INSTRUCTION MANUAL
AIR COMPRESSOR
GB
LL2/140
SPERRE
Instruction manual for compressor type LL2/140
PREFACE
Sperre has produced this instruction manual in order to provide users of its compressor equipment with information about the compressor’s construction and operation, as well as basic information about inspection and maintenance.
It is important that the operator should familiarise himself with the contents of this instruction manual, so as to ensure that installation, use and maintenance work is carried out in a correct and safe manner from the outset.
The maintenance intervals and individual technical data are average values based on experience, and may vary, depending on the compressor’s operational parameters.
The supplier accepts no responsibility for damage resulting from careless operation or inadequate maintenance. Keep the compressor in good mechanical condition, and remember that preventive maintenance of the equipment reduces the danger of damage and unnecessary operational interruptions.
Sperre reserves the right to modify details without prior warning.
Ellingsøy, February 2006
Sperre Industri A/S
CONTENT
Content Page
Personal safety ............................................................................................................................ 2
General description ..................................................................................................................... 2
Sketch.......................................................................................................................................... 3
Installation.................................................................................................................................... 4
Starting up ................................................................................................................................... 5
Operation ..................................................................................................................................... 5
Stopping....................................................................................................................................... 5
Maintenance – Overhaul – Repairs............................................................................................. 5
Valves....................................................................................................................................... 5
Bearings Dismantling and Assembly ..................................................................................... 6
Coolers ..................................................................................................................................... 7
Gaskets .................................................................................................................................... 7
Recommended lubricating oil brands .......................................................................................... 8
Table of normal pressures and temperatures ............................................................................. 8
Maintenance routines .................................................................................................................. 9-10
Fault tracing chart........................................................................................................................ 11
Tolerances – wear limits.............................................................................................................. 12
Ordering spare parts.................................................................................................................... 13
Spare parts list............................................................................................................................. 14-15
Available spare part kits .............................................................................................................. 16
Illustration for spare parts list....................................................................................................... 17
Page 1
Instruction manual for compressor type LL2/140
PERSONAL SAFETY
The installation, operation and maintenance of the compressor should be carried out by trained personnel who are familiar with the contents of this instruction manual.
The compressor must only be used to compress air.
Unauthorised remodelling or modification of the compressor may result in a safety hazard, and are not permitted.
Before any form of work is commenced on the compressor the electrical power must be turned off at the starter panel and at the main switchboard, and the switch on the main switchboard must be marked with a notice indicating that repair work is in progress. The discharge valve of the compressor must be closed, and the pressure must be released in all pressurised parts of the compressor.
The safety valve and any other safety equipment must be inspected regularly. Damaged components should be replaced with new, original parts. Adjustment of the safety valves shall only be carried out by authorised personnel. The compressor must never be used if the safety equipment is defective.
GENERAL DESCRIPTION
This is a two cylinder, one stage compressor. The cylinders are fitted in a V-shape at 90° angle to each other. Cylinders and compressed air coolers are air-cooled by a built in fan. Supply pressure is determined by adjusting the safety valve.
Cooling air is supplied by a well-dimensioned fan fitted in flywheel.
The compressor and motor are normally supplied fitted together on a strong bedplate. The compressor and motor are connected by means of a heavy duty flexible coupling.
All the materials used are of first class quality, thoroughly tested and in accordance with the requirements of the classification societies.
Instrumentation is supplied in accordance with classification society requirements and if desired the compressor can be fitted with equipment for fully automatic operation.
Bearings and cylinder walls are splash lubricated. The oil level in the sump can be checked through a sight glass. An automatic low oil level alarm can be supplied as an optional extra.
The compressor is supplied with a manual relief mechanism for the suction valves.
The compressor unit can be supplied either for bolting directly to the foundation, or for flexible installation by means of resilient mountings fitted under the bedplate.
Page 2
Instruction manual for compressor type LL2/140
Page 3
Instruction manual for compressor type LL2/140
INSTALLATION
When the compressor is being installed, it is of the greatest importance to ensure that there are no distortion of the bedplate. The compressor and motor are normally supplied ready-fitted to the bedplate. In cases where the motor is installed separately, alignment must be carried out with great care.
Alignment should be carried out as follows:
1. Use vernier callipers to check that the distance between the coupling halves is equal around the whole circumference. The distance between the coupling halves should be 37 ± 1 mm. The exact distance is not important, but it must be the same all around the coupling.
2. When angular alignment has been checked as described above, check for parallel displacement, using a dial gauge mounted on a magnetic base. Measure the parallel displacement around the circumference. Displacement must not exceed ±0,05 mm.
In order to ensure trouble-free operation it is important that the foundation is well stiffened and free from vibrations from other installed machinery. This applies to rigid mounting and flexible mounting alike.
A well-dimensioned fresh air duct must be provided to the location where the compressor is installed.
The mouth of the duct should be as close as practically possible to the suction side of the cooling fan.
The ambient temperature should not exceed 45°C.
In principle the pipe from the compressor to the air reservoir should be arranged as shown in the installation diagram supplied with the compressor. A non-return valve of strong construction and little air resistance should be installed between oil and water separator and air receiver.
If the compressor unit is installed with resilient mountings, a flexible hose must be installed in the compressed air pipe. An oil and water separator should be fitted at some distance from the compressor, and arranged so that the line slopes downwards from the compressor to the separator. It is recommended to provide the oil and water separator with both manual and automatic draining.
Equipment for automatic draining is available as an optional extra.
If the pipe from compressor to reservoir is longer than about 10 meters, the dimensions shown in the installation diagram supplied with compressor should be somewhat increased to ensure the lowest possible air resistance.
Arrange the piping so that condensate cannot collect in pockets.
All piping must be well clamped and free from vibration.
Page 4
Instruction manual for compressor type LL2/140
STARTING UP
Before initial starting up and after long periods out of use, carry out the following operations in the sequence given:
1. Check the oil level (sight glass).
2. If the compressor has been out of service for more than 6 months, remove valves and lubricate cylinder walls.
3. Turn the compressor by hand.
4. Open valves on compressed air line, and start the unit.
5. Check that all components are running normally. Inspect instruments, check for air leaks.
OPERATION
During operation, pressures and temperatures must be within the recommended limits. Any deviation is abnormal and it’s cause should be ascertained by means of the fault tracing chart. In the case of pressure or temperature deviations, it is recommended first to check the values with new thermometers and pressure gauges in order to ensure that the fault is not to be found in the instruments.
STOPPING
If the compressor is to remain unused for a long period, lubricate valves and cylinder walls with oil.
The compressor should be turned over from time to time.
MAINTENANCE – OVERHAUL – REPAIRS
Only Sperre original spare parts should be used for overhauls and repairs. Before ordering spare parts, please read the instructions given in chapter: “Ordering spare parts”.
Valves
To dismantle a valve, proceed as follows:
1. Loosen cooler pipe connections at cylinder head.
2. Loosen and remove cylinder head.
3. The valve is now free and can be removed.
Valve assembly sequence is the opposite of the above.
Worn and damaged parts should be replaced. Always replace valve gaskets.
Valve overhaul: Release the lock at the top of the valve, loosen the nuts and carefully open the valve.
Note the location of the parts, so that they can be correctly refitted.
Clean the valve parts, carbon deposits can best be removed by means of a good solvent, carbon remover or similar, then flush with hot water.
Important: The valves are an essential part of the compressor and it is important for operational safety that all parts have the correct material specifications and machining tolerances. Even the smallest defect in a valve component may lead to overheating and consequent damage. The supplier accepts no responsibility for damage to the compressor resulting from the use of non-original parts.
Only original Sperre copper gaskets can be used as valve seating gaskets. Exact dimensions and correct hardness are of great importance for trouble free operation.
Page 5
Instruction manual for compressor type LL2/140
Cylinder head nuts should be tightened a little at a time, in sequence, to prevent unsymmetrical load on the valve.
Piston and connecting rod
The procedure for dismantling and assembling the piston and connecting rod is as follows:
1. Loosen and remove the cylinder head.
2. Remove the crankcase front cover, and remove the locking plate at the end of the crankpin.
3. Remove the cylinder from the crankcase.
4. Turn the crankshaft until the piston is at TDC.
5. Slide the connecting rod off the crank pin.
Assembly sequence is the opposite order.
Bearings - Dismantling and Assembly
Important: Work on bearings requires great care and scrupulous cleanliness.
Worn or damaged crankshaft bearings should be replaced complete. Replacement of parts of the bearings is not satisfactory. Bearings dismantled from shaft and/or connecting rod should always be replaced with new bearings.
