vapor/vector power installation
010-ELV-12
100 | 101 | 102
Tech Support: 360-687-4530
tech_support@trailtech.net
VAPOR/VECTOR POWER INSTALLATION
CONVERT KTM HARNESS TO TRAIL TECH CONNECTOR
LOCATE STOCK CONNECTOR:
INSTALL 2-PIN CONNECTOR:
Top side of terminal
Stock power connection
Install yellow/red lead
Install brown lead
Fig 3.
Fig 4.
Provided connector
Terminal installed into seal
Seal
Fig 1.
Locking tabs
Stock power connector
1. Remove the stock or after market headlight.
2. Locate the stock white three pin connector used to
power the stock computer. Note: This is only found on
models manufactured with a harness for use with a
factory computer.
3. Using diagonal cutters, carefully apply pressure to
the exterior of the white connector housing. Gently
break away the connector exposing the two pins
(Fig 2.), making sure not to damage the insulation or
terminals!
CONNECTOR REMOVED:
Fig 5.
Locking Tab exposed
1. Install the provided two pin connector by pushing
the yellow/red & brown leads through the back of the
blue seal (Fig 4.) and into the white connector. Make
sure to line up the “Top side of terminal”(Fig.4) with the
locking tabs(Fig 5.) Note: When installed properly
you will hear a slight clicking noise, indicating the
connector has successfully locked into place. If the
terminal does not click you may have the terminal
installed upside down.
2. After installing the new 2-pin connector plug the
connector into the Vapor/Vector head unit.
FINISHED INSTALLATION:
Power lead
Ground lead
Fig 2.
Connector sucessfully removed
Note: The yellow/red lead shown above is the
12VDC power lead & the brown lead shown is the
ground lead.
Fig 6.
Final installation
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertising