism whereby all targets are frequently revisited.
2.1. Scheduling problem
The sensor management problem to solve is selecting the maximum number of targets to measure with multiple radars. It is assumed that the mechanically steered positioners of the radars are not allowed to change direction
during the scan, as doing so would increase the cost and complexity of the
radars. Thus each radar will temporally scan over all targets in a specific
sequence.
Given a multistatic radar network that is scanning a scene of N targets,
10
the scheduling goal per scan can be written as:
argmax
PN
k=1
Q (k) · S(k)
(1)
subject to: C(m, n, r) ∀ {m, n} ∈ K, r ∈ R
where k, m and n are target indexes; r is the radar index, K is the set of
scheduled targets and R is the set of radars. Q(k) is the priority of target
k. S(k) denotes whether target k has been scheduled. The full enumeration
of C(m, n, r) for all values of m and n in K, as well as radars r in R are the
constraints that need to be satisfied. In other words, the goal is to find the
largest set K, which maximises the value of Equation 1 but does not violate
any constraints.
The target selection function S(k) is then simply:

 1 if k ∈ K,
S(k) =
 0 otherwise
(2)
Given an arbitrary reference line and radar positioner rotation, C(m, n, r)
returns constraints as follows:



θ (m) ≺ θr (n) if m < n,

 r
C(m, n, r) =
θr (m) θr (n) if m > n,



 ∅
otherwise
(3)
Here θr (m) is the function that determines the angle from the radar r taken
from the arbitrary reference line to target m. This reference line is selected
such that the angles for all targets increase monotonically. For a dual radar
case used in this research, the best selection for the reference is the line that
connects the radars. The C(m, n, r) function imposes the constraint that all
targets must either appear in sequence or simultaneously for a specific radar.
11
The precede ‘≺’ and succeed ‘’ operators are used as the ordering depends
on the scan direction. Thus, all the radars should be able to measure the
targets in sequence without requiring a change in scan pattern.
2.2. Ambiguity in the sequence of targets
Ambiguities arise in the azimuth ordering of the targets for either radar.
This is due to the azimuth angle measurement accuracy of the radar, which
cannot be infinitesimally small. This is an unavoidable situation even if
monopulse measurements are made, as in both cases the angular accuracy is
determined by the beam width [44]. Consequently, when targets are too close
together in azimuth angle the radar is unable to discern their true order.
The mechanically steered multistatic surveillance radar network (MSMSRN) scheduling algorithms must be able to exploit these ambiguities so
that they can be used to schedule more multistatic measurements per scan.
Furthermore, no tracking degradation will be experienced in the ambiguous
case. This is due to the fact that the targets are sufficiently close to the
centre of the radar beam in order to receive maximum antenna gain.
Figure 2 illustrates a scenario where targets are measured ambiguously.
Radar one does not need to discern the true order of targets two and five.
2.3. Target motion and scheduler nimbleness
Since the targets are moving, the geometry of the targets relative to the
two radars changes over time, as depicted in Figure 2 by the curved dotted
arrows. If the targets move fast enough and scheduling is performed without
any future prediction, then it is possible that the target will not lie in the
beam of one or both radars and a multistatic measurement will not be made.
12
2
2
Radar Two
1
1
2
1
5
5
4
4
4
5
3
3
Radar One
3
6
6
6
Figure 2: Ambiguity in the sequence of targets and target motion as scheduling proceeds
13
Similarly, targets that are ambiguous for a radar will only remain in this
state for a brief period of time.
As a result, the scheduling problem to solve is dependent on the targets
that are scheduled. Each time a target is scheduled, the intersection point
of the radar beams must move from the current target to the next target.
The shortest path is a straight line between the two targets and is shown in
Figure 2 by the solid straight arrows. Thus the minimum time that will pass
is the angular difference between the two targets divided by the maximum
scan rate. This value will be largest for the radar which has the greatest
angular difference to rotate.
During this time, all targets that must still be measured by the radars
later in the scan will have moved. The distance required to move out of the
beam of the radar is dependent on the target distance from the radar, the
beam width of the radar and the direction of motion. Assuming straight
line motion, the last parameter can be simplified to an aspect angle of the
motion. The minimum velocity can be calculated from the distance and the
scheduling time between the two multistatic measurements, which will cause
multistatic measurements to be missed.
The degree to which multistatic measurements will be missed is thus
dependent on the velocity of the target as well as the scanning rate of the
radars. Targets that will be measured closer to the end of the scan will also be
the worst affected, as more time would have passed before these mulstistatic
measurements were attempted. Fast vehicles, helicopters, airplanes and fastmoving boats, such as go-fast boats, will cause the largest problems for any
surveillance radar scheduler. Ballistic and supersonic targets are usually not
14
tracked by surveillance systems and are instead tracked by a tracking radar
due to their extremely fast motion. For all these types of target, the scene
unfolds quickly at each time step and it is not possible to rely on targets
falling within the edge of the beam to ensure detections.
In order to handle fast targets, a scheduling algorithm must therefore
predict target locations after each multistatic measurement is made. However, as the goal is to measure as many targets as possible, this leads to two
interacting requirements. Firstly, the schedule of targets to visit that will be
generated is dependent on the geometry of the targets. However, the geometry changes over time and the degree of change depends on which targets
have been scheduled. There is no simple solution to this problem that will
ensure that no multistatic measurements are missed.
Nevertheless, any forward predictions made should result in a better
scheduling performance than making no predictions. One simple approach
would be to determine the fastest time the two radar beams could be made
to intersect at any target in isolation. Thus all other multistatic measurements that may be made before this target is visited are ignored. This will
once again lead to a static target geometry, with errors that increase over the
scan, which can be used to select the targets for multistatic measurements.
A better approach would be to calculate the schedule of targets to visit on
the fly, while still attempting to measure as many high-priority targets as
possible. This scheduler would be nimble in terms of reacting to the changes
in the target geometry.
15
Both approaches require solving
θr (t0 ) + t · θ̇r (t) = arctan
!
Atf · x̂f (t0 ) − xr · [0 1 0 0]0
Atf · x̂f (t0 ) − xr · [1 0 0 0]0
(4)
for each radar r, where t0 denotes the current time, t denotes the prediction
time, f signifies the target, θ and θ̇ is the current positioner movement profile
of the radar, A is the motion model of the target, x̂ is the current filter
estimate of the target Cartesian location and velocity, and xr is the Cartesian
location and velocity of the radar (assumed to be stationary). This equation
can be solved for t using the Newton-Raphson method along with a numerical
differentiation technique. Similarly, the tracking covariance matrices of the
targets must also be updated:
0
P̄f (t) = Atf · P̂f · Atf + t · Qf
(5)
where A is the motion model of the target, P̂ is the estimate of the tracking
covariance, Q is the acceleration model of the target and P̄ is the prediction
of the tracking covariance. However, as our simulation used discrete time, it
was possible to search for the first potential solution.
2.4. Scanning, tracking and confirmation tasks
The multisensor management solution investigated here then uses a hybrid architecture consisting of two levels [13]. The higher-level radar coordinator attempts to schedule multistatic measurements for as many targets
as possible. The lower-level radar manager is replicated for each radar and
operates independently of the radar coordinator. The radar manager could
also have been implemented using IA; however, it is not the focus of this
16
research. In this research, the radar manager makes a decision to track,
confirm or search independently.
Thus far, only the mulstistatic aspect of the radar system has been discussed. However, nothing stops the radars from scanning for new targets
while they are not making multistatic measurements. Furthermore, targets
that will not be measured in the multistatic mode should still be measured in
a monostatic mode by the radar so as to maintain a stable track. Finally, it
is also possible to confirm the presence of new targets during the same time.
Performing these types of tasks will not affect the multistatic measurement capability of the radars for slow targets, as they only require one radar
to make the measurement. Also, they always temporally occur between two
multistatic measurements for the radar performing these tasks. During the
time that these tasks are performed the other radar may only be required to
slow down.
These tasks will, however, impact on the maximum scan time, and thus
if there is an upper bound on the scan time or a requirement for a fixed scan
time, only a certain number of these tasks will be possible. This can easily be
accommodated in any scheduling algorithm by keeping a sum of the duration
of all tasks. As long as the sum of task durations is less than the maximum
scan time, more of these tasks can be added.
2.5. Implementation of scheduling algorithms
The target priority queue is initialised with all targets having the highest priority level for the comparison simulations when the simulation starts.
Targets are then placed at their initial 2D positions and will travel on their
selected 2D paths. In all the comparison simulations, targets were always
17
Table 1: Table demonstrating input format with ambiguities as multiple entries in a column
1 3 4 5
2
6 7
8
9
visible to both radars when they were scanning over the area. For the nimble scheduling simulations, the probability of detection (Pd ) was set to 0.9
for monostatic measurements and 0.99 for multistatic measurements. Furthermore, the probability of false alarm (Pf a ) was set to 10−6 per radar cell
(radars were assumed to have a 3.75 m resolution and a 1◦ azimuth resolution).
A recognised surveillance picture is assumed to be perfectly generated
by a fusion system for the comparison simulations. However, for the nimble
simulations the recognised surveillance picture is built by first detecting targets, then forming tracks, associating the tracks of the two radars and finally
fusing the associated tracks. The recognised surveillance picture is used by
the radar schedulers to generate an ambiguous target azimuth ordered list.
Before a scan commences, each of the MSMSRN scheduling algorithms
accepts two ambiguous target lists from the simulation environment, one list
for each radar that scans over the area. An example of these lists can be
found in Table 1, where the columns indicate discrete azimuth sectors and
the rows are individual targets within the sector. The nimble scheduler is
also supplied with two updated ambiguous target lists once each interception
point has been reached.
The MSMSRN scheduling algorithms select the targets measured in the
18
Table 2: Table demonstrating output format
1 2 5 7
8 9
multistatic mode by taking into account the priorities and the azimuth angle
orderings per radar for each target. This list of multistatic measurements is
then returned to the simulation environment (refer to Table 2). Finally, the
simulation environment executes the next scan as quickly as possible under
the positioner slew rate constraints. This is achieved by ensuring that the
radars illuminate the targets in the list simultaneously.
