NEWPORT BRASS 1-594, 1-595 Pressure Balancing Valve Installation instructions

Below you will find brief information for Pressure Balancing Valve 1-594, Pressure Balancing Valve 1-595. This document provides instructions for proper installation and operation of the Tempress Pressure Balancing Valve. It covers topics like standard and back-to-back installations, setting the temperature limit stop, troubleshooting common issues, and ensuring safe and reliable operation.

PDF Download
Document
Pressure Balancing Valve 1-594, 1-595 Installation Instructions | Manualzz

Advertisement

Advertisement

Advertisement

Key features

  • Pressure balancing cartridge
  • Anti-scald design
  • Built-in check valves
  • Temperature limit stop
  • Adjustable handle position
  • Easy to install
  • Detailed troubleshooting guide

Frequently asked questions

Follow the instructions on "Setting the Temperature Limit Stop" in the manual. You'll need to remove the trim, broach, and limit stop. Rotate the cartridge stem to the desired temperature and reinstall the components.

This is usually caused by residual water in the valve and piping. Allow 3-8 minutes for the water to drain. If it continues to drip, check the mechanical stop setting and the O-ring seal on the cartridge inlet for any damage.

The minimum operating pressure is 20 psi (140 kPa), and the maximum operating pressure is 125 psi (860 kPa).

This could be a result of insufficient backpressure or a restricted showerhead. Verify the flow restrictor at the showerhead is 2.5 GPM. If not, replace it. Also, ensure that all service stops for hot and cold water are fully open and pressurized.
Preparing document for printing…
0%