Crankshaft bearings
Dismantle as follows:
1. Remove the outer ring from the connecting rod, using a hydraulic press.
2. Remove the inner ring from the crankpin by heating it rapidly with a welding torch, then push it off the pin by means of a screwdriver or the like. If necessary, grind a notch in it to reduce its tension.
3. Fit a new outer ring to the connecting rod by using a hydraulic press.
4. To fit the inner ring, heat it in an oil bath or on an electric hotplate to 80 – 100 °C before sliding it onto the pin.
Gudgeon pin bearings
Dismantle as follows:
2. Press out the gudgeon pin. If necessary, heat the piston slightly.
3. Use a hydraulic press to remove and re-install the gudgeon pin bearing in the connecting rod.
Important: Check that there is axial play between connecting rod and piston after installation.
Page 6
Instruction manual for compressor type LL2/140
Main bearings
Dismantle as follows:
1. Remove the grille from the front of the fan, loosen the air deflector from base and manifold and pull the deflector backwards over the electric motor.
2. Remove fan and flywheel.
3. Loosen the cooler pipe from the manifold, cylinder head and lower clamps.
4. Dismantle cylinders, pistons and connecting rods as described under "Piston and connecting rod".
5. Loosen bearing housing nuts. Pull the bearing housing and crankshaft clear of the crankcase.
6. Remove the internal seeger rings in the bearing housing and pull the crankshaft complete with bearings out of the bearing housing.
7. Pull the bearings off the shaft.
8. Check that the oil sealing ring in the bearing housing is not damaged.
Before fitting the bearings, heat them in an oil bath to about 100°C. Ensure that the seeger rings are correctly placed in their respective slots.
Assembly is done in the opposite order.
Coolers
To ensure trouble-free operation it is of the greatest importance to ensure that the coolers are kept clean and free of foreign matter at all times. If the coolers are not kept properly clean, high air temperatures will result, with a consequent reduction of working life of valves and cylinders.
The coolers can be externally cleaned by spraying on a good grease solvent and then blowing them clean with compressed air.
In the case of heavy deposits of dirt the coolers should be dismantled for external and internal cleaning.
Any carbon deposits in the tubes can be removed by placing them in a bath of carbon remover or similar solvent overnight, and then flushing with hot fresh water.
Important: Make sure that the cleaning products are suitable for use on copper pipes.
Gaskets
In order to achieve satisfactory operation it is recommended to replace gaskets at every overhaul.
Worn or damaged gaskets will reduce compressor capacity and cause faulty operation.
Use only original SPERRE gaskets.
Page 7
Instruction manual for compressor type LL2/140
LUBRICATING OIL
The lubrication oil volume in the crank case is 10,0 liters.
The following lubricating oil brands are recommended:
Synthetic oil
ANDEROL 555
Mineral oil
BP ENERGOL RC 68
BP ENERSYN RX 100
CASTROL AIRCOL SN 100
COSMO RECIPRO SX 100
DAPHNE MARINE COMPR. 100
ESSO / EXXON ZERICE S 100
ESSO / EXXON SYNNESTIC 68
FAMM CETUS DE 100
MOBIL RARUS 827
NIPPON OIL CO. FAIRCOL SA 100
SHELL CORENA AP 68
STATOIL FRIDGEWAY S 100
CASTROL AIRCOL PD 100
CALTEX RPM COMPR. OIL 68
ESSO / EXXON EXXCOLUB 77
COSMO RECIPRO 100
FAMM COMPRESSOR OIL EP VDL 100
GENERAL COMPOL A 100
MITSUBISHI COMPR. OIL 100
MOBIL RARUS 427
PHILLIPS COMPR. OIL 68
SHELL CORENA P 68
STATOIL COMPWAY 68
TOTAL LUBMARINE BARELF AL 100 TOTAL DACNIS P
Ask SPERRE for advice before using lubricating oil of any other type.
TABLE OF NORMAL PRESSURES AND TEMPERATURES
Temperatures in service, with shaft speed 1450 rpm. The values are valid for ambient temperature
40°C and delivery pressure 7 bar.
Temperature after cylinder:
Temperature after cooler:
175 - 195°C
55 - 65°C
At lower or higher ambient temperatures, the compressed air temperatures at the points indicated above will be approximately an equal number of degrees lower or higher.
Temperatures will be lower at lower shaft speeds.
Page 8
Instruction manual for compressor type LL2/140
MAINTENANCE ROUTINES
The following is a guideline for a normal maintenance schedule. However, the compressors operating conditions vary widely from installation to installation and it is therefore important to adapt the maintenance schedule to the experience of the individual operator.
The following schedule applies to automatically monitored and manually operated installations alike.
After the first 200 hour operation:
Change lubricating oil. Drain the sump while the oil is warm, clean the sump thoroughly before filling with fresh oil.
Daily inspection:
Make a quick general inspection of the whole compressor (in normal operation) and specially check the following:
1. Lubricating oil level.
2. Compressed air temperature and pressure.
Overhaul routine A (1.000 running hours or every 2 years):
Make sure that 2 pc. of overhaul kit no. 3042MK2 are in stock before starting overhaul of compressor according to Routine A - 1.000 hour service. Follow installation instructions included in the kit.
1. Replace lubricating oil.
2. Remove the valves from both cylinders. Check for carbon deposits. Dismantle the valve for cleaning and repair if necessary. Use spare part kit no. 3042MK2 to overhaul valve. All valve gaskets should be replaced with new parts at assembly.
3. Inspect the flexible coupling between compressor and motor.
4. Check all bolts and nuts for proper tightness. Also check vibration dampers and hose connections if the unit is flexibly mounted. Check that no oil has come in contact with the rubber elements in the vibration dampers.
5. Function-test the safety valve. Start the compressor, and slowly close the stop valve on the compressed air line. The air pressure should not exceed max. working pressure + 10%. The safety valves are sealed and the setting should not be adjusted. If the valves are malfunctining or open at wrong pressure, the safety valves should be replaced.
6. Check all pipe connections (compressor running).
7. Check that all automatic equipment is functioning correctly.
8. Clean suction air filters.
Page 9
Instruction manual for compressor type LL2/140
Overhaul routine B (5.000 running hours):
Make sure that overhaul kit no. 7931 are in stock before starting overhaul of compressor according to Routine B - 5.000 hour service. Please follow installation instructions included in the kit.
1. Change lubricating oil.
2. Remove the valves from both cylinders. Check for carbon deposits. Overhaul valves. Use spare
part kit no. 3042MK2 to overhaul valve. All valve gaskets should be replaced with new parts at assembly.
3. Replace the flexible coupling between compressor and motor.
4. Check all bolts and nuts for proper tightness. Also check vibration dampers and hose connections if the unit is flexibly mounted. Check that no oil has come in contact with the rubber elements in the vibration dampers.
5. Function-test the safety valve. Start the compressor, and slowly close the stop valve on the compressed air line. The air pressure should not exceed max. working pressure + 10%. The safety valves are sealed and the setting should not be adjusted. If the valves are malfunctining or open at wrong pressure, the safety valves should be replaced.
6. Check all pipe connections (compressor running).
7. Check that all automatic equipment is functioning correctly.
8. Clean suction air filter.
9. Remove the compressors cooler tubes and clean the outside and inside. Spray the outside with a good grease solvent, and wash clean with warm water. The inside is cleaned by letting the cooler tube soak in a bath of carbon remover, and then flushing the tube with warm water. Make sure that cleaning products suitable for copper tubes are used.
10. Remove cylinders, pistons and connecting rods. Inspect cylinder walls and piston. Replace the piston rings (use a piston ring expander tool to fit the rings on the piston). Clean all parts. Replace gudgeon pins with bearings and crank bearings. Rotate the shaft by hand, and check that the main bearings are rotating smoothly and without any signs of excessive wear. Use overhaul kit
no. 7931.
Overhaul routine C (10.000 running hours):
Make sure that overhaul kit no. 7961 are in stock before starting overhaul of compressor according to Routine C - 10.000 hour service. Please follow installation instructions included in the kit.
1. Change lubricating oil.
2. Replace the valves. Use spare part kit no. 3042MK. All valve gaskets should be replaced with new parts at assembly.
3. Replace the flexible coupling between compressor and motor.
4. Check all bolts and nuts for proper tightness. Also check vibration dampers and hose connections if the unit is flexibly mounted. Check that no oil has come in contact with the rubber elements in the vibration dampers.
5. Function-test the safety valve. Start the compressor, and slowly close the stop valve on the compressed air line. The air pressure should not exceed max. working pressure + 10%. The safety valves are sealed and the setting should not be adjusted. If the valves are malfunctining or open at wrong pressure, the safety valves should be replaced.