If used, the target priority queue is updated for the next scan at the
end of the current scan. This is done using the final list of targets that was
selected for multistatic measurement. Targets that were scheduled decrease
in priority, and unscheduled targets can either stay at the same priority level
or increase in priority (refer to Figure 1).
2.6. Choice of a comparison algorithm
For the comparison simulations it was important to compare the IA
scheduling algorithm to another widely used algorithm. However, the focus
of this research is not an exhaustive comparison but rather an introduction
to IA for the purposes of multisensor scheduling. It includes a meaningful
comparison of IA to show that IA can be used in practical settings. Most
scheduling algorithms tend to fall predominantly in three categories: heuristics, optimisation and information-theoretic approaches. Furthermore, many
scheduling algorithms make use of greedy optimisations, as these tend to lead
to quicker convergence [2].
19
GRASP, as a meta-heuristic optimisation algorithm, seems to be a good
representative algorithm for both of the first two choices. It is neither a full
heuristic, as the search aspect is done in a rigorous manner that should find
optimal solutions, nor is it very cumbersome, as it uses simple heuristics to
build locally optimal solutions. GRASP was chosen as it is a heuristic search
algorithm and should require both little processing time and provide good
scheduling performance [26]. This comparison ensures that IA is computationally feasible while achieving similar performance to that of a conventional
scheduling algorithm. Interested readers can refer to Appendix B for the
theory of GRASP.
Optimality is not achievable in general and is not necessarily the best approach for scheduling, mainly for the reason that there are other important
requirements such as meeting deadlines, resource usage, processing requirements and trading off constraints. Our goal is to demonstrate IA to the sensor
scheduling community and not prove optimality in all cases. IA should be
seen as a tool that can be used alongside more rigorous approaches, for example with search procedures either to validate or generate solutions. IA
can be used to validate temporal constraints and this is required for many
problems.
3. Calculation
Previous work presented by the authors [39] compared IA to a heuristic
algorithm that was devised to solve the MSMSRN scheduling (MS) problem. This comparison did not demonstrate the effectiveness of IA against
established techniques. Thus, the IA MS (I-MS) algorithm was compared
20
to a conventional algorithm to evaluate the suitability of IA as a solution to
the MS problem. GRASP, a mathematical programming technique, [26] was
selected for the comparisons.
The GRASP MS (G-MS) algorithm, unlike the I-MS algorithm, performs
a global search by repeatedly performing multiple local searches. In each
iteration of GRASP, a solution is generated and then a local search is performed, which continually adds and removes targets in order to find a better
solution. In contrast, the I-MS algorithm generates a single locally optimal
solution and so is expanded by using it as the local search for the GRASP
algorithm to draw fair comparisons. This form of the I-MS algorithm was
referred to as the Iterative IA MS (II-MS) algorithm.
The comparison of the II-MS algorithm to the G-MS algorithm was then
evaluated from two different perspectives to ensure that a fair comparison
was performed. The first perspective compared the algorithms in terms of the
computational gain they offer. The algorithms were optimised such that they
performed equally well against the tested metric of mean multistatic measurements per scan. Algorithms that require less computation time provide
a better solution to the scheduling problem.
Conversely, the second perspective compared the algorithms in terms of
the performance gain they offer. The algorithms were optimised such that
they perform in the same amount of processing time. Algorithms that make
more multistatic measurements of targets on average per scan of the radars
provide better solutions. While the II-MS algorithm compared well to the
G-MS algorithm when only considering the performance of the algorithms, it
also required three orders of magnitude greater processing time. This is due
21
to the fact that IA provides a much richer set of constraints than that which
was being used by the MSMSRN scheduler. To address this shortcoming the
Iterative Reduced Point Algebra MS (IRP-MS) algorithm was developed that
can be regarded as an equivalent to the G-MS algorithm in both respects,
and is discussed in Section 3.5.
3.1. Basic IA scheduling
As per Section 2, the IA scheduler receives an ordered lists of targets Tr
from each of the radars r forming a multistatic radar network, where Tr (n)
is the location of the target n in the list. The IA scheduler then creates
an interval Ir,n per target for each of the radars, which represents a task
for the radar to track the target during the scan. Next, the IA network is
initialised by adding each of the created intervals and only populating the
IA relationships for tasks of the same radar.
This is done by consulting the two order lists and generating suitable IA
relations. If the relationship is unambiguous then it will only contain either
the IA operator ‘before’ or ‘after’. The order list is consulted for each target
and the relationship for a corresponding interval is set as follows:
Ir,n {before}Ir,m | ∀ (r, n 6= m, Tr (n) ≺ Tr (m))
(6)
All other relationships are kept at their initial value of {all}.
Next, the scheduler must decide which targets will be measured by both
radars simultaneously; thus a multistatic measurement can be made. For the
IA scheduler, this requires setting the relationship between the intervals for
the selected target n of all the radars r and s to contain only ‘equal’.
22
Algorithm 1 IASchedulerInit (A : target order for each radar)
create IA network N = ∅
for all radars r do
create handled set H = ∅
for all bins b ∈ Ar in sequence do
for all targets t ∈ Ar,b in sequence do
create interval It
add row and column t to N for It
for all intervals In in H do
if n ∈ Ar,b then
PC (N , [n, t], {all})
else
PC (N , [n, t], {before})
end if
end for
H = {H, In }
end for
end for
end for
return N
23
Ir,n {equal}Is,n | ∀ r 6= s
(7)
Each time a target is scheduled for a multistatic measurement, the IA
scheduler first makes a backup of the current IA network. Then the scheduler
randomly selects a target with the highest priority and sets the corresponding
intervals to the ‘equal’ relationship. If the network remains consistent the
target is added to the list of targets that will be measured simultaneously and
the resulting IA network is retained. Alternatively, when an inconsistency
is generated, the IA network is reinstated to the backup and the target is
discounted from being measured simultaneously.
The final list of targets to measure simultaneously is the list that is generated once each target has been attempted. Targets of a lower priority are
only selected once every target of a higher priority has been attempted. If
there are two targets with the same priority a random selection is made.
3.2. IA scheduling with ambiguities
IA can easily manage the case where the azimuth angle of the targets
cannot be determined. As per Section 2, the scheduler now receives an order
list of azimuth sectors Ar for each radar r. Each azimuth sector Ar,k can
contain one or more targets, where sectors containing zero targets need not
be reported.
The same IA operators are used in the relationships of targets from different azimuth sectors, which will again match their ordering in the list as
follows:
Ir,n {before}Ir,m | ∀ (r, n 6= m, n ∈ Ar,k , m ∈ Ar,l , k < l)
24
(8)
Algorithm 2 IASchedulerRun (N : IA network, A : target order for each
radar, Q : target priority queue)
create schedule S = ∅
for all targets n ∈ Q select n randomly according to priority do
for all radars r do
pr = index of n in Ar
end for
set consistency c = true
for all unique combinations a and b |a 6= b in index of p do
c = c ∧ PC (N , [pa , pb ], {equal})
end for
if c = true then
S = {S, n}
end if
end for
return schedule S
25
where n is the first target number, m is the second target number, k is
the sector number corresponding to target n and l is the sector number
corresponding to target m.
However, the relationships between targets in the same azimuth sector
are not updated and remain {all}, as per
Ir,n {all}Ir,m | ∀ (r, n 6= m, {n, m} ∈ Ar,k )
(9)
Targets are selected as per the unambiguous case and the list of targets
to visit is generated again by using ‘equal’ relationships. Scheduling with
ambiguities then progresses exactly as per basic IA scheduling.
The IA scheduling algorithm, which can handle the ambiguities in the
target sequence, is presented as Algorithm 2. This algorithm requires using
Algorithm 1 to initialise the IA network once per scan.
3.3. Growing the IA network
Algorithm 3 RpaNetGrow (n : Reduced PA network, A : radars’ target
order, Q : target priority queue)
for all t ∈ Q select t randomly according to priority do
if t ∈
/ nk | ∀ k then
n = RpaNetAdd (n, A, t)
end if
end for
return n
Here the way IA is used to schedule is reconsidered by revisiting the way
intervals are added to the IA network. The I-MS algorithm first adds all intervals to the IA network before performing any constraint processing. Thus
26
each iteration of the IA path consistency algorithm executes on a maximumsized constraint matrix.
A better method to perform the IA computations would be to only add the
intervals as they are required, thereby growing the IA network as processing
continues. This is a simple contribution, which has parallels with the work by
Van Beek and Manchak [45], as this work focuses on adding intervals in the
order of maximum impact to least impact. This highlights the importance
of adding intervals to the IA network in the best possible order.
In the IA Growing-network MS (IG-MS) algorithm, multistatic measurement intervals from each radar are added for one target at a time to the IA
network. In this way, the IA network only grows as more multistatic measurements of the targets are scheduled. Algorithm 3 captures the essence of
the growing technique by only adding intervals as they are required.
3.4. Constraint ordering
Ordering heuristics could then be considered from the work of Van Beek
and Manchak [45] to be applied to the IG-MS algorithm. Constraint ordering
is described in Appendix A.3.
However, the ordering heuristics cannot be used directly for the IA scheduling algorithm discussed. This is because the constraints with the ‘equals’ relation have the largest impact and these are determined during the operation
of the algorithm. These represent the multistatic measurements, which must
be selected by the scheduling algorithm.
The ordering heuristics did, however, lead to the notion of using a single interval per multistatic tracking task. Doing so removes the need for
the ‘equals’ constraints as there is only one interval per target, which now
27
Algorithm 4 RpaNetAdd (n : Reduced PA network, A : radars target
order, t target number)
d = length of vector n
for all s = 1 → d do
for all m ∈ ns do
R = {all}
for all radars r do
Rr = RpaGenRel (Ar , t, m)
R = R ∩ Rr
end for
if R = ∅ then
return n
else if R = {before} then
ns−1 = {ns−1 , t}
return n
else if R = {before, after} then
ns = {ns , t}
return n
end if
end for
end for
nd+1 = {t}
return n
28
represents the multistatic measurement task for both radars.
All IA scheduling algorithms up until the IG-MS algorithm used an interval for each target per radar; thus there were also two times more intervals
than targets for these algorithms. Using a single interval for a multistatic
measurement task leads to a further improvement in performance, as the IA
constraint matrix size is reduced by three quarters.
