Installation diagram

Installation diagram
Installation Diagrams
Installing a HydroLink™ Watering System on your Trojan Batteries
Yamaha
IMPORTANT: For detailed installation instructions review Trojan’s Hydrolink™ Watering
System with the Snake™ Tubing Manual included with your kit. Make sure to follow
instructions on Page 4 of the manual before installing.
STEP 1
Remove Current Vent Caps and Insert HydroLink™ Vents.
Yamaha “The Drive” 12-Volt Batteries - (2006 or newer)
STEP 2
Firmly Press HydroLink™ Vents Down. Ensure HydroLink™ vents are
completely seated to avoid electrolyte spillage.
Warning! Press in the HydroLink™ vent with your hands only - do not use a hammer.
STEP 3
Install Snake™ Tubing
Review the proper diagrams for correct Snake™ tube routing based on
the application and manufacturers vehicle. Once reviewed, remove the
red center plastic plug from the HydroLink™ vent.
Yamaha 8-Volt Batteries
Then snap each Snake™ plug into each HydroLink™ vent. Press firmly
until your hear a click.
If you don’t hear a click, it has not been installed correctly.
Yamaha 6-Volt Batteries
Correctly Installed
Incorrectly Installed
Your HydroLink™ Watering System is now ready for use.
Trojan batteries are available worldwide through Trojan’s Master Distributor Network.
We offer outstanding technical support, provided by full-time application engineers.
For a Trojan Master Distributor near you,
call 800.423.6569 or + 1.562.236.3000 or visit www.trojanbattery.com
12380 Clark Street, Santa Fe Springs, CA 90670 • USA
© 2012 Trojan Battery Company. All rights reserved. Trojan Battery Company is not liable for damages that may result from any information provided in or omitted from this
publication, under any circumstances. Trojan Battery Company reserves the right to make adjustments to this publication at any time, without notices or obligation.
YID • 0912 / TRJN_InstallationDiagram
Installation Diagrams
Installing a HydroLink™ Watering System on your Trojan Batteries
E-Z-GO
IMPORTANT: For detailed installation instructions review Trojan’s Hydrolink™ Watering System with the Snake™ Tubing
Manual included with your kit. Make sure to follow instructions on Page 4 of the manual before installing.
STEP 1
Remove Current Vent Caps and Insert HydroLink™ Vents.
STEP 2
Firmly Press HydroLink™ Vents Down.
Ensure HydroLink™ vents are completely seated to avoid electrolyte spillage.
Warning! Press in the HydroLink™ vent with your hands only - do not use a hammer.
E-Z-GO “RXV” 12-Volt Batteries
STEP 3
Install Snake™ Tubing
Review the proper diagrams for correct Snake™ tube routing based on the application and
manufacturer vehicle. Once reviewed, remove the red center plastic plug from the HydroLink™
vent.
Then snap each Snake™ plug into each HydroLink™ vent. Press firmly until your hear a click.
If you don’t hear a click, it has not been installed correctly.
E-Z-GO “TXT” 6-Volt / 8-Volt Batteries
* Terminal configuration may be differ on 8-Volt battery.
Correctly Installed
Incorrectly Installed
Your HydroLink™ Watering System is now ready for use.
Trojan batteries are available worldwide through Trojan’s Master Distributor Network.
We offer outstanding technical support, provided by full-time application engineers.
For a Trojan Master Distributor near you,
call 800.423.6569 or + 1.562.236.3000 or visit www.trojanbattery.com
12380 Clark Street, Santa Fe Springs, CA 90670 • USA
© 2012 Trojan Battery Company. All rights reserved. Trojan Battery Company is not liable for damages that may result from any information provided in or omitted from this
publication, under any circumstances. Trojan Battery Company reserves the right to make adjustments to this publication at any time, without notices or obligation.
EZGOZID • 0912 / TRJN_InstallationDiagram
Installation Diagrams
Installing a HydroLink™ Watering System on your Trojan Batteries
Club Car
IMPORTANT: For detailed installation instructions review Trojan’s Hydrolink™ Watering
System with the Snake™ Tubing Manual included with your kit. Make sure to follow
instructions on Page 4 of the manual before installing.
STEP 1
Remove Current Vent Caps and Insert HydroLink™ Vents.
Club Car “Precedent” 12-Volt Batteries - (2008 or newer)
STEP 2
Firmly Press HydroLink™ Vents Down. Ensure HydroLink™ vents are
completely seated to avoid electrolyte spillage.
Warning! Press in the HydroLink™ vent with your hands only - do not use a hammer.
STEP 3
Install Snake™ Tubing
Review the proper diagrams for correct Snake™ tube routing based on
the application and manufacturer vehicle. Once reviewed, remove the
red center plastic plug off the HydroLink™ vent.
Club Car “DS” 12-Volt Batteries - (2006 or newer)
Then snap each Snake™ plug into each HydroLink™ vent. Press firmly
until your hear a click.
If you don’t hear a click, it has not been installed correctly.
Club Car “Precedent” 8-Volt Batteries - (2008 or newer)
Correctly Installed
Incorrectly Installed
Your HydroLink™ Watering System is now ready for use.
Trojan batteries are available worldwide through Trojan’s Master Distributor Network.
We offer outstanding technical support, provided by full-time application engineers.
For a Trojan Master Distributor near you,
call 800.423.6569 or + 1.562.236.3000 or visit www.trojanbattery.com
12380 Clark Street, Santa Fe Springs, CA 90670 • USA
© 2012 Trojan Battery Company. All rights reserved. Trojan Battery Company is not liable for damages that may result from any information provided in or omitted from this
publication, under any circumstances. Trojan Battery Company reserves the right to make adjustments to this publication at any time, without notices or obligation.
CCID • 0912 / TRJN_InstallationDiagram
Was this manual useful for you? yes no
Thank you for your participation!

* Your assessment is very important for improving the work of artificial intelligence, which forms the content of this project

Download PDF

advertising