6. Check all pipe connections (compressor running).
7. Check that all automatic equipment is functioning correctly.
8. Clean suction air filter, or replace filter cartridge where possible. Replace crank case breather valve.
9. Remove the compressors cooler tubes and clean the outside and inside. Spray the outside with a good grease solvent, and wash clean with warm water. The inside is cleaned by letting the cooler tube soak in a bath of carbon remover, and then flushing the tube with warm water. Make sure that cleaning products suitable for copper tubes are used.
10. Remove cylinders, pistons and connecting rods. Inspect cylinder walls and piston. Replace the piston rings (use a piston ring expander tool to fit the rings on the piston). Clean all parts. Replace gudgeon pins with bearings, crank bearings and main bearings. Use overhaul kit no. 7961.
Page 10
Instruction manual for compressor type LL2/140
FAULT TRACING CHART
1. Compressor capacity is low, or the compressor is not delivering full pressure
Possible causes Remedy
Dirty, damaged or worn valves.
Carbon deposits on valves.
Piston rings are stuck.
Clean and check all valve plates, springs and gaskets. Replace defective parts.
Piston rings are worn. Replace.
Unsuitable lubricating oil. Change oil brand.
Loosen and remove piston rings.
Clean piston ring grooves and rings.
Clean filter. Air filter clogged.
Air leaking to surroundings or leaking inside the compressor through valve gaskets and valve plates.
Faulty automatic control equipment.
Check for external leakages with soapy water.
Check valve gaskets and valves.
Inspect components and circuits.
Possible causes
Closed air line valve.
Carbon deposits in non-return valve.
Faulty adjustment of automatic system.
Compressor does not stop when air reservoir is full.
Safety valve damaged or defective (causing it to open at lower pressure).
3. Valves require maintenance too frequently
Possible causes
Remedy
Open the valve.
Clean the valve.
Check pressure switch and automatic circuitry.
Replace safety valve.
Overheating.
Remedy
High ambient temperature. Improve fresh air supply. Carbon deposits in coolers. Clean coolers.
Dirt or foreign matter in intake air.
Cooler tubes dirty.
Air filter damaged. Improve suction air quality.
Clean.
4. Bearings and bearing housings running hot. Lub. oil overheating. Noise from bearings
Possible causes
Damaged or worn bearings.
Uneven wear on crankshaft bearings.
Low oil level.
5. Piston running hot
Possible causes
Remedy
Replace bearings.
Check crankshaft for straightness.
Refill lub. oil.
Remedy
Worn bearing on flywheel end.
Check little end bearing, piston rings and piston clearance.
Piston and/or rings binding in cylinder.
Ensure cool fresh air supply to cooling fan and suction air filter. If the piston has completely seized, wait a while before turning over the compressor. Clean cylinder and piston, fit new piston if necessary.
Page 11
Instruction manual for compressor type LL2/140
TOLERANCES - WEAR LIMITS
1. End tolerances for piston rings
Push a piston without piston rings halfway into the cylinder, and place the piston ring in the cylinder so that it presses against the top of the piston. Withdraw the piston and using a feeler gauge, measure the clearance between the piston ring ends.
Piston diameter
140 mm
Clearance for new rings in new cylinder
0,5 – 0,7 mm
Maximum
Permissible clearance
1,1 mm
2. Height clearance in piston ring grooves
Clean piston rings and ring grooves. Fit ring in groove and measure the height clearance of the ring in the groove using a feeler gauge.
Top ring
All other rings
Clearance for new rings in new piston
0,015 - 0,04 mm
0,00 - 0,025 mm
These values apply to both piston diameters.
Maximum
Permissible clearance
0,06 mm
0,04 mm
3. Clearance between piston and cylinder
Measure the clearance by means of a dial gauge, measuring the cylinder and piston separately.
Alternatively the piston can be placed in the cylinder and the clearance measured with thickness gauges. The piston clearance should be measured in the area above the upper ring groove.
The clearance listed in the table below is the difference in diameter for the two parts.
Piston diameter
140 mm
Clearance for new piston in new cylinder
0,26 mm
Maximum
Permissible clearance
0,66 mm
4. Clearance between piston top and cylinder head/valve.
The clearance between the top of the piston and the valve should be 1,0-1,5 mm.
Page 12
Instruction manual for compressor type LL2/140
ORDERING SPARE PARTS
The following information must be given when ordering spares:
(A)
Compressor type
(B)
Compressor number
(C)
Quantity, parts number and description of the spare parts required
(A) and (B) are stamped on the compressor rating plate, which is fixed to the side of the crankcase and (C) will be found in the spare parts list in this instruction book.