Using a single interval per target requires performing the intersect of the
constraints from the radar in the multistatic cluster. If the set is not null
then the interval can be added to the IA network. The resulting algorithm
was called the IA Simplified-Constraints MS (IS-MS) algorithm.
3.5. Reduced-point algebra networks
Algorithm 5 RpaGenRel (A : target order, n : target one, m : target two)
cn = column of n in A
cm = column of m in A
if cn < cm then
R = {before}
else if cn = cm then
R = {before, after}
else
R = {after}
end if
return R
After the preceding optimisations, only two IA operators were used in
interval relations, namely the ‘before’ and ‘after’ IA operator. This is a
29
subset of Point Algebra (PA), which uses only ‘before’, ‘after’ and ‘equals’.
This means that the relationships between the interval for a single radar
would either be {before}, {after} or {before, after}. The intersection of the
relationships from both radars would then be similarly constrained.
R code analyser revealed that, in all cases, this PA network
Using Matlab
remained consistent. This was as long as the intersect of the constraints
from either radar was not null. Looking at the PA relational matrix for
the resulting PA network showed that each row of the PA network matrix
for MSMSRN scheduling is merely a permutation of every other row if set
inversion is applied. That is, one row captured all the information about the
relationships for the entire matrix.
Thus the entire PA network matrix could be captured more efficiently as
a vector of sets containing intervals. Intervals from different elements in the
vector, a set, are temporally organised as per their occurrence in the vector.
However, intervals found in the set have an ambiguous temporal relationship
to each other. In this case, a surrogate interval could be used in the vector
to represent this ambiguous grouping of intervals.
The Reduced PA Scheduling (RP-MS) algorithm therefore uses a vector of sets, containing intervals, to capture and maintain the relationships
between all the intervals. The Iterative RP-MS (IRP-MS) algorithm again
uses RP-MS as the local search for GRASP. This leads to savings in memory
and processing time, as the Reduced PA form does not require storing or
maintaining all the relationships between every interval. This algorithm is a
novel contribution which demonstrates that under certain circumstances the
relationships in a PA network can better be captured as a vector of sets than
30
a matrix.
Algorithms 3–5 implement the Reduced PA defined as part of this research. All set operations have their usual meaning, while subscripts denote
the indexing operation. Sets are in upper case, matrices are in bold upper
case while vectors are in bold lower case. Finally, the target order matrices
Ar are the ambiguous azimuth angle ordering from a radar r. Each column
represents the known angular sequence and the true order of targets in the
same column (on different rows) cannot be discerned. The pseudo code for
the Reduced PA scheduler is provided as Algorithm 6.
Algorithm 6 ReducedPAScheduler (A : target order for each radar, Q :
target priority queue)
create reduced PA network n = ∅
create schedule S = ∅
n = RpaNetGrow (n, A, Q)
for all targets i ∈ n in sequence do
S = {S, n}
end for
return schedule S
3.6. Nimble IA scheduling
As discussed in Section 2.3, in certain circumstances it is not sufficient
to perform scheduling only when the scan commences. In these cases, the
scheduling is performed at scan boundaries as well as during the time the
multistatic measurement is being made. The Nimble IA Scheduler solves
Equation 4 for each target before building the list of ambiguous targets. In
31
Algorithm 7 NimbleIAScheduler (x̂ : target state estimate vector for all
targets, t0 : current time)
for all targets f where θf (t0 ) θr (t0 ) do
for all radars r do
δ f,r = θf (t0 ) − θr (t0 )
end for
find radar r with maximum |δ f,r |
solve Equation 4 for t using r
x̄f = Atf · x̂f (t0 )
compute P̄f (t) using Equation 5
add target f and priority P̄f (t) to priority queue Q
add target f to Ar bins as per δ f,r
end for
N = IASchedulerInit(A)
S = IASchedulerRun(N, A, Q)
send target Sf with minimum |δ f,r | to radar schedulers
32
doing so, it assumes that the target will be visited by moving the radar with
the largest azimuth delta at the fastest positioner rate. Furthermore, the
assumption is made that no other target will be visited. The target priority
is also updated using Equation 5.
The selection of targets for multistatic measurement is then performed as
per all the other IA scheduling algorithms, except that the target priority is
the area of the 2σ ellipse defined by the predicted tracking covariance. Thereafter, the low-level scheduler is tasked with ensuring that the positioners of
the two radars are moved so that the beams of the radars intercept on the
target. The low-level scheduler also solves Equation 4 but instead of assuming no other targets are visited, it must compute the times as determined for
the entire sequence of targets. When reaching interception points, targets
that can no longer be measured in the multistatic mode are not considered
by the nimble scheduler.
Each time the scheduler is invoked at the boundaries of the scan or at
target intercepts, an IA network must be built from the remaining targets
that can be visited. As the target relationships change during the time it
takes the radar beams to reach an interception point, the IA network from
previous iterations must be discarded as it contains invalid information. In
the current form IA can only further constrain relationships; however, future
work could address this by allowing IA also to permit more ambiguity in
relationships. Nevertheless, generating the IA network for subsequent rounds
gradually requires less computation so that total processing time increases
logarithmically. The pseudo code for the Nimble IA Scheduler is presented
as Algorithm 7.
33
4. Results
4.1. Simulation set-up
For each of the comparison simulations1 performed a 40 × 40 km area was
selected, while a 10 × 10 km area was selected for the nimble simulations2
to reduce simulation times. One radar is situated at coordinate (0, 0) km or
the bottom left corner of the area. The other radar is situated at the top
left corner of the area (coordinate (0, 40) km or (0, 10) km). Both radars are
assumed to have a maximum detection range greater than 57 km. The maximum slew rate of the positioners of the radar was selected to be Π /2 radians
per second, or a 90◦ rotation every second. The radars always scan over the
area in opposing directions; therefore, if one radar is scanning clockwise the
other will scan anti-clockwise.
A number of targets are then generated with random starting points and
random motion profiles. The relative positions of the targets in relation to
the two radars represent a target geometry. During the scan, the radars are
not allowed to change scan direction until they have reached the boundaries
of the surveyed area. With these constraints and any given target geometry,
a different upper limit of multistatic measurements can be generated. The
target geometry will change slowly as the targets move during the simulation.
Target motion for the nimble simulations is modelled according to the Singer
random-walk acceleration model [13].
Three Monte-Carlo simulation batches were performed to analyse the
performance of IA scheduling. The first two batches compared IA to GRASP,
1
2
https://code.google.com/p/multiple-radar-fusion-simulation-simple/
https://code.google.com/p/multiple-radar-fusion-simulation-realistic/
34
where one batch varied the number of targets and the other varied the radar
beam width. For these batches the simulation time, for each random run, was
kept low at 1 000 seconds, which is not necessarily equivalent to execution
time. The final batch of simulations determined the nimbleness of the IA
scheduler when used in highly dynamic scenarios. Simulation time had to be
limited to 60 seconds due to the computational complexity of the nimble IA
scheduling simulation runs.
In all cases, the simulation time is realistic when considering the radar
positioner slew rates and target motion, but the simulation does not take
into account the processing time of the algorithms. During a simulation
run, the target geometries vary slowly due to the target movements. The
initial target geometry is generated randomly and varies greatly between
two different random seeds. Therefore, using more simulation runs tests a
greater diversity of the target geometries than using fewer simulations that
run for a longer simulation time.
The random seed was reinitialised every time the MSMSRN scheduling
algorithm changed. This was done for all the batches of simulations to ensure
that the different scheduling algorithms operated under exactly the same
conditions. A global counter was used as the random seed and was only
incremented after testing all scheduling algorithms. A 100 different global
counter values were used for each batch of simulations. The random seed
determines the initial placement and paths of the targets, as well as the
priority change of each target within the priority queue when used.
35
Table 3: Results comparing IA to GRASP by varying the number of targets in the scenario.
Mean (µ) and standard error (), in factors of 10−2 , of scan duration (S), targets measured
(M ) and total execution time (E) as the number of targets is varied for IA (I) and GRASP
(G). This table captures the results of 800 Monte-Carlo simulation runs, where the number
of targets in the scenario were varied between 10, 20, 40 and 80 targets. The beam width
of the radars was kept at a constant value of 1◦ . The G-MS algorithm is abbreviated to
G while the IRP-MS algorithm is abbreviated to I.
Targets
10
µ
20
µ
40
µ
80
µ
SG
5.9 3 6.0 2 6.1
2
6.2
1
SI
5.9 3 6.0 2 6.1
1
6.2
1
MG
3.7 7 5.5 7 8.3
7
13
8
MI
3.7 7 5.5 7 8.3
7
13
8
EG
5.2 4
18
8
66
20 260 60
EI
4.9 3
16
7
60
20 240 60
36
Table 4: Results comparing IA to GRASP by varying the radar beam width of both radars
simultaneously. Mean (µ) and standard error (), in factors of 10−2 , of scan duration (S),
targets measured (M ) and total execution time (E) as the beam width is varied for IA (I)
and GRASP (G). This table gives the results of 1 200 Monte-Carlo simulation runs, where
◦
the beam width of the radars was varied between 10−6 , 1◦ , 2◦ , 4◦ and 8◦ . The number
of targets was kept at a constant value of 20 targets. The G-MS algorithm is abbreviated
to G while the IRP-MS algorithm is abbreviated to I.
Beam width
◦
µ
10−6
0.5
1
2
4
8
SG
6.0
6.0 6.0 6.1 6.2 6.5 1.8
SI
6.0
6.0 6.0 6.1 6.2 6.5 1.8
MG
5.3
5.4 5.6 5.8 6.4 7.3 7.6
MI
5.3
5.4 5.6 5.8 6.4 7.3 7.7
EG
18
17
18
17
17
16
8.1
EI
16
16
16
16
16
15
7.0
4.2. IA comparison to GRASP
4.2.1. Varying the number of targets
Refer to Table 3 for the results of the simulation batch that compared IA
to GRASP when varying the number of targets.
4.2.2. Varying the beam width of the radars
Refer to Table 4 for the results of the simulation batch that compared IA
to GRASP when varying the beam width of the radars.
37
370
Naive
Intercept
Nimble
365
Multistatic measurements
360
355
350
345
340
335
330
325
320
315
1
2
Simulation scenario
3
Figure 3: Effect of target initial velocity and acceleration on number of measurements made
using IA scheduling. Average number of multistatic measurements made for 900 nimble
IA scheduling Monte-Carlo simulation runs. Three different simulation scenarios were
employed to investigate the effect of highly dynamic targets. For each, the acceleration
variance σa of the Singer random-walk motion model and initial target velocity, a Gaussian
random value with mean µv , were set as follows: σa = 2 m · s−2 and µv = 25 m · s−1 ,
σa = 2 m·s−2 and µv = 50 m·s−1 or σa = 20 m·s−2 and µv = 25 m·s−1 . Three MSMSRN
scheduling modes were tested: naive, once per scan using the current target geometry, thus
ignoring highly dynamic targets; intercept, once per scan simply predicting the location of
the target using the fastest beam intercept time; or nimble, at each intercept point where
all target locations are predicted using the fastest beam intercept time as per Section 3.6.
38
2.4
Naive
Intercept
Nimble
2.2
Missed multistatic measurements
2
1.8
1.6
1.4
1.2
1
0.8
0.6
0.4
0.2
0
1
2
Simulation scenario
3
Figure 4: Effect of target initial velocity and acceleration on number of measurements
missed using IA scheduling. Average number of multistatic measurements missed for
900 nimble IA scheduling Monte-Carlo simulation runs. Three different simulation scenarios were employed to investigate the effect of highly dynamic targets. For each, the
acceleration variance σa of the Singer random-walk motion model and initial target velocity, a Gaussian random value with mean µv , were set as follows: σa = 2 m · s−2 and
µv = 25 m · s−1 , σa = 2 m · s−2 and µv = 50 m · s−1 or σa = 20 m · s−2 and µv = 25 m · s−1 .
Three MSMSRN scheduling modes were tested: naive, once per scan using the current
target geometry, thus ignoring highly dynamic targets; intercept, once per scan simply
predicting the location of the target using the fastest beam intercept time; or nimble,
at each intercept point where all target locations are predicted using the fastest beam
intercept time as per Section 3.6.
39
4.3. Nimble scheduling with IA
Refer to Figures 3 and 4 for the results of the nimble scheduling simulation
batch.
5. Discussion
5.1. IA comparison to GRASP
Running Monte-Carlo simulations comparing the IRP-MS algorithm to
the G-MS algorithm revealed that the two algorithms not only compute in
a similar amount of time but also perform equally in terms of multistatic
measurements made. In the case of the IRP-MS algorithm, the RP-MS
algorithm would be run once per target in the scene. Thus, in these respects
the RP-MS algorithm is equivalent to the GRASP construction algorithm
used by the G-MS algorithm.
However, IA can cater for a richer set of temporal constraints without
modifying the underlying algorithm. The GRASP construction algorithm
would need to be redesigned to handle the new set of constraints and the
modifications would become increasingly complicated matching the complexity of the constraints. IA would be able to handle the new constraints without
modification, as long as these constraints can be expressed using the temporal
relationships defined by Allen [46].
5.1.1. Effect of increasing the number of targets
As the targets in the scene were increased, both the IRP-MS algorithm
and the G-MS algorithm could make more multistatic measurements per
scan. However, the increased number of multistatic measurements came
40
Table 5: Scheduling performance versus number of targets
Targets
Mean multistatic Percentage %
measurements
10
3.7148
37.148
20
5.5500
27.750
40
8.3025
20.756
80
12.519
15.649
Table 6: Scheduling processing time versus number of targets
Targets
Processing time (s) Time per target (s)
10
5.0505
0.5051
20
16.919
0.8460
40
63.406
1.5852
80
251.92
3.1490
at the expense of more computations. Table 5 shows that the number of
multistatic measurements made decreases as a percentage of the number of
targets present in the scene. Furthermore, processing time required per target
in the scenario also increases as per Table 6.
The reason for these trends is due to the fact that as the number of targets
increases linearly, the number of different choices of sequences of targets that
can be measured multistatically increases much quicker. The positions of the
targets relative to the two radars determines a unique geometry. The number
of unique geometries of targets that can be generated was the key factor and
the longer sequences became less likely when increasing the number of targets.
41
Thus, on average, the total length of each of the sequences of targets that
solved the scheduling problem increased slowly. The statistical distribution of
the geometry of the targets within the area under surveillance affected both
of these factors. Each of the simulation runs within a batch of simulations,
using the same scheduling algorithm, tested a different geometry.
5.1.2. Effect of increasing the radar beam width
When the radar beam width increased this did not cause much change in
the required computation for either algorithm. This was due to the fact that
the computation time for both algorithms is not dominated by the number
of ambiguities in the radar target sequences. Both algorithms efficiently
handled the ambiguities present in the azimuth ordering of targets.
G-MS employed a very simple construction algorithm, which was also
used to generate mutated solutions. The mutated solutions were generated
during the local search from the first solution constructed. In both these
algorithms, a single target was added at a time and simple checks ensured
that the target was only added if the sequence remained consistent. Thus,
this simple searching nature keeps the computational requirements low.
Reduced PA has some of the benefits of normal IA, but with fewer processing requirements. This is because the IA relationship matrix was collapsed
from a matrix to a single row (or column) vector of interval sets. Ambiguities
in the list of targets from either radar changed the input relationships whose
intersection generated the IA relationships contained in the vector. The same
computation was performed regardless of the content of the relationships for
Reduced PA. Thus, more ambiguities did not require more processing time.
The slight decrease in processing time required can be attributed to the
42
fact that as the number of ambiguities increased, the average length of the
solutions generated also increased. This means that, on average, more targets
can be added to the list of simultaneous measurements, and thus, on average,
fewer mutated solutions need to be generated in the search phase of GRASP.
5.1.3. Effect of increasing the number of radars
No simulations were performed to test the effect of increasing the number
of radars; however, it is easy to extrapolate what will occur from the results
given and the workings of these algorithms.
G-MS will require a redesigned construction and mutation algorithm to
handle the dimension increase in the number of radars used. This will lead
to more complicated checks that need to be performed and will lead to a
more complicated solution. The processing time for the G-MS algorithm
should increase linearly, as is the case when the number of targets increases.
This will be true as long as a sufficiently simple construction and mutation
algorithm can be generated for GRASP.
Reduced PA and any other form of IA will easily handle the addition of
multiple radars. In the case of Reduced PA, this only requires intersecting
more relationships for the multistatic target measurement intervals. Adding
more sensors should also cause computation time of the IRP-MS algorithm
to increase linearly. The IRP-MS makes use of a vector of interval sets to
store the relationships between intervals, and the size of this vector bounds
the computation. Each time a radar is added, one more intersect per target
addition will be required, thus the processing time should double. Thus, a
linear increase in computation is expected for the IRP-MS algorithm as well.
43
5.1.4. IA network compression using Reduced PA
The two novel contributions were key to allowing the IRP-MS algorithm
to perform as well as the G-MS algorithm. Without these modifications
IA algorithms required more processing than GRASP for the same sized
MSMSRN scheduling problems. It is important to note, however, that these
modifications could be used in any IA algorithm. Thus they are not exclusive
to the MSMSRN scheduling problem.
The technique of growing the IA matrix was similar to the work of
Van Beek and Manchak [45] as the performance improvement results from
the order that intervals are added. Unlike the previous work, however, the
key was that intervals should only be added to the IA network when they
are necessary to generate a solution. Adding the interval prior to this time
leads to wasted computations, which, even though they are initially small,
adds up over multiple iterations of the IA path consistency algorithm.
Reduced PA became evident after considering the work of Van Beek and
Manchak [45]. It also builds on the initial work of Allen [46], in which he
noted that a set of intervals could be summarised using a surrogate interval.
However, details of when using a surrogate interval would be beneficial were
not clear. In the Reduced PA algorithm, it is clear that surrogate intervals
could be used to represent a set of IA intervals that have simple relationships.
When the IA relationships amongst a set of IA intervals were purely of
an ordering nature (containing ‘before’, ‘after’, ‘meets’ and ‘met’) then the
Reduced PA form would be applicable. For more complex IA relationships,
especially those that consider various types of overlapping intervals, the Reduced PA format is insufficient and the matrix format must be used.
44
The relationships of the set of intervals with simple constraints can then
be captured in the more computationally efficient Reduced PA format. Alternatively, a surrogate interval could be used in the Reduced PA relationship
vector to represent portions of the network that could only be represented
using an IA relationship matrix. Which of these two approaches will work
best depends on the IA network, and thus both techniques may be usable to
solve future problems more efficiently. Similarly, a surrogate PA network can
also be used to reduce the size and computations of a large IA network and
vice versa. This holds true for any two constraint programming languages
where parts of a network only require the simpler constraint language.
5.2. Nimble IA scheduling
None of the nimble scheduling results obtained are statistically significant
due to the large variance of the two tested parameters: multistatic measurements made and missed. On average, however, the nimble scheduling strategy
is able to make the most multistatic measurements, approximately ten more
than non-predictive scheduling strategy for all simulation modes. This is due
to the fact that the nimble scheduler is acting based on an updated recognised
surveillance picture and not on a single sample of the target geometry.
Unfortunately, it also requires much more processing than either of the
other strategies, as at each interception point all target locations are predicted for targets that can still be visited. The updated recognised surveillance picture is then fed to the nimble scheduling algorithm to recompute.
Thus it appears that this simple intercept prediction strategy offers the best
alternative. It performs as well as the naive/non-predictive scheduling strategy for both slow-moving targets and those with high accelerations, but per45
forms better for fast-moving targets.
In terms of missed multistatic measurements, both of the predictive scheduling strategies provided a small improvement. However, once again, the results
are neither statistically significant nor give a large improvement, and thus
do not warrant the extra processing.
5.3. Multisensor manager architecture
For this research a hybrid architecture was employed, where the multisensor manager is centralised and the radar managers are decentralised.
However, there are three ways that this architecture could be decentralised.