SPERRE INDUSTRI AS reserves the right to amend technical specifications without prior notice and disclaims all legal liability in connection with such amendments.
Address: SPERRE INDUSTRI AS
NORWAY
Phone:
Fax:
E-mail:
+ 47 70 11 16 00
www.sperre.com
Page 13
Instruction manual for compressor type LL2/140
SPARE PART LIST
Qty. Description
1 Crankcase.................................. 1020
Qty. Description
1 Flywheel..................................... 1082
2 Cylinder...................................... 1145
1 Manifold ..................................... 1348
1 Crankshaft.................................. 1405
1 Counterweight............................ 1518
1 Fan............................................. 1997
1 Grille ...........................................3789
1 Bolt .............................................3882
4 Bolt .............................................3884
2 Valve .......................................... 3042
2 Valve opener, complete ............. 3245
1 Locking plate, crankshaft ........... 3250
2 Valve body, lower section .......... 3286
2 Valve body, upper section ......... 3307
16 Bolt .............................................3945
3 Bolt .............................................3947
8 Bolt .............................................3949
2 O-ring .........................................3979
2 Gasket ........................................4081
1 Gasket ........................................4097
1 Gasket ........................................4098
1 Gasket ........................................4100
2 Clamp .........................................4129
4 Clamp .........................................4149
2 Elbow ......................................... 3341
2 Piston ......................................... 3362
4 Compression ring, stepped........ 3492
41 Nut..............................................4238
8 Nut..............................................4240
10 Locknut.......................................4251
Page 14
1 Reduction ...................................4292
4 Plug ............................................4294
1 Plug ............................................4296
1 Plug ............................................4297
Instruction manual for compressor type LL2/140
Qty. Description
1 Plug............................................ 4298
1 Nipple......................................... 4377
6 Bolt............................................. 4405
1 Elbow ......................................... 4411
3 Nipple......................................... 4413
16 Washer....................................... 4414
13 Washer....................................... 4416
2 Bolt............................................. 4432
4 Bolt............................................. 4449
1 Coupling insert, complete .......... 4516
1 Flange ........................................ 4548
Page 15
Instruction manual for compressor type LL2/140
SPARE-PART & MAINTENANCE KITS
SPERRE’s kits of genuine spare-parts include the wear parts you must change when you overhaul the compressor. For example, if you replace a valve, it is strongly recommended to replace the valve gaskets at the same time. With a spare-part kit available, all necessary parts are at hand together with clear installation instructions.
For model LL2/140 following kits are available:
Description
Gasket kit
Part no.
4125
Content of kit
All flat gaskets, O-rings, sealing rings, and valve gaskets.
Crankshaft with all bearings, flywheel key and nut, Seegerrings, endplate and screw.
Valve LP 3042MK Valve and necessary copper rings and/or gaskets.
Overhaul kit - LP valve 3042MK2 Valve springs, plates and gaskets.
Piston LP
Connecting rod
3362MK
1426MK
Piston, gudgeon pin with Seeger-rings and piston rings.
Connecting rod with small- and big-end bearings, oil scoop with set screw.
Cylinder LP 1145MK Cylinder with gaskets, stud bolts/nuts and fittings.
Overhaul kit Routine B 7931
All parts needed for 5 000-hours’ maintenance: Overhaul kits for valves complete with gaskets and guide rings, piston rings, connecting rod bearings, gudgeon pins, Seeger-rings, gaskets and ventilator.
Overhaul kit Routine C 7961
All parts needed for 10 000-hours’ maintenance: Same as kit B, plus complete valves, crankshaft bearings and seal ring.
Maintenance kits:
• All necessary parts at hand when you need them
• With clear installation instructions enclosed
Genuine Sperre parts give you peace of mind at sea!
Page 16
Sole suppliers of genuine spare parts:
Sperre Asia PTE Ltd
63 Hillview Avenue #09-13
Lam Soon Industrial Building
Singapore 669569
Tel +65 6763 6300
Fax + 65 6763 1811 [email protected]
Sperre Industri AS
N-6057 Ellingsøy
Norway
Tel + 47 70 16 11 00
Fax + 47 70 16 11 10 [email protected]
Sperre Rotterdam BV
Glasblazerstraat 12B
NL-2984 BL Ridderkerk
The Netherlands
Tel +31 180 463 299
Fax + 31 180 463 264 [email protected]
www.sperre.com