One approach would be to simply replicate the fusion centre and multisensor manager at each radar. In this scheme, each radar would supply the
tracks that occur in a region of overlap to other radars. The tracks would
be associated, fused and a scheduling decision would be made. Each radar
potentially arrives at a different locally optimal solution. Then to reach
consensus, the radars share their chosen schedule with each other. The final
choice of targets to schedule is the sequence that maximises Equation 1. This
approach is equivalent to running iterations of GRASP in parallel using IA
as the construction algorithm.
Another approach would be to divide up the sensed area into zones. Again
the information fusion system and multisensor manager are replicated at each
radar. However, the radars now only share tracks with other radars managing
the zone in which the track lies. A radar with a decentralised multisensor
manager then solves the IA constraints for their zones. Each partial solution
is then fed to the other radars collaborating in the multistatic network. The
final choice of targets to schedule is the concatenation of each partial solution
46
in the correct sequence. This approach is only practical when the search
volume can be divided up into zones that each radar scans in exactly the
same sequence.
Finally, it is also possible to solve the scheduling with a decentralised
CSP (DCSP) [40]. As per the previous approach, the sensed area would
still be divided up into zones. Each radar would be responsible for a zone
and would need to receive tracks from the other radars that fall in the zone.
Each radar then associates and fuses tracks for the zone it controls. These
are then entered into the DCSP, where the radars collaborate to solve the
CSP as per our usage of IA in this research. For this approach the choice
of zones becomes completely arbitrary as a solution will be found taking all
constraints into account.
5.4. Information gain
It is important for a multisensor manager to improve the measures of
effectiveness of an information fusion system [47]. Performing multistatic
measurements for radars achieves this in three ways, and the Nimble IA
Scheduler offers the best improvement.
Firstly, the amount of information flowing into the fusion system is increased. This is a direct consequence of the radars being able to make both
bistatic and monostatic measurements. Thus it is desirable to increase the
number of multistatic measurements that can be made and reduce the ones
that are missed. This is indeed the case for the Nimble IA Scheduler and
also the simple prediction scheduling. It is important to note that given our
comparison to GRASP, similar results can be expected for GRASP.
47
Secondly, the quality of tracks formed for targets gaining multistatic measurement should improve due to the increased information gain from the
multistatic measurements. Even when a multistatic measurement cannot
be made due to partial occlusion, the target will still be measured. More
accurate tracks should provide better information to all processes.
Finally, robustness of the information fusion system is improved. It is
far less likely that when a target is occluded for one radar that it will be
occluded for all radars. Therefore it is more likely that the target will be
measured regardless.
6. Conclusions
In this paper, Interval Algebra (IA) was compared to the Greedy Randomised Adaptive Search Procedure (GRASP) for scheduling mechanically
steered multistatic surveillance radar networks (MSMSRNs). This was done
to show that IA is not computationally cumbersome and can provide equivalent performance to that of GRASP. Furthermore, a realistic tracking environment was employed to show how IA could be used to perform nimble scheduling. In the latter environment, three different scheduling modes
were tested: naive or no prediction, simple intercept prediction and nimble
scheduling.
Three Monte-Carlo simulations for a binary radar system were run to
produce results, where targets are randomly placed and move along random
trajectories. The first two simulation runs were used to vary the number of
targets and the radar beam width in order to compare IA to GRASP. The
final simulation runs compared the three scheduling modes used along with
48
IA against slow, fast and rapidly accelerating targets.
While IA scheduling performed as well as GRASP in the binary radar
simulations, indications are that it would be easier to adapt this scheduling
algorithm to cater for more radars. IA is also more amenable to coping with
a richer set of temporal constraints that may be imposed. Since GRASP is
based on simpler heuristics, its implementation is more adversely affected by
changes in imposed constraints than IA.
IA guarantees that a maximum length solution will be found for the target
selections that are made as it performs locally optimal examinations. Instead,
conventional optimisation algorithms carry out global searches. Thus, combinations of IA with conventional optimisation algorithms such as GRASP
should lead to even more effective scheduling algorithms.
While the processing time required is within the real time available for
both algorithms, adding many more iterations or more targets would make
this difficult to sustain. Thus, while performing a global search is desirable,
it would not always be possible. Employing parallel processing architectures such as field programmable gate arrays, multicore central and generalpurpose graphical processing units could make the use of a global search
technique practically feasible.
In most cases, the IA scheduling algorithm already provides good performance and only a small incremental improvement is possible by utilising
a conventional optimisation algorithm alongside IA. Thus, the performance
given by the IA algorithm may be sufficient and it then provides a computationally effective solution to a radar network scheduling problem. The IA
R for around 10 targets
algorithm can be used as implemented in Matlab
49
without requiring parallel processing.
IA path consistency can be run for 16 384 targets in about 0.5 s of execution time using C3 . Future work could consider how parallel architectures
can be leveraged to reduce the computation time required by IA. Doing so
together with running the separate GRASP iterations in parallel may make
it possible to produce better results within realistic scan durations.
Given the present results it would appear that nimble scheduling is not
a major problem for a surveillance radar network that is tracking realistic
targets that are neither ballistic nor supersonic. However, the simple intercept prediction strategy does provide a minor improvement and may be
worth considering if there is spare processing capacity in the system. Nevertheless, both multistatic measurements and nimble scheduling improves the
information gain of an information fusion system.
In the case of scheduling a multifunction radar, nimbleness is significantly
more important as the platform housing the radar is usually moving quickly
and it is likely that ballistic and supersonic targets may be encountered.
Thus, the Nimble IA Scheduler could be adapted for use in multifunction
radar networks and this would be an interesting topic to pursue in the future.
IA can also be used in decentralised multisensor management solutions
and does not impose a specific architecture to the multisensor manager. Furthermore, IA is not only useful in scheduling sensors but can be used to
ensure that constraints are satisfied in other information fusion functions.
3
R CoreTM
These are preliminary results from our C environment run on an Intel
i7-2670QM CPU at 2.2 GHz.
50
di
si
fi
o
b
oi
m
reference interval
s
d
f
e
mi
bi
Figure A.1: Temporal ordering of intervals in IA
Appendix A. IA Theory
Appendix A.1. Allen’s IA with improvements
The details of IA presented here is a rework of a conference paper [39],
which was presented by the authors to the sensor management community,
along with some new material that covers further interesting aspects.
IA is a method of reasoning about the temporal ordering of intervals in a
consistent manner [46]. Tasks can be represented by intervals in IA and, in
the case of the MSMSRN scheduling dealt with here, they either represent
target measurement for a single radar or a multistatic measurement for the
group of radars. The relationships capture the temporal ordering of intervals
between an arbitrary start and end point in time. Here, the relationships
are the temporal ordering constraints that the MSMSRN scheduler must
satisfy when scheduling tasks, and these arise due to physical constraints on
positioner movement and target geometries.
Intervals are related to each other using relationships that can contain
51
any set of the 13 temporal operators: ‘before’ (b), ‘after’ (bi), ‘meets’ (m),
‘met by’ (mi), ‘overlaps’ (o), ‘overlapped by’ (oi), ‘finishes’ (f), ‘finished by’
(fi), ‘starts’ (s), ‘started by’ (si), ‘during’ (d), ‘contains’ (di) and ‘equals’ (e).
Figure A.1 depicts what each of the temporal operators means in isolation
when referenced to a common reference interval. The suffix ‘i’ is used to
associate two operators as inverse pairs, where the inverse operator imposes
exactly the opposite temporal ordering. Logically, the ‘equals’ operator is
the inverse of itself.
When no information is known about the temporal ordering between two
intervals, then the relationship is the set {all} that contains all 13 temporal
operators. The null set, ∅, denotes an inconsistency, as all intervals must
have some temporal ordering in relation to each other. Any other combination of operators, within a relationship, captures some degree of certainty in
the ordering of intervals. Relationships also always have an inverse relationship, which can be found by placing into the inverse relationship the inverse
of each operator present in the relationship to invert. The inverse operation
is called ‘Inverse (·)’ in the pseudo code. When considering the relationship
between two intervals, there are always two reciprocal relationships that exist. Each relationship uses one of the intervals as a reference, and thus the
inverse relationship denotes the relationship using the alternate interval as
the reference interval.
A specific scenario is then captured in an IA network, which consists of
a set of intervals and all the relationships between each interval pair. The
relationships of an IA network are stored in a matrix N , where each cell
N r,c contains a relationship between an interval defined by the row r and an
52
interval defined by the column c. The row or column number in the matrix
matches the index of the interval when they are stored in a vector.
Cells in the upper and lower triangle of the relationship matrix, where
the column and row numbers are swapped, are always the set inverse of
each other. The reason for this is that these two relationships represent
the relationship between the same intervals from the two possible reference
points. Relationships on the diagonal of the matrix must always contain
only the ‘equals’ operator (the ‘equals’ relationship), as they determine the
temporal ordering of an interval referenced to itself. For our research, each
scan for the radars is planned by the MSMSRN scheduler using a single IA
network, or in the case of the nimble scheduler one network per intercept.
Algorithm 8 CP (RA→B , RB→C )
RA→C = ∅
for all n ∈ RA→B do
for all m ∈ RB→C do
RA→C = RA→C ∪ T n,m
if RA→C = {all} then
return {all}
end if
end for
end for
return RA→C
Constraint propagation, or set composition for relationships, is captured
as Algorithm 8, which is the algorithm in IA that keeps the relationships
amongst any three intervals temporally consistent. Consider three intervals
53
‘A’, ‘B’ and ‘C’, where knowledge about the relationship between ‘A’ and ‘B’
(RA→B ) as well as ‘B’ and ‘C’ (RB→C ) is known. Constraint propagation can
then determine the possible operators in the relationship between ‘A’ and
‘C’ (RA→C ), which is consistent with the two known relationships. This is
done by pairing one operator, n, from RA→B with another, m, from RB→C
and then determining the operators permissible in RA→C . The permissible
operators for each combination of basic operators are stored as a transitivity
matrix T . The details for the contents of the transitivity matrix can be
found in Allen’s paper on IA [46], but these can also easily be determined by
considering each case in isolation. The transitivity matrix has 13 columns
and rows, where the row and column number matches one of the 13 operators,
and the contents are the permissible operators for the unknown relationship.
Path consistency is presented as Algorithm 9, where set L contains each
of the cells that have been updated. When possible, by using constraint
propagation, this algorithm allows an interval to be added to an IA network
such that all relationships remain consistent. Furthermore, path consistency
can be used to alter a relationship in the IA network so as to determine the
constraints this will place on the rest of the relationships. In both cases, the
temporal ordering constraints can result in an inconsistent network or they
will be maintained so as to be consistent with each other. However, even
when consistent, it is not guaranteed that the network as a whole will yield
a consistent scenario through a single use of path consistency. Total path
consistency can only be maintained through iterative use of path consistency,
where each relationship in the network, in turn, is treated as though it were
updated (populating L with all cells).
54
Algorithm 9 PC (N , [r, c], R)
N r,c = N r,c ∩ R
N c,r = Inverse(N r,c )
add [r, c] to set L
while L 6= ∅ do
select and delete first [r, c] from L
for all cells [k, l] in same row or column as [r, c] do
if l = c then
if not Skip (N k,r , N r,c ) then
R = N k,l ∩ CP (N k,r , N r,c )
end if
else
if not Skip (N r,c , N c,l ) then
R = N k,l ∩ CP (N r,c , N c,l )
end if
end if
if R = ∅ then
return false
end if
if R 6= N k,l then
N k,l = R
N l,k = Inverse (R)
add [k, l] to L
end if
end for
end while
return true
55
Initially, when adding the interval, the relationship between the newly
added interval and every other interval already in the network is {all}. Next,
one relationship between the newly added interval and an existing interval is
updated with a known set of operators. Updates must always be done by taking the set intersection of the existing relationship and the requested update,
as the IA algorithms only constrain relationships. Then every relationship in
the same row and column as the updated relationship is further constrained
by using constraint propagation. In this case, the relationship for the cell
under test is treated as the unknown relationship and the two other relationships include the updated relationship and the relationship that completes
the CP triangle. This process is repeated for each subsequent update that
may occur during any iteration of path consistency.
Algorithm 10 Skip ( R1 , R2 )
if (b ∈ R1 and bi ∈ R2 )
or (bi ∈ R1 and b ∈ R2 )
or (d ∈ R1 and di ∈ R2 ) then
return true
else
return false
end if
Some improvements to the IA algorithms as given by Allen are now listed.
Algorithm 10 is used by path consistency to skip computations that will yield
{all} [45]. Algorithm 8 includes an improvement that stops computation if
the resultant set becomes {all} [45]. Furthermore, Algorithm 9 can return
the consistency of the algorithm whenever a set becomes ∅ [45, 48].
56
Appendix A.2. Hogge’s constraint propagation
Each time constraint propagation algorithm is invoked, it computes the
set composition that results for the two input relationships. It is also possible to pre-compute all combinations of the set composition by executing
Allen’s constraint propagation using all possible inputs. The result would
be a square lookup matrix where each dimension is 213 long. Each cell of
this matrix contains the set composition of the relationship matching the
row versus the relationship matching the column. This would, however,
require storing the result of 67 108 864 compositions (128 MiB for 16-bit
relationships). However, doing so would also regain most of the constraint
propagation processing time, as only one memory lookup would be required.
Hogge devised a compromise between the ideal case above and Allen’s constraint propagation [49]4 . The approach splits relationships into two lookup
parameters. Seven IA operators are chosen to form the first lookup value and
will be referred to as the lower operators. The remaining six IA operators
yield the second lookup value and will be referred to as the upper operators.
Ideally, the choice of IA operators should match their packing in a 13-bit
field such that minimal encoding and decoding is required to generate these
values (preferably no encoding or decoding).
Using this definition, four inputs are derived from the two known relationships and are then used to look up a value in four different matrices.
1. Matrix one is a 128 × 128 matrix, which is populated with the results
of set composition of all combinations of relationships that contain only
4
It is difficult to obtain this manuscript hence the full treatment of the technique here.
57
the lower operators.
2. Matrix two is a 128 × 64 matrix, which is populated with the results of
set composition of all combinations of relationships that contain only
the lower operators along with all combinations of relationships that
contain only the upper operators.
3. Matrix three is a 64 × 128 matrix, which is populated with the results
of set composition of all combinations of relationships that contain only
the upper operators along with all combinations of relationships that
contain only the lower operators.
4. Finally, matrix four is a 64 × 64 matrix, which is populated with the
results of set composition of all combinations of relationships that contain only the upper operators.
The four retrieved relationships are then combined using a set union to give
the final relationship.
This method requires four times the computation as per the ideal case
(simple logical conjunction, ∧, operations) but only requires storing 36 864
compositions (72 KiB for 16-bit relationships). Although memory requirements are becoming less important, the Hogge method is a good compromise
between storing all set compositions and computing them every time.
Appendix A.3. Constraint ordering
Constraint ordering is a technique where the intervals are added in an
order that is determined by the weight of each of the relationships associated
with that interval to others [45]. Thus, each relationship that must be applied
to the IA network is first scored based on the impact that it may have on
the IA network.
58
As the relationship is composed of up to 13 IA operators, each IA operator
can potentially be given a different score. The final score of the relationship
is the combination, usually the sum, of each of the scores of the IA operators
that are present in the relationship.
For example, in the weighted scoring method [45], the score is determined
by the extent to which each IA operator will restrict the allowable operators
in the rest of the IA network. The IA operator that has the most weight in
this case is the IA ‘equals’ operator.
Constraint ordering is used to reduce the amount of computation required
for the IA path consistency algorithm. If the intervals whose relationships
have the most impact on the network are added first the computation required will be less than if they were added last. This is because relationships
with a higher score will result in multiple updates on each iteration of the
IA path consistency algorithm. Thus more iterations of IA path consistency
are required before the network stabilises.
The number of relationships that need to be updated per iteration of IA
path consistency is potentially twice that of the number of intervals present
in the IA network. Thus it is better to execute updates requiring multiple
iterations of the IA path consistency algorithm while the IA network is still
small.
Appendix A.4. Fuzzy and Bayesian IA
As mentioned in the authors’ conference paper [39], there are also two extensions to IA that increase the amount of information that can be captured
in the IA network. The first uses fuzzy-logic constructs on the relationships
and sometimes on durations of intervals, and the other uses probabilistic
59
extensions to the relationships only.
Fuzzy IA has been examined by various authors and seems to be the most
promising extension of IA to employ [50–53]. An advantage of fuzzy IA is that
it can easily capture ordinary IA networks within the proposed framework.
In Allen’s IA, each operator is either fully present within the relationship or
absent. However, for fuzzy IA the degree of membership is allowed to vary,
as a real number, over the interval [0, 1]. The degrees of membership for all
of the operators in a relationship can therefore capture the certainty with
which it may be the true relationship, and this allows fuzzy IA to capture
more information than Allen’s IA. Fuzzy mixing is required to update the
degrees of membership during constraint propagation, path consistency and
total consistency checking.
Some authors also make the duration of the intervals fuzzy [50, 52], which
can be useful when the interval durations are not precisely known. The
duration is captured as a trapezoid in fuzzy IA where the ramp up and ramp
down are again the degree to which each point in time forms part of the
interval. This extension is useful in most practical applications, as tasks
generally only have a desired length, which can usually increase or decrease
given the current load a system performing those tasks is experiencing.
Bayesian IA has also been proposed, where a probability is assigned to
each of the operators in a relationship [54, 55]. In this case, the probability of
all operators in the set must add up to one, which is a much more difficult constraint to maintain. Capturing ordinary IA networks in this framework would
require keeping the probabilities equal for operators present in the relationship. Bayesian IA also requires much more complex consistency algorithms,
60
as during all updates the probabilities must add up to one. Furthermore,
updates to the relationships would require using Bayesian mathematics to
ensure that the probabilities are maintained consistently, which is more computationally expensive than fuzzy-logic mixing. Much of the finer details of
Bayesian IA have not been published yet.
A good example of where fuzzy or Bayesian IA could be employed, is for
the case where targets are not exactly in the middle of the beam of the radars.
In this case, there is a degree of uncertainty both in the ordering of the tasks
for the radars as well as their duration. The ordering uncertainty occurs
when multiple targets are closer in the azimuth angle than the azimuth angle
resolution of the radar measurements. Allen’s IA is able to handle this case
through the inclusion of multiple operators, but fuzzy IA could be used to
determine the true ordering by tracking the change in degree of membership
over time. Such a technique will be considered in future work. Finally, the
uncertain duration occurs because the actual time the beams of two or more
radars would simultaneously measure the targets cannot be determined, as
the radars cannot measure azimuth angle to infinite accuracy.
Appendix B. GRASP Theory
GRASP is a meta-heuristic search procedure that is comprised of three
main steps, as per Algorithm 11:
1. Generate a reduced candidate list (RCL) that will be used to generate
solutions. In the case of the G-MS algorithm the RCL is the priority
queue of targets, and is the Q input to the algorithm. The priority
queue is explained in Section 2.
61
Algorithm 11 GraspSchedule (Q : target priority queue, A : target order
for all radars, k : iteration)
create best solution b = ∅
for i = 1 → k do
create candidate solution c = ∅
c = GraspConstruction (Q, A, c)
c = GraspLocalSearch (Q, A, c)
b = GraspUpdateSolution (Q, c, b)
end for
for all radars r do
GraspCheckSolution (b, Ar )
end for
return b
2. Next, construct an initial solution from the RCL that adheres to the
solution space. Each radar supplies the azimuth angle ordering of targets as L1 and L2 . The azimuth angle orderings can be seen as a set
of vectors, where each vector contains an ambiguous cluster of targets
and the sequence of vectors denotes the true ordering of the clusters in
relation to each other. The construction algorithm used by the G-MS
algorithm is presented as Algorithm 12, making use of Algorithms 13
and 14.
3. Search the solution space by performing a local search around the candidate solution from the previous step. The local search algorithm is
defined as Algorithm 15, making use of Algorithms 13, 14, 12 and 16.
When compared to genetic algorithms, the local search of GRASP can
62
be likened to the mutation operation used for genetic algorithms.
The last two steps are repeated iteratively and the number of iterations
to perform, k, is a parameter that can be tuned for the GRASP algorithm.
At the end of the last step, during each iteration, the best solution found
during the local search is then compared to a stored best solution. If the
current solution is better than the stored best solution, the current solution
becomes the stored solution.
When the GRASP algorithm completes, the best solution found after all
iterations will be returned as the sequence of targets to measure using the
multistatic mode of the radars. The low-level scheduler will then ensure that
the radars will make simultaneous measurements of the targets contained in
this list by speeding up or slowing down either of the radar positioners.
Algorithm 12 constructs an initial solution that will be used as the starting point during the GRASP local search algorithm. The algorithm receives
the priority queue of targets (Q), the azimuth angle ordering of targets (A)
for all radars and a list of already scheduled targets (s). During the execution the algorithm will attempt to add targets randomly selected from the
priority queue to the list of scheduled targets using Algorithm 13. If the
azimuth angle ordering of neither radar is violated the target will be added,
which is checked in Algorithm 14. The final updated list of scheduled targets
is returned to the calling algorithm and this parameter can be seen as an
input and output parameter.
Algorithm 13 generates a list of possible solutions of how a target (t)
could be added to a list of scheduled targets (s) adhering to the azimuth
ordering (A) specified by a radar low-level scheduler. The algorithm first
63
Algorithm 12 GraspConstruction (Q : target priority queue, A : target
order for all radars, s : scheduling vector)
for all t ∈ Q select randomly according to priority do
if t ∈
/ s then
for all radars r do
Nr = GraspAddToSolution (t, s, Ar )
end for
if GraspFindMatchingSolutions (N , m) then
s=m
end if
end if
end for
return s
finds the location of the target in the azimuth ordering of the radar, and it
will determine the scan sector (r) and the element number (c) in the scan
vector. Only the scan sector ordering must be adhered to as targets within a
scan sector will be illuminated simultaneously by the radar beam regardless
of the scheduling sequences. Then the algorithm iterates through the list
of scheduled targets determining the first insert point and last insert point
that will adhere to the scan sector ordering. The first insert point will be
just before the first target that is in the same sector or a subsequent sector.
The last insert point will be just after the last target that is in the same
sector. Using these two insert points a number of solutions are generated.
The number of solutions generated will depend on the difference between the
two insert points plus one.
64
Algorithm 13 GraspAddToSolution (t : target number, s : scheduled targets vector, A : target order for a radar)
find row and column [r, c] of t ∈ A
f =0
l=0
sort s in target order A for radar
for all k ∈ s in sequence do
find row and column [i, j] of k ∈ A
if i < r then
f = index of k in s
l = index of k in s
end if
if i = r then
l = index of k in s
end if
end for
R=∅
for k = f → l do
v = [s1→k , t, sk+1→length(s) ]
R = {R, v}
end for
return R
65
Algorithm 14 GraspFindMatchingSolutions (S : set of integer vectors per
radars, m : scheduled target vector)
for all s1 ∈ S1 do
create match flag f = true
for all radars r 6= 1 do
for all sr ∈ Sr do
if length (s1 ) = length (sr ) then
for i = 1 → length (s1 ) do
if s1,i 6= sr,i then
f = false
end if
end for
else
f = false
end if
if f = true then
continue to next radar
end if
end for
end for
if f = true then
m = s1
return true
end if
end for
return false
66
Algorithm 14 receives two inputs: a set of scheduling vectors for radar
one (S1 ) and a set of scheduling vectors for radar two (S2 ). It also receives a
matched scheduling vector output parameter (m) that will contain a matching solution from the two scheduling vector sets if found. The algorithm
searches within the two scheduling vector sets for a matching scheduling vector. If the vector is found the algorithm returns Boolean ‘true’ and sets the
matched scheduling output parameter appropriately. Alternatively, the algorithm returns Boolean ‘false’ and does not modify the matched scheduling
output parameter.
Algorithm 15 performs a local search around the initial scheduling solution found by Algorithm 12. The algorithm receives three inputs: a priority
queue of targets (Q), the azimuth angle scan ordering for all radars (A)
and the initial scheduled list of targets (s). The algorithm returns the best
scheduling solution found (s). The set of scheduling solutions is generated
during the execution of the algorithm by randomly selecting targets to add to
the initial scheduled list of targets. The GRASP search algorithm generates
solutions by using a modified version of the GRASP construction algorithm.
After the randomly selected target is added, the GRASP construction algorithm (Algorithm 12) is once again called to add any remaining targets to
the solution generated. Each of the generated solutions is then compared
to each other using the GRASP fitness algorithm (Algorithm 16). Only the
solution generated or the initial solution with the highest fitness score is kept
and returned as the new list of scheduled targets.
Algorithm 16 simply consults the target priority queue (Q) and sums all
the priorities of all the targets present in the scheduled list of targets (s).
67
Algorithm 15 GraspLocalSearch (Q : target priority queue, A : target
order for all radars, s : scheduled targets vector)
R = {s}
for all t ∈ Q select randomly according to priority do
if t ∈
/ s then
v=∅
M = {t, k ∈ s}
for all i ∈ M do
for all radars r do
Nr = GraspAddToSolution (i, v, Ar )
end for
if GraspFindMatchingSolutions (N , u) then
v=u
end if
end for
v = GraspConstruction (Q, A, v)
R = {R, v}
end if
end for
m = −∞
for all k ∈ R do
f = GraspFitness (Q, k)
if f >= m then
s=k
m=f
end if
end for
return s
68
Algorithm 16 GraspFitness (Q : target priority queue, s : integer vector)
f =0
for t ∈ s do
p = priority of t in Q
f =f +p
end for
return f
The result is returned as the fitness value for the list of scheduled targets.
Thus longer target sequences as well as target sequences with high priority
targets are preferred.
Algorithm 17 GraspUpdateSolution (Q : target priority queue, s1 : schedule integer vector, s2 : schedule integer vector)
f 1 = GraspFitness (Q, s1 )
f 2 = GraspFitness (Q, s2 )
if f 1 > f 2 then
b = s1
else
b = s2
end if
return b
Algorithm 17 is used to keep a globally optimal solution during each
iteration of the GRASP scheduling algorithm. The algorithm receives the
priority queue of targets (Q) which is used to determine the fitness of each of
the scheduled list of targets (s1 and s2 ). The scheduled list of targets with
69
the highest fitness value is returned as the solution to keep.
Algorithm 18 GraspCheckSolution (s : integer vector, L : set of integer
vectors)
(i, j) = (0, 0)
for all sk ∈ s do
find location (r, c) of sk in L
if r < i then
s=∅
return false
end if
for all sl ∈ s | k 6= l do
if sk = sl then
s=∅
return false
end if
end for
(i, j) = (r, c)
end for
return true
Algorithm 18 checks the solutions generated by the GRASP scheduling
algorithm for validity. The algorithm receives the scheduled list of targets
(s) as well as the azimuth angle ordering of targets for a radar (L). The
ordering of targets within the scheduled list of targets is checked against
the azimuth angle ordering. Only if the orderings match will the scheduled
list of targets be valid. The scheduled list of targets is also checked for any
70
duplicate targets, as a target can only appear in the list once.
Acknowledgment
The authors would like to thank all the reviewers of the draft manuscripts
for their detailed critique. It is not often that authors receive such excellent feedback and genuine interest. We would also like to thank Ana M.
Huenchuquir Mardones, Larissa Focke and Walter W. Focke for their detailed
reviews. This document was also proofread by Beverlie and Linton Davies
of Stylus. Finally, we must thank the Council for Scientific and Industrial
Research, the University of Cape Town and the University of Pretoria for
without whose funding this research would not have been possible.
R. W. Focke acknowledges the hard work and sacrifices his wife had to
endure during his studies; thanks to Adré Synman, Andre Le Roux, Adrian
Adams, Casper van Zyl, Leon O. Wabeke, Magdaleen Vierbergen, Premilla
Govender, Willie Fourie, Willie A. J. Nel and the co-authors for their support; and he acknowledges the South African Department of Science and
Technology for their financial support. J. P. de Villiers acknowledges the
Armaments Corporation of South Africa and the South African Department
of Defence for their financial support. M. R. Inggs acknowledges the King
Abdulasiz City for Science and Technology for their research support.
References
[1] G. W. Ng, K. H. Ng, Sensor management – what, why and how, Inf.
Fusion 1 (2000) 67–75.
71
[2] N. Xiong, P. Svensson, Multi-sensor management for information fusion:
issues and approaches, Inf. Fusion 3 (2002) 163–186.
[3] J. Llinas, C. Bowman, G. L. Rogova, A. N. Steinberg, E. Waltz, F. E.
White, Revisiting the JDL data fusion model II, in: Proc. Int. Conf.
Inf. Fusion, (2004), pp. 1218–1230.
[4] A. N. Steinberg, C. L. Bowman, F. E. White, Revisions to the JDL
data fusion model, in: Proc. SPIE, vol. 3719, (1999), pp. 430–441.
http://dx.doi.org/10.1117/12.341367. doi:10.1117/12.341367.
[5] E. Blasch, A. N. Steinberg, S. Das, J. Llinas, C. Chong, O. Kessler,
E. Waltz, F. E. White, Revisiting the JDL model for information exploitation, in: Proc. Int. Conf. Inf. Fusion, (2013), pp. 129–136.
[6] A. O. Hero III, D. Cochran, Sensor management: past, present, and
future, IEEE Sens. J. 11 (2011) 3064–3075.
[7] V. Krishnamurthy, D. V. Djonin, Optimal threshold policies for multivariate POMDPs in radar resource management, IEEE Trans. Signal
Process. 57 (2009) 3954–3969.
[8] P. R. Barbosa, E. K. P. Chong, Adaptive sensing for target tracking
in covert operations, in: Proc. SPIE Conf. Def. Secur., (2009), pp.
73360A–73360A–10. http://dx.doi.org/10.1117/12.818357. doi:10.
1117/12.818357.
[9] S. Guha, K. Munagala,
Approximation algorithms for partial-
information based stochastic control with markovian rewards,
72
in:
Proc. Annu. IEEE Symp. Found. Comput. Sci., (2007), pp. 483–493.
doi:10.1109/FOCS.2007.23.
[10] H. Su, Q. Wang, K. Ren, K. Xing, Jamming-resilient dynamic spectrum
access for cognitive radio networks, in: Proc. IEEE Int. Conf. Commun.,
(2011), pp. 1–5. doi:10.1109/icc.2011.5962525.
[11] J. M. Molina López, J. Garcı́a Herrero, F. J. Jiménez Rodrı́guez, J. R.
Casar Corredera, Cooperative management of a net of intelligent surveillance agent sensors, Int. J. Intell. Syst. 18 (2003) 279–307.
[12] C. Kreucher, K. Kastella, A. O. Hero III, Sensor management using an
active sensing approach, Signal Process. 85 (2005) 607–624.
[13] S. Blackman, R. Popoli, Design and Analysis of Modern Tracking Systems, Artech House Radar Library, Artech House, Norwood, MA, 1999.
[14] A. R. Benaskeur, F. Rhéaume, Adaptive data fusion and sensor management for military applications, Aerosp. Sci. Technol. 11 (2007) 327–338.
[15] S. Musick, R. Malhotra, Chasing the elusive sensor manager, in: Proc.
IEEE Natl. Aerosp. Electron. Conf., vol. 1, (1994), pp. 606–613. doi:10.
1109/NAECON.1994.332850.
[16] Z. Ding, A survey of radar resource management algorithms, in: Proc.
Can. Conf. Electr. Comput. Eng., (2008), pp. 001559–001564. doi:10.
1109/CCECE.2008.4564804.
[17] G. Earl, B. Ward, Frequency management support for remote sea-state
73
sensing using the JINDALEE skywave radar, IEEE J. Ocean. Eng. 11
(1986) 164–173.
[18] S. L. C. Miranda, C. J. Baker, K. Woodbridge, H. D. Griffiths, Phased
array radar resource management: a comparison of scheduling algorithms, in: Proc. IEEE Radar Conf., (2004), pp. 79–84. doi:10.1109/
NRC.2004.1316399.
[19] R. Tharmarasa, T. Kirubarajan, J. Peng, T. Lang, Optimization-based
dynamic sensor management for distributed multitarget tracking, IEEE
Tran. Syst., Man, Cybern., Part C: Appl. Rev. 39 (2009) 534–546.
[20] F. Barbaresco, J. C. Deltour, G. Desodt, B. Durand, T. Guenais,
C. Labreuche, Intelligent M3R radar time resources management: advanced cognition, agility & autonomy capabilities, in: Proc. Int. Radar
Conf., Surveillance for a Safer World, (2009), pp. 1–6.
[21] Y. Xun, M. M. Kokar, K. Baclawski, Control based sensor management
for a multiple radar monitoring scenario, Inf. Fusion 5 (2004) 49–63.
[22] V. Krishnamurthy, Emission management for low probability intercept
sensors in network centric warfare, IEEE Trans. Aerosp. Electron. Syst.
41 (2005) 133–151.
[23] H. Godrich, A. P. Petropulu, H. V. Poor, Power allocation strategies
for target localization in distributed multiple-radar architectures, IEEE
Trans. Signal Process. 59 (2011) 3226–3240.
[24] H. Aftab, N. Raj, P. Cuff, S. Kulkarni, Mutual information scheduling
for ranking, in: Proc. Int. Conf. Inf. Fusion, (2011), pp. 1–8.
74
[25] Y. Cheng, X. Wang, M. Morelande, B. Moran, Information geometry of
target tracking sensor networks, Inf. Fusion 14 (2013) 311–326.
[26] P. Z. Thunemann, R. Mattikalli, S. Arroyo, P. Frank, Characterizing
the tradeoffs between different sensor allocation and management algorithms, in: Proc. Int. Conf. Inf. Fusion, (2009), pp. 1473–1480.
[27] Q. Ling, Y. Fu, Z. Tian, Localized sensor management for multi-target
tracking in wireless sensor networks, Inf. Fusion 12 (2011) 194–201. Special Issue on Information Fusion in Future Generation Communication
Environments.
[28] R. Tharmarasa, T. Kirubarajan, A. Sinha, T. Lang, Decentralized sensor
selection for large-scale multisensor-multitarget tracking, IEEE Trans.
Aerosp. Electron. Syst. 47 (2011) 1307–1324.
[29] S. R. Martin, A. J. Newman,
The application of particle swarm
optimization and maneuver automatons during non-Markovian motion planning for air vehicles performing ground target search,
in:
Proc. IEEE/RSJ Int. Conf. Intell. Robot. Syst., (2008), pp. 2605–2610.
doi:10.1109/IROS.2008.4651133.
[30] P. J. Shea, J. Kirk, D. Welchons, Adaptive sensor management for multiple missions, in: Proc. SPIE Conf. Def. Secur., (2009), pp. 73300M–
73300M–12. http://dx.doi.org/10.1117/12.818892. doi:10.1117/
12.818892.
[31] Y. He, K. P. Chong, Sensor scheduling for target tracking in sensor
75
networks, in: Proc. IEEE Conf. Decis. Control, vol. 1, (2004), pp. 743–
748. doi:10.1109/CDC.2004.1428743.
[32] C. Kreucher, A. O. Hero III, K. Kastella, D. Chang, Efficient methods
of non-myopic sensor management for multitarget tracking, in: Proc.
IEEE Conf. Decis. Control, vol. 1, (2004), pp. 722–727. doi:10.1109/
CDC.2004.1428735.
[33] S. Ahlberg, P. Hörling, K. Johansson, K. Jöred, H. Kjellström,
C. Mårtenson, G. Neider, J. Schubert, P. Svenson, P. Svensson, J. Walter, An information fusion demonstrator for tactical intelligence processing in network-based defense, Inf. Fusion 8 (2007) 84–107. Special
Issue on the Seventh International Conference on Information Fusion –
Part II.
[34] K. Sycara, R. Glinton, B. Yu, J. Giampapa, S. Owens, M. Lewis, L. C.
Grindle, An integrated approach to high-level information fusion, Inf.
Fusion 10 (2009) 25–50. Special Issue on High-level Information Fusion
and Situation Awareness.
[35] R. Popoli, S. Blackman, Expert system allocation for the electronically
scanned antenna radar, in: Proc. American Control Conf., (1987), pp.
1821–1826.
[36] J. M. Molina López, S. J. Jimenez Rodrı́guez, J. R. Casar Corredera,
Fuzzy reasoning for multisensor management, in: Proc. IEEE Int. Conf.
Syst., Man., Cybern., vol. 2, (1995), pp. 1398–1403.
76
[37] V. S. Chernyak, Fundamentals of multisite radar systems: multistatic
radars and multistatic radar systems, CRC Press, Boca Raton, FL, 1998.
[38] J. Li, P. Stoica, MIMO Radar Signal Processing, Wiley-IEEE Press,
Hoboken, NJ, 2008.
[39] R. W. Focke, L. O. Wabeke, J. P. de Villiers, M. R. Inggs, Implementing
Interval Algebra to schedule mechanically scanned multistatic radars, in:
Proc. Int. Conf. Inf. Fusion, (2011), pp. 1–7.
[40] E. Shakshuki, A. Trudel, Y. Xu, D. C. Rine, A multi-agent temporal constraint satisfaction system based on Allen’s Interval Algebra and
probabilities, in: A. I. Ghazi (Ed.), Agent Technologies and Web Engineering, IGI Global, Hershey, PA, 2009, pp. 56–76.
[41] Y. Bar-Shalom, Tracking and Data Association, Academic Press Professional, Inc., San Diego, CA, 1987.
[42] I. Kadar, E. R. Eadan, R. R. Gassner, Comparison of robustized assignment algorithms, Proc. SPIE 3068 (1997) 240–249.
[43] K. C. Chang, R. K. Saha, Y. Bar-Shalom, On optimal track-to-track
fusion, IEEE Trans. Aerosp. Electron. Syst. 33 (1997) 1271–1276.
[44] S. M. Sherman, Monopulse principles and techniques, Artech House
Radar Library, Artech House, Norwood, MA, 1984.
[45] P. Van Beek, D. W. Manchak, The design and experimental analysis of
algorithms for temporal reasoning, J. Artif. Intell. Res. 4 (1996) 1–18.
77
[46] J. F. Allen, Maintaining knowledge about temporal intervals, Commun.
ACM 26 (1983) 832–843.
[47] E. Blasch, P. Valin, E. Bosse, Measures of effectiveness for high-level
fusion, in: Proc. Int. Conf. Inf. Fusion, (2010), pp. 1–8.
[48] P. van Beek, Reasoning about qualitative temporal information, Artif.
Intell. 58 (1992) 297–326.
[49] J. C. Hogge, TPLAN: a Temporal Interval-based Planner with Novel Extensions, Technical Report, University of Illinois at Urbana-Champaign,
Department of Computer Science, 1987.
[50] S. Badaloni, M. Falda, M. Giacomin, Integrating quantitative and qualitative fuzzy temporal constraints, AI Commun. 17 (2004) 187–200.
[51] S. Badaloni, M. Giacomin, The algebra IAfuz : a framework for qualitative fuzzy temporal reasoning, Artif. Intell. 170 (2006) 872–908.
[52] S. Schockaert, M. D. Cock, Temporal reasoning about fuzzy intervals,
Artif. Intell. 172 (2008) 1158–1193.
[53] L. Deng, Y. Cai, C. Wang, Y. Jiang, Fuzzy temporal logic on fuzzy
temporal constraint networks, in: Proc. Int. Conf. Fuzzy Syst. Knowl.
Discov., vol. 6, (2009), pp. 272–276. doi:10.1109/FSKD.2009.464.
[54] K. Zhang, A. Tradel, Efficient heuristics for solving probabilistic Interval
Algebra networks, in: Proc. Int. Symp. Temporal Represent. Reason.,
(2006), pp. 111–120. doi:10.1109/TIME.2006.13.
78
[55] M. Mouhoub, J. Liu, Managing uncertain temporal relations using a
probabilistic Interval Algebra, in: Proc. IEEE Int. Conf. Syst., Man and
Cybern., (2008), pp. 3399–3404. doi:10.1109/ICSMC.2008.4811823